HomeMy WebLinkAboutM-501CUSTOMER/COMRACTOR FURNISHE� AND
INSTALLE� CRVOGEN EXITING DUCT SYSTEM.
NOTE THE SIZE OF THE CRYOGEN E%ITING DUCT
MAY VARY IN SRE DEPENDING ON iHE LENGiH OF
RUN AND THE AMOUNT OF BENDS REpUIRED TO
EXIT THE BUILDING. SEE THE pUENCH VENT
ROUTING DEiAIL THIS SHEEf FOR MPORMATION ON
SRING iHE CRYOGEN EXItING �UCi.
ouENCH vENr cna ro eE oEsicNEo (iN nccoaonNCE
WITH OUENCH VENT NOTES. THIS SHEEf). DEfAILED
AND SPECIFlED BV THE AIECHANICAL ENGMEER OF
RECORD i0 PREVENi RAIN FROM EMERING iHE
OUENCH DUCT. SEE QUENCH VENT NOTES.
iME OF BUG SCREEN - 3/8" WIRE MESH COVERING
AN AREA AT LEAST 25 TIMES TNE CROSS SECTION
OF THE pUENCH VENT EXITING �UCT. SEE DEfAIL
M-501-3.
PlA1E, SEE OUENCH VEN1 NOTES.
�
: TO BE SIZE�, �EfAILE� AN� SPEQFlE�
MECHANICAL ENGMEER OF RECORO.
JE OF ROOF
INSiALLE� BV THE
oie�ecraic isounoN
see orrni� n-soz-z
RF WAVEGUIDE MADE WIiH FIANGES FOR OUENCH
VENT COUPLING TO BE SRED. FABRICATED AND
INSTALLED BV RF SHIEL� CONTRACTOR IN
COOPERAiION WIiH pUENCH VENi MANUFACTURER.
�RF SHIELD
FINAL CONNECiION OF iHE CRYOGEN EXRING
OOCT SYSTEAI SHALL 9E PERFORAIE� BV THE
CUSTOMER/CONTRACTOR �URING THE OAY OF
MAGNEf �ELNERY.
W
PROVIDED BV
WSTOMER/COMRACTOR �
aRovioeo er
SIEMENS
�
pUENCH VEM FIANGE Ai MAGNEfJ �
FOR QUENCH VENi COUPLING
�ACOUSiIC �ECOUPLER SECiION AT
IAAGNET PROVIOEO BV SIEIAENS.
BE SUPPLIE�
ED BY THE
TVPICAL OF
IOIAiION Ai
cRrocEN ExiriNc oucr sysrEM NorEs:
1) THE MECHANICAL ENGMEER OF RECOR� SHALL BE RESPONSIBLE FOR THE DESIGN, DEfAIL AND SPECIFlCATION OF THE
CRYOGEN EXITING �l1CT SVSTEM WITH ALL WORK TO PERFORME� 6Y THE Cl15TOMER/CONTRACTOR UNLE55 SPECIFIED OTHERWISE.
2) TAKE PROPER PRECAUTIONS WHEN FlELD WELDING IN THE VICINIIY OF LIOVEFlE�/FROZEN 0%YGEN.
3) UNLE55 SPECIFlE� 0?HERW6E ALL MAiERIAL AN� WORK SHALL 6E PERFORME� 9Y iHE C115i0MER/CONiRAC?OR WRH FlNAL
CONNECTION OF THE CRVOGEN EXITING DUCT SYSTEM TO THE SIEMENS MAGNET TO BE PERFORMED BV THE
WSTOMER/COMRACTOR UNDER 9EMENS' SUPERVISION.
4) iHE DIAMEfER OF 7HE CRYOGEN EXItING �UCi MAY VARV WIiH ACiVAL ROU7ING.
CRYOGEN EXITING DUCT SYSTEM DETAIL
usE n rnESH srzE oF iomm (a/a") +z/-imm.
1.Omm (1/16") +/-0.3mm i. i"3�g••
ROUND WIRE� 'I 9
A Spl1ARE. STAWLESS STEEL WIRE MESH MUST BE FITfED TO
ALL Ol1TLEf5. THE AREA OF THE MESH MUST BE >25 TIMES
THE AREA OF THE OVENCH VENT OUTLEf. REV 1
3 QUENCH VENT MESH �o s�A�E
S�A�E:
NO SCALE
e > zs . (oz—oi)
E%PANSION TO A GREATER DIAMEfER TUBE CAN BE ACCOMPLISHE�
BV USE OP A pIFFUSER. iHE DIFFUSER MUSi MEEf WENCH VENi
REQIIIREMENTS AND THE GEOMEfRIC PARAMEfERS SHOWN HERE.
THE DIAMETER OF THE PIPE SHOULD NEVER �ECREASE IN THE
DIRECTION OF FLOW.
REV 0
— QUENCH VENT DIFFUSER �o s�p�E
PLAN
VIEW
CRYOGEN NOTES
1) 'CRYOGENS" IS A TERM USED TO IDENTIFV THE REFRIGERANT USED
TO MAKE THE MAGNEi "SUPER-CON�UCTING", W THIS APPLICATION,
LIOUID AN� GASEOUS HELIUM. SPECIAL CARE MUSt BE iAKEN
�l1RING iHE rRANSFlLLING OF iHE MAGNEf WIiH CRYOGENS AN�
NORMAL EXHAUST OF CRVOGENS FROM THE SYSTEM. ASIDE FROM THE
OBVIOUS �ANGER OF FREEZING, HELIUM GAS WILL AL50 DISPLACE THE
OXYGEN IN THE ROOM. THE INSTALlATION OF AN APPROVED TOXGAR�
MONIiORING SY4EM IS RECOMMENDEO.
2) THERE SHALL BE A TRANSPORT ROUTE FOR DELNERY OF
CRVOGENS TO THE E%AM ROOM. SPECIAL VESSELS CALLED �EWARS
ARE USE� t0 iRANSPORi HELIUM. A 2W LIiER �EWAR WEIGHS 335
POUN�S AN� HAS A 32" �IAMEfER, A 500 LIiER 6 540 POlIN�S,
AND IS 47' IN DIAMETER.
3) HELIUM GAS CYLINDERS MAY BE USE� DURING THE INITIAL FlLLING
OF HELIUM IMO iHE MAGNEf. iHE FACILIiY IN WHICH iHESE MAY BE
USED NEE�S TO HAVE THE ABILIN TO TEMPORARILV STORE AND
SECURE THESE CVLINDERS THAT WILL PREVEM THEM FROM
INA�VERTENTLY FALLING OVER.
4) OUTSIDE VENTING OF THE HELIUM IS TO BE PROVIDE� BY MEANS
OF A VEM PIPE OF NON-MAGNEfIC MAtERIAL CALLE� A WENCH
VENT. RFV (
OPTION 1
��OPTION 2
��
MESH AREA =
25 x TUBE AREA
SEE DEfAIL M-501-
MESH AREA = �
25 T116E AREA
SEE DEfAIL M-501-J
>10' CONE ANGLE
MESH AREA =
2 5 x TUBE AREA
SEE �EfAIL M-501
OPTION 3
�
191[H.t!
OPTIONS FOR QUENCH TUBE
EXITING THROUGH A WALL
ANGLED RAIN HOOD
� �
MESH
J
RAIN HOLES
wsuunaH
SEE Ol1ENCH
anw mvEa
MESH AREA
z.5 T�BE
�EFLECt
PUTE . e i -I �i
SEE QIIENCH VENT NOTES
HORIZONTAL OUTLET
RELEASED FOR CONSTRl1CTI0N
Su6jec��o compliance with allregula�ions
04 S�a�e antl Local Codes
City of Carmel
�Sv�� �'l'�^l�`�RAiI
�
onrE: 12/02/19
REV 1
SCALE
NONE
QUENCH VENT NOTES
QUENCH VENT DESIGN INSTRUCTIONS
1) IN iHE EVENt OF A QUENCH, iHE iHERMAL ENERGV �6SIPAiED
CA115E5 AN EXiREMELV RAPI� BOIL OFF OF iHE LIpUI� HELWM. iHE
SYSTEM MUST BE CAPABLE OF VENTING THE LARGE VOWME OF GAS
GENERATED AT THE APPRO%IMATE EXPANSION RATIO OP 1]00 FROM
LIOUID AT 42'K TO ROOM TEMPERATURE GAS. THE EXHAUST SVSTEM
IS CRIiICAL FOR iHE SAFE OPERAiION OF iHE MAGNEf, iHE �AiA IN
THIS �OCUMENT M115T BE FOLLOWED. SINCE HELIUM VENTED IN A
OUENCH IS AN ASPHVXIANT & AN EXTREMELV COLD GAS, THE pUENCH
TUBE MUST ALWAYS END AT A POINT WHERE ACCESS BY PWPLE IS
NOt POSSIBLE. WENCH iUBE PLANNING MUSt ONLV BE DONE BV
Ql1ALIFlED PERSONNEL IT IS THE OWNER'S RESPONSIBILIiV TO ENSl1RE
THAT THE QUENCH TUBE IS MAINTAMED IN AN OPERABLE STATE.
2) IF THE pUENCH VENT IS NOT CONFIGURED CORRECTLV THERE IS
A RISK OF DANGER THAT MAY LEAD TO DEATH OR SERIOUS INJURV
AND CAN RESULT IN STRUCTURAL DAMAGE THE E%HAUST MUST NOT
BE VEMED IN AN ENCLOSED SPACE. iHE OPERAtOR OF iHE SY4EM
MuST PREPnRE AN EMERGENCv PLAN IN THE EVENT OF A �UENCH.
3) THE QUENCH TUBE CONSISTS OF STRAIGHT, HYDRAULICALLY
SMOOtH SECilONS, BENDS UP i0 90' AND A DIFPUSER,IF REOUIRE�.
THE END OF THE TUBE M115T BE PROTECTED FROM RAIN, SNOW, ANO
FOREIGN OBJECTS. ROUN� SECTIONS ONLV, NO SOUARE SECTIONS.
4) THE 9EMEN5 MAGNET HAS A pUENCH VALVE ASSEMBLV FOR
CONNECTION TO THE TUBE LOCATED AT THE TOP LER SIDE OF THE
MAGNEf (SEE MAGNEf ELEVAiION). iHE MECHANICAL CONiRAC10R WILL
suaa�v nNo ir�srn�� n oueNCH veNt tuee witH cnP, ro ae
NON-MAGNETIC STAWLESS STEEL �22 GAUGE RECOMMENDED).
GRADES AISIJ04, 309, 316, OR 321 ONLY THERMAL CONDITIONS MAV
CAUSE THE TUBE TO CONTRACT UP TO 3mm/MEfER SO A STAINLE55
4EEL BELLOWS OR FLEXIBLE SECtION MUSt BE INStALLED A MINIMUM
OF EVERY 37-9" NOT TO ExCEED 2% OF THE OVERALL LENGTH. THE
OUENCH TUBE MAY ALSO BE MADE OF AWMINUM, E%TRU�ED TUBE
AWMINUM GRADES 6063 AND 6082 ONLY MUST BE USE�. ROLLED
AN� WEL�ED iUBE FROM SHEEf ALUMINUM GRADE 5003 ONLY MUSt
BE USED. THE WALL SECTIONS OF AWMINl1M Tl1BE MUST 6E A
MINIMl1M 14 GAl1GE. THERMAL CONTRACTION OF 4.5 MM/METER M115T
BE CONSIDERED FOR AWMINUM pUENCH TUBES. THE MOVEMENT OF
THE BELLOWS MUST BE RESTRICTED TO PREVEM E%CESSNE
EXPANSION �llE i0 PRESSl1RE THE WEIGHi OF iHE il1BE M115i BE
SUPPORTED BY THE BUILDING AND BE FLEXIBLE ENOUGH TO ALLOW
MOVEMENT FROM THERMAL CONTRACTION. THE WALL EXIT SHOUL�
AL50 BE FLE%IBLE.
PRESSl1RE CALCl1LATI0N
5) THE MAXIMUM INTERNAL PRESSURE IS CALCl1LATED AT tA5 PSI.
THE MA%IMUM PRESSURE SHOUL� BE ENGWEERED FOR 6.5 P51.
6) USE THE OUENCH VEM CALCUUTOR PROVI�ED BV SIEMENS TO
�ESIGN A QUENCH VENT THAT MEETS DESIGN REOUIREMENTS FOR
�IAMEfER, LENG?H, NUMBER OF ELBOWS AN� PRESSl1RE �ROP. ALL
BENDS MUST BE SMOOTH WALLED AND HAVE A CENTERLINE TO
WTERNAL PIPE �IAMEiER RATIO OP LS ID S.Q EXPANSIONS TO
PIPE DIAMEfER CAN BE �ONE WITH A DIFFUSER. ONLY ROUND TUBE
SECilONS MAY BE USED, RECiANGULAR SECiIONS ARE NOt ALLOWED.
]) THERE MUST BE A 12-19 INCH FLEXIBLE SECTION OF PIPE FOR
WNNEC?ION i0 iHE QIIENCH VALVE A? iHE MAGNEf WIiH AN INSI�E
DIAMEfER GREATER THAN 4" (1.ST) OR 6" (3.OT) AND ABLE TO
WITHSTAN� 6.5 PSI.
CONNECTING SECTIONS
8) SECilONS OF iHE PIPE CAN ONLV BE JOMED BV WELDMG OR
BOLiE� FLANGES WIiH FIBER GASREfS. RO?ARY FIANGES ARE
PERMII'rED, VEE CLAMPED FLANGES MAY NOT BE USED.
OUENCH VENT EXR
9) THE PROTECTION AT THE END OF THE TUBE SHALL BE 3/8"
WIRE MESH WITH 1/16 INCH WIRES, COVERING AN AREA AT LEAST
25 iIMES iHE CRO55 SECiION AREA OF iHE �UENCH PIPE.
10) WHERE THE pUENCH TUBE EXITS THROUGH A FLAT ROOP, THE
iME OUtLEf MUSt BE ABOVE A LEVEL WMERE WAiER COULD EMER
IN THE EVENT THAT THE ROOF DRAINS BECOME BLOCKED. IN THE
CASE OF A HORRONTAL EXIT THROUGH A WALL, THE OUTLEf SHALL
BE ANGLED DOWNWARD NOT LE55 THAN 1 PIPE DIAMEfER TO PREVENT
RAIN INGRESS. iHE EXIt SHALL BE LOCAiED ABOVE iHE LEVEL OF
oRirrwc sNow.
11) WHERE iHE pUENCH iUBE EXItS VERiICALLY, A RAIN COVER
MUST ALSO BE FITTE� WITH THE DIAMETER TO BE iW0 TIMES THE
DIAMEiER OF THE pUENCH TUBE THE CLE4RANCE BEIWEEN THE
RAIN GUARD AN� THE MESH SHALL 2 TIMES THE DIAMEfER OF
THE TUBE A DEFLECTOR PLATE SHALL BE WELDED TO THE TUBE
WHERE li EXIiS iHE ROOF i0 PREVEN? HELIUM FROM RE-EMERING
THE Bl11LDING. THE DEFLECTOR SHALL BE AT LEAST 3 TIMES THE
�IAMEiER OF THE pUENCH TUBE AND LOCATED PNO PIPE
�IAMEiERS ABOVE THE RWF AN� PNO PIPE DIAMEfERS BELOW THE
RAIN GUARD.
�URING A OUENCH THE HELIUM GAS E%ITING THE pUENCH PIPE MAY
BE AT TEMPERATURES OF LE55 THAN -400'F. �UE TO THIS
iEMPERAiURE RWFlNG MAiERIALS OR ItEMS AROUND iHE VENt
EXIT MAY BE ADVERSELV AFFECTED. CONSIDERATION OF MATERIALS
AND ITEMS PLACED NE4R THE VENT EXIT SHOl1LD BE TAKEN INTO
ACCOUNT 50 DAMAGE DOES NOT OCCUR.
12) WHERE rHE aIIENCH iUBE EXIiS HORIZON?ALLV, iHE OIIiLEf
MU4 CONFORM TO OPTIONS 1-4 OR THE ANGLED RAIN HOOD.
THE OUTLEi SHOULD NOT BE LOCATED WHERE HELIUM GAS CAN
BE �RAWN IMO AN AIR WLEi, EMER AN OPEN WIN�OW, OR
BLOW DIRECiLY OMO 4RUCiURE OR EOUIPMENL RESiRICi
ACCE55 TO WINDOWS AN� DOORS TO AVOID INJl1RY FROM COL�
BURNS AND ASPHVXIATION BV 9'-11" ON EACH SIDE, BELOW AND
19'-9" ABOVE, IF THE OUTLET IS POSITIONE� T00 LOW A
oEF�EcroR PurE cnN eE usEo wirn oPrioN i nNo 3.
WARNING SIGNS AND OUTLET RESTRICTIONS
A WARNING SIGN MUST BE FlXE� AND VISIBLE NEAR THE OUENCH
VENT OUTLEf. THE TUBE MUST HAVE A WARNING POSTE� ALONG
li'S ENiIRE LENGiH FOR EXiREMELY WLD HELIUM GAS -
Al1THOPoZED PERSONNEL ONLV.
13) AREAS WRH ACCESS IN THE AREA OF THE OUTLET MUST BE
CLEARLY IDENTIFlED AND FENCEq FOR EXAMPLE, A ROOF OUTLET
WIiH MAIMENANCE ACCESS.
INSULATION AN� GALVANIC SEPARATION
14) THE pUENCH TUBE MUSr HAVE MINIMUM 1" INSULATION FOR
iHE FULL LENGiH. WIiHIN iHE RF ROOM iHERE SHOUL� BE A 1"
LAYER OF MWERAL FI6ER INSULATION WITH A VAPOR BARRIER AND
1" CLA55 0 OR CLASS AP ARMARE%. OUTDOOR PIPES MUST BE
WEATHERPROOE THE INSULATION MUST NOT TOUCH THE MAGNET
COVERS. i0 AV01� RF DISiURBANCES iHE INSULAiION MUSt NOi
MAKE ELEC?RICAL CON?ACi WIiH iHE WAVEGIII�E.
15) GALVANIC SEPARATION M115T 6E PROVIDED BER4EEN THE
MAGNEi, THE pUENCH VENT, THE RF ROOM, AN� THE BUILDING,
PNO SEPARATIONS ARE REQUIRED USING STAWLESS STEEL BOLTS,
INSULAtING BUSHES AND LOCKING NUtS. NO OiHER DESIGNS ARE
aERMittEo Faa snFErv.
DOCUMENiAiION
16) THE DESIGN AN� CONSTRUCTION OF THE QIIENCH PIPE MUST
BE DOCUMENTED WITH DRAWINGS AND CALCl1LATI0N5 THAT ARE
KEPT WITH INSTALLATION �OCUMENTS. IT MUST COMPLV WITH THE
REOUIREMENTS IN THIS �OCUMENT BEFORE BEING CONNECTED TO
iME MAGNEf.
N T I O N. �� � � ��� �, � ���� � � �,�� ��� :. � �� � ��. � �� � �� �, �� � �� � �� ,� � � � ��, � �� �� �,�� ��� ,�"' 't�,��� ��, � � �
� � � ��� � � ��� �� �� �:� � �,� ����., �� � �� :� �, � �� � �� ��r� ���
r.i i ui i i �- rF n i rF u F i F i ini, u i� FF F m � i �� u F i v m mi i� eF�- F , i:n
��� �� � � �s �� � ��� _�,�N��� �� � ��,��, ��� � �� .�� -� N..��, ��- � � � � N„�� ����� � , N��� �����
iHE EQUIPMENi CONFlGURAiION SHOWN
ON iHESE ELEVAilONS REPRESENi
"iYPICAV' INSTALUTION CONDITIONS.
fHE QUENCH VENt IS i0 BE SUPPLIED AND INStALLED BY iHE MECHANICAL CONiRACiOR. It MAV BE
:ONNECiE� i0 iHE FIANGE Ai iHE MAGNEf HORRONiALLV OR VERiICALLV AN� SHOUL� BE �ESIGNE�,
;ONSTRUCTED AND INSTALLED AS PER THE WSTRl1CTI0N5 ON THIS SHEET.
LME OF FlNISHE�
CEILING
�
I
I
I
I
I
I
I
I
I
I
I
I
I
I
OUENCH VEM CONNECTION
2'-2 ]/8" LEFT OF
ISOCENtER
FLEXIBLE BELLOWS/ACOOSTIC
�ECOUPLER, FLEXi COUPLING >> >I�
AT MAGNEf PROVIDED BV
9EMENS.
i
�
I
a�
I
i
� m i
�
SIEIAENS SIIPPLIED
PATIEM COUCH
RF
�
�
THE LOCATION, PRCH, AND MOUMING HEIGHT ABOVE FINISHED FLOOR
FOR THE MECHANICAL SYSTEMS SHALL BE SPEQFlED, DEiAILED AN�
NOiE� 6Y ?HE MECHANICAL ENGWEER OF RECOR�. ALL MECHANICAL
SVSTEM LOCATIONS SHALL BE COORDINATED WITH THE LOCATION OF
THE CABLE TRAVS AS SHOWN ON THE 1/4" SCALE ELECTRICAL PUN.
'I
(12) 3/8" � ��e..
] 1/8
5 �/6"
I � �
� ���,�' "
- — � — -
,� �I � i
AT THE AIAGNEf
isocE�urEa
�MAGNET WITH COVERS
FOR HORRONTAL CONNECTION, A 90'
ELBOW MUSt BE PROVIDEO BY
WSTOMER/CONTRACTOR TO MATCH
�IAMEiER OF THE FLE%IBLE SECTION.
MAGNET SIDE ELEVATION
OUENCH VENi FLANGE Ai MAGNEf AN� ACCOUSiIC DECOUPLER.
CONNECTION OF THE pUENCH VEM PIPE TO SIEMENS SUPPLIED
FLANGE TO BE DESIGNED, DETAILED, AND SPECIFlED BY THE
MECHANICAL ENGINEER OF RECORD. TO BE FABRICATED AND
IN4ALLE� BV iHE MECHANICAL WNiRACiOR 11N�ER SIEMENS
Sl1PERVISION.
2 I QUENCH VENT FLANGE I�o s�A�E
�
�-
OUENCH VENT
o�r«
1
I�P1.YN_\�i
NO OPENINGS
IN iHIS AREA.
IN iHE CASE OF A HORIZONIAL EXIi ?HROl1GH A WALL, iHE OUiLEf
M115T BE Tl1RNED DOWN BV NOT LE55 THAN THE LINE OF THE
DIAMEfER TO PREVENT RAIN INGRESS THE EXIT MUST BE SRUATE�
WHERE R CANNOT BE BLOCKED BY DRIFTING SNOW.
i0 AVOID RISK OF INJURY FROM COLD BURNS AND ASPHVXIAtION,
ACCE55 TO THE Ql1ENCH VENT OUTLET Ml1ST BE RESTRICTED AS
SHOWN. THE OUTLET MUST NOT BE SITUATED WHERE, W THE EVENT
OF A QUENCH, HELIUM GAS CWLD BE �RAWN INTO AN AIR WLEf
OR OPEN WINDOW. WHERE WINDOWS ARE WRHIN THE RESTRICTED
AREA, iHEY MU4 BE PERMANEMLV CLOSE�.
OUTLET SAFETI' CLEARANCES R�v i
— QUENCH VENT �o s�a�E
HELIUM CONTENT
LRERS AT 1003 1,511 LIOUID HELIUM WEIGHT 41] L8.
TYPICAL BOIL OFF RATE OD L/HR FOR iVPICAL CLINIGL USE,
DEPENOING ON SEOl1ENCE5
1VPICAL REFlLL IMERVAL N.A. AN� OPERATING TIME.
WITHOUT THE COLD HEAO RUNNING THE LipUID HELIUM BOIL OFP IS
APPRO%IMATELV 3.59. PER 24 HOl1R5.
VIDA
R[v a
-f....i� -F� Tf Iluf�...G.'.
�� " SIEMENS
I�^.�r I- c-F�-
IU HEALTH NORTH HOSPITAL
11700 NORTH MERIDIAN STREE�, CARMEL, IN 46032
MRI ROM �JB132 — MAGNEfOM VI�A VIOA XQ GRADIENTS
Qi os/os/ts eoMP��re New urouT easeo iHr F ,�r :: � u = PROJECT #: SHEEL
aH uhst wnu eacKcreouHos - n r ri . i-��.
1901780RF �AiE� 04�27�19 �L'�, ���i I nlll L � 9 O � 7 $ O
Qo oe/z�/i s wPRaho ar eusmuEas roe nw�s F � ,rF F �_;;�. � �� 1
SVM DATE DESCRIPTION ALL RIGHTS ARE RESERVED. SHEEf OP DRAWN BY:
10 10 D. BRISiOE
—ISSUE BLOCK— S�AqS NOTED REF. 7-PZZCYK �ATE� 09/O6/19
DIRECTION _
OF FLOW