HomeMy WebLinkAboutP101RELEASED FOR CONSTRl1CTI0N
Su6jec��o compliance with allregula�ions
of Sla�e antl Local Codes
City of Carmel
��
`��¢m�' lamn�Ml1 �
onrE: 12/02/19
�
53
R 52
�51
49
� 48
�00l�t 4]
q� 46
I�E NI 44
MMO� 43 II
9
4z 0
41 �
39
� 38
3]
� 36 33 �Q
� 34
�
� 32
�� 31
� p� 29
28
n 21
�� 26
�� 24
� 23
p� zz
5] �
56 �
�6NNLJ
��MOM'� 11
�
12
R 13
�,a
K is
� 1]
�� 18
u �y
�yp 21
58 ��
59 ��
61 �
62
63 '�
•noi
LJIZ aCNI
66
6]
68
69 ��
�� w�F1s
�Z u
]3
]6
�� �
LJ��
MIY
��wo
l:l°" ��
�ny¢m
l:l��
N10
KITCHEN EQUIPMENT PLAN
scue: �a��=r�a�
IEem
6
11
12
13
14
19
42
iS
�
�
�
31
�
41
�
14
�
52
53
81
N
72
73
74
78
�ramrF
Fland SNk
Yfru er�FihaUon �lam. far YulSpls APP��
Tne (3) CampaiUmnt Sfnk
OIM�adier� Undnoounlx
Raach-M Fnssr
R�odrin R�IAgwoWr
Comeelion Own. fletUk
Faod Pon Wanw�� Cant�rlaP
�I�lO� w01�4 T0�
RapiE Cook Oran
ICa CIIba1 �1 BYI
Rtdwr 16sr
Dlop-il $Ylk
Orop-M SNk
Glan fial
Co(fw de�ar
CoNw Bre�ar
UnOeitoudx Rehlqxotor
ka Craam dppa�all
Undoroantar Rahlqxatar
�IMacMiw S 4Yaq
PRcher 16nar
3" HFAT
2" SAN
\/
� 2" GW -
12
:ii
I
� 13
�__ �
8
O
FD-1 01=1
� � �
p J �� 7' 11P TO 3" V�R
�� I- �.
p �f
O
T� — __
�=—,4pF — ___
1 I
I �
�� �
II
�
�� �� I ��
�
� ��
,o �1;
� o-_J
1" IN BEAM WEB
2" UP TO 3" VrR
3/4�3/4 � _'
3�4"IN BEAM WEB
�
.__Me-1 �y� .
II
i
� 140'F
O TMV-1
I
i
LAV 1 WC-1
_____�
WHA
�
�
, PLUMBING FLOOR PLAN
P100 scn�e: va��=r����
z UNDERFLOOR PLUMBING PLAN
P100 scn�e va��=r-o��
DWH-1 Oq
1�2" CW DN i0 WC
1/7' CW �N TO WC
1•
----�
\
---�
�
�
I
I
�
H
1" UP i0 RTU
H
SCOPE OF PWMBING CONTRACT:
THE PLUMBING CONTRACT SHALL CONSIST OF A COMPLEfE INSTALUTI01
COMPLIAM WITH ALL STATE AND LOCAL REQUIREMENTS THIS WORK
SHALL INCLU�E BUT NOT BE LIMITED T0:
> COMPLETE SANITARY DRAINAGE AND VENT SYSTEM.
> COMPLETE �OMESTIC WL� & HOT WATER SUPPLY SYSTEMS
INCWDING WAiER HEATERS, AN� THERMOSTA7IC CONTROLS.
> PWMBING FlXTl1RES & TRIM
> COORDINATION OF AN� WSTALLATION OF PWMBING CONNECTIONS TO
KRCHEN EQUIPMENT, FIXTURES AN� APPLIANCES,
> FUEL GAS PIPING SYSTEM
> ENGINEERING OR �ESIGN SERVICES RE�UIRE� i0 COOR�INAiE
BUILDING ARCHITECTURAL, STRUCTURFL, FlRE PROTECTION, ELECTRICAL
AND HVAC SVSTEMS.
CONTRACTOR DESIGN TASKS:
THIS PROJECT IS A DESIGN & WNSTRUCT COMRACT. THE BUIL�MG
ARCHITECTURE AS WELL AS THE MECHANICAL & ELECTRICAL SYSTEMS
MAV CHANGE DUE TO VAWE ENGMEERING.
GENERAL NOTES:
1. ALL WORK SHALL COMPLY WITH THE CURRENT E�ITION OF THE
IN�IANA PWMBING CO�E.
2. THE CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED BY STATE
AND LOCAL BUIL�ING OFFlCIALS.
3. THE WNiRAC70R SHALL BE RESPONSIBLE TO COOR�INAiE THE
WORK OF THE UTILItt COMPANIES. OBTAIN UTILItt COMPANY PERMITS
AND SCHE�ULE INSTALlATION OF SERVICES AN� ME�ERS.
4. COORDINA7E iHE WORK WITH OTHER 7RADE5 AS IT PROGRESSES.
VERIFY THE E%ACT ROUGH-IN LOCATIONS OF FlXTURES WITH THE
ARCHRECTURAL FLOOR PLANS FURNISH ROUGH-IN �ATA TO OTHER
TRA�ES AS REOUIRED W COORDINA7E PoR PWMBING SYSiEMS AN�
EQUIPMENT.
5. THE RE�UIREMEMS OF "SPEQFlCATIONS FOR ROSE & LOIS
EXPRESSO" PREPARE� BY DESIGN lAYOIJ� SERVICES OF OF MYRTLE
BEACH, S.C. ALONG WITH THE NOTES TO PLUMBING CONTRACTOR ON
PAGE 2 SHALL APPLY TO THIS WORK.
6. ALL SANITARY �RAINAGE AND VEM PIPING � 1�8° PER 1�-0'
EQUIPMENT�FlXiURES SHALL BE WNNECiED IN ACCORDANCE WIiH KES
HANGERS. �0 NOi SUPPORi PIPING FROM OTHER PIPE, �UCiWORK,
EfC.
9. SANRARY PIPMG BRANCHES RECEIVING �RAINAGE FROM APPLIANCES
THAi UTILIZE WAiER W17H TEMPERATURES HIGHER iHAN 120'F SHALL BE
CAST IRON OR POLYPROPYLENE PIPE PoR A DISTANCE OP AT LEAST 10
R. �OWNSTREAM OF THE APPLIANCE(SJ. FlX�URES RECENMG WATER
WITH TEMPERATURES LESS iHAN 120'F MAY BE SCHEWLE 40 PVC.
10. GAS PIPING SHALL BE BUCK IRON WITH CAST FITfINGS AN�
THREADE� JOINTS. PAINT ALL EXPOSE� GAS PIPING OUTSI�E THE
BUILDING.
11. UNDERFLOOR WATER PIPING SHALL BE COPPER WITH BRAZED
JOIMS, 1" RUBATEX NPE INSULATION AND PVC SHEATH OR
PRE-INSUTATE� PEX PIPE �ESIGNE� FOR UNDERFLOOR APPLICAiIONS.
12. ABOVE GROUND WATER PIPING MAY BE COPPER, PVC, CPVC OR
PIX WITH 1/2' INSUlATION IN ACCOR�ANCE WITH THE IN�IANA ENERGY
CODE.
13. PROVIDE MAINTENANCE AND OPERATION MANUALS AND RECOR�
oanwiNcs.
PLAN NOTES:
OCONNECT 1 1/4" CW SUPPLY TO EXISTMG CW SUPPLY
DOWNSTREAM OF BACKFLOW PREVENTER AND ME�ER.
OTMV AT f70" AEF.. 3/4" CW AND 14PF HW DOWN TO TMV,
3�4" 7EMPERED HW FROM 7MV.
O3 1 1�7' VENT, 1�Y HW AN� CW DOWN TO LAV.
O4 3/4" CW & 140'F HW TO WATER HFATER.
5 Y' VENT, 3/4" 14PF HW AND CW DOWN TO MOP BASIN,
6 1 1�7' VENi, 1�2" HW, CW & FlLiERE� CW �OWN TO BELOW
COUNiER HEIGHi. EX�EN� i0 NIiCHEN E�UIPMENi AS
REQUIRE� BY KITCHEN E�UIPMENT SUPPLIEft. PROVI�E �
OUARTEft TURN BALL VALVE FOR EACH APPLIANCE �
O7' SANITARY FROM BELOW. 1/2" HW & CW FROM BELOW. 1
EXiENO TO KITCHEN E�UIPMENT AS RE�UIRE� BY KITCHEN
EQUIPMENT SUPPLIER AN� CIN PIAN REVIEWER. PROVIDE �
1/4 TURN BALL VALVE FOR EACH APPLIANCE.
e>>�z° veNt, i/z• cw & Hw oowN ro eE�ow F�ooe.
O9 1 1/2" VENT, 3/4" CW & 1/2" HW �OWN IN WALL TO HAN�
WASH SINK EX�END 1/2" CW TO WATER FlLTER Sl1PPLIED BY
KITCHEN EQUIPMENT SUPPLIER.
10 3/4" CW & 140'F HW �OWN 10 iHREE COMPARiMENi SINK.
EXiEND GREASE UDEN WASTE FROM SINK TO THE FLOOR
SIN C 1 1 7' VE T F OM BE OW.
11 7' OPEN SITE DRAIN. 7�4" 140'F HW DOWN TO THE
DISHWASHER.
ip FABRICATE SUPPORTS TO MSTALL A SECOND GAS MEiER
ABOVE THE EXISTING ME�ER. IF THE EXISTING GAS PIPING IS
LESS THAN 1°, REPUCE THE PIPING TO THE LOCATION SHOWN
witn i' PiPE. cooRoiNntE witH tHE cns PRovioER to
INSTALL 1W0 MEfERS. INSTALL NEW GAS i0 iHE WATER
HEAiER, RELOCATED ROOFfOP UNIT AN� NEW ROOFfOP UNR.
CONSULi OWNER ABOUi INSiAWNG PIPE BOLIARDS TO
�
13 2�� OPEN SITE �RAIN, IN�IRECT CONNECT WASTE PER CIIY
REQUIREMENT. REFER TO KES REQUIREMENTS FOR WAiER
CONNECTIONS.
SCOPE OF FlRE PROTECTION CONTRACT:
THE FIRE PROTEC710N CONTRACi SHALL CONSIS7 OF A COMPLEfE
WSTALlATION COMPLIAM WITH ALL STATE AND LOCAL RE4�IREMENTS.
THIS WORK SHALL MCWOE BUT NOT BE LIMITE� T0:
> OBiAIN HYDRAULIC �A7A FROM iHE INSiALLER OF iHE EXISTING
SVSTEM.
> HY�RAULIC CALWlA710NS.
- > ANY NECESSARY CONNECTIONS TO KITCHEN EQUIPMENT, FI%TURES
AN� APPLIANCES.
CONTRACTOR DESIGN TASKS:
THis aRodEcr is n oEsicN & coNsrRucr coNrancr. rHE eui�oiNc
ARCHITECTURE AS WELL AS THE MECHANICAL & ELECTRICAL SYSTEMS
MAY CHANGE DUE TO VAWE ENGMEERING.
SUBMITfALS:
SUBMIT THE FOLLOWING FOR OWNER AN� STATE APPROVAL
> PRO�UCT �ATA ON ALL FlRE PROTECiION COMPONENiS.
> HYDRAl1LIC CALCl1UTI0NS.
> FABRICATION �RAWMGS.
� �
Q �
� O
� Q M
M
� w J Cp
� U U � z
� � � m w
a J Q � �
L.L.� z Q
W Q U
Ll z
Ll w
� �
SCOPE DRAWINGS:
Na
20754
ms a ,
�
issueonTe oanwN ev -cNecneo ev
�912�12�19 Author Checker
DRAWING TITLE:
PLUMBING
FLOOR
PLANS
DRAWING NUMBER
P101
PROJECTNUMBER
18023
rr p _t,t � ___ 13 � __ li