Loading...
HomeMy WebLinkAbout294JGW - Truss Placement Guide7-00-00 TOP 15-03-12 TOP 8-00-00 TOP 8-00-00 TOP 8-00-00TOP 8-00-00TOP 8-00-00TOP 10-01-02 TOP 10-01-02 TOP Stick frame gable end over beam8-01-02TOP Stick frame overhang segment of curved roof Filloutdormersidewallsinthefieldasneeded. 9-01-02 TOP 9-01-02 TOP Stickframeroofatbump HGUS26-2 HGUS26-2 HGUS28-2 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26Padoutgableendasneeded HGUS26-2 HGUS26-2 Frametoroofdeck HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26Framertobuildwallwithwindow in front of vertical truss member.HTU26 HTU26 HTU26 Ladder frame TG01T01T03TG02T04T05TG03T06 GE01 GE02 GE02 TG04 GE03 GE04 T11 T12 TG05 T14 T15 T16TG06GE05GE05GE07GE07GE08 GE09 MG01MG01TG07 TG08 GE10T23T25GE06T18GE11GE12 GE13 GE13 GE14 T29V01V02V03V04V05V06V07V08V09V10V11V12 V13V14V15PBE01 PBE02 PB03 PB04 PBE06PBE07 PBE08 PBE03 T02(5)T07(4)T08(4)M01(4)T09(2)T10(4) T13(5)T16(3)T17(3) M02(2) T20(5)T22(2)T24(2)T26(6)T26(6)T27(4)T28(4)PB01(2)PB01(6)PB01(2)PB05(7) PB06(23)PB07(6)PB07(6)PB08(6) PB09(5)PB02(12)T19(3) T22(2) M03(3) M03(3) M04(3) PB10(11) 25-11-0010-00-0012-00-00 1-08-00 36-08-00 5-00-00 13-04-00 10-11-00 1-08-00 18-08-00 2-08-001-08-0020-00-00 19-11-00 37-08-00 10-00-00 25-07-006-09-00 8-08-00 34-11-00 30-07-0016-00-00 15-04-00 9-11-0011-01-00 15-08-008-08-00 13-03-00 2-04-0024-00-00 4-07-00 11-01-00 49-07-0027-00-10 3-11-068-05-04 13-09-04 8-05-04 IRC2006TPI2002 ®¯TLL- °¯TDL- °¯BDLWedgewoodBuildingCompany MeierResidence 294Westvale 1/4"=1'November20,2019 PH B19903276CUSTOMER:LOCATION:MODEL:JOB#: DATE:DESIGNER: DESIGNINFORMATION: SCALE:9028OldSR67South Mooresville,IN46158 (317)834-5380Truss Placement Guide 1) This layout is intended for the purpose of truss location and placement only. Refer to the building plans for actual building construction. 2) All dimensions shown 00-00-00 are in feet-inches-sixteenths. 3) Trusses are spaced 24" on center unless otherwise noted. 4) Do not cut or modify trusses. 5) Refer to the individual truss design drawings for the location of member bracing, uplift and truss end reactions. 6) Installation of all temporary and permanent bracing is essential. See truss drawings, BCSI-B2 Summary Sheet and building designer requirements. 7) Non-bearing walls may not be shown on layout. 12/03/19 Mike Sheeks