HomeMy WebLinkAboutM100sco—z
200 CFM
EG-1
150 CFM �-
SCD—.
200 C
10"X10°UP �'
i0 EF-2
EG-1
150 CFM
GENERAL NOTES & SPECIFICATIONS;
1. ALL WORK SHALL COMPLY WITH THE IATEST E�RION OF THE
IN�IANA MECHANICAL CO�E
2 THE CONTRACTOR SHALL OBTAIN ALL PERMRS REO�IRED BY LOCAL
BUILDING OFFlCIALS.
3. DUCM'ORK SHALL BE GALVANIZED SiEEL CONSiRUCiE� IN
ACCORDANCE WITH Cl1RRENT SMNACNA STANDAR�S FOR 1" W,G,
PRESSl1RE
4. SEAL ALL DUCM'ORK TRANSVERSE SFAMS WITH �UCT SEALER
5. iHE MECHANICAL WNiRACiOR SHALL iESi AN� A�JUSi AIR FLOW
ON ALL AIR SYSTEMS TO WITHIN 109 OF THE AIR QUANTITIES IN�ICATE�
ON THE DRAWINGS. PERFORM THE START—UP PROCEDURES
RECOMMENDE� BY EQUIPMENT MANUFACTl1RERS.
6. COORDINATE THE HN.A,C. WORK WITH THE WORK OP OTHER
iRA�ES AS iHE WORK PROGRESSES. PROVI�E ROUGH—IN MFORMAiION
AN� WALL OR FLOOR OPENING REQUIREMENiS REOUIRE� i0
COOR�INAiE iHE WORN.
7. PROVIDE MANUAL VOWME DAMPER IN BRANCH Dl1CT TO EACH
SUPPLY DIFFUSER.
8. COORDINATE DIFFUSER LOCATIONS WITH LIGHT FI%TURES AND FIRE
PROiEC710N SPRINKLER SYSiEM.
9. LOCATE ALL DUCPNORK AS HIGH AS POSSIBLE.
10. USE RADIUSED DUC7WORK ELBOWS WHERE SPACE PERMITS. WHEN
SQUARE ELBOWS MUST BE USED,INSTALL TURNING VANES.
11. FINAL LOCAiION OF iHERMOS1AiS TO BE FIEL� VERIFIE�.
PLAN NOTES:
ONEW LOCATION OF E%ISTING 4 TON ROOROP UNIT PROVIDE
NEW ROOF CURB.
z 6" 0 COMBUSTION AIR INTAKE UP THROUGH ROOF, TERMINAT
WITH ROOF INTAKE CAP
SHEPHERD
ENGINEERING
SERVICES
GREENPIEL➢, IN➢IANA
46140 (31�) 462-]]35
ENGINEERING
CONSULTANTS
�
aHfvITC:`R
�
4"0 UP 10 ROOF CAP
� MECHANICAL FLOOR PLAN
M100 scn�e va,=r�o,
VACAVI ILNA�I� _.-1_
SYMBOLS & ABBREVIATIONS
SYMBOLS ABBREVIATIONS
O tHERMOSiAt CFM CUBIC FEET PER MINUTE
� RTU ROOF TOP A.C. UNIT
RErURN OR E%HAUST GRILLE
� OA OUTSIDE AIR
SUPPLY AIR DIFFUSER CEF CEILING EXHAUST FAN
SW SOUARE CEILING DIPFUSER
� VOWME DAMPER RA REiURN AIR
� MOTORIZED DAMPER RG REiURN AIR GRILLE
SG SUPPLY GRILLE GRILLE
SCHEDULES OF GRILLES & REGISTERS
MARK DESCRIPTION MANUF. & SIZE REMARKS
N0. MODEL N0.
SCD-1 ROUND NECK SQUARE FACE PRICE 4"0 �p^ X 12" SURFACE MOUNT WITH FUNGE
LOWERED CEILING DIFFUSER SCD SEE PIAN
SC�-2 ROUN� NECK S�UARE FACE PRICE 8��� pq" X 24" SURFACE MOUNT WITH FIANGE
LOWERED CEILING DIFFUSER SW SEE PUN
SG-1 CROOBLE DERECTION SUPPLY P520E �p" g 4° 1�7' SPACING DOUBLE �EFLECiION, STEEL
SG-2 �OUBLE �EFLECTION SUPPLY PRICE �2• x 8• ��p° SPACING DOUBLE �EFLECTION, STEEL
GRILLE 520
RG-1 EGGCRATE RETURN GRILLE PRICE 6° X 6" AWMINUM EGGCRAiE GRILLE, 1�7'X1�2"X1" DEEP GRI�
81 SERIES
Q �
� O
� Q M
M
� r \ J �
W( l \_.J � Z
& U' �mw
a J Q � �
L1..� z Q
W Q U
LL z
LL w
� �
SCOPEDRAWWGS:
REVISIONS:
N o.
20754
srnrz or
� \`
RELEASED FOR CONSTRl1CTI0N
Su6jec��o compliance with allregula�ions
of Sla�e antl Local Codes
City of Carmel
��
`��¢m�' lamn�Ml1 �
onrE: 12/02/19
FAN SCHEDULE
FAN OPERATING DATA ELECL DATA
MARK MANUF. & SERVICE/ MARK
N0. NAME MODEL N0. PURPOSE OUTLET STATIC H.P VOLT REMARKS N0.
CPM VEL PRESS RPM DRIVE
PHASE
cEF—i cEwNc MouNrEo cREENHECK so �za
EXHAUST FAN SP—A 100 i01LEf5 80 0.375 900 DIRECT WA� CEF-1
EF_Z CENTRIFUGAL ROOF GREENHECK C— KITCHEN 300 900 DIRECT �A� �Z� WITH ROOF CURB, BACK DRAFT DAMPER AND DISCONNECT EF2
EXHAUST FAN 0.375
1
PACKAGED ROOFTOP A.C. UNIT SCHEDULE
COOLING HEATING SUPPLY FAN DATA ELECT. �ATA
MARK NAME MANUE & EpDB LADB MBH AMB EER �T T.AIR ESP �' REMARKS VOLi
MODEL N0. i07AL 1EMP �EG F MBH MBH LBS.
N0. FqµB IAWB MBH UT INPUT OUTPUT EFF FRESH I�G H.P. DRNE MCA MOCP PHASE
SENS. �EG F AIR
PACKAGE� TRANE MO�EI 80.0 — 48.0 55 EXISTING UNIT TO BE RELOCATE� TO ROOF ABOVE VACANT TENANT 208
RiU—E ROOROP A.C. UNIT YSC 048 95 7�,� 150 124 80 0.5 %%X — 1,000 SUITE INSTALL ROOF CURB 23,5 40
fi7.0 — XX%X 99.0 440 3
PACKAGE� iRANE MO�EL 80.0 — 64.0 55 1,900 WITH ROOF CURB, ECONOMIZER, AND GRAVIiY RELIEF
RTU-1 ROOROP A.C. UNIT YSC O60 95 1p2 13� 120 80 0.6 1.0 BELT 1,000 33b 5� 208
fi7.0 — XXXX 99.0 500 3
ISSUE�ATE �RAWNBV CHECKE�BV
�9�P��P�19 AUNor Checker
DRAWMG TITLE:
MECHANICAL
FLOOR
PLANS
DRAWING NUMBER
M 100
PROJECTNUMBER
18023