Loading...
HomeMy WebLinkAboutP102CW SUPPLY HW TO SYSTEM THERMOMEfER (IYP.J � HW SUPPLY � iHERMOMEfER (IYP.J THERMOSTATIC MI%ING VALVE SEf TO 110'F DISCHARGE TEMP. �1 THERMOSTATIC MIHING VALVE DETAIL No scn�E GAS SUPPLY SIZE AS SHOWN ON PLANS � GAS COCK ID EQUIPMENT � N � �,7 GAS iIGHi 7EE �oiaT �cc (snME sizc ns cns suaa�r) b" MIN 6" MA% GAS iIGH7 CAP i1 iYPICAL DIRT LEG DETAIL U No scn�E ��no s�EVE wirH ruNCE BY MECHANICAL CONTRACTOR � ROOF FLASHING BY p" RWFlNG WMRACiOR MEfAL ROOFING ON 30� FELT ON 5/8" PLYWOOD INCREASER �1 VENT THRU ROOF DETAIL U No scn�E P�I STAN�AR� CALCOlATIONS: SINK BOWL = 14X14X14 = 2744 CU. IN. � 231 = 11.88 GAL "JS FlLL LEVEL = 8.9 GAL " 3 COMPARTMEMS = 2fi.72 GAL TOTAL / 1 MIN. DRAIN TIME = 26.74 GPM. MOST MANUFACTURERS RECOMMEND P�I SRING PROCEDURES. SCMER HAS A PROGRAM BUT DOES NOT HAVE AN MiERCEPTOR SUITABLE PoR THIS PROJECT, HOWEVER Cltt IS RE�UIRING SCHIER ONLY. THE FOLLOWING IS PROVI�E� FOR THE CfIY PIAN RWIEWER WFORMA710N. SCHIER MANUFACTURING CALCUlATION PROGRAM. PROJECi NAME: R & L STEP L FLOW RATE TO GREASE INTERCEPTOR FIXiURE FLOW RATB (CO IN / 231) = GAL X 075 / 1 MIN = 1 MW FLOW RATE IYPE �IMENSIONS piV Cll IN FLOW RA1E 3 COMP SINK 14" X 14" X 14" (3) 1 8232 2673 GPM TDTAL 26.73 GPM STEP 2 GREASE PRODUCTION NUMBER OF MFALS SERVE� PER OAY: 4�0 GREASE PRODUCTION VALUE: 0.005 LBS PER SERVING DAYS BERYEEN PUMP—OUTS: 90 DAYS GAS LOAD SUMMARY DESCRIPTION GAS LOAD (BTUH) BUILDWG HEATWG 140,000 waTER HEnnNc ao,000 TOTAL GAS LOAD �80,000 B1UH � 10" W.C. oEuvEm PREssuRE P�UMBING FIXTURE SCHEDU�E TAG DESCRIPTION MTG. HEIGHT AIANUfAC7UR MODEL N0. TRIM ROUGH—IN SIZES REMARKS WAS1E VENT H.W. C.W. DOMESiIC WATER J.R. SMRH 42 GPH RECOVERY AT 90'F TEMP. RISE, 40,00� BTUH, O.fi9 UMFORM ENERGY FACTOR. �WH-1 HEATER OR EQUAL GCF50 - - - 3/4" 3/4" PROVI�E FACiORY STAN�, INLET AN� OUTLB SHUTOFF VALVES ANO UNIONS. INSiALL THERMOMEiER ON OUTLEf PIPING. SEf TO 140'F DISCHARGE TEMPERATURE FD-1 FLOOR DRAIN _ MIFAB F10�0-EF - p" - _ _ IAC�UERED CAST IRON BODY, STAWLESS STEEL STRAMER, FUNNEL GRATE, DEEP OR EQUAL SEAL P-TRAP. INSTALL TOP OF STRAWER FWSH WITH FLOOR. FS-1 FLOOR SINK _ MIFAB F5722-30-5-150 SEDIMENT BUCKEf 2. _ _ _ 12"X12"'X6" PVC FLOOR SINK WITH REMOVEABLE SEDIMENT BUCKEf, 1�2 GRATE AND OR EQUAL AND 1/2 GRATE DEEP SEAL P-TRAP. MSTALL TOP OF STRAWER FWSH WITH FLOOR. lAV-1 COUNTER MOUMED � COUMERTOP AMERICAN STANDARD "qQpALYN" AMERICAN SiANDARD 1 1/2" 1 1/2° 1/2" 1/Y COUN7ER MOUME�, WTREOUS CHINq RFAR OVERFLOW. PRON�E A�A INSUUTION KIT, IAVATORV OR EQUAL 0476.028 COLONY 2175.50 FlXil1RE TO BE WHITE IN COLOR. MB-1 MOP SERVICE ROOR FlAT OR MSB-2424 FAUCEf Bb0-AA �, � ��z. ��p^ ��p" WNNECT R�NMOP4ANGER�OHOSE A D BRACKEfUVINYL BUMPERGAIROS �pICWADRAIUARD BASM EQOAL STRAINER 1453-BB GI-1 GREASE BURIED SCHIER ONLY PER �BZ 30 GPM FLOW 4„ 2. _ 35 GPM POLVPROPYLENE INTERCEPTOR WITH EX�ENSION WLLAR AS NECESSIRY. INiERCEPTOR CRV REVIEWER CONTROL FlITWG PROVI�E 30 GPM FLOW CONTROL FITfING. WALL MOUNT HAN�ICAPPE� ZURN ZURN WALL HUNG, VITREOUS CHINA, REAR OVERROW WNCEALEO ARM SUPPORT. SK-1 HAND WASH SINK � ACCESSIBLE OR EQUAL 25310 GOOSENECK FAUCE� 1 1/2" 1 1/Y 1�2" 1/2" PROVIOE A�A INSUlATION KIT Z871B4-XL SK-2 THREE COMPARTMENT _ SEE KES PIANS - - � ��p� � ��p^ 3�q• 3�4. BY KITCHEN EQUIPMENT SUPPLIER SCULLEBV SINK TMV-1 tHERMOSTATIC }54" A,F.E POWERS LM-491 - _ _ _ _ 0.5 - 7 GPM � 5 P51 PD.. PROVI�E UNIONS. INSTALL THERMOMEfERS ON MLET MIXING VALVE OR E�UAL AND OUiLEf. SEf i0 11PF DISCHARGE TEMPERAiURE FLOOR MOUMED AMERICAN STANDARD #5321.110 ELONGAiE� WC-1 � FLOOR °CAOEf PRO" OPEN FRONT SEAT 3" p• _ � z• WHITE V17REOU5 CHINA, FLOOR MOIINiE�, 7ANK IYPE WITH HAN�LE ON WI�E WATER CLOSEf OR EQl1AL p�5A4.104 �SS COVER � SI�E, 128 GPF, MINIMUM MAP RATING ID�0 FOR HIGH EFFlQENCY TOILEfS FLOOR MOUNTE� .L AMERICAN SiANDARD �`50�1G.055 OPEN W�_p "BABY DEVORO" _ CMLDREN'S WHITE VITREOUS CHINA, FLOOR MOUMED, TANK ttPE, L28 GPF, MINIMUM BABY WATER CLOSEf l7l FLOOR OR EQUAL P315 pp8 FRON7 SEAi 3" 2" V2� MAP RATING 1000 FOR HIGH EFFlCIENCV TOILEfS LESS COVER 3" FWE � BALL VALVE (NP.) �' ��HW SUPPLY CW SUPPLV ASME T&P RELIEF VALVE PIPE �ISC. TO �RAIN PAN — uwoN (rva.) WATER HFATER (DWH-1) SEi TO iaaF oaniN PnN- MANUFACTURER SUPPIJED STAND �1 DOMESTIC GAS FIRED WATER HEATER PIPING U No scn�E oisHwasHca Q � L.L.� � � � � Q M c�J } w J (p � Q Q � Z w � � z m W a J Q � � L.L.� z Q W Q U L.L z L.L w � � SCOPE DRAW INGS'. REVISIONS'. \� ~ � �� � N0. r $ 20�754 g �`SV /q,y1L iS�' � issuEoarE oaawuav cHECKEoav 0912012019 AaMor CM1eCter �RAW MG TITLE: PLUMBING SCHEDULE AND DETAILS CERTIFlED BV'. li����:��������i,���i���i��������i Su6jec��o compliance with allregulahons of Sla�e antl Local Codes City of Carmel �� `��¢m�' lamn�Ml1 � onrE: 12/02/19 WASTE AND VENT RISER DIAGRAM NO SCALE DRAWMG NUMBER P102 PROJECTNUMBER 18023