Loading...
HomeMy WebLinkAboutMinutes COM 11-07-19 Individuals won't be able to access from the north?Corrie Meyer: That entrance will remain.Bill Nicholls: We are hoping to have a separate entrance for a private event. The façade adjacent to the north courtyard will be replaced with window,folding door,and the limestone wash. • Having those hotels on either side are going to be an asset for you. Bill Nicholls: The corporate side of the Cannel base will be an interesting part of the future. We are excited. Laura motions to approve Docket#19100009 with the conditions of Urban Forester approval,updated photometric plan,and updated sidewalk connection is submitted to Staff,John seconds,3-0,absent Kirsh. 8. Docket No. 19100007 ADLS Amend: Penske Honda&Pre-owned buildings—Exterior Renovations The applicant seeks site plan and design approval for exterior renovations to the Penske Honda building and the Pre-owned building. Renovations include new signage and exterior façade materials. Combined,the sites are 11.25 acres in size.The buildings are located at 4140 E.96th Street and 4100 E.96th Street.The sites are zoned B-3 and are not located within any overlay zone. Filed by Matthew Hoener of TGD Architects on behalf of the owner. Petitioners: Matthew Hoener(TGD Architects): • We are doing required updates to the building,required by Honda corporate.The biggest change is the cylinder where the Honda logo is in the center of the 4140 E. 96th St,building. Currently,the cylinder stops and is open below.The new design is a full cylinder with open windows where you can walk under. The current site has 40' of canopy before one reaches the doors. • We are also proposing a new glass vestibule underneath the existing canopy to provide a weather break before one walks into the showroom. • There is an accent tile band that goes along the perimeter of the wall and roof line. This is being replaced with ACM metal panels.The blue is the same color,but is being updated. • All the EIFS will be fixed,repaired,and repainted. • The white metal coping will be replaced with silver metal coping. • The exterior pillars will have a new block base to match the Honda Express Service building,the old Harley Davidson building,we renovated last year(Docket#18020001 ADLS Amend). Some of those details will be used on this proposal, like the grey block base. • The wave will stay and will be refreshed with metal panels.New signage is proposed and we will be seen by the BZA on November 25th,2019(Docket#19100011 V). • For the pre-owned building,(4100 E. 96th St.)other than signage,a blue band is being added across the building,a block base on the columns is proposed,and EIFS will be repainted. • The EIFS is off yellow and will be white to match the Honda Express Service building. • The Express building renovation was completed at the beginning of this year. • Rachel Keesling: What happened to the service sign?Matthew Hoener: It was removed.All service signs were removed because all service is now at the Express building.Any quick service will be there. Any long-term service will take place at the Sales building(4140 E.96th St.). In the rear is long-term service for engine,transmission,or anything of that type of repair. • Behind the pre-owned building is the body/collision shop. • The old service area is now for new car delivery. Department Report: Rachel Keesling: • I have been to this site before to test drive a car.The building is set back.There is an awning and steps up to the building. Matthew Hoener: It is about 3' from grade to the sales floor. We will be redoing the steps. • The changes they are making are in line with what exists in the area,but with a fresh look.The building will be white to match the Express Service building.That is a positive. • The new cylinder element is more modern and gives the building a fresh look. • Signage has to be seen by the BZA.By separating them it becomes two signs."Penske Honda"is one sign and by separating them they are two separate signs.This becomes a total of three signs. • The changes for the pre-owned building changes are simple and a refresh. Commercial Committee Minutes 10-01-19 9 • Staff recommends approval. Committee Comments: John Adams: • Signage will be handled separately?Rachel Keesling: Yes. It has to be seen by the BZA and then the Sign Administrator will issue sign permits. 111 Alan motions to approve Docket#19100007,Laura seconds,3-0,absent Kirsh. Meeting adjourned at 7:35 PM. Nathan F. Chavez Recording Secretary Alan Po ik Committee Chairman Commercial Committee Minutes 10-01-19 10