HomeMy WebLinkAboutA7.0 Door Schedules, Sections, & DetailsPROJECT COORDINATOR/ DESIGN CONSULTAM
�4) 12 GA. SPLAV WIRES AT
A MAX. OF 45° FFOM
HORIZONTAL AT 4'-0" OG.
MAX PERPENDICULAP TO
EACH OTHER
CEILING SVSTEM AS
SGHEDULED
PAPTITIONASSCHEDULED --
3625200-43 MTL STUD HEADER
FASTENEDTO Sl1SPENDED
CEILING SVSTEM W/ (2) #8 SMS @
EAGH GEILING TEE, 4'-0" O.G. MAX
DOOR AS SCHEDULED
FRAMEASSCHEDULED
BACK TO BACK STUD',
PEF PAFTITION TVPE
� I O
/ JAMB
� N�
� _�
O HEAD
DOOP AS
SGHEDULED
--- FRAMEAS
SGHEDULED
1/4" GLEAF
s TEMPERED GLASS
O JAMB-DOOR
/SIDE LITE
DOOR HEAD/JAMB DTL
O � SCALE: 3'• = 1'-0'•
DOOR SCHEDULE - 1 ST FLOOR
SIZE MATERIAL 1YPE HW REMARKS
� W HT DR FR DR FR GLASS SET ROOM NAME
1-1 3'-0" 8'-4" GL/AL AL B 1 TEMP SET1C T�INING � 5 12
ROOM
b2 3'-0'• 8'-4" GUAL AL 6 1 TEMP SET1C TRAINING 1.5.12
ROOM
13 3'-0" 8'-0" SGWD AL A 1 - SET1 HUDDLEFOOM 3,5,13
1-4 3'-0'• 8'-4" GL/AL AL 6 1 TEMP SET1 CONFERENCE 1.5
ROOM
DOOR SCHEDULE - 2ND FLOOR
SIZE MATEFIAL iVPE HW REMARKS
� W HT DR FR DR FR GLASS SET FOOM NAME
2-1 3'-0" e'-4" SCWD AL A 1 - SE� MAIL ROOM 3. J, /, 8.9. �3
PAIR EVIDENCE
22 30 8'-4'• SCWD AL C 2 - SET10 CLOSET 3,5,13
23 3'-0" 8'-4" SGWD AL A � _ SET CONFERENCE 2,],8,9,10,
11C ROOM 13,14
24 3'-0" 8'-4" SCWD AL A 1 - SET2 HROFFICE 2,10,13
2-5 3'-0" 8'-4" SCWD AL A 1 - SEf BC VESTIBULE 4, 5, ], 8, 9, 13
26 3'-0" e'-4" SCWD AL A 1 - S2G VESTIBULE 45,13
2-9 3'-0'• 8'-4'• SCWD AL A 1 - SET3C GIVE-BACK ��
ENTM
DOOR SCHEDULE - 3RD FLOOR
SIZE MATEPIAL NPE HVy REMARKS
� W HT DR FR DR FR GLASS SET ROOM NAME
3-1 3'-0" 8'-4" SCWD AL A 1 - SET 2 MOTHER'S 5, 13, 15
ROOM
3-2 3'-0" 8'-4" SCWD AL A 1 - SEf 3 STORAGE 3, 5, 13
33 3'-0" 8'-0" SCWD AL A 3 TEMP SEfBC RE LEnP�ON- 5,6,�,8,9
3-4 3'-0'• 8'-0" SCWD AL A 1 - SE� SAFEROOM �a�14'9,10,
DOOR REMARKS
1 qEUSESTOFEFFONTD00FANDFFAMEASSEMBLVFFOMDEMOLITIONSTOFAGETOUGHUP
DOORANDFRAMETO"LIKENEW"CONDITION. GCTOENSURETHATHARDWAREISINPROPER
WORKINGORDERANDCOMPLIESWITHLISTEDHARDWARESET. UPGRADEASREpUIRED.
2 DOORANDFRAMEASSEMBLVTOREMAIN.TOUCHUPFRAMETO"LIKENEW'CONDITIONAND
REPAINT DOOR AS SCHEDULED, U ON.
3 REl1SEDOORANDFRAMEASSEMBLVFROMDEMOLITIONSTORAGE.TOl1CHl1PFRAMETO"LIKE
NEW"CONDITIONANDREPAINTDOORASSCHEDULED. GCTOENSURETHATHARDWAREISIN
PROPERWORKINGOROERANDCOMPLIESWITHLISTEDHAPDWARESET. UPGPADEAS
REpUIRED.
4 GGTOPFOVIDENEW20MINFATEDDOOFANDFRAMEASSEMBLV. DOOFANDFFAMETO
MATCH BUILDING STANDARD. DOOR TO BE PREPPED TO BE PAINTED AS SCHEDl1LED.
5 CONFIRMWALLTHICKNESSANDLOCATIONSWHERENEWAND/ORRELOCATEDDOORAND
FFAME AFE BEING INSTALLED. A0.1UST THFOAT SRE OF FFAME TO FlT WALL AS SGHEDULED.
6 NEW DOOR WITH INTEGRAL SIDE-LITE TO MATCH EXISTING LAW SWTE DOORS WITH INTEGRAL
SIDELITES. FINISHOFDOORANDSIDELITETOBEPAINTEDASSCHEDULED. REFERENCE
SHEET SERIES A2.5 FOR ADDITIONAL INFORMATION.
� CARD READER TO HAVE FAIL SAFE RELEASE IN CASE OF EMERGENCV.
e TRAVELERSSEGURINVEN�ORTOPROVIOEANDINSTALLALLSECURINDEVICESANDSHALL
FlELD PREP ALL RELOCATED DOORS AND FRAMES TO RECENE NEW AND/OR RELOCATED
SECURITV HARDWARE. GC TO PROVIDE LOCKSET HARDWAREAND OTHER NON SECURITY
RELATEDHARDwAREITEMSASSGHEOULEo. GCSHALLENSURETHATCODECOMPLIANT
RELEASESENSORSAREMSTALLED. REFERENCESHEEfSERIESA22,SECURITVDRAWINGS
AND ENGINEERING DRAWINGS FOR ADDITIONAL INFORMATION.
9 NEW�OORANOFRAMETOaEFACTORVPREPPEOFORNEWAN��ORRELOCATEDSECURITV
HARDWARE REFERENCESHEEfSERIESA22,SECURITVDPAWINGS,ANDENGMEERING
DRAWINGS FOR ADDITIONAL INFORMATION.
10 GC TO MOOIFV EXISTING HAROWARE AS NEEOEo TO GOMPLV WITH uSTED HARDWARE SET. GC
TO ENSURETHAT FlNAL MSTALLATION IS IN PROPER WORKING ORDER.
11 HLLOC�ILUIJOOH�NUINMALASSW6LY106LIOl1CIILIJUPlO'LIKLNLW'CON�IIIO�.GCIO
FNSURF THAT HAF[JWARF IS IN PROPFR WORKWG ORDFR A�[J COMPIJFS WITH IJSTF[J FAFOWARP
SET. UPGRHDEASREOUIRED.
�� FEFEFENGEALTEFNATE#AINOTEDONSHEETGOAFOFADDITIONALMFOFMATION.
13 TENANT SIDE OF ENTRV DOORS AND ALL SIDES OF DOORS FULLV WITHM TENANT SUITE TO BE
PREPPEDANDPAINTED"PT-8". REFERENCESHEETSERIESA25FORFINISHSCHEDULE.
14 GC TO PATCH �OOR WHERE PREVIOUS HARDWARE WAS REMOVED PRIOR TO REPAINTING
DOOR AS SCHEDULED.
15 GC TO PROVIDE NEW DOOR AND FRAME ASSEMBLV TO MATCH EXISTING ON SITE. DOOR TO BE
PREPPEo TO REGENED NEW PAINT FINISH AS SCHEDULED.
DOOR TYPE SCHEDULE
� 3 0' � � 3 0' � � 3 0' X 3'-0" �
NOTES:
1) REFERENCE DOOR SCHEDULE FOR SRES AND MATERIALS (TVP.)
2) REFERENCE GENERAL HARDWARE NOTES AND SCHEDULE.
3) ALL VISION PANEL GLAZING TO BE TEMPERED GLASS �•)
DOOR FRAME TYPE SCHEDULE
2• 2• 2
N�� � N��
a' a
B/A]. - 01B/A]0
� �
1
2�. 2. 2�. 2�.
� �� ��� o ���
i� a� �"
, 0 6 0
�
�
- 01B/A1D 01C/A1D �� � z
� � m¢
�/ �
0
�j
2 3
HARDWARE SCHEDULE
ITEM DESCRIPTION
1C
2
3
3C
8C
10
11C
12C
(2) PAIR BWLDING STD, BALL BEARING HINGES
p) ROOF STOP
BLDG.STD.FRAMESILENCERS
PASSAGE SET - SINGLE DOOR
(2) PAIR BWLDING STD, BALL BEARING HINGES
p) FLOOR STOP
BLDG.STANDARD CLOSER
BLDG. STD. FRAME SILENCERS
LOCK SET - ENTRANCE/OFFICE - �THUMB TURN INSIDE) SINGLE DOOR
(2) PAIF BUILDING STD., BALL BEAFING HINGES
(1) FLOOR STOP
BLDG.STD.FRAMESILENCERS
LOCK SET - STOREROOM - SINGLE DOOR
(2) PAIR BWLDING STD., BALL BEARING HINGES
(1) FLDOR STOPS
BLDG.STD.FFAMESRENGEFS
LOCK SET - STOREROOM - SINGLE DOOR
(2) PAIR BWLDING STD., BALL BEARING HINGES
p) ROOR STOPS
BLDG.STD.CLOSER
BLDG. STD. FRAME SILENCERS
LOCKSET-STOREROOM LOCKSET-SINGLE DOOR
�2) PAIR BUILDING STD., BALL BEARING HINGES
(1) ELECTRIC STRIKE
(1) LATCH al1ARD
(1) FLDOR STOP
(1) GAFD FFADEF
(1) DOOR CONTACT
(1) REpUEST TO EXIT (PJA. DEVICE)
BLDG.STD.CLOSER
BLDG.STD.FRAMESRENCERS
LOCK SEL STOREROOM - DOl1BLE DOOR
(1) DUMMV SET
(4) PAIR BUILDING STD., BALL BEARING HINGES
(1) MANUAL RUSH BOLTS
(1) FLDOR STOPS
BLDG.STD.FRAMESILENCERS
LOCKSET-STOREROOM LOCKSET-SINGLE DOOR
(2) PAIF BUILDING STD., BALL BEAFING HINGES
(1) ELECTRIC STRIKE
(1) FLDOR STOP
(1) GAFD FFADEF
(1) DOOR CONTACT
(1) REpUEST TO EXIT (PJA. DEVICE)
BLDG.STD.GLOSEF
BLDG.STD.FRAMESRENCERS
LOCK SET - STOREROOM - SINGLE DOOR
(2) PAIR BWLDING STD., BALL BEARING HINGES
�1) FLOOR STOPS
BLDG.STD.CLOSER
BLDG.STD.SMOKESEAL
GENERAL HARDWARE NOTES
TENANT SEGUFITV VENDOF IS TO PFOVIDE ALL ASSOGIATED SEGUFIiV HAFDWAFE
AS FOLLOWS, UAN. (L4TCH GUARDS, CARD RE4DERS, ELECTRIC STRIKES, DOOR
CONTACTS,REpUESTTOEXITHARDWARE). GCSHALLTOPROVIDEALLOTHER
HADWARE AS LISTED IN THE HARDWARE SCHEDULE.
THE GENERAL CONTRACTOR SHALL SALVAGE HARDWARE FROM DEMO. IF
ADDITIONAL HARDWARE IS NEEDED, GC SHALL PROVIDE AND INSTALL NEW TO
MATGH BUILDINGSTANDAFD.
THE GENERAL CONTRACTOR TO VERIFY ALL HARDWARE SETS MATCH BUILDING
STANDARDS PRIOR TO CONSTRUCTION WITH CBRE PROJECT MANAGER. IN THE
EVENT THE HARDWAPE SEfS DO NOT MATCH BUILDING STANDARDS, COOPDINATE
WITH CBRE PROJECT MANAGER.
GC SHALL VERIFY AND ENSl1RE ALL HARDWARE FIN ISHES MATCH THROl1GHOl1T
SCOPEOF WORKAREA, BOTH EXISTINGAND NEW HARDWARE.IN THE EVENTTHAT
DIFFEFENT FlNISHES AFE FOUND GOOFDINATE WITH GBFE PFOJEGT MANAGEF
BEFORE PROCEEDING.
HARDWARE TO BE SCH LAGE ND SERIES "SPARTA" LEVER 1YPE, UAN. (FINISH: TO
BE SATIN GHFOME
HMaES (HAa) HAQER
PIVOTS (RIX) RIXSON
ROOF GLOSEFS (FIX) FIXSON
KEY SVSTEM TO MATCH BUILDING STANDARDS
LOCKS/LATCHSETS (SCH) SCHLAGE
EXIT DEVICES (VON) VON DUPPIN
CLOSERS�LCN)LCN
AUTO F W SH BOLTS (GLV) GLVNN-JOHNSON
COORDINATORS (GLh GLVNNJOHNSON
SRENGEFS�GLV)GLVNN-JOHNSON
KICK PL4TES (IVE) IVES
STOPS&HOLDEPS�POC)POCkW00D
OVEFHEAD STOPS (GLV) GLVNN-JOHNSON
THRESHOLDS(PEM)PEMKO
SEALS & BOTTOMS (PEM) PEMKO
VEPIFV LOCKS, KEVS AND CVLINDEP PPOVIDED WILL COMPLV W ITH BUILDING
STANDARD. COORDINATE KEYING WITH CBRE PROJECT MANAGER.
CLOSERS TO BE ADJUSTED TO MEET ACCESSIBILIIY GUIDELINES:
DOOP SHALL CLOSE FPOM AN OPEN POSITION OF ]0 DEGREES TO A POINT 3" FPOM
LATCH IN A MINIMUM OF (3) THREE SECONDS AND SHALL REpUIRE A MAXIMUM OF
(5) POUNDS OF FORCE (L6� TO OPEN.
DOOP CLOSEPS SHALL BE A0.IUSTED SO THAT FPOM AN OPEN POSITION OF 90
DEGREES, THE TIME TO MOVE DOOR TO A POSITION OF 12 DEGREES FROM THE
LATCH IS (5) FNE SECONDS MINIMl1M.
ALL LEVER HARDWARE TO BE LOCATED AT 403/4" O.C, UAN.
GC IS RESPONSIBLE FOR KEYING OF HARDWARE CBRE TO PROVIDE KEYING PLAN
FOR ALL NEW AND/OR REl1SED LOCKSETS.
THEGC MUST COORDINATE WITH BWLDING MANAGEMENT FOR MASTER KEVAND
GFAND MASTEF KEV SVSTEM GOMPLIANGE.
ALLNEW KEVINGTO MATCH EXISTING LOCKSETS ON SITE.
ALL NEW SUITE ENTRV DOORS TO'GIVE BACK" SUITES TO BE KEVED TO BWLDING
GFAND MASTEF SVSTEM.
ALL NEW LOCKSEfS WITH W TENANT S WTE TO BE KEYED TO TENANT MASTER AND
BWLDING GRAND MASTER.
SUB LEVEL KEVING TO BE PROVIDED FOP ALL OFFICE AND SECURED STORAGE
ROOM LOCKSETS.
GC TO PROVIDE A MINIMUM OF (3) TENANT MASTER KEVS. CONFIRM WITH CBRE
PPOJECT MANAGEP IF ANV ADDITIONAL KEVS WILL BE NEEDED.
/
1 /
id
2641 IRVING BLVD.
�ALLAS,TEXAS 75207
TEL 214-fi38-fi800
APCHITECT/ ENGWEEP
::�PPy.9 MC •'•
.UQ, .,���sreaF. _9�<
e O
� ! No. AR11800034 "': �
S NL01� i
vRo�Ecirvo.:
�RAWN BY:
CHECKED BY'.
iRnvE�ER'svRo�Ecitt:
r='i
I � L/
�n
�l
�
�J
�
�
�
�
INDIANAPOLIS
r
10.14.19
nns-oso
MPMP
HN/KGCM
P18 0312
SEVEN PARKWOOD
CROSSING
280 E. 96TH STREET
1 ST, 2ND, & 3RD FLOOR
INDIANAPOLIS, IN 46240
NO. REVISIONS: DATE.
LANDLORDREVIEWISSUEDATE_ 10.10.19
TENANT REVIEW ISSUE DATE'. 10.08.19
BI�ISSUE�ATE 10]4]9
PERMITISSUEDATE 101019
CONSTRUCTIONISSUEDATE'. %%/%%/2019
liii��:��i������,���i{����i�������i
Su6jec� �o compliance with all regula�ions
of Sla�e antl Local Codes
City of Carmel
�i
`��¢m�' lamn�MNi�
onrE: 12/09/19
DRAwiNG TiTLE�.
DOOR SCHEDULES,
SECTIONS, & DETAILS
DRAW ING NUMBER:
A7.0
OO 2019 idGROUP, LLC
ii B C