HomeMy WebLinkAboutA201DOOR
SIZE
w Q �
H Z � = Q N
¢ a C7 U � (n > tn
� � Widfh = � g LL w C7
]�_�" 1 3/4" WD
]' _ p•' 1 3/4" W D
]' _ p•' 1 3/4" W D
]�_ �• 1 3/4" WD
]�_ �• 1 3/4" WD
DOOR ELEVATIONS
SEE W�
METALSTU�
5�0" GVPSUM
WPLLBOAR�
SHIM SEALANTJOINT
��
HOLLOW METAL
FRAME
w000000a
WALLTHICKNE55+1"
HEAD DETAIL 1
Mern�sruo
�
<
3
518" pYP6UM
WALLBOAR�
RETURN WALL ON HINGE SI�E
R.O. NOMINAL
000a wiorH«r�
sE^�^NT w000000a
JOINT SHIM �
;
U
¢
� 3
2
HOLLOW METAL
FRAME
I:11: � : Ifl
�
RELEASED FOR CONSTRl1CTI0N
Su6jec��o compliance with allregula�ions
of Sla�e antl Local Codes
City of Carmel
��
`��¢m�' lamn�Ml1 �
onrE: 12/02/19
G•
DOOR LOCATION TYP.�
D1
UY]
DOOR AND FRAME SCHEDULE
FRAME
DETAIL
J Z
Q �
CL ~
� � W Q Q � J
Q Z � J W �
� LL W (7 S � . f/]
- - F1 - H1 J1 -
- - F1 - H1 J1 -
R H1 J1
R H1 J1
R H1 J1
R H1 J1
2"� SEE I� 2"
Cfu11 Fnlll F 11
F1
FRAME ELEVATIONS
C7 Z �
Z � y
¢ � Hard Q
� U w210 �
� � Set �
�
�
2
2
2
2
ABBREVIATIONS LEGEND
AL = ALUMINUM
nN - nNoo¢Eo
BL = BORROWE�LITE
GHM = GPLVANNEALE�HOLLOWMETAL
GL = GLA55
HM = HOLLOWMETAL
PT = PAIM
ST = STAIN
SS = STAWLESS STEEL
STL = STEEL
wo - w000
9�M = 9�MINUTEASSEMBLYRATING
' = SEEREMARNSGOWMNFORNOTES
HARDWARE NOTES
A. HAR�WARESUPPLIERTOVERIFVHAR�WARESCHE�ULEWRHTENAM.
B. HAR�WARESCHE�ULEAN��RAWINGSSHALLBEPREPARE�AN�
SUBMRTE� FOR RENEW NJ� APPROVAL AN� COOR�INATION WITH TENANT
AN� GENERAL GOMRAGTOR.
G HAR�WAREFlNISHESTOBEBRUSHE�STAINLESSSTEEL,US26�,OR
ANO�IZE� AW MINUM TO MATCH STOREFRONT AS APPLICABLE.
�. �OORHAR�WARESHALLBEOFA�AGOMPLIAMLEVELTVPE,MOUME�30
WCHESTO4� WCHES PHOVE THE FLOOR. THE MAXIMUM EFFORTTO
OPERATE SHALL BE B.5 POUN�S FORCE FOR EXTERIOR �OORS AN� 5
POUNOS FORCE FOR INTERIOR OOORS. THE LOW ER 12 WCHES OF THE
�OOR SHALL HAVE A SMOOTH PANEL ON THE PUSH SI�E OF HTE �OOR
WHICH WILL ALLOW THE �OOR TO BE OPENE� BY A WHEELCHAIR
FOOTREST W RHOUT CREATING ATRAP OR HAZARO. �TRLE 24, CCR,
SECTION 1133B2a3.�
E GOOROINATEHINGETYPE,LOGAT10N,ANOMOUNTINGFORo00R
WSTALLATIONS.
DOORNOTES
A. HOLLOWMETALOOORFRAMESTOBETIMELVqJOCK00WNFRAMES.
B. ALLNEWLOCKSETS,LATCHSETS,PN�THRESHOL�STOBEOFATVPEIN
AGGOR�ANGE W RH THE PROVISIONS OF iHE AMERIGANS WITH �ISABILITIES
AGT�A�A�
c NEw000RSToeEwHiTEeiRCHExcECTnsNOTEo.
�. THESEGENERALNOTESAPPLVTOTHE�OORSGHE�ULE.
E. �OORAN�FRAMENUMBERSGORRESPON�TORESPEGTIVEROOM
NUMBER. IN ROOMS WITH MULTIPLE OPENINGS, ANUMERICAL SUFFlX HAS
BEEN A��E� TO �OOR NUMBERS.
F. VERTICALFRAMINGMEMBERSATALLOOORFRAMESSHALLEXTENOTO
STRUCTUREABOVE.
c. uNOEacuTnu000asnsaEouwEosvFiNUFiNisH.
H. PROVIOECONTINUOUSSEALANTBETWEENHOLLOWMETALFRAME
PERIMETERS AN� SURROUN�ING WALL CONSTRUCTION.
I. WHEREAFlRERATINGISIN�IGATE�ONTHE�OORSGHE�ULE,HAR�WARE
ANO OOOR ASSEMBLV COMPONEMS SHALL MEET THE REpUIREMEMS OF
THATLABEL.
J. WHEREANSTGRATINGISIN�IGATE�ONTHE�OORSGHE�ULE,HAR�WARE
ANOOOORASSEMBLVCOMPONENTSSHALL MEETTHEREpUIREMENT50F
THATLABEL.
N. PROVIOESILENGERSONALLo00RFRAMES.
L VERIFVALLEXISTINGCONOITIONSPNOOIMENSIONSINTHEFIELOPRIORTO
FPBRICATION OF �OORS NJ� FRAMES. BRING �ISCREPANCIES TO THE
ATfENTION OF THE ARGHITEGT.
HARDWARE SCHEDULE
HnaownaESETi
EACH TO HAVE�.
3 HINGES
1 LEVER LOCKSET �PRIVACV�
1 WALLSTOP
HnaownaESETz
EACH TO HAVE�.
6 HINGES
1 LEVER LOCKSET �STOREROOM�
, FINISH PLAN �
A201 scn�e. va��-r�o�
NoarH
GENERAL FINISH NOTES
n. aEFEaENCEwTEaioaE�EvnTioNs,wHEaEPaovmEo,Foa
nooiTioNn�FwisH wFoaMnnoN.
B. ALLHOLLOWMETALKNOCK-0OWN�OORFRAMESARETOBE
PAIME�.
C. PAIMPLLE%POSE�METALSURFACES�IEGRILLES,HEATERS,PN�
FIRE E%TINGUISHER CABINETS� TO MATCH A0.IACENT SURFACE.
�. ALLBULNHEA�SAN��RVWALLCEILINGARETOBEPAIME�CEILING,
UNLESSNOTE� OTHERWISE ON REFLECTE� CEILING PLANS.
E ALLFLOORINGTRNJSITIONSARETOBEEASE�USINGLATEXTO
ACHIEVE A SMOOTH AN� UW FORM TRANSRION.
F. ALLCARPETISTOBE�IRECTGLUE,UNLESSNOTE�OTHERWISE.
G. TRANSITIONSTRIPSBETWEENUNLINEFLOORINGSURFACESISTO
BE MANUFAGTURERS STMI�AR� THIN PROFlLE VINYL MOL�ING,
COLOR SELECTE� BVARCHRECTI�ESIGNER.
H. ZWCSTRIPSARERE�UIRE�ATALLGROUTCOLORCHANGESINTILE
FLOORING AN� AT TRANSRIONS FROM TILE FLOORING TO CARPET.
. ALLFLOORINGTILETOBETHINSET.
J. REFERENCEREFLECTE�CEILINGPLPNFORNOTESREGAR�ING
A W USTIGAL GEILING GRI� MI � TILES.
K. ALLPAINTTOBESHERWINWILLIAMSEMERAL�OREpUIVIIAMZERO
VOC INTERIOR LATEX. SATW FINISH UNLE55 OTHERWISE NOTE�.
L EPDXYPAINTINWETAREAS.
M. BASETOBEVBI.
FINISH REMARKS
1. BASETOBEVBI
2. EPO%VPAINTTOBEUSE�INTOILETROOMSAN�WETAREAS
FINISH PLAN NOTE
Plan Note Description
1 EPDXYPAINTINWETAREA
2 PRIVACYFILMTOBEADDEDTO
EXTENTS OF EXISTING GLAZING
FINISH LEGEND
F��AF����_
����aF����-�
wa�F����_ � _ � AE�aA�
FINISH MATERIALS SCHEDULE
LVT-1
LVT 2
T1
Tz
ia
P1
P2
wc
VB
TB
GL1
SS1
SS2
�i
PLANK W XURV NNVL TILE
HEx wxuav viNn Ti�E
FLOOR POR. TRE
WALL POR. TILE
F�ooaTae�ounaav
GENERAL PAINT
ACCENT PAINT
WALL COVERING
VINYL BASE
TILEBASE
GLASS MARKER BOAR�
souo sua Fnce coainN
�UARTZ
PLASTIC LAMINATE
Teo
Teo
TB�
TB�
Teo
TB�
TB�
TB�
TB�
TB�
TB�
TBD
TB�
TB�
�
Teo
Teo
TB�
TB�
Teo
TB�
TB�
TB�
TB�
TB�
TB�
TBD
TB�
TB�
I-
.
FORGE
ARCHITECTVRE
�
�
O
� Q M
� � �
J _ V
� � � Z
w �y� —
Ow W J
a � � �
O � �
� � Q
U
Z
W
�
SCOPE DRAW INGS:
REVISIONS:
ISSUE�ATE �RAWNBV CHECKE�BV
osns,zms dNw dNw
DRAWING TITLE:
FINISH PLAN /
DOOR
SCHEDULE
DRAW ING NUMBER
A201
PROJECTNUMBER
18023
D1 D2 D3