Loading...
HomeMy WebLinkAboutDumpster Enclosure_Stamped Approved 12-03-1917'-4"7'-0"4 A-10 6'-6"5" 8'-3" 8'-3"1" 5 A-10 NOTE: ALL EXTERIOR TRASH ENCLOSURE STEEL SHALL BE GALVANIZED 18'-0"1'-0"10'-4"11'-4"9"2'-0" 1'-0" 8'-0" 4'-0" 2'-0" 1'-0" 5 A-10 8 A-10 4 A-10 1 A-10 9 A-108" 2'-8" 4'-0"6'-8"3'-0"LINE OF FOOTER8"1 A-10 8 A-10 ±5"V.I.F.6" 5'-6" 6"2 A-10 3 A-10 EQUALEQUAL 3'-0" TYP.1'-0"6'-6"FOOTING DEPTH (TYP.)1'-6" Ø FOOTING3'-0"POST DEPTH (TYP.)DOME TOP OF CONCRETE FOOTING (1")3'-6"2'-0" @ DUMPSTER ENCLOSURE6'' DIA. X GALVANIZED STEEL PIPE, SOLID IN CONCRETE. PRIME & PAINT VALVOLINE RED. ROUND OVER TOP OF CONCRETE UNDISTURBED OR COMPACTED SUBGRADE 8'' COARSE STONE, HAND COMPACTED 18'' DIAMETER, 4000 PSI, AIR ENTRAINED CONCRETE BASE 3'-6'' OF PIPE BELOW GRADE CENTER IN CONCRETE PAVEMENT AS NOTED ON CIVIL DRAWINGS & DETAILS 6 A-10 BOLLARD DETAIL SCALE: 1" = 1' - 0"3'-6''3'-3" @ DUMPSTER ENCLOSURE1 A-10 8 A-10 3 A-10 GATE SECTION SCALE: 3" = 1' - 0" 7 A-10 HINGE DETAIL SCALE: 3" = 1' - 0"3" 6"Date Drawing No. Project No. Scale Checked Drawn Drawing Title 2019 CESO, INCc DateNo. Revisions/Submissions BWHVALVOLINE INSTANT OIL CHANGE9835 N MICHIGAN ROAD, CARMEL, IN 46032756309-01 08.09.19 175 MONTROSE WEST AVE., SUITE 400, AKRON, OH 44321 PHONE: (330) 665-0660 FAX: (888) 208-4826 \\cesoinc.local\root\data\PROJECTS\VALVOLINE\756309-CARMEL, IN (N. MICHIGAN RD.)\02-BLDG\PLAN\DWG\3BLH-STnD-EXTwR ArchCAD 2019-05\EXTR_3BLH A10 Dumpster Enclosure, 9/5/2019 7:23:50PM, RICHARDCESO AS NOTED A-10 DUMPSTER ENCLOSURE FIELD PAINT w/SHERWIN-WILLIAMS B66-310 PRO-CYRL PRIMER FOLLOWED BY (2) FINISH COATS OF B66-300 SHER-CYRL HPA. COLOR SHALL BE "VALVOLINE RED". FIELD PAINT w/SHERWIN-WILLIAMS B66-310 PRO-CYRL PRIMER FOLLOWED BY (2) FINISH COATS OF SHERWIN WILLIAMS 7515 HOMESTEAD BROWN. SEMI-GLOSS DTM ACRYLIC B66-200. MATCH BUILDING MORTAR ALL SURFACES SHALL BE TREATED W/ SEALER. REFER TO SPECIFICATIONS. REFER ALSO TO "EXTERIOR FINISHES", SHEET A-3. PRECAST LIMESTONE CAP. COLOR TO MATCH BUILDING STONE WAINSCOT MORTAR: BOLLARDS / GUARD POSTS: GATES & GATE POSTS: DUMPSTER EXTERIOR FINISH NOTES COPING: SEALER: MATCH BUILDING BRICKBRICK: BRICK 12/03/19