From: Duane Sharrer <sharrerd@weihe.net>
Sent: Thursday, October 03, 2019 3:15 PM
To: Krueskamp, Theresa A
Cc: Conn, Angelina V
Subject: CAD File for the plat of Waterfront of West Clay Section 5-A
Attachments: W160409 Waterfront of West Clay Sec SA Plat.dwg
**** This is an EXTERNAL email. Please exercise caution and Do Not open attachments or click links
from unknown senders or unexpected email. ****
Terry, attached is a CAD file of the plat for Waterfront of West Clay Section 5-A which is being
presented to the Community Services Dept. for signatures within the next few days. Please let me
know if you have any questions or need any additional information from me.
Thank you.
Duane A. Sharrer, P.E.
Vice President, Residential Development
Weihe Engineers, Inc.
10505 N. College Avenue
Indianapolis, Indiana 46280
317-846-6611 office
800-452-6408 toll free
317-690-1540 cell
sharrerd@weihe.net email
WEIHE TOP
ENGINEERS WORK
Land Surve.pnciCtiti Engineenng PLACES
Landscape Archttecuire 201'
l4ui1d uirfr runl{Jencr`
Indianapolis I St, Louis STAR
Connect With Weihe
® v
1
Conn, Angelina V
From: Conn, Angelina V
Sent: Friday, October 26, 2018 1:25 PM
To: Hollibaugh, Mike P
Cc: Littlejohn, David W; Ogg, Chris;Warner, Caleb
Subject: FW:Waterfront (Sanctuary)
Hi, Mike—Here is the December 2017 email from Paul Shoopman stating that he will install his portion of the path along
116th Street. (As you know, he had issues this year with getting Etica/PCS to respond to his project engineer.) Please let
me know if you need anything additional.
Angie Conn, AICP
Carmel Planning&Zoning Dept.
From: Paul Shoopman [mailto:paul@shoopmanhomes.com]
Sent: Wednesday, December 13, 2017 5:58 PM
To: Kashman, Jeremy M; Barnes, David R
Cc: Hollibaugh, Mike P; Jordan, Alex; Thomas, John G; skoogr@weihe.net; Conn, Angelina V; 'Duane Sharrer'
Subject: RE: Waterfront (Sanctuary)
To Whom It May Concern,
We have come to an agreement with Mike and Angie at the City of Carmel to install the 10'trail along 116th Street in the
Spring of 2018 on the property I own known as Sanctuary at 116th Street/Waterfront of West Clay. If you have any
questions, let me know.
Thanks,
t o ,L Shoop vvLavt/
Paul Shoopman Home Building Group
Zionsville, IN 46077
paul@shoopmanhomes.com
(317) 733-9841 fax
(317) 714-2406 cell
Mailing Address:
11731 Cold Creek Court
Zionsville, IN 46077
Ip
CONFIDENTIALITY NOTICE: This transmission and any attachments contain legally privileged or confidential information and are
intended only for the recipient(s) named above. If you are not a named recipient, or if this transmission has been addressed to you
in error, you are not authorized to read, copy or distribute this transmission and any attachments, and we request that you please
delete this transmission and attachments (including all copies thereof) and notify us by return email or by phone at (317) 733-
9810. Delivery of this transmission and any attachments to any person other than the intended recipient(s) is not intended in any
way to waive confidentiality or privilege. All personal transmissions express views only of the sender and should not be attributed
to Paul Shoopman Home Building Group, Inc., Paul Shoopman Custom Homes, Inc. or Indiana Land Development Corporation. No
transmissions may be copied or distributed without this statement.Thank you.
1
Conn, Angelina V
From: Conn, Angelina V
Sent: Tuesday, May 15, 2018 9:02 AM
To: 'Duane Sharrer'
Subject: RE: Review comments, Waterfront of West Clay, Section 5A (#17040017 SP)
Good morning, Duane—
Yes,you can remove the paragraph about the' Hamilton county' roads, or you can just change the wording to 'City of
Carmel' roads.
I was able to find an email from December of last year,where Shoopman committed to installing his portion of the path
along 116th Street, and you were copied on that email, so I will place a copy of that email in the secondary plat file. And, I
will also follow up with Mike Hollibaugh when he gets back from his conference next week,to verify that that is all that
is needed.
Angie Conn,AICP
Carmel Planning&Zoning Dept.
From: Duane Sharrer [mailto:sharrerd@weihe.net]
Sent: Tuesday, May 15, 2018 8:55 AM
To: Conn, Angelina V
Subject: RE: Review comments, Waterfront of West Clay, Section 5A (#17040017 SP)
Angie,thanks for responding so quickly. In your comment no. 3 below,the subdivider agreement form has a paragraph
about road improvements to existing Hamilton County roads. Since there are no Hamilton county roads affected by this
project, I assume that paragraph can be deleted from the agreement. .Is that a correct assumption?
As for conmient no. 4, I have not seen a written agreement although I assume there is one. I do know that Section 2C was
held up until that agreement was in place and since it is now under construction, I assume Mike was satisfied. Should I
try to obtain a copy of a written agreement from Paul Shoopman?
Duane A. Sharrer, P.E.
Vice President, Residential Development
Weihe Engineers, Inc.
317-846 -661.1 t31IieE'
317 -690 - 1540 cell
sharrerd@weihe.net email
Connect With Weihe
[rn
From: Conn, Angelina V<Aconn@carmel.in.gov>
Sent: Monday, May 14, 2018 4:26 PM
To: Duane Sharrer<sharrerd@weihe.net>
Cc: Brady Kuhn <KuhnB@weihe.net>; 'paul@shoopmanhomes.com'<paul@shoopmanhomes.com>; Rusty Skoog
<skoogr@weihe.net>
Subject: RE: Review comments,Waterfront of West Clay, Section 5A(#17040017 SP)
1
(VROVO-i AAVV," C_ommevi+s c-3 -1 q-iy)
Conn, Angelina V
From: Conn, Angelina V
Sent: Monday, May 14, 2018 4:26 PM
To: 'Duane Sharrer'
Cc: 'Brady Kuhn'; 'paul@shoopmanhomes.com'; 'skoogr@weihe.net'
Subject: RE: Review comments,Waterfront of West Clay, Section 5A (#17040017 SP)
Good afternoon, Duane—
Thank you for providing us with the responses to our review comments,as well as copies of the revised plat and plans.
Listed below are the remaining planning/zoning items that still need to be addressed or need further clarification by you.
Please address these in writing as soon as you can.Thank you.
1I"v/ Comment 3. Please fill out and submit a copy of the subdivider agreement form; see section 9.06 of the Subdivision
Control Ordinance, online at: http://www.carmel.in.gov/Home/ShowDocument?id=278 . You wrote that is was
attached, but I did not see it.
;.41-V Comment 4. Please note that the requirement to install the multi-use path along 116th Street is still an outstanding
item. What is the status of this topic?I will need to verify this 'agreement'you wrote about with the Planning Director
(who is currently at a conference out of state).At the very least we will need to have some type of formal
correspondence in writing,for the file. If you can provide copies of that to me now, that would be great,so it can be
,' on the record.
X,
f,,"Comment 10. Sheet 1—please add the instrument no. for Section 2C near the left hand side of the sheet. This
comment remains active.
/\4_, Comment 20. Staff has been advised that we cannot present a Secondary Plat to the Director for signature from this
0 A point forward until Ms.Terry Krueskamp(tkrueskamp@carmel.in.gov) in Information Systems has received an e-mail
\p' with an electronic file attached (MicroStation .dgn is preferred, or AutoCad .dwg of the subdivision) and it(the e-mail)
has been copied to myself(aconn@carmel.in.gov). This comment remains active.
`,Comment 21. Please submit a revised Secondary Plat after making above-mentioned changes. Once these changes
p�). have been made and comments addressed, please produce a Mylar copy(with the surveyor's and land owner's
\ signatures) for signature by this Department. Two paper copies of the plat must be filed with the Mylar prior to
recording, and two paper copies and an electronic copy of the scanned, recorded plat must be submitted following
recording of the document. Our approval of the secondary plat(signature) will be forthcoming upon revision of the
plans according to the items listed above. This comment remains active.
Comment 22. Lastly, please submit a .pdf or.jpg file of the scanned, recorded plat. This comment remains active, and
we understand that it will be one of the last steps.
Comment 27. Please submit a paper copy& PDF of the Landscape Plan. This comment remains active;please have
�-the third party get that to us as soon as they can.
'b`j'\t\°‘
Angie Conn,AICP
Carmel Planning&Zoning Dept.
1 Civic Sq.3rd Flr.,Carmel, IN 46032
P:317-571-2417 I W:www.carmeldocs.com
From: Conn, Angelina V
Sent: Friday, December 15, 2017 12:20 PM
To: 'skoogr@weihe.net'
Cc: 'Brady Kuhn'; 'Duane Sharrer'; 'paul@shoopmanhomes.com'
Subject: RE: Review comments, Waterfront of West Clay, Section 5A (#17040017 SP)
1
LIE WEIHE
ENGINEERS p [EI ` [lW
Land Surveying I Civil Engineering _MAY.,�y,2018 11
Landscape Architecture
Build with confidence.' By
B7
TRANSMITTAL
of
To: Carmel Planning Department Project; Waterfront/4 West Clay—Section Five A
One Civic Square—3rd Floor Job#: W160409
Carmel,IN 46032 Phone: 317-571-2426
Attn: Angie Conn
Date: May 9,2018 Re: Response to TAC Comments
We are sending you®Attached ❑Under separate cover via Delivery the following items:
® Prints ® Copies of Letters
❑ Specifications ❑Meeting Minutes
❑Change Order(s) ❑ Inspection Report
❑ Sketches/Drawings ❑Application(s)for Payment
Sets Document Document Description
❑ Copies Date Number
1 5/8/2018 Revised Construction Plans
1 5/8/2018 Revised Secondary Plat
1 5/9/2018 Response Letter to TAC Comments
1 5/9/2018 Copies of Response Letters to TAC Members
1 5/9/2018 Thumb Drive with Digital Files of Items listed above
These are transmitted as indicated below:
❑For Your Review or Use
®For Your Review&Comment
❑As Requested
❑For Your Records
❑ For Your Approval
Angie,please let me know if you have any questions. Thank you.
By:Duane A.Sharrer,P.E. cc:
10505 North College Avenue I Indianapolis, IN 46280 I www.weihe.net I (317) 846-6611 I (800) 452-6408 I Fax: (317) 843-0546
Allan H.Weihe,P.E.,L.S.,-Founder
UH WEIHE
ENGINEERS
Land Surveying Civil Engineerint.
Landscape Architect,err li?
Build with confidence.'
May 9,2018 MAY 112018
Mr. Ryan Hartman By
Clay Township Regional Waste District
10701 College Avenue, Suite A
Indianapolis, IN 46280
RE: Waterfront at West Clay Sec. 5A
Formerly known as Sanctuary at 116`h St. Section 5A
Weihe Engineers Project No.: W 160409
Dear Ryan:
This letter is in response to your comment email dated April 28, 2017 for the above referenced project. We
have prepared the following responses to your comments:
General Comments:
1. Comment: Interceptor Fees on attached diagram will need to be paid prior to pre
construction. Those areas include the delineated Pink and Orange in the attached
diagram.
Response: Understood
2. Comment: CTRWD would like to see an angle that in non-acute into existing tie in
structure.
Response: The angle was revised into a non-acute angle tying into the existing MH.
3. Comment: CTRWD asks that the 8"sewer tie in at elevation 868.71 and the first
manhole upstream be a prefabricated drop structure. No inside drops allowed.
Response: The elevation into the existing MH has been revised to 868.71 and the
upstream manhole is now indicated to be a drop structure with a
prefabricated outside drop.
4. Comment: Due to potential maintenance issues we would ask that the structures that
protrude more than 3'above existing grade be installed to grade and then adjusted
when the next development phase occurs. Due to tripod manhole entries we need a
10'radius from center of manhole to have a safe flat area to work from.
Response: The top of casting elevation on MH WFW37 was revised per your comment
and notes have been added for structures that are proposed to be above
existing grade but less than 3 ft.above existing grade.
5. Comment: Prefixes for all manholes need to be MH-WFW27, MH-WFW28, etc.
Response: The MH prefixes have been revised as requested.
6. Comment: Pipe run between Str 36-37 needs to be SDR 26 designation.
Response: The pipe was revised to SDR 26.
7. Comment: Easements need to be 30'from structure 36-38 and 20'from 30-36 and 28-29.
10505 North College Avenue I Indianapolis, IN 46280 I www.weihe.net I (317) 846-6611 I (800) 452-6408
Allan H.Weihe,P.E.,L.S.,-Founder
El! WEIHE
ENGINEERS
Response: The easements have been revised as requested.
8. Comment: Str. #31, 38, and 39 need to speck bolt down structures.
Response: A note for bolt down structures has been added to the above-mentioned MH's.
9. Comment: Str. 37 should not show stub. Manhole will need to be cored when other areas
develop.
Response: The stub was removetL
10. Comment: Please indicate caliper size and type of trees to be reinstalled in LBE for
trees being removed.
Response: The developer is working with a landscape architect who will provide this
information on a separate plan.
11. Comment: Please go to www.ctrwd.org and insert all pertinent detail drawings.
Response: The pertinent details have been added to sheet C502
12. Comment: Please note that anything that gets installed in a non platted area recorded
easements will be required.
Response: Understood. Easement exhibits are attached. Please provide the CTRWD
easement documents for the developer to complete.
13. Comment: Summary of Lateral Installation Requirements are outdated please insert
most current spec.
Response: The current Summary of Lateral Installation Requirements has been added to
sheet C503.
14. Comment: Please modify IDEM permit and application as appropriate based upon
requested changes and submit a copy of each with next submittal.
Response: The revised IDEM permit and application are attached.
Ryan, if you have any questions or need additional information, please contact me at 317-846-6611.
Sincerely,
OseGrai
Duane A. Sharrer, P.E.
Vice President,Residential Development
Waterfront at West Clay Section 5A Page 2 of 2 W160409
WEIHE
ENGINEERS M
Land Surveying I Civil Engineering � U
LEI)
Landscape Architecture
b-112
Build with confidence!' MAY 112018
May 9,2018 By
Mr. Steve Cook
City of Carmel Utilities
3450 W. 131'St
Cannel, IN 46074
RE: Waterfront at West Clay Section 5A
(previously known as Sanctuary at 116th St_ Section 5A)
Weihe Project No. W160409
Dear Steve:
This letter is in response to your comment email dated May 10,2017 for the above referenced project. We
have prepared the following responses to your comments listed below:
General Comments:
1. Comment: At project completion, as-builts must have all corrections made and
submitted in the following digital and paper formats:
Files must be submitted on a CD-ROM in a jewel case labeled with Engineering
Company Name, Project Name, and date CD was burned w/o using a file
compression in AutoCAD Version 2004 or earlier format. There should be one
drawing labeled as Water Features with only water pertinent information.
Response: Understood
2. Comment: Certified as-builts shall accurately reflect all field design.As-build must
be stamped "Field Verified"and signed by the developer's registered
professional engineer or land surveyor.
Response: Understood
3. Comment: Disc file names shall be clearly labeled and easily identifiable to all users.
Response: Understood
4. Comment: Projection shall be referenced to NAD83, Indiana State Plane Coordinate
System East Zone, using U.S. Survey Feet and per the Hamilton County datum.
Response: This subdivision was designed originally on its own coordinate system.
Changes at this time would affect our site control and could cause staking
errors. We would like to continue on the current system. All as-builts and
digital submittals will be up-dated to State Plane Coordinates.
5. Comment: All pertinent drawing elements will reside in the primary drawing file.
There shall be no cells, nodes, blocks, or reference files attached to the drawing.
Response: Understood
6. Comment: Tie into section corners in the Indiana State Plane Coordinate System to
insure proper orientation.All underground fittings shall be marked with lath or
PVC and identification for GPS capturing.
Response: Understood
10505 North College Avenue I Indianapolis, IN 46280 I www.weihe.net I (317) 846-6611 I (800) 452-6408
Allan H.Weihe.P.E.,L.S.,-Founder
LI! WEIHE
ENGINEERS
7. Comment: Must show measurements between all fittings and from centerlines with
each fitting identified, watermains identified by size and material, services from
lot line and centerline, and location of any traps.
Response: Understood
8. Comment: The as-built, both paper and digital, must be revised to show the exact
location of all watermains, laterals constructed, hydrants, valves, service lines&
fittings as installed with measurements from a permanent structure (e.g.fire
hydrant).
Response: Understood
9. Comment: After installation, actual point coordinate locations for all hydrants,
valves,fittings, etc shall be captured using a Survey Grade GPS unit. Points must
be submitted digitally as a cor file on as-builts.
Response: Understood
Corrections:
1. Comment: At the dead end of lot#110, an 8"valve needs to be installed with a
temporary hydrant.
Response: The temporary hydrant has been added to sheet C700 at Lot 66 which was
Lot 110 on the previous submission.
2. Comment: Prairie Falcon Drive and the dead end of the cul-de-sac on lot 105, 6"
main with 6"valve hydrant and NO TEE.
Response: The 6"valve hydrant and no tee has been added to sheet C700 at Lot 61
which was Lot 105 on the previous submission.
Steve, if you have any further questions or requests for additional information pertaining to this project
review,please contact me at 317-846-6611.
Sincere,
3. ,.
Duane A. Shar r, P.E.
Vice President,Residential Development
Page 2 of 2
LI: WEIHE ENGINEERS ir@NOWM1
Land Surveying Civil Engineering MAY 112018
Landscape Architecture
Build with confidence"' B
May 9,2018 y
Ms.Angie Conn
City of Carmel Department of Planning
One Civic Square
Carmel,IN 46032
RE: Review comments for Waterfront at West Clay, Section 5A(#17040017 SP)
Dear Ms. Conn:
This letter is in response to your comment emailed on April 28, 2017 for the above referenced project. We
have prepared the following responses to your comments listed below:
Plat:
e54 /1. Comment: Please provide digital copies of any revised plat or plans, in addition to
paper copies.
Response: Paper and digital copies of the revised plans are included in the submission.
'✓2. Comment: Please provide copies of your correspondence with the TAC members and
their correspondence with you.
Response: Response letters to all TAC members are attached.
Comment: Please fill out and submit a copy of the subdivider agreement form;see
section 9.06 of the Subdivision Control Ordinance, online at:
http://www.carmel.in.gov/index.aspx?page=41&parent=256
Response: The subdivider agreement form has been completed and is attached.
Comment: Please note that the requirement to install the multi-use path along 116th
Street is still an outstanding item. What is the status of this topic?
Response: Mr. Shoopman has reached an agreement with the City on this matter.
✓S. Comment: Title of the plat—did you want to change this to read Waterfront of West
Clay?
Response: The plat has been revised to Waterfront of West Clay.
O/6. Comment: Please add the Plan Commission Docket Nos. 78-03 PP Amend
(03050038)and 17040017 SP to the top portion of the plat sheet.
Response: This information has been added to the plat.
'1'7. Comment: Please add the source of title warranty deed instrument number to the plat
sheet.
Response: This information has been added to the plat.
611(i\8. Comment: Please add the owner's phone number to the Owner info at the bottom of
the plat sheets.
Response: The owner's phone number has been added to title block on all plat sheets.
'10505 North College Avenue I Indianapolis, IN 46280 I www.weihe.net I (317) 846-6611 I (800) 452-6408
Allan H.Weihe,P.E.,L.S.,-Founder
LIE WEIHE
ENGINEERS
fr19. Comment: Please add the zoning to the plat, near the Building Setbacks
Requirements text box: S-1/Residence-ROSO III
Response: This information has been added to plat sheet 2.
10. omment: Sheet 1—please add the instrument no.for Section 2C near the left hand
side of the sheet.
Response: This information has been added to plat sheet 1. The recording information has
been left blank and will be completed prior to recording this plat.
d'IVH. Comment: Sheets 1 &2:Please label the Block number/letter. Right now, it does not
have a name, it just reads Block " ".
Response: The unlabeled block has now been labeled as"Block E."
4�12. Comment: Sheets 1 &2:In the common area block,please also add the text label
Lake or Pond.
Response: "Block E"is now labeled as the pond.
di--c/13. Comment: Sheet 2:please dash in the approximate boundary of where the lake meets
land(in the common area), along the right-hand side of the sheet.
Response: The edge of water for the normal pool of the lake is now shown on the plat.
cAV14. Comment: Sheet 3:please make the Vicinity Map more zoomed in to the site.
Response: The vicinity map has been revised to show a larger view of the area around the
project.
yV15. Comment: Sheet 4:please remove the County Commissioners signature block, as it is
not needed.
Response: The county commmissioners' signature blocks have been removed as requested.
fr✓16. Comment: Sheet 4: under the Commission's Certificate,please change Mike's name
to Michael P. Hollibaugh.
Response: Mike's signature has been corrected as requested.
7. Comment: Sheet 4: in the land description, there are references to section Two "C",
when it should be Five "A". Please fix.
Response: The references to Section 2C are correct in that they are referring to the
adjoining plat for Section 2C that will be recorded prior to Section 5A.
eS1718. Comment: On the zoning standards text box,please also add that the Max. Lot Cover
% =N/A.
Response: This has been added as requested.
g4/9. Comment: Please work with Dave Barnes in the City Engineering Dept. to get on a
BPW(Board of Public Works) meeting agenda, which has a filing deadline. His
number is 571-2441, and his email address is dbarnes@carmel.in.gov.
Response: Understood.
20. Comment: Staff has been advised that we cannot present a Secondary Plat to the
Director for signature from this point forward until Ms. Terry Krueskamp
(trueskamp@carmel.in.gov) in Information Systems has received an e-mail with an
Waterfront at West Clay Section 5A Page 2 of 3 W 160409
LI: WEIHE
ENGINEERS
electronic file attached(MicroStation.dgn is preferred, or AutoCad.dwg of the
subdivision)and it(the e-mail) has been copied to myself(aconn@carmel.in.gov)
Response: A digital file will be provided to Terry once all comments have been successfully
addressed.
0'21. omment: Please submit a revised Secondary Plat after making above-mentioned
changes. Once these changes have been made and comments addressed,please
produce a Mylar copy(with the surveyor's and land owner's signatures)for
signature by this Department. Two paper copies of the plat must be filed with the
Mylar prior to recording, and two paper copies and an electronic copy of the
scanned, recorded plat must be submitted following recording of the document. Our
approval of the secondary plat(signature)will be forthcoming upon revision of the
plans according to the items listed above.
Response: The Mylars of the plat will be provided once all easements have been finalized
with the local utility providers.
22 Comment: Lastly,please submit a.pdf or.jpg file of the scanned, recorded
Response: A digital copy of the recorded plat will be provided when it becomes available.
Construction Plans:
✓23. Comment: Sheet C001, Title:will this be changing to Waterfront of West Clay?
Response: The title sheet and the title blocks on all sheets have been updated with the new
project name.
✓24. Comment: Sheet C300:Please add LME& its meaning to the Legend.
Response: LME (landscape maintenance easement) has been added to the legend.
Miscellaneous:
t45. Comment: The filing fee has been paid—thank you.
Response: You're welcome.
ek/6. Comment: Please provide the Dept. with a copy of the Covenants&Restrictions for
this neighborhood
Response: The covenants and restrictions have recently been updated and recorded. I will
obtain a copy and provide under separate cover.
omment: Please submit a paper copy&PDF of the Landscape Plan.
Response: The developer is having someone else prepare a landscape plan which will be
filed separately.
Angie, if you have any further questions or comments,please contact me at 317-846-6611.
Sincerely,
(;----V;4:44.47-t17:1-41/7/- tiLe/t—'
Duane A. Sharrer,P.E.
Vice President, Residential Development
Waterfront at West Clay Section 5A Page 3 of 3 W 160409
LI: WEIHE
ENGINEERS
Land Surveying Civil Engineerii D (�
Landscape Architecture Cy 11 ng
Build with confidence' v
May 9, 2018 MA r 1 2018
BY
Mr.Alex Jordan
City of Carmel
Department of Engineering
Carmel,IN 46032
RE: Waterfront of West Clay, Section 5A—Project Review#1
(Previously knows as Sanctuary at 116`h St. Section 5A
Weihe Project No. W160409
Dear Alex:
This letter is in response to your comment email dated May 17,2017 for the above referenced project. We
have prepared the following responses to your comments listed below:
Construction Plan Review Comments:
1. Comment: Please include the legal description, zone district, setback distances, and
total disturbance of the site on the cover sheet.
Response: This information was added to sheet C001.
2. Comment: Please include the design speed on the cover sheet.
Response: This information was added to sheet C001.
3. Comment: Please verb that the location of all existing utilities with top of curb and
invert elevations,pipe sizes, and direction are shown.
Response: This information was added to sheet C300 and C301.
4. Comment: Please show markings indicating monuments at the external corners of the
subdivision.
Response: All monuments are shown on the plat except those in the water.
5. Comment: Please include all technical information required by Section 102.02
(xi)(m)of the Storm Water Technical Standards on the primary plat and the
construction drawings.
Response: This information was added to a table on sheet C300.
6. Comment: Please stamp the plans as "Approval Pending-Not for Construction."
Response: The construction plans are stamped as requested.
7. Comment: Are any basements planned in this section?If so, all buildings with
basements that are to be occupied must have 25'of separation from the limits of
the 100-year elevation of the detention facility.
Response: A 25' setback from the 100-yr.flood elevation was added to sheet C300.
This setback was also added on the plat.
8. Comment: Please include the adjacent landowners from the existing Sanctuary
sections on the plans.
10505 North College Avenue I Indianapolis, IN 46280 I www.weihe.net I (317) 846-6611 I (800) 452-6408
Allan H.Weihe,P.E.,L.S.,-Founder
�= WEIHE
ENGINEERS
Response: The adjacent plat information is shown for all adjoiners with the exception
of the north landowner which is owned by the developer.
9. Comment: Please ver fy with CFD that all turning radii are appropriate and
adequate for fire trucks.
Response: The proposed cul-de-sac is designed per Carmel Standards.
10. Comment: Please verb that there will be no direct discharge areas.
Response: This entire section will discharge into the storm sewer system or directly into
the lake. There will be no direct discharge of storm water outside of the
overall project limits.
11. Comment: Please indicate any off-site flood routes through the site and all flood
routes for the rear yard swales for the maximum water surface elevation for the
100-year rain even with inlets clogged.
Response: The lake elevations for the emergency overflow routes are shown on sheet
C302B.
12. Comment: Was the right-of-way for Prairie Falcon Drive previously
requested/approved?If it is to be a local street, the required right-of-way is 56'
with a pavement width of 28'(30'back to back').
Response: The right-of-way and pavement widths for Prairie Falcon Drive are
consistent with what was approved in Section 2C.
13. Comment: Please place the following note on the plans in the vicinity of the local
street pavement section: "All paving is to be completed in one paving season."
Response: This note has been added to sheet C401.
14. Comment: Please indicate that the pavement of Prairie Falcon Drive is to be saw cut
at the limits of the new pavement.
Response: This note has been added to the plan view on sheet C400.
15. Comment: Please provide INDOTs ADA ramp details for any ramps that will be
installed.
Response: These details have been added to Sheet C402.
16. Comment: Please ver*that all lots adjacent to side yard easements are wide enough
to accommodate the anticipated house and any planned driveways so that there
is no encroachment into the easements.
Response: House layouts have been performed and the proposed houses and driveways
do not encroach on the easements.
17. Comment: Please verb that the locations of all electrical power vaults,
transformers,power lines, gas lines, television cable, and telephone lines are
shown.
Response: All existing utilities are shown.
18. Comment: Please indicate sawcut at the nearest joint of the existing curb past the
connection point of the new curb and indicate removal of the existing curb and
replacement with new curb to this point.
Response: A note was added in this area on sheet C400.
Page 2 of 4
LIE WEIHE
ENGINEERS
19. Comment: Please include the following note on the plans: "Damage to the existing
right-of-way shall be restored/repaired to the satisfaction of the City at the
completion of the project. The Contractor is encouraged to inspect the right-of-
way with the City prior to the start of construction to document the existing
condition of the right of way."
Response: This note was added as note 21 of the General Notes on the C300 sheets and
as note 9 on sheet C400.0
20. Comment: Please indicate the anticipated start construction date in the response
letter.
Response: The Developer would like to start this project as soon as approval is given.
21. Comment: Please verb all elevations are North American Vertical Datum of 1988
(NAVD)and that the horizontal datum of topographic map is Indiana State Plan
Coordinates, NAD83.
Response: This subdivision was designed originally on its own coordinate system.
Changes at this time would affect our site control and could cause staking
errors. We would like to continue on the current system. All as-builts and
digital submittals will be up-dated to the State Plane Coordinates.
22. Comment: Are there any easements that will need to be vacated?
Response: No.
23. Comment: What is the anticipated start construction date?
Response: See response to Comment 20.
24. Comment: Please include the City's curbing and paving policy in the next submittal.
Response: The paving policy has been added to sheet C403.
25. Comment: Please show the limits of disturbance along the northern perimeter of the
new pipeline and the western perimeter of the site on C200.
Response: The limits of disturbance have been added to sheet C200.
26. Comment: Please show erosion control blanket from the 901-contour line down in
the rear of lots 104-109 on C202.
Response: Erosion control blankets were added to the lots from the 901-contour line to
the lake on sheet C202. Note: the lot numbers have been revised since the
previous submission.
27. Comment: Please adjust the silt fence in the rear of lots 108 and 109 to contain the
grading on future lot 136.
Response: The Silt Fence has been relocated to include the grading of future lot 136
(now numbered Lot 184)on sheet C202.
28. Comment: Please show silt fence at the back of curb on C202.
Response: Silt fence has been added behind the curb as requested.
29. Comment: Please provide a construction sequence on how the existing bio-swale will
be filled and show any necessary controls and provide details. Will it be possible
to build a home on this area?
Page 3 of 4
mE WEIHE
ENGINEERS
Response: There are no bioswales that will be filled. Please clarify.
30. Comment: We would like sumps and snouts to be installed in structures 27 and 31.
Please ensure that these are sized correctly per the snout detail.
Response: Snout details have been added to sheet C206. Sumps have been added to the
mentioned structures and are shown on sheet C600.
31. Comment: Please adjust the limits of disturbance to that they contain the sanitary
laterals run to the future lots of the section to the north.
Response: The limits of disturbance have been extended to include the lateral runs on
the SWPPP plans.
32. Comment: Please revise#3 of the construction SWPP to list out the flow rates of the
peak discharge. Currently they are listed as XXX.
Response: Item #3 in SWPPP for Construction Sites has been revised to include the
flow rates from the drainage report on sheet C204.
33. Comment: Please replace the dandy bag detail with a completely below the grate
inlet protection.
Response: The Dandy Bag detail was removed and replaced with the Flexstorm Inlet
Filter(a below-the-grate inlet protection)on sheet C205.
34. Comment: Please provide MFPGs for all the lots and provide afront and back
MLAG/MFPG for any homes that will have walkout basements.
Response: The MFPGs have been added to the front and back of the lots.
35. Comment: Please provide the finished floor elevations of all homes.
Response: The minimum first floor elevation has been added to Sheet C300.
36. Comment: Please revise the 10-year elevation of the pond. It is shown as being 100
feet above the other elevations.
Response: The 10-yr flood is now the correct elevation on sheet C300.
Alex, if you have any further questions or need additional information, please contact me at 317-846-
6611.
t-c17,Si ,
,...metei,
Duane A. Sharrer, P.E.
Vice President, Residential Development
Page 4 of 4
WEIHE oEd 0 IHWM -:`
ENGINEERS MAY 112018
Land Surveying(Civi(Engineering
Landscape Architecture By
Build with confidence`
May 9,2018
Mr.David Littlejohn
City of Cannel
Department of Community Services
One Civic Square
Cannel,IN 46032
RE: Waterfront of West Clay, Section 5A
(previously known as Sanctuary at 116`h St. Section 5A)
Weihe Project No. W160409
David:
This letter is in response to your comment email dated May 16,2017 for the above referenced project. We
have prepared the following responses to the plan review comments listed below.
Alternative Transportation Review Comments:
1. Comment: Align the ADA ramps at the intersection of Stone Lake Drive and Prairie
Falcon Drive so they provide a straight crosswalk across each street.
Response: The ADA ramps have been placed as requested and are shown on Sheet
C300 and C400 on the intersection detail.
2. Comment: The Bicycle and Pedestrian Plan and the original approval of this
subdivision requires the construction of a 10'asphalt path along the
subdivision's frontages of 116t"St and 121'St. Please ensure that these facilities
will be constructed in compliance with Bicycle and Pedestrian Plan and the
originally approved subdivision plan.
Response: An agreement between the City and the developer has been reached
regarding the trail along 116`h St. The trail along 121st St.will be
constructed as part of the future section that will abut 121st St.
David, if you have any further questions or requests for additional information pertaining to this project
review, please contact me at 317-846-6611.
Sincerely,
Duane A. Sharrer, P.E.
Vice President, Residential Development
10505 North College Avenue I Indianapolis, IN 46280 I www.weihe.net I (317) 846-6611 I (800) 452-6408
Allan H.Weihe,P.E.,L.S.,-Founder
um
L1: WEIHE u. E
ENGINEERS MAY .112018
Land Surveying I Civil Engineering
Landscape Architecture By
Build with confidence`."
May 9,2018
Mr. Gregory Ilko
CrossRoad Engineers,P.C.
3417 Sherman Drive
Beech Grove,IN 46107
RE: Waterfront at West Clay Section 5A
Formerly known as Sanctuary at 116th St. Section 5A
Docket No. 17040017 SP
Dear Greg:
This letter is in response to your comment email dated May 16,2017 for the above referenced project. We
have prepared the following responses to your review comments below:
Drainage:
1. Comment: Per Section 102.02 of the manual, all future construction plan submittals
shall have the revision date indicated on all sheets, and per Section 102.03.ii.k of
the manual, all future storm water drainage technical report submittals shall
contain the current revision date.
Response: The revision dates have been added to all plans and the drainage report.
2. Comment: Per Section 102.02.iii of the manual, the construction plans shall include
an overall project storm water management plan that includes the location,
dimensions, and supporting analyses of all detention/retention facilities,primary
conveyance facilities, and outlet conditions for all phases of a multi phase
development.
Response: See sheet C300 for required information.
3. Comment: Per Section 102.02.v.a of the manual, the existing project site layout
requires all elevations shall be given in North American Vertical Datum of 1988
(NA VD). The horizontal datum of topographic map shall be based on Indiana
State Plane Coordinates, NAD83. The map will contain a notation indicating
this datum information. Please revise accordingly.
Response: This subdivision was designed originally on its own coordinate system.
Changes at this time would affect our site control and could cause staking
errors. We would like to continue on the current system. All as-builts and
digital submittals will be up-dated to State Plane Coordinates.
4. Comment: Per Section 102.02.vii of the manual, the storm sewer plan/profile sheet
(C600)shall include any references with general notes,plan notes or legends to
the granular backfill material shall reference the appropriate trench detail on the
detail sheets. Please revise accordingly.
10505 North College Avenue I Indianapolis, IN 46280 I www.weihe.net I (317) 846-6611 I (800) 452-6408
Allan H.Weihe,P.E.,L.S.,-Founder
WEIHE
ENGINEERS
Response: The legend on sheet C600 has been revised to reference the detail sheet
(sheet C601)for the granular backfill trench detail which was added to sheet
C601.
5. Comment: Per Section 102.02.vii of the manual, the storm sewer plan/profile sheet
(C600)shall include the hydraulic grade line to demonstrate that the hydraulic
grade line remains below the rim elevation for the design condition. Please
revise accordingly.
Response: The hydraulic grade line has been added to the profile on Sheet C600.
6. Comment: Per Section 102.02.xi.a of the manual, the grading and drainage plan
(C300)shall include existing drainage facilities, including size, material, invert
elevations and top casting information. Existing structure and pipe information
shall be as-built information and not design information. Please revise
accordingly.
Response: Sheet C300 was revised to include the requested information for all
infrastructure that have been constructed.
7. Comment: Per Section 102.02.xi.g of the manual, the grading and drainage plan
(C300)shall include, in addition to the information provided, details of all new
storm sewers, sub-surface drains (for both swales and roadways), and 100-year
overflow paths/ponding areas shown as hatched areas, along with all associated
easements. Details to be shown include structure locations, with structure
number reference and top of casting elevations,piping between structures as well
as other drainage pipe (roof drains, subsurface drains, etc.). Existing structure
and pipe information shall be as-built information and not design elevations. See
also comment 6 above and comment 21 below. Please revise accordingly.
Response: The 100-yr overflow paths have been added to Sheets C302A& C302B.
Details for the storm sewers have been added to sheets C300& C301.
8. Comment: Per Section 102.02.xi.m of the manual, the grading and drainage plan
(C300)shall include a drainage summary, which summarizes the basic
conditions of the drainage design, including site acreage, off-site/upstream
acreage, allowable release rates,post-developed 10 year, and 100-year flows
leaving the site, volume of detention required, volume of detention provided, and
any release rate. Please revise accordingly.
Response: A table has been added to sheet C300 showing the revised pond staging and
release rates.
9. Comment: Per Section 102.02.xi.q of the manual, the grading and drainage plan
(C300)shall include drainage arrows shall be indicated for all surface drainage,
swales and on each side of every break in swale slopes. Please revise
accordingly.
Response: Drainage arrows have been added to sheets C300& C301.
10. Comment: Per Section 102.02.xiv of the manual, a Structure Data Table shall be
provided in the plan set. At a minimum, the structure data shall include the
following information:structure number reference, upstream structure number,
downstream structure number, top casting elevation, upstream pipe elevation,
downstream pipe elevation,pipe length,pipe material,pipe size, type of structure
and detail reference to type of structure and any notes related to the structure.
Please revise accordingly.
Waterfront at West Clay Section 5A Page 2 of 4 W 160409
LI: WI- IHF,
ENGINEERS
Response: The structure data table has been added to sheet C600.
11. Comment: Per Section 303.07 of the manual,ponding and overflow path throughout
the development resulting from a 100-year storm event, calculated based on all
contributing drainage areas, in their proposed or reasonably anticipated land
use and with the storm pipe system assumed completely plugged, shall be
determined, clearly shown as hatched area on the plans, and a minimum width of
30 feet along the centerline of the overflow path contained in permanent
drainage easements and shall remain within the limits of the development(shall
not encroach onto adjacent properties). A statement shall be added to the
secondary plat that would refer the viewer to the construction plans to see the
entire extent of overflow path as hatched areas.
Response: Emergency flood routing calculations have been added to the drainage
report and ponding limits/overflow routes are shown on C302B. The
required statement on the plat has been added referring readers to the
construction plans for more information.
12. Comment: Per Section 306.02.A of the manual, all new drain tiles equal to or greater
than 12 inches in diameter, inlet and outlet structures of detention and retention
ponds, and appurtenances thereto as required by this Article, that are installed in
subdivisions requiring a stormwater management permit from the City of Carmel
shall be contained within a minimum 30 feet of drainage easement(15 feet from
centerline on each side)and shown on the recorded plat. New drain tiles refer to
all sub-surface stormwater piping, tubing, tiles, manholes, inlets, catch basins,
risers, etc. The storm run from existing structure 3004A through and including
Str. 32 will need to be contained in said 30 foot easement as a part of the
proposed plat, half of which will be outside the limits of this section.
Response: Will the City accept a separate 15 ft. easement to cover the area that falls
outside of the boundaries of this plat? If so,we will prepare the description
and exhibit for your review.
13. Comment: Per Section 501.01 of the manual, there should be no less than 2.5 feet of
cover along any part of the pipe from final pavement elevation or final ground
surface elevation to the top of the pipe. Please review Str. 27 and 30, and revise
accordingly.
Response: This standard has been met in most locations,however,I am requesting a
waiver from this requirement at Structures 27 and 30. To meet this
requirement would require an extensive amount of fill to raise the street. I
can designate the pipe to be Class V if that will alleviate concerns from the
City.
14. Comment: Per Section 501.03 of the manual, manhole/inlet inside sizing shall be per
the Hamilton County Standard Detail Drawings. Please remove City of Carmel
Standard Drawing 10-34 on Plan Sheet C601.
Response: The Carmel detail was removed and the Hamilton County detail(D-20)was
added to sheet C601.
15. Comment: A portion of the exiting pond is shown being filled in on Plan Sheet C300.
Please provide calculations and/or a statement as to the impact this will have on
the storage volume, if any. In addition, by ordinance, this pond should have a
drainage easement a minimum of 15 feet beyond the actual footprint(top of the
Waterfront at West Clay Section 5A Page 3 of 4 W 160409
I1: WEIHE
ENGINEERS
bank or the 100-year pond elevation if no top of bank is present), which will need
to be addressed
Response: Portions of the existing pond currently encroach on proposed and future
lots. This condition was known at the time the original master plan was
prepared,therefore,the master plan accounted for portions of the pond to
be filled in. The calculations for the pond were based on the smaller pond
surface area after the areas were filled. The proposed grading for Section
5A reduces the normal pool of the existing pond by the amount anticipated
by the master design.
Greg, if you have any questions or need additional information,please contact me at 317-846-6611.
Sry,
Duane A. Sharrer, P.E.
Vice President, Residential Development
Waterfront at West Clay Section 5A Page 4 of 4 W160409
-11 C(5-1,-twei./10
Conn, Angelina V
From: Conn, Angelina V
Sent: Friday, December 15, 2017 12:20 PM
To: 'skoogr@weihe.net'
Cc: 'Brady Kuhn'; 'Duane Sharrer'; 'paul@shoopmanhomes.com'
Subject: RE: Review comments,Waterfront of West Clay, Section 5A (#17040017 SP)
Hi, Rusty-I am resending these review comments, since the project is now moving forward, and since you never
provided responses, prior. Please provide written responses to these review comments as soon as you can, as well as a
set of the latest secondary plat and construction plans.Thanks, and have a nice weekend.
Angie Conn, AICP
Carmel Planning&Zoning Dept.
From: Conn, Angelina V
Sent: Friday, April 28, 2017 2:28 PM
To: 'skoogr@weihe.net'
Cc: 'Brady Kuhn'; 'Duane Sharrer'; 'paul@shoopmanhomes.com'; Lopez, Alexia K
Subject: Review comments, Waterfront at West Clay, Section 5A (#17040017 SP)
Happy Friday, Rusty-
The Planning/Zoning Department's preliminary review comments are listed below for this Secondary Plat. Please
address each item via letter or email correspondence.Additional comments might be voiced at or after the May 17
TAC meeting. If you would like to have a conference call or meet in person, please feel free to contact me. Have a
nice weekend!
Plat:
1. Please provide digital copies of any revised plat or plans,in addition to paper copies.
2. Please provide copies of your correspondence with the TAC members and their correspondence with you.
3. Please fill out and submit a copy of the subdivider agreement form; see section 9.06 of the Subdivision
Control Ordinance, online at: http://www.carmel.in.gov/index.aspx?page=41&parent=256.
4. Please note that the requirement to install the multi-use path along 116th Street is still an outstanding item.
What is the status of this topic?
5. Title of the plat-did you want to change this to read Waterfront of West Clay?
6. Please add the Plan Commission Docket Nos. 78-03 PP Amend(03050038)and 17040017 SP to the top
portion of the plat sheet.
7. Please add the source of title warranty deed instrument number to the plat sheet.
8. Please add the owner's phone number to the Owner info at the bottom of the plat sheets.
9. Please add the zoning to the plat,near the Building Setbacks Requirements text box:S-1/Residence-ROSO III.
10. Sheet 1 -please add the instrument no. for Section 2C near the left hand side of the sheet.
11. Sheets 1 &2: Please label the Block number/letter.Right now,it does not have a name,it just reads Block" ".
12. Sheets 1 &2: In the common area block,please also add the text label Lake or Pond.
13. Sheet 2: please dash in the approximate boundary of where the lake meets land (in the common area),along
the right hand side of the sheet.
14. Sheet 3: please make the Vicinity Map more zoomed in to the site.
1
15. Sheet 4: please remove the County Commissioners signature block,as it is not needed.
16. Sheet 4: under the Commission's Certificate,please change Mike's name to Michael P. Hollibaugh.
17. Sheet 4: in the land description,there are references to section Two "C,when it should be Five "A". Please fix.
18. On the zoning standards text box,please also add that the Max. Lot Cover% = N/A.
19. Please work with Dave Barnes in the City Engineering Dept.to get on a BPW(Board of Public Works) meeting
agenda, which has a filing deadline. His number is 571-2441, and his email address is dbarnes@carmel.in.gov.
20. Staff has been advised that we cannot present a Secondary Plat to the Director for signature from this point
forward until Ms. Terry Krueskamp (tkrueskamp@carmel.in.gov) in Information Systems has received an e-
mail with an electronic file attached (MicroStation.dgn is preferred, or AutoCad .dwg of the subdivision) and
it (the e-mail) has been copied to myself(aconn@carmel.in.gov).
21. Please submit a revised Secondary Plat after making above-mentioned changes. Once these changes have
been made and comments addressed,please produce a Mylar copy(with the surveyor's and land owner's
signatures) for signature by this Department. Two paper copies of the plat must be filed with the Mylar prior
to recording, and two paper copies and an electronic copy of the scanned, recorded plat must be submitted
following recording of the document. Our approval of the secondary plat(signature) will be forthcoming
upon revision of the plans according to the items listed above.
22. Lastly,please submit a.pdf or.jpg file of the scanned,recorded plat.
Construction Plans:
23. Sheet C001,Title:will this be changing to Waterfront of West Clay?
24. Sheet C300: Please add LME&its meaning to the Legend.
Miscellaneous:
25. The filing fee has been paid-thank you.
26. Please provide the Dept.with a copy of the Covenants&Restrictions for this neighborhood.
27. Please submit a paper copy&PDF of the Landscape Plan.
Sincerely,
Angie Conn, AICP I Planning Administrator
City of Carmel Planning &Zoning Dept.
1 Civic Square, 3rd Flr., Carmel, IN 46032
0: 317-571-2417 I F: 317-571-2426 I W: www.carmeldocs.com
2
Conn, Angelina V
From: Paul Shoopman <paul@shoopmanhomes.com>
Sent: Wednesday, December 13,2017 5:58 PM
To: Kashman,Jeremy M; Barnes, David R
Cc: Hollibaugh, Mike P;Jordan, Alex;Thomas,John G; skoogr@weihe.net; Conn, Angelina V;
'Duane Sharrer'
Subject: RE:Waterfront (Sanctuary)
To Whom It May Concern,
We have come to an agreement with Mike and Angie at the City of Carmel to install the 10' trail along 116th Street in the
Spring of 2018 on the property I own known as Sanctuary at 116th Street/Waterfront of West Clay. If you have any
questions, let me know.
Thanks,
Paul/Shoop naa,vi.
Paul Shoopman Home Building Group MVIACL-Q
Zionsville, IN 46077 (i(j1/4.
paul@shoopmanhomes.comCk
(317) 733-9841 fax •
(317) 714-2406 cell fro vv..) I R n
Mailing Address:
11731 Cold Creek Court -1— I t)j—l -7 (FLAY S2 Cj e 7)
Zionsville, IN 46077
Ip 1�J� Si da,u_fr C_
S+U-to 6w1
CONFIDENTIALITY NOTICE: This transmission and any attachments (1.-0 56UL.- oi4- {-a 121 5i- , n and are
intended only for the recipient(s) named above. If you are not a nam__ .__. . ..., ., „ ��aiu1inarurr nas oeen aaaressed to you
in error, you are not authorized to read, copy or distribute this transmission and any attachments, and we request that you please
delete this transmission and attachments (including all copies thereof) and notify us by return email or by phone at (317) 733-
9810. Delivery of this transmission and any attachments to any person other than the intended recipient(s) is not intended in any
way to waive confidentiality or privilege. All personal transmissions express views only of the sender and should not be attributed
to Paul Shoopman Home Building Group, Inc., Paul Shoopman Custom Homes, Inc. or Indiana Land Development Corporation. No
transmissions may be copied or distributed without this statement.Thank you.
From: Conn, Angelina V [mailto:Aconn@carmel.in.gov]
Sent: Monday, December 11, 2017 12:09 PM
To: Paul Shoopman<paul@shoopmanhomes.com>
Cc: Hollibaugh, Mike P<MHollibaugh@carmel.in.gov>;Jordan,Alex<ajordan@carmel.in.gov>;Thomas,John G
<jthomas@carmel.in.gov>; Kashman,Jeremy M <jkashman@carmel.in.gov>; skoogr@weihe.net
Subject: RE:Waterfront(Sanctuary)
Hi, Paul:
Thanks for meeting with Mike and me last week. Does the Carmel Engineering Dept. know that you have committed to
installing the 116th Street path along your frontage,this coming spring? Please also let them know about this.
•
N .: n i
rT-r'm. (r- r-
,11r EL
May 17,2017
DAMES BRAINARD, MAYOR
Mr. Paul Shoopman
Waterfront Homes Homes
12080 Abney Run Drive
Zionsville, IN 46077
RE: Waterfront of West Clay,Section 5A-Project Review#1
Dear Mr.Shoopman:
The City received your submittal on April 21, 2017. We offer the following comments:
CONSTRUCTION PLAN REVIEW COMMENTS
1. Please include the legal description, zone district, setback distances, and total disturbance of the
site on the cover sheet.
2. Please include the design speed on the cover sheet.
3. Please verify that the location of all existing utilities with top of curb and invert elevations, pipe
sizes, and direction are shown.
4. Please show markings indicating monuments at the external corners of the subdivision.
5. Please include all technical information required by Section 102.02(xi)(m) of the Storm Water
Technical Standards on the primary plat and the construction drawings.
6. Please stamp the plans as"Approval Pending- Not for Construction".
7. Are any basements planned in this section? If so, all buildings with basements that are to be
occupied must have 25' of separation from the limits of the 100-year elevation of the detention
facility.
8. Please include the adjacent landowners from the existing Sanctuary sections on the plans.
9. Please verify with CFD that all turning radii are appropriate and adequate for fire trucks.
10. Please verify that there will be no direct discharge areas.
11. Please indicate any off-site flood routes through the site and all flood routes for the rear yard
swales for the maximum water surface elevation for the 100-year rain event with inlets clogged.
12. Was the right-of-way for Prairie Falcon Drive previously requested/approved? If it is to be a local
street, the required right-of-way is 56'with a pavement width of 28' (30' back to back").
13. Please place the following note on the plans in the vicinity of the local street pavement section:
"All Paving Is To Be Completed In One Paving Season."
14. Please indicate that the pavement of Prairie Falcon Drive is to be saw cut at the limits of the new
pavement.
15. Please provide INDOTs ADA ramp details for any ramps that will be installed.
16. Please verify that all lots adjacent to side yard easements are wide enough to accommodate the
anticipated house and any planned driveways so that there is no encroachment into the
easements.
17. Please verify that the locations of all electrical power vaults, transformers, power lines,gas lines,
television cable, and telephone lines are shown.
DEPARTMENT OF ENGINEERING
ONE CIVIC SQUARE, CARRMEL, IN 46032 OFFICE. 317.571.2441 FAX 317.571.2439
EMAIL engineering$carmel.in.gov
Mr.Paul Shoopman
May 17,2017
RE:Waterfront of West Clay,Section 5A-Project Review#1
Page 2 of 5
18. Please indicate sawcut at the nearest joint of the existing curb past the connection point of the
new curb and indicate removal of the existing curb and replacement with new curb to this point.
19. Please include the following note on the plans: "Damage to the existing right-of-way shall be
restored/repaired to the satisfaction of the City at the completion of the project.The Contractor
is encouraged to inspect the right-of-way with the City prior to the start of construction to
document the existing condition of the right-of-way."
20. Please indicate the anticipated start construction date in the response letter.
21. Please verify all elevations are North American Vertical Datum of 1988(NAVD)and that the
horizontal datum of topographic map is Indiana State Plane Coordinates, NAD83.
22. Are there any easements that will need to be vacated?
23. What is the anticipated start construction date?
24. Please include the City's curbing and paving policy in the next submittal.
25. Please show the limits of disturbance along the northern perimeter of the new pipeline and the
western perimeter of the site on C200.
26. Please show erosion control blanket from the 901 contour line down in the rear of lots 104-109
on C202.
27. Please adjust the silt fence in the rear of lots 108 and 109 to contain the grading on future lot
136.
28. Please show silt fence at the back of curb on C202.
29. Please provide a construction sequence on how the existing bio-swale will be filled and show
any necessary controls and provide details.Will it be possible to build a home on this area?
30. We would like sumps and snouts to be installed in structures 27 and 31. Please ensure that
these are sized correctly per the snout detail.
31. Please adjust the limits of disturbance so that they contain the sanitary laterals run to the future
lots of the section to the north.
32. Please revise#3 of the construction SWPPP to list out the flow rates of the peak discharge.
Currently they are listed as X.XX.
33. Please replace the dandy bag detail with a completely below the grate inlet protection.
34. Please provide MFPG's for all the lots and provide a front and back MLAG/MFPG for any homes
that will have walkout basements.
35. Please provide the finished floor elevations of all homes.
36. Please revise the 10 year elevation of the pond. It is shown as being 100 feet above the other
elevations.
GENERAL INFORMATION
• These comments represent the Department of Engineering's first review of the development plan for this
project.
• We request that all responses to our comments be provided in writing and be accompanied by a drawing
reflecting the requested revisions. Failure to provide written responses may result in the delay of the
review process.
• It is critical that this office be made aware of all modifications made on the plans being re-submitted,
particularly if any such changes are considered"new"or fall outside of our previous reviews. Please
provide revised plans including all revisions. Please notify us of any changes and specifically state any
changes,including changes resulting from Plan Commission,BZA or other committee meetings.
Mr. Paul Shoopman
May 17,2017
RE:Waterfront of West Clay, Section 5A-Project Review#1
Page 3 of 5
• We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations
submitted to this office for review. If you have not already done so, please provide a set of drainage plans
and calculations to their office for review.We will share Crossroad's comments as they are received.
• Final drawings will not be approved for construction until:
o All Engineering Department and Utility Department and Hamilton County Surveyor issues have
been resolved.
o All bonds and performance guarantees are posted.
o All Board of Public Works and Safety approvals and any other governing agency approvals(if
required)are obtained.
o All off-site easements necessary to install utilities to serve the development are secured.
o SWPPP is approved.
o All fees are paid.
• The Department reserves the right to provide additional comments based upon subsequent reviews.
• An approved Stormwater Management Permit is required prior to commencing any earth disturbing
activity. Please contact Mr.John Thomas regarding Stormwater quality requirements.
• An approved right-of-way permit is required prior to commencing any work in the public right-of-way and
for construction equipment access from the City's right-of-way.
• If it will be necessary to relocate existing utilities,the costs for such relocation shall be borne solely by the
developer. Any utility poles requiring relocation shall be relocated to within one foot of the outside edge
of the proposed right-of-way.
• The Department requires that the construction drawings be developed in accordance with the City of
Carmel digital submission standards and that all required submittals for primary plat,secondary plat,and
construction drawings be made. The digital files must be submitted to the Department of Engineering
prior to the approval of the construction plans. Please contact the City GIS Department for the
requirements.
• Jurisdictions:
o The project site is located within current City of Carmel Corporate Limits.
• Perimeter Street and Right-of-Way—City of Carmel
• Water—City of Carmel Utilities
• Sanitary Sewers—Clay Township Regional Waste District
• Storm Sewers/Drainage—City of Carmel
• Legal Drains—Hamilton County Surveyor's Office
• Drawings submitted for approval:
o The design engineer must certify all drawings submitted for final approval.
o This office will require 9 sets of drawings for approval after all issues have been resolved. The
drawings will be stamped as approved and signed by the City Engineer and by Carmel Utilities.
The Owner will receive 3 sets, one of which must be maintained on the construction site at all
times. If this project is subject to review and approval by the Hamilton County Surveyor's Office,
a total of 11 sets will be required for final approval.
• Carmel Utilities will provide separate reviews of this project for water issues. Please assure that copies of
all drawings are sent to:
John Duffy
Carmel Utilities
30 West Main Street
Carmel, IN 46032
• Carmel Utilities subscribes to "Holey Moley"who should be contacted directly for all water main
locations.
• The following items will be sent electronically upon request regarding this correspondence and project:
o Project Approval Checklist
Mr.Paul Shoopman
May 17,2017
RE:Waterfront of West Clay,Section 5A-Project Review#1
Page 4 of 5
o Performance/Maintenance Guarantees
o Utility Jurisdictions/Right of Way Permits
o Availability(acreage)Fees
BOARD OF PUBLIC WORKS AND SAFETY
• A schedule for Board of Public Works and Safety meeting dates and agenda deadlines will be sent
electronically for your use upon request. Please use the Engineering Department deadlines for
submissions to the Board.
• Any submission to the Board requires prior approval by the Carmel Clay Plan Commission and/or the
Board of Zoning Appeals(if applicable)and completion of review by the Technical Advisory Committee.
All written requests to be placed on the Board's agenda must include the appropriate Docket Number
and the date(or dates)of approval by the Plan Commission and/or the Board of Zoning Appeals(if
applicable).
• Commercial Curb Cut Approval. Please provide 8Y2 x 11 exhibits with the request for approval. Provide all
pertinent information including lane widths,overall width,radii,lane markings,location of opposing
drives or streets,relationship to the location of previous curb cut,etc.
• Temporary Construction Entrance Approval. It appears the construction entrance is planned at the
location of a permanent curb cut. Therefore Board approval is not required.
• The installation of any permanent,privately owned and/or maintained improvement(signs,decorative
street signs,walls,streetlights,etc.)within dedicated right of way or dedicated easements requires the
execution of a Consent to Encroach Agreement between the Owner and the City of Carmel.Such
agreements are executed by the Board of Public Works and Safety. The City Engineer may approve
irrigation system agreements.
• Secondary Plat approval if applicable. All performance guarantees must be posted prior to submission of
secondary plats for Board of Public Works and Safety approval.
• Dedication of right-of-way if not platted. This is based upon the City of Carmel 20-Year Thoroughfare Plan
requirements. Dedication documents are available upon request. Please be advised that all Right-of-Way
Dedications must be accompanied by a Sales Disclosure Agreement completed by the owner for the
property being dedicated to the City. The dedication document cannot be recorded without a completed
Sales Disclosure. The form is available upon request.
• Any open pavement cuts of City right-of-way will require Carmel Board of Public Works and Safety
approval.
• All existing drives need to be abandoned through the Board of Public Works and Safety.
BONDING REQUIREMENTS
• Please contact Mr. Dave Barnes to review performance guarantee requirements. Please contact Mr.John
Duffy to review water and sanitary sewer bonding requirements.
• The amount of the Performance Guarantee is based upon a certified Engineer's Estimate for 100%of the
cost of labor and materials to construct the individual improvements,to be provided by the design
engineer. Please provide detailed Engineer's Estimates for each improvement including quantities,unit
costs,pipe sizes,and materials,etc.
• Upon completion and release of individual Performance Guarantees,a three-year Maintenance
Guarantee will be required(see Street Sign comments above). The Maintenance Guarantee amount is
based upon 15%of the Performance amount for Streets and Curbs and 10%of the Performance amount
for all other improvements.
• Performance Guarantees may be Performance or Subdivision Bonds or Irrevocable Letters of Credit.
Mr. Paul Shoopman
May 17,2017
RE:Waterfront of West Clay,Section 5A-Project Review#1
Page 5 of 5
RIGHT OF WAY PERMIT AND BONDING
• Any work in the dedicated right-of-way will require an approved Right-of-Way Permit and a License&
Permit Bond.
• The bond amount is determined by our Right-of-Way Manager. However,if the work is included in the
scope of work of a required and posted Performance Guarantee,the Performance Guarantee may be
used to satisfy the bond requirements of the Right-of-Way Permit.
• Please contact our Right-of-Way Manager,Caleb Warner,to arrange right-of-way permitting and bonding.
AVAILABILITY AND CONNECTION FEES
• We defer to Carmel Utilities regarding this issue.
• If an entryway or overall site irrigation system is planned for this development,additional Water
Connection Fees will be assessed based upon the size and usage of the system and upon the
recommendations of the Director of Carmel Utilities.
• These fees are required to be paid prior to final approval of construction plans by Engineering and prior to
issuance of building permits by Building Codes Services. Please confirm these fees and calculations with
Carmel Utilities.
If you have questions, please contact me at 571-2441.
Sincerely,
cL&
Alex Jordan
Plan Review Coordinator
Department of Engineering
Cc(via email): Angelina Conn, Department of Community Services
Steve Cook,Carmel Utilities
John Duffy,Carmel Utilities
Greg Noyes, Hamilton County Surveyor's Office
Greg Ilko,Crossroad Engineers, PC
Jeremy Kashman, Carmel Engineering
Rachel Keesling, Department of Community Services
David Littlejohn, Department of Community Services
Alexia Lopez, Department of Community Services
John Thomas,Carmel Engineering
Ryan Hartman, Clay Township Regional Waste District
Rsy�
1 AlAl
Cityo arme
¢sa iii aet¢
''.!NDIANP,,
DEPARTMENT OF COMMUNITY SERVICES
May 16,2017
Mr. Rusty Skoog
Weihe Engineers
10505 N College Ave.
Indianapolis,IN 46280
RE:Waterfront of West Clay,Section 5A
Dear Mr. Skoog:
The following letter represents comments for this project specifically addressing the area of alternative transportation.
I have reviewed the drawings submitted for the May 17,2017 Technical Advisory Committee meeting and offer the
following comments:
ALTERNATIVE TRANSPORTATION REVIEW COMMENTS
1) Align the ADA ramps at the intersection of Stone Lake Drive and Prairie Falcon Drive so they provide a
straight crosswalk across each street.
2) The Bicycle and Pedestrian Plan and the original approval of this subdivision requires the construction of a
10' asphalt path along the subdivision's frontages of 116st St and 121st St. Please ensure that these
facilities will be constructed in compliance with Bicycle and Pedestrian Plan and the originally approved
subdivision plan.
We request that all responses to our comments be provided in writing. Failure to provide written responses may result
in delay of the review process.
It is critical that this office be made aware of all modification made on the plans being re-submitted,particularly if any
such changes are considered"new"or fall outside of our previous reviews.Please provide revised plans indicating all
revisions. Please notify us of any changes and specifically state any changes,including changes resulting from Plan
Commission, Special Studies or other committee meetings.
The Department of Community Services reserves the right to provide additional comments based on subsequent
reviews.
If you have questions,please contact me at 571-2417.
Sincerely,
David Littlejohn
Alternative Transportation Coordinator
cc: Rachel Keesling,Department of Community Services
Engineering Department Review
Project File
Page 1
ONE CIVIC SQUARE CARMEL,INDIANA 46032 317/571-2417
.�jofc4,?. Clay Township Regional Waste District Review Comments
..411 ,.. CARMEL TECHNICAL ADVISORY COMMITTEE
MEETING AGENDA
40.0
Date: Wednesday,May 17,2017
Place: Dept.of Community Services Conference Room,3td Floor,Carmel City Hall.
Time: 9:00 a.m. (Approximate start times for each item are listed below)
9:00 a.m. (UV,V)Lucas Estate Special Events Venue/Meeting or Party Hall
The applicant seeks the following Use Variance&Development Standards Variance approvals for a
Meeting/Party Hall with multiple buildings,on 70 acres of land:
Docket No. 17040002 UV ZO Chptr 5.01.01 Permitted Uses in S-1 Zoning District.
Docket No. 17040003 V ZO Chptr 27.03 No parking lot curbing
Docket No. 17040004 V ZO Chptr 33.05.E No parking lot interior plantings
Docket No. 17040005 V ZO chptr 26.04 &33.05.A Reduced perimeter bufferyards widths
Docket No. 17040006 V ZO Chptr.2.09 Reduced right-of-way dedication along 116th St.
The site is located at 1143 W. 116th Street. The site is zoned S-1/Residence and partially lies within the West
116th Street Overlay Zone and the Floodplain Zone. Filed by Timothy Ochs of Ice Miller LLP,on behalf of
The Lucas Living Trust
- CTRWD has no issue with Variance& Development Standards. Lucas has a private FM and
Liftstation(s)that has been able to accommodate all events to date.
9:10 a.m. Docket No. 17040016 DP Amend/ADLS Amend: IU Health—North Campus Parking Lot
Expansion.
The applicant seeks site plan and design approval for a new parking lot, on 5.3 acres. 532 new spaces
are proposed. The site is located at 11700 N. Meridian Street and is zoned PUD within the US 31
Overlay Zone. Filed by Joseph Scimia with Ice Miller LLP on behalf of the owner, Indiana
University Health.
- CTRWD has requested that along with this project IU Health extend sewer to their Northern most
property line. As for the parking lot expansion there are no related issues.
9:20 a.m. Docket No. 17040017 SP: Waterfront at West Clay, Section 5A.
The applicant seeks administrative approval of the Secondary Plat&Construction Plans for 13 lots
on 12.8 acres. The site is located at approximately 11821 West Rd. and was formerly called The
Sanctuary at 116th Street. The site is zoned S-1/Residence - ROSO III. Filed by Paul Shoopman of
Shoopman Homes.
- CTRWD sent comments to Weihe(Rusty Skoog) on 4/28/2017 and we are waiting on
resubmittal with comments addressed.
9:30 a.m. Docket No. 17040018 SP Amend: Bear Creek South.
The applicant seeks administrative approval of the Secondary Plat&Construction Plans, for 32 lots
on 24 acres. The site is located at approximately 14291 Little Eagle Creek Ave. and was formerly
called The Retreat of West Clay. It is zoned S-1/Residence-ROSO III. Filed by Matthew Lohmeyer
of Pulte Homes of Indiana, LLC.
- CTRWD sent comments to HWC (Brandon Burke) on 5/2/2017 and we are waiting on
resubmittal with comments addressed.
Page 1
WWW.CARMEL.IN.GOV ONE CIVIC SQ. CARMEL,IN 46032 (317)571-2417
9:45 a.m. Docket No. 17040019 SP: The Prairie at the Legacy.
The applicant seeks administrative approval of the Secondary Plat&Construction Plans for 79 lots
on 5.8 acres, for a mix of townhomes&apartments. The site is located at approximately 14490 River
Rd. The site is zoned PUD/Planned Unit Development. Filed by Keith Lash of Cal-Atlantic Homes
of Indiana, Inc.
- Not in CTRWD service area.
9:55 a.m. Docket No. 17040020 SP: The Ridge at the Legacy,Section 4.
The applicant seeks administrative approval of the Secondary Plat&Construction Plans, for 38 lots
on 19 acres. The site is located near 14371 Arnett Dr., south of 146th St. &west of Community Dr.
The site is zoned PUD/Planned Unit Development. Filed by Tim Walter of Platinum Properties
Mgmt. Co.,LLC.
- Not in CTRWD service area.
10:05 a.m. Docket No. 17040026 Z: College& 116th PUD Rezone
The applicant seeks approval to rezone 4 acres to PUD/Planned Unit Development in order to
develop approximately 64 townhomes. The site is located at the SW corner of College Ave. and
116th St. It is zoned R-1/Residential. Filed by Jim Shinaver and Jon Dobosiewicz of Nelson&
Frankenberger,on behalf of Onyx and East,LLC.
- CTRWD has no issue with the rezone. CTRWD will need plan review fees submitted with
detailed plan sheet for revive once a more detailed plan is complete.
10:15 a.m. Docket No. 17050002 TAC: Jackson's Grant Amenity Area.
The applicant seeks administrative construction plans approval for an amenity area for Jackson's
Grant on Williams Creek Subdivision. The site is located at the northeast corner of Jackson's Grant
Blvd. and Frenzel Pkwy. and is zoned Silvara PUD,Ordinance Z-553-11. Filed by Doug Wagner of
Jackson's Grant Real Estate Co.
- CTRWD has been in contact with JG(Doug Wagner) and Stoeppelwerth (Brett Huff)
concerning this project. CTRWD has requested additional information concerning flow
#'s,detailed kitchen equipment list,and a plan showing exactly what from the pool will tie
into sanitary.
TAC members- Please note that the items listed below won't be at a TAC meeting; however, the petitioner should have
submitted plans to each TAC member,planning to work with each TAC member individually to gain review comments
and approvals.
Docket No. 17040014 SP: Waterfront at West Clay,Sections 1 & 2.
The applicant seeks administrative approval of the Replat of portions of The Sanctuary at 116th Street, Sections 1 &3,for
26 affected lots on 37.2 acres.The site is located at approximately 11765 West Rd.,the northeast quadrant of 116th St.
and West Rd. It is zoned S-1/Residence-ROSO III. Filed by Paul Shoopman of Shoopman Homes.
- Issues still be resolved as lateral stubs yet to be constructed are being revised to accommodate
replat.
Docket No. 17050001 SP: Auman's Addition,Lots lA-1D.
The applicant seeks administrative approval of the Secondary Plat&Construction Plans for 4 lots on 0.92 acres. The site
is located at 231 E. 126th St.,at Auman Dr. W. The site is zoned R-2/Residence.Filed by Doug Hall of JD Hall Land
Surveying,on behalf of Justin Moffett of Old Town Development LLC.
File: TAC 5-17-17.doc
Page 2
WWW.CARMEL.IN.GOV ONE CIVIC SQ. CARMEL,IN 46032 (317)571-2417
•
�. To• URVEYOR'S OFF!
•• ---_ 7f* tritiV
J ' ,
Ili \ /if r _\ \� -� - -� '.,1' 1��._� r�-- /-7 ) `l `'�j('y�
C) e
1.1 1. _.. . Xenton C. 'Ward, C EM Suite 133
Surveyor of.7familton County One Manahan County Square
(Phone(317)776-5495 Noblesville, Indiana 46060-2230
(Fax (37)776-9623
May 5, 2017
Weihe Engineers
ATTN: Rusty Skoog, Jr. PE, PS
10505 North College Avenue
Indianapolis, IN 46280
VIA E-MAIL: SkoogR@weihe.net
RE: Waterfront of West Clay Section 5A
Dear Mr. Skoog:
We have reviewed the revised construction plans submitted to the Hamilton County Surveyor's
Office on April 24, 2017, for this project and have the following comments:
1. The proposed project falls in the incorporated area and MS4 jurisdiction of the City of
Cannel.
2. The proposed project DOES NOT fall in a Cannel Wellhead Protection Zone.
3. The proposed project falls in the Long Branch Regulated Drain Watershed.
4. Please submit the following procedural items: Petition for Regulated Drain Subdivision,
Subdivision Non-enforcement Agreement, crossing request for sanitary sewer,
engineer's estimate, and all associated bonds for 120% of construction cost. The
bonding includes storm sewers, SSD, and monumentation.
5. Please address all additional drainage review comments from Crossroad Engineers,
reviewer for the City of Cannel.
6. Please note that further comments may be necessary at a later date.
Should you have any questions, I can be reached at 317-776-8495.
Sincerely,
-V'fi 1)14v
Greg Hoyes, AC, CFM, CPESC
Plan Reviewer
CC: Angie Conn—Carmel DOCS
John Thomas—Carmel Engineering
Dave Barnes—Carmel Engineering
Greg Ilko—Crossroad Engineers
Paul Shoopman—Shoopman Homes
Conn, Angelina V
)'/2 C--e\i-cud Coivw„te,,ktS
From: Conn,Angelina V
Sent: Friday,April 28, 2017 2:28 PM
To: 'skoogr@weihe.net'
Cc: 'Brady Kuhn'; 'Duane Shaffer; 'paul@shoopmanhomes.com'; Lopez, Alexia K
Subject: Review comments, Waterfront at West Clay, Section 5A (#17040017 SP)
Happy Friday, Rusty-
The Planning/Zoning Department's preliminary review comments are listed below for this Secondary Plat. Please
address each item via letter or email correspondence.Additional comments might be voiced at or after the May 17
TAC meeting. If you would like to have a conference call or meet in person,please feel free to contact me. Have a
nice weekend!
Plat:
1. Please provide digital copies of any revised plat or plans, in addition to paper copies.
2. Please provide copies of your correspondence with the TAC members and their correspondence with you.
3. Please fill out and submit a copy of the subdivider agreement form;see section 9.06 of the Subdivision
Control Ordinance,online at: http://www.carmel.in.gov/index.aspx?page=41&parent=256.
4. Please note that the requirement to install the multi-use path along 116th Street is still an outstanding item.
What is the status of this topic?
5. Title of the plat-did you want to change this to read Waterfront of West Clay?
6. Please add the Plan Commission Docket Nos. 78-03 PP Amend(03050038)and 17040017 SP to the top
portion of the plat sheet.
7. Please add the source of title warranty deed instrument number to the plat sheet.
8. Please add the owner's phone number to the Owner info at the bottom of the plat sheets.
9. Please add the zoning to the plat, near the Building Setbacks Requirements text box:S-1/Residence-ROSO III.
10. Sheet 1 -please add the instrument no. for Section 2C near the left hand side of the sheet.
11. Sheets 1 &2: Please label the Block number/letter. Right now, it does not have a name,it just reads Block" ".
12. Sheets 1 &2: In the common area block,please also add the text label Lake or Pond.
13. Sheet 2: please dash in the approximate boundary of where the lake meets land (in the common area),along
the right hand side of the sheet.
14. Sheet 3: please make the Vicinity Map more zoomed in to the site.
15. Sheet 4: please remove the County Commissioners signature block,as it is not needed.
16. Sheet 4: under the Commission's Certificate,please change Mike's name to Michael P. Hollibaugh.
17. Sheet 4: in the land description,there are references to section Two "C",when it should be Five "A". Please fix.
18. On the zoning standards text box,please also add that the Max. Lot Cover%= N/A.
19. Please work with Dave Barnes in the City Engineering Dept.to get on a BPW(Board of Public Works) meeting
agenda, which has a filing deadline. His number is 571-2441,and his email address is dbarnes@carmel.in.gov.
20. Staff has been advised that we cannot present a Secondary Plat to the Director for signature from this point
forward until Ms. Terry Krueskamp (tkrueskampPcarmel.in.gov) in Information Systems has received an e-
mail with an electronic file attached (MicroStation.dgn is preferred, or AutoCad.dwg of the subdivision) and
it(the e-mail) has been copied to myself(aconn@carmel.in.gov).
i
21. Please submit a revised Secondary Plat after making above-mentioned changes. Once these changes have
been made and comments addressed,please produce a Mylar copy(with the surveyor's and land owner's
signatures) for signature by this Department. Two paper copies of the plat must be filed with the Mylar prior
to recording, and two paper copies and an electronic copy of the scanned,recorded plat must be submitted
following recording of the document. Our approval of the secondary plat(signature) will be forthcoming
upon revision of the plans according to the items listed above.
22. Lastly,please submit a.pdf or.jpg file of the scanned, recorded plat.
Construction Plans:
23. Sheet C001,Title:will this be changing to Waterfront of West Clay?
24. Sheet C300: Please add LME&its meaning to the Legend.
Miscellaneous:
25. The filing fee has been paid-thank you.
26. Please provide the Dept.with a copy of the Covenants&Restrictions for this neighborhood.
27. Please submit a paper copy&PDF of the Landscape Plan.
Sincerely,
Angie Conn, AICP I Planning Administrator
City of Carmel Planning &Zoning Dept.
1 Civic Square, 3rd Flr., Carmel, IN 46032
0: 317-571-2417 I F: 317-571-2426 I W: www.carmeldocs.com
2
UN WEIHE
ENGINEERS RECEIVED
Land Surveying I Civil Engineering A 21 NJ7
Landscape Architecture DDCS
Build with confidence!'
TRANSMITTAL
To: Carmel Planning/Zoning Department Project: The Sanctuary at 116th Street—Section 5A
One Civic Square—3rd Floor Job#: W160409
Carmel, IN 46032 Phone: 317-571-2426
Attn: Angie Conn Fax:
Date: April 20, 2017 Re: TAC Submittal
We are sending you ® Attached ❑ Under separate cover via Delivery the following items:
❑ Shop Drawings ® Prints ❑ Copy of Letter
❑ Product Data ❑ Specifications ❑ Meeting Minutes
❑ Samples ❑ Change Order(s) ❑ Inspection Report
❑ ❑ Sketches/Drawings ®Application(s)for Payment
® Sets Document Document Description
❑ Copies Date Number
2 Construction Plans
2 Secondary Plat
1 Application for Secondary Plat and Check# �,`j6(4 for$2,838
1 TAC Application and Check# 6 9068 for$345
These are transmitted as indicated below:
❑Approved ❑ For Your Review or Use
❑Approved as Noted ® For Your Review&Comment
❑Not Approved, Revise and Resubmit ❑As Requested
❑Action Not Required ❑ For Your Records
❑Action Indicated on Item Transmitted ❑ For Your Approval
❑ For Signature. Return Copies to Us ❑
Remarks: Please review for the next TAC review. Thank you.
By: Alvin E. (Rusty) Skooq, Jr. PE, PS cc:
10505 North College Avenue I Indianapolis, [N 46280 I www.weihe.net I (317) 846-6611 I (800) 452-6408 I Fax: (317) 843-0546
Allan H.Weihe,P.E.,L.S.,-Founder
Conn, Angelina V
From: Rusty Skoog (via Dropbox) <no-reply@dropbox.com>
Sent: Friday,April 21, 2017 11:32 AM
To: Conn, Angelina V
Subject: Rusty Skoog shared "Waterfront 5A (Sanctuary 5A)"with you
Hi angie,
Rusty Skoog(skoogr@weihe.net) invited you to edit the folder"Waterfront
5A(Sanctuary 5A)" on Dropbox.
Rusty said:
"I am inviting you to the Dropbox of Waterfront at West Clay-Section 5A.
The name has been changed from Sanctuary @ 116th Street-Section 5A.
Thanks Rusty Skoog"
Go to folder
Enjoy!
The Dropbox team
1 ;E
Email secured by Check Point
i