HomeMy WebLinkAbout294JGW - Truss Placement Guide7-00-00 TOP
15-03-12 TOP
8-00-00 TOP
8-00-00 TOP
8-00-00TOP
8-00-00TOP
8-00-00TOP 10-01-02 TOP
10-01-02 TOP
Stick frame gable
end over beam8-01-02TOP
Stick frame overhang segment of curved roof
Filloutdormersidewallsinthefieldasneeded.
9-01-02 TOP 9-01-02 TOP
Stickframeroofatbump
HGUS26-2 HGUS26-2
HGUS28-2
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26Padoutgableendasneeded
HGUS26-2
HGUS26-2
Frametoroofdeck
HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26Framertobuildwallwithwindow
in front of vertical truss member.HTU26 HTU26
HTU26
Ladder
frame
TG01T01T03TG02T04T05TG03T06
GE01
GE02 GE02
TG04
GE03 GE04
T11
T12
TG05
T14 T15 T16TG06GE05GE05GE07GE07GE08 GE09 MG01MG01TG07
TG08 GE10T23T25GE06T18GE11GE12
GE13
GE13
GE14
T29V01V02V03V04V05V06V07V08V09V10V11V12 V13V14V15PBE01 PBE02 PB03 PB04 PBE06PBE07
PBE08 PBE03 T02(5)T07(4)T08(4)M01(4)T09(2)T10(4) T13(5)T16(3)T17(3)
M02(2)
T20(5)T22(2)T24(2)T26(6)T26(6)T27(4)T28(4)PB01(2)PB01(6)PB01(2)PB05(7)
PB06(23)PB07(6)PB07(6)PB08(6) PB09(5)PB02(12)T19(3)
T22(2)
M03(3)
M03(3)
M04(3)
PB10(11)
25-11-0010-00-0012-00-00 1-08-00 36-08-00 5-00-00 13-04-00 10-11-00 1-08-00 18-08-00 2-08-001-08-0020-00-00 19-11-00 37-08-00 10-00-00
25-07-006-09-00 8-08-00 34-11-00 30-07-0016-00-00
15-04-00
9-11-0011-01-00
15-08-008-08-00 13-03-00 2-04-0024-00-00 4-07-00 11-01-00 49-07-0027-00-10
3-11-068-05-04 13-09-04 8-05-04 IRC2006TPI2002 ®¯TLL- °¯TDL- °¯BDLWedgewoodBuildingCompany
MeierResidence 294Westvale 1/4"=1'November20,2019
PH B19903276CUSTOMER:LOCATION:MODEL:JOB#:
DATE:DESIGNER: DESIGNINFORMATION: SCALE:9028OldSR67South
Mooresville,IN46158
(317)834-5380Truss Placement Guide
1) This layout is intended for the purpose of truss location
and placement only. Refer to the building plans for actual
building construction.
2) All dimensions shown 00-00-00 are in feet-inches-sixteenths.
3) Trusses are spaced 24" on center unless otherwise noted.
4) Do not cut or modify trusses.
5) Refer to the individual truss design drawings for the location
of member bracing, uplift and truss end reactions.
6) Installation of all temporary and permanent bracing is
essential. See truss drawings, BCSI-B2 Summary Sheet
and building designer requirements.
7) Non-bearing walls may not be shown on layout.
12/03/19
Mike Sheeks