Loading...
HomeMy WebLinkAboutSite Plan_Stamped Approved 12-03-19NORTH STREET (plat) (30' R/W) 1st ST. NW MAIN STREET (plat)(66' R/W)RANGELINE RDEXISTING I 1 2 STORY FRAME/MASONRY BUILDING VINE REAL ESTATE HOLDING, LLC NO. 2013-51323 REKINAZ, LLC NO. 2008-994510' ALLEY10' ALLEY UNION STATE BANK DEED BOOK 237, PAGE 175 UNION STATE BANK DEED BOOK 335, PAGE 154 CITY OF CARMEL INSTR. NO. 2017-10010 CITY OF CARMEL INSTR. NO. 2017-10010 BART L. POER NO. 2005-26488 FFE=831.60' FFE=830.25' ORIGINAL TOWN OF BETHLEHAM NOW CARMEL LOT 13 LOT 14 NATHAN HAWKIN'S LOT 1 CITY OF CARMEL REDEVELOPMENT COMMISSION 0.095 Ac. INSTR.NO. 2007-12511 SIMEON HAWKINS ADDITION LOT 10 SIMEON HAWKINS ADDITION LOT 3 SIMEON HAWKINS ADDITION LOT 11 ORIGINAL TOWN OF BETHLEHAM NOW CARMEL LOT 1 ORIGINAL TOWN OF BETHLEHAM NOW CARMEL LOT 2(4)-PARKING SPACES(6)-PARKING SPACES(4)-STREET PARKING SPACES 18 .0' 18 .0'5.0'9.0'9.0'25.0' 5' CONC. WALK6" BARRIER CURB SEE DETAIL ON SHEET C5.2 12.6' CARMEL COMMERCIAL DRIVE APPROACH IN R/W SEE DETAIL ON SHEET C5.2 (1)-COVERED BIKE SPACE UNDER AWNING, SEE DETAIL 1/C6 NEW CONCRETE SIDEWALK SEE DETAIL ON SHEET C5.2 NEW ADA RAMP EACH SIDE OF DRIVE PARKING BLOCK (TYP.) NEW STAIRS TO NEW 7'x13' CONCRETE PORCH (SEE ARCH. SHT's.) 8.3'FRONT ADDITION REAR ADDITION ADA SIDEWALK RAMP SEE DETAIL E604-SWCR-08 ON SHEET C5.2 FRONTADDITION43.2'18.7'1.67'26.25'46.2' 23.4'4.33'18.6'3.6' 5.0'11.8'24.3'2.0'19.8' RELOCATE EXISTING PENDANT SIGN TO COMPLY WITH SIGN UDO2- A/C UNITS 3- A/C UNITS NEW 5' CONC. STAIRS TO EXISTING WALK (SEE ARCH. SHT's.) NEW 5' CONC. STAIRS TO EXISTING WALK (SEE ARCH. SHT's.) (3) BIKE SPACES, ON CONC. PAD 9.4' x 6', INSTALL PER UDO DETAIL 1/C6 17.5' 9.2' 2'4.0' LIMITS OF CARMEL 17-ENG-001 VETERANS WAY STREET PROJECT REPAIR CARMEL SIDEWALK IN R/W SEE DETAIL ON SHEET C5.2 PROPOSED WATER TAPS & VALVE, VERIFY TYPE, SIZE & LOCATION, INSTALL ALL WATER PER CARMEL DETAILS PROVIDE 18" OF VERTICAL SEPARATION AT ALL WATER LINE CROSSING LOCATIONS WITH ALL SEWERS & UTILITIES CONTRACTOR TO CONFIRM THE LOCATION & DEPTH OF ALL UTILITY CROSSINGS WARNING SIGN RAIN GARDEN RAIN GARDEN PLANTINGS SEE DETAIL ON SHEET L2 CONTRACTOR TO CONNECT CONCRETE WALK TO EXISTING WOOD RAMP & CONFIRM RAMP COMPLIES W/ ADA 2016 PROPOSED SITE PLAN C2.1KEELER-WEBB ASSOCIATES1805-008CLIENT REVIEW11-16-2018 LEGEND PROPOSED BUILDING VINE HEALTHCARE SRS ARCHITECTSINDIANA DESIGN CENTER200 S. RANGELINE ROADCARMEL, IN 46032PH: 317.989.624840 NORTH RANGELINE ROAD CARMEL, IN ADLS SUBMITTAL12-19-2018 ADDITIONS PRE-FILING CONF.5-09-2019ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT -OF-WAY SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY. COMMITTEE REVISIONS6-26-20191 1 1 1 1 1 1 1 ENGINEERING REVISIONS8-27-20192 3 2 2 ENGINEERING REVISIONS9-26-20193 3 12/03/19