HomeMy WebLinkAboutA3.0-3 Furniture Plan- 3rd Floor3RD FLOOR KEY PLAN
ST.�IF
H2
H
�
�.iEN
��
i' ��
N�OMB�
334
ELE:
339
� �
L� L�
�
342
�
L� v
311
_ �
345
�� �� ���
333
�����i
��
330
`
<
� �
301
/
/
/
s
�
�
I
� 320
�!
�
o s ,a zo
��
L•J
ST'.IF
#3
] 1
�
NORTH
� LAW SUITE (325)
i��i TRAVELERS SUITE (300)
FURNITURE PLAN NOTES:
• REFERENCE SHEET G0.0 AND G0.1 FOR APPLICABLE GENERAL NOTES,
SPECIFICATIONS AND ALTERNATES.
• BULLETED NOTES ARE GENERAL CONDITIONS REpUIRED FOR THE PLAN.
NUMBEFED NOTATIONS FEFEFENCESPEQFlC LOCATIONS ON THE DFAWINGS.
• EXISTING CONDITION INFORMATION HAS BEEN BASED ON AS-BWLT DRAWINGS.
CONTRACTOR TO FIELD VERIFV ALL EXISTING CONDITIONS PRIOR TO PRICING
AND CONSTFUCTION. COOFDINATEANV DISCFEPANQES WITH itlGFOUP.
• CUBICLE PANEL, COMPONENTAND ELECTRICAL MSTALLATION TO BE
COMPLETED DURING NORMAL BUSINESS HOURS. ELECTRICIAN TO BE ON HAND
TO HOOK UP FURNITURE WHIPS AS PANELS ARE INSTALLED. GC TO ENSUPE
CABLING IS ROUGHED IN AND READV AT JUNCTION LOCATIONS FOR CABLE
VENDOR TO PLACECABIJNG IN FURNITURE PANELS DURING FRAMEASSEMBLV.
COORDINATE SCHEDULE WITH CBRE PROJECT MANAGER.
• SPACE WILL BE OCCUPIED DURING ALTERATIONS. CONTRACTOR TO PROVIDE A
BARRIER AT AREA OF WORK TO CONTROL NOISE AND Dl1ST.
• ANV WORK THAT HAS THE POTENTIAL TO DISRUPT NORMAL BUSINESS ACTIVI71'
MUST BE PEFFOFMED OUTSIDE NOFMAL BUSMESS HOUFS. COOFDINATE WITH
CBRE PROJECT MANAGER FOR CONFIRMATION.
• FURNITURE SHOW N IS FOR GC INFORMATION ONLV AND IS NOT IN THE
CONSTFUCTION CONTFACT, U.O.N.
• SVSTEM Fl1RNITl1RE TO BE PROVIDED M STEELCASE "ANSWER" PROVIDED AND
INSTALLED BV TRAVELER'S FURNITURE VENDOR.
• ALL FUFNITUFE, STOFAGE, E�UIPMENT AND SFATING PFOVIDED BV
CBRE/TRAVELERS AND SHOWN FOR W FORMATION ONLV.
• ALL FURNITURE IS EXISTING UAN. AND IS SHOWN LIGHTER.
• PPOVIDE A QEAP PATH OF 36" MINIMUM BENJEEN ALL FUPNITUPE, FlXTUPES
AND EpUIPMENT, U.O.N.
• RELOCATION OF ANV EpUIPMENT TO BE COORDINATED WITH CBRE PROJECT
MANAGERANDTENANT.
OO FURNITURE PLAN KEYNOTES
USED H NOTE
1 EpWPMENT ITEM (MFD/COPIER) TO BE RELOCATED FROM ELSEWHERE IN
THE BWLDING. COORDINATE EpUIPMENT RELOCATION WITH CBRE
PROJECT MANAGER.
� AIR
#1
�
1
/
/
FURNITURE PLAN - 3RD FLOOR
:lIAI F 1/pu = �ifu
PPOJELT COOPDINATOP� DESIGN CONSULTANT
/
1 %
id
2fi41 IRVING BLVD.
DALLA$ TEXAS �520�
TEL: 214-638-6800
AFCNIiECii ErvG W EEF
;+'PP� . D:..M�'�''•.
J�Q, , P�G\ST EFFQ -92:
� I� No. AR11800034 �! �
aRo�eci No.:
DRAWN BY'.
CHECKEDBY:
TRAVELERB PROJECTY:
10.14.19
ms oao
MPNP
HN/NC/CM
P18 0312
�—� L1
n�1
�^
�
�
�
�
�
�
INDIANAPOLIS
SEVEN PARKWOOD
CROSSING
280 E. 96TH STREET
1ST, 2ND, & 3RD FLOOR
INDIANAPOLIS, IN 46240
NO. REVISIONS'. DATP.
3RD FLOOR ROOM SCHEDULE
ROOM ROOM NAME ROOM ROOM NAME ROOM ROOM NAME ROOM ROOM NAME
NUMBER NUMBER NUMBER NUMBER
301 qECEPTION 313 OPENAFEA 325 OFFICE 33l OFFlCE
302 CONFERENCEROOM 314 OPEANAREA 326 OPENAREA 338 OFFICE
303 CABLE CLOSET 315 OFFICE 32] OPEN AREA 339 OPEN AREA
304 CORRIDOR 316 CONFERENCEROOM 328 OFFICE 340 OFFICE
305 COPV/WOFKAFEA 31� OFFICE 329 OFFICE 341 OFFICE
306 OPENAREA 318 OPENAREA 330 RECEPTION 342 OPENAREA
319 OFFICE 331 CONFERENCE ROOM 343 OFFICE
RELEASEDFORCONSTRACTION szo oPeNnaen ssz conraoser saa oFFice
Su6jec��ocompliancewithallregula�ions 321 OPENAFEA 333 OPENAFFA 345 COPVAFEA
ofSla�eantlLocalCodes 322 CONFERENCEROOM 334 GOPV�INORKAREA 346 CONFERENCEROOM
CilyofCarmel 323 OFFICE 335 BREAKROOM 34� OFFICE
�� � I 324 OFFIOE 336 OFFIOE
`��¢m�' lamn�M�
1
onrE: 12/09/19
6_ i �
rL�
s�-�■
�L�
il�
30l
1 µ �� � .
�� �
�1 �'�
I I
� .
�II .O. .O.
� . . . . ��
� ��
(� � �) (� 0 �) (�
6� —� �
��
� � Pw�
306 j � e
U � �
L�
�� L �
� g �
. �� � Q �
-�- �
� �
—L_ n
34]
303
\ ^ �i
Y�'
332 � 346
304
302 �
� � 305
� ��
,
/ / /
�I�II��
�
�1
314
�� �
W
uc —1 ■ ��
309 � I�
�
� �� ��
_� 6-i �
� 321 il
L� I_I mn
� �
sL� �I I �
sl I � �I I �
n � �
� � �
LAN�LOR�REVIEWISSUE�ATE 10]4]9
TENANT REVIEWISSUE DATH 1008.19
a�o�ss�EOArE ,o,4,s
vERMiTissuE onTE: io.in.is
CONSTRUCTIONISSUEDATH %%�%%2019
�RAWING TITLE:
FURNITURE PLAN - 3RD FLOOR
DRAWING NUMBER.
A3.0-3
�O 2019 idGROUP, LLC