Loading...
HomeMy WebLinkAboutA7.0 Door Schedules, Sections, & DetailsPROJECT COORDINATOR/ DESIGN CONSULTAM �4) 12 GA. SPLAV WIRES AT A MAX. OF 45° FFOM HORIZONTAL AT 4'-0" OG. MAX PERPENDICULAP TO EACH OTHER CEILING SVSTEM AS SGHEDULED PAPTITIONASSCHEDULED -- 3625200-43 MTL STUD HEADER FASTENEDTO Sl1SPENDED CEILING SVSTEM W/ (2) #8 SMS @ EAGH GEILING TEE, 4'-0" O.G. MAX DOOR AS SCHEDULED FRAMEASSCHEDULED BACK TO BACK STUD', PEF PAFTITION TVPE � I O / JAMB � N� � _� O HEAD DOOP AS SGHEDULED --- FRAMEAS SGHEDULED 1/4" GLEAF s TEMPERED GLASS O JAMB-DOOR /SIDE LITE DOOR HEAD/JAMB DTL O � SCALE: 3'• = 1'-0'• DOOR SCHEDULE - 1 ST FLOOR SIZE MATERIAL 1YPE HW REMARKS � W HT DR FR DR FR GLASS SET ROOM NAME 1-1 3'-0" 8'-4" GL/AL AL B 1 TEMP SET1C T�INING � 5 12 ROOM b2 3'-0'• 8'-4" GUAL AL 6 1 TEMP SET1C TRAINING 1.5.12 ROOM 13 3'-0" 8'-0" SGWD AL A 1 - SET1 HUDDLEFOOM 3,5,13 1-4 3'-0'• 8'-4" GL/AL AL 6 1 TEMP SET1 CONFERENCE 1.5 ROOM DOOR SCHEDULE - 2ND FLOOR SIZE MATEFIAL iVPE HW REMARKS � W HT DR FR DR FR GLASS SET FOOM NAME 2-1 3'-0" e'-4" SCWD AL A 1 - SE� MAIL ROOM 3. J, /, 8.9. �3 PAIR EVIDENCE 22 30 8'-4'• SCWD AL C 2 - SET10 CLOSET 3,5,13 23 3'-0" 8'-4" SGWD AL A � _ SET CONFERENCE 2,],8,9,10, 11C ROOM 13,14 24 3'-0" 8'-4" SCWD AL A 1 - SET2 HROFFICE 2,10,13 2-5 3'-0" 8'-4" SCWD AL A 1 - SEf BC VESTIBULE 4, 5, ], 8, 9, 13 26 3'-0" e'-4" SCWD AL A 1 - S2G VESTIBULE 45,13 2-9 3'-0'• 8'-4'• SCWD AL A 1 - SET3C GIVE-BACK �� ENTM DOOR SCHEDULE - 3RD FLOOR SIZE MATEPIAL NPE HVy REMARKS � W HT DR FR DR FR GLASS SET ROOM NAME 3-1 3'-0" 8'-4" SCWD AL A 1 - SET 2 MOTHER'S 5, 13, 15 ROOM 3-2 3'-0" 8'-4" SCWD AL A 1 - SEf 3 STORAGE 3, 5, 13 33 3'-0" 8'-0" SCWD AL A 3 TEMP SEfBC RE LEnP�ON- 5,6,�,8,9 3-4 3'-0'• 8'-0" SCWD AL A 1 - SE� SAFEROOM �a�14'9,10, DOOR REMARKS 1 qEUSESTOFEFFONTD00FANDFFAMEASSEMBLVFFOMDEMOLITIONSTOFAGETOUGHUP DOORANDFRAMETO"LIKENEW"CONDITION. GCTOENSURETHATHARDWAREISINPROPER WORKINGORDERANDCOMPLIESWITHLISTEDHARDWARESET. UPGRADEASREpUIRED. 2 DOORANDFRAMEASSEMBLVTOREMAIN.TOUCHUPFRAMETO"LIKENEW'CONDITIONAND REPAINT DOOR AS SCHEDULED, U ON. 3 REl1SEDOORANDFRAMEASSEMBLVFROMDEMOLITIONSTORAGE.TOl1CHl1PFRAMETO"LIKE NEW"CONDITIONANDREPAINTDOORASSCHEDULED. GCTOENSURETHATHARDWAREISIN PROPERWORKINGOROERANDCOMPLIESWITHLISTEDHAPDWARESET. UPGPADEAS REpUIRED. 4 GGTOPFOVIDENEW20MINFATEDDOOFANDFRAMEASSEMBLV. DOOFANDFFAMETO MATCH BUILDING STANDARD. DOOR TO BE PREPPED TO BE PAINTED AS SCHEDl1LED. 5 CONFIRMWALLTHICKNESSANDLOCATIONSWHERENEWAND/ORRELOCATEDDOORAND FFAME AFE BEING INSTALLED. A0.1UST THFOAT SRE OF FFAME TO FlT WALL AS SGHEDULED. 6 NEW DOOR WITH INTEGRAL SIDE-LITE TO MATCH EXISTING LAW SWTE DOORS WITH INTEGRAL SIDELITES. FINISHOFDOORANDSIDELITETOBEPAINTEDASSCHEDULED. REFERENCE SHEET SERIES A2.5 FOR ADDITIONAL INFORMATION. � CARD READER TO HAVE FAIL SAFE RELEASE IN CASE OF EMERGENCV. e TRAVELERSSEGURINVEN�ORTOPROVIOEANDINSTALLALLSECURINDEVICESANDSHALL FlELD PREP ALL RELOCATED DOORS AND FRAMES TO RECENE NEW AND/OR RELOCATED SECURITV HARDWARE. GC TO PROVIDE LOCKSET HARDWAREAND OTHER NON SECURITY RELATEDHARDwAREITEMSASSGHEOULEo. GCSHALLENSURETHATCODECOMPLIANT RELEASESENSORSAREMSTALLED. REFERENCESHEEfSERIESA22,SECURITVDRAWINGS AND ENGINEERING DRAWINGS FOR ADDITIONAL INFORMATION. 9 NEW�OORANOFRAMETOaEFACTORVPREPPEOFORNEWAN��ORRELOCATEDSECURITV HARDWARE REFERENCESHEEfSERIESA22,SECURITVDPAWINGS,ANDENGMEERING DRAWINGS FOR ADDITIONAL INFORMATION. 10 GC TO MOOIFV EXISTING HAROWARE AS NEEOEo TO GOMPLV WITH uSTED HARDWARE SET. GC TO ENSURETHAT FlNAL MSTALLATION IS IN PROPER WORKING ORDER. 11 HLLOC�ILUIJOOH�NUINMALASSW6LY106LIOl1CIILIJUPlO'LIKLNLW'CON�IIIO�.GCIO FNSURF THAT HAF[JWARF IS IN PROPFR WORKWG ORDFR A�[J COMPIJFS WITH IJSTF[J FAFOWARP SET. UPGRHDEASREOUIRED. �� FEFEFENGEALTEFNATE#AINOTEDONSHEETGOAFOFADDITIONALMFOFMATION. 13 TENANT SIDE OF ENTRV DOORS AND ALL SIDES OF DOORS FULLV WITHM TENANT SUITE TO BE PREPPEDANDPAINTED"PT-8". REFERENCESHEETSERIESA25FORFINISHSCHEDULE. 14 GC TO PATCH �OOR WHERE PREVIOUS HARDWARE WAS REMOVED PRIOR TO REPAINTING DOOR AS SCHEDULED. 15 GC TO PROVIDE NEW DOOR AND FRAME ASSEMBLV TO MATCH EXISTING ON SITE. DOOR TO BE PREPPEo TO REGENED NEW PAINT FINISH AS SCHEDULED. DOOR TYPE SCHEDULE � 3 0' � � 3 0' � � 3 0' X 3'-0" � NOTES: 1) REFERENCE DOOR SCHEDULE FOR SRES AND MATERIALS (TVP.) 2) REFERENCE GENERAL HARDWARE NOTES AND SCHEDULE. 3) ALL VISION PANEL GLAZING TO BE TEMPERED GLASS �•) DOOR FRAME TYPE SCHEDULE 2• 2• 2 N�� � N�� a' a B/A]. - 01B/A]0 � � 1 2�. 2. 2�. 2�. � �� ��� o ��� i� a� �" , 0 6 0 � � - 01B/A1D 01C/A1D �� � z � � m¢ �/ � 0 �j 2 3 HARDWARE SCHEDULE ITEM DESCRIPTION 1C 2 3 3C 8C 10 11C 12C (2) PAIR BWLDING STD, BALL BEARING HINGES p) ROOF STOP BLDG.STD.FRAMESILENCERS PASSAGE SET - SINGLE DOOR (2) PAIR BWLDING STD, BALL BEARING HINGES p) FLOOR STOP BLDG.STANDARD CLOSER BLDG. STD. FRAME SILENCERS LOCK SET - ENTRANCE/OFFICE - �THUMB TURN INSIDE) SINGLE DOOR (2) PAIF BUILDING STD., BALL BEAFING HINGES (1) FLOOR STOP BLDG.STD.FRAMESILENCERS LOCK SET - STOREROOM - SINGLE DOOR (2) PAIR BWLDING STD., BALL BEARING HINGES (1) FLDOR STOPS BLDG.STD.FFAMESRENGEFS LOCK SET - STOREROOM - SINGLE DOOR (2) PAIR BWLDING STD., BALL BEARING HINGES p) ROOR STOPS BLDG.STD.CLOSER BLDG. STD. FRAME SILENCERS LOCKSET-STOREROOM LOCKSET-SINGLE DOOR �2) PAIR BUILDING STD., BALL BEARING HINGES (1) ELECTRIC STRIKE (1) LATCH al1ARD (1) FLDOR STOP (1) GAFD FFADEF (1) DOOR CONTACT (1) REpUEST TO EXIT (PJA. DEVICE) BLDG.STD.CLOSER BLDG.STD.FRAMESRENCERS LOCK SEL STOREROOM - DOl1BLE DOOR (1) DUMMV SET (4) PAIR BUILDING STD., BALL BEARING HINGES (1) MANUAL RUSH BOLTS (1) FLDOR STOPS BLDG.STD.FRAMESILENCERS LOCKSET-STOREROOM LOCKSET-SINGLE DOOR (2) PAIF BUILDING STD., BALL BEAFING HINGES (1) ELECTRIC STRIKE (1) FLDOR STOP (1) GAFD FFADEF (1) DOOR CONTACT (1) REpUEST TO EXIT (PJA. DEVICE) BLDG.STD.GLOSEF BLDG.STD.FRAMESRENCERS LOCK SET - STOREROOM - SINGLE DOOR (2) PAIR BWLDING STD., BALL BEARING HINGES �1) FLOOR STOPS BLDG.STD.CLOSER BLDG.STD.SMOKESEAL GENERAL HARDWARE NOTES TENANT SEGUFITV VENDOF IS TO PFOVIDE ALL ASSOGIATED SEGUFIiV HAFDWAFE AS FOLLOWS, UAN. (L4TCH GUARDS, CARD RE4DERS, ELECTRIC STRIKES, DOOR CONTACTS,REpUESTTOEXITHARDWARE). GCSHALLTOPROVIDEALLOTHER HADWARE AS LISTED IN THE HARDWARE SCHEDULE. THE GENERAL CONTRACTOR SHALL SALVAGE HARDWARE FROM DEMO. IF ADDITIONAL HARDWARE IS NEEDED, GC SHALL PROVIDE AND INSTALL NEW TO MATGH BUILDINGSTANDAFD. THE GENERAL CONTRACTOR TO VERIFY ALL HARDWARE SETS MATCH BUILDING STANDARDS PRIOR TO CONSTRUCTION WITH CBRE PROJECT MANAGER. IN THE EVENT THE HARDWAPE SEfS DO NOT MATCH BUILDING STANDARDS, COOPDINATE WITH CBRE PROJECT MANAGER. GC SHALL VERIFY AND ENSl1RE ALL HARDWARE FIN ISHES MATCH THROl1GHOl1T SCOPEOF WORKAREA, BOTH EXISTINGAND NEW HARDWARE.IN THE EVENTTHAT DIFFEFENT FlNISHES AFE FOUND GOOFDINATE WITH GBFE PFOJEGT MANAGEF BEFORE PROCEEDING. HARDWARE TO BE SCH LAGE ND SERIES "SPARTA" LEVER 1YPE, UAN. (FINISH: TO BE SATIN GHFOME HMaES (HAa) HAQER PIVOTS (RIX) RIXSON ROOF GLOSEFS (FIX) FIXSON KEY SVSTEM TO MATCH BUILDING STANDARDS LOCKS/LATCHSETS (SCH) SCHLAGE EXIT DEVICES (VON) VON DUPPIN CLOSERS�LCN)LCN AUTO F W SH BOLTS (GLV) GLVNN-JOHNSON COORDINATORS (GLh GLVNNJOHNSON SRENGEFS�GLV)GLVNN-JOHNSON KICK PL4TES (IVE) IVES STOPS&HOLDEPS�POC)POCkW00D OVEFHEAD STOPS (GLV) GLVNN-JOHNSON THRESHOLDS(PEM)PEMKO SEALS & BOTTOMS (PEM) PEMKO VEPIFV LOCKS, KEVS AND CVLINDEP PPOVIDED WILL COMPLV W ITH BUILDING STANDARD. COORDINATE KEYING WITH CBRE PROJECT MANAGER. CLOSERS TO BE ADJUSTED TO MEET ACCESSIBILIIY GUIDELINES: DOOP SHALL CLOSE FPOM AN OPEN POSITION OF ]0 DEGREES TO A POINT 3" FPOM LATCH IN A MINIMUM OF (3) THREE SECONDS AND SHALL REpUIRE A MAXIMUM OF (5) POUNDS OF FORCE (L6� TO OPEN. DOOP CLOSEPS SHALL BE A0.IUSTED SO THAT FPOM AN OPEN POSITION OF 90 DEGREES, THE TIME TO MOVE DOOR TO A POSITION OF 12 DEGREES FROM THE LATCH IS (5) FNE SECONDS MINIMl1M. ALL LEVER HARDWARE TO BE LOCATED AT 403/4" O.C, UAN. GC IS RESPONSIBLE FOR KEYING OF HARDWARE CBRE TO PROVIDE KEYING PLAN FOR ALL NEW AND/OR REl1SED LOCKSETS. THEGC MUST COORDINATE WITH BWLDING MANAGEMENT FOR MASTER KEVAND GFAND MASTEF KEV SVSTEM GOMPLIANGE. ALLNEW KEVINGTO MATCH EXISTING LOCKSETS ON SITE. ALL NEW SUITE ENTRV DOORS TO'GIVE BACK" SUITES TO BE KEVED TO BWLDING GFAND MASTEF SVSTEM. ALL NEW LOCKSEfS WITH W TENANT S WTE TO BE KEYED TO TENANT MASTER AND BWLDING GRAND MASTER. SUB LEVEL KEVING TO BE PROVIDED FOP ALL OFFICE AND SECURED STORAGE ROOM LOCKSETS. GC TO PROVIDE A MINIMUM OF (3) TENANT MASTER KEVS. CONFIRM WITH CBRE PPOJECT MANAGEP IF ANV ADDITIONAL KEVS WILL BE NEEDED. / 1 / id 2641 IRVING BLVD. �ALLAS,TEXAS 75207 TEL 214-fi38-fi800 APCHITECT/ ENGWEEP ::�PPy.9 MC •'• .UQ, .,���sreaF. _9�< e O � ! No. AR11800034 "': � S NL01� i vRo�Ecirvo.: �RAWN BY: CHECKED BY'. iRnvE�ER'svRo�Ecitt: r='i I � L/ �n �l � �J � � � � INDIANAPOLIS r 10.14.19 nns-oso MPMP HN/KGCM P18 0312 SEVEN PARKWOOD CROSSING 280 E. 96TH STREET 1 ST, 2ND, & 3RD FLOOR INDIANAPOLIS, IN 46240 NO. REVISIONS: DATE. LANDLORDREVIEWISSUEDATE_ 10.10.19 TENANT REVIEW ISSUE DATE'. 10.08.19 BI�ISSUE�ATE 10]4]9 PERMITISSUEDATE 101019 CONSTRUCTIONISSUEDATE'. %%/%%/2019 liii��:��i������,���i{����i�������i Su6jec� �o compliance with all regula�ions of Sla�e antl Local Codes City of Carmel �i `��¢m�' lamn�MNi� onrE: 12/09/19 DRAwiNG TiTLE�. DOOR SCHEDULES, SECTIONS, & DETAILS DRAW ING NUMBER: A7.0 OO 2019 idGROUP, LLC ii B C