Loading...
HomeMy WebLinkAboutG0.3 SpecificationsSHORT FORM GUIOE SPECIFICATIONS SECTION 00100 DIVISION t - GENERAL REQUIREMENTS GOMMENT'. �IVISION 1 SPEGIFlGNTION SEGTIONS WILL BE PROVI�E� BV GLIENT REPRESENTATNE. SELELTIVE OEMOLITION SELTION 020]0 PART 1 - GENERAL t.t SECTION INCLUDES A. REMOVALANDLEGALDISPOSALOFEXISTWGINTERIORANDEMERIORCONSTRUCTION ITEMS SPEQFlED TO BE REMOVED AND AS INDIGATED ON THE DRAW W GS. THE WORK INGLUDES, BUT IS NOT LIMITED TO, REMOVAL OF THE FOLLOW W G ITEMS, INGORPORATION OF THESE ITEMS INTO THE PROJEGT ARE NOT PERMITfEO'. i. ExisriNccouNrEas,cnaiNErsnNOFucruaEs. 2 INTERIOR PARTITIONS, �OORSAN� WIN�OWS. 3. FLOOR FINISHESAND BASE, AND CEILING MATERIALS, MCWDING SUSPENSION WIRES AND FRAMING. 4. HVAC,PLUMBINGANDELECTRICALSVSTEMS,INCLUDINGCONDUITSANDCONTROL WIRWG. t 2 PROJEGTGONDITIONS A. OWNER ASSUMES NO RESPONSIBILIry FOR THE AGTUAL GON�ITION OF ITEMS OR sraucruaes ro ae oemousr+eo. rHe oasriNG sraucruae is uNoccuaieo. i a aseesros iNsaecrioN a aeaoar A. IF REQUIRED BV THE ENVIRONMENTAL PROTECTION AGENCV'S "NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS" (NESHAP), PROVIDE THE SERVICES OF AN INSPECTOR TO EVALUATE THE PROJECT SITE FOR THE PRESENCE OF REGULATED ASBESTOS CONTAINING MATERIALS (RACM'S). THE INSPECTOR SHALL BE LAWFULLV QUALIFlED/ CERTIFlED TO PERFORM SUCH INSPECTIONS BV APPLICABLE FEDERAL, STATE AND LOGAL REGULATIONS. PROVIDE A MINIMUM OF TEN (10) WORKWG DAVS NOTIFlGATION TO THE APPROPRIATE OFFlGE OF THE EPA'S ASBESTOS HAZARD MANAGEMENT OEPARTMENT, W HETHER RAGM'S ARE FOUNO TO EXIST OR NOT. UNLE55 orHeawise iNoicnreo, oemourioN oa nanremeNr oF ancm�s wi�� Nor ae iNcwoeo IN THE SCOPE OF WORK. PART 2 - PRODUCTS (NOT APPLICABLE) PART 3 - EXEGUTION 3.1 EXAMINATION A. INSPEGTAREAS IN WHIGH WORK WILL BE PERFORMEO PRIOR TO GOMMENGEMENT OF OEMOLITION WORK. B. LOCATE, I�ENTIFV, STUB-0FF, AN� �ISCONNECT E%ISTING UTILITV AN� SERVICE LINES THAT ARE NOT TO REMAIN. PROVIDE BV-PASS CONNECTIONS AS REQUIRED TO MAINTAIN CONTINUITVOFSERVICETOOTHERAREASOFTHEBUILDING IFNECESSARV. 32 DEMOLITION A. PERFORM DEMOLITION WORK IN A SVSTEMATIC MANNER. USE SUCH METHODS AS REQUIRED TO GOMPLETE THE WORK REQUIRED IN AGGORDANGE WITH REQUIREM ENTS OF GOVERN WG REGULATIONS. B. IF UNANTIGIPATEO UTILITIES, STRUGTURAL ELEMENTS, OR HHZAROOUS MATERIALSARE ENCOUNTERE�, INVESTIGATE AN� MElvSURE BOTH NATURE AN� EXrENT OF THE CONFLICT. SUBMIT REPORT TO THE OWNER IN W RITfEN, ACCURATE �ETAIL PEN�ING RECEIPT OF DIRECTIVE FROM THE OW NER, REHRRANGE SELECTIVE DEMOLITION SCHEDULE AS NECESSARV TO CONTINUE OVERALL JOB PROGRESS W ITHOUT DELAV. Q E%ISTING RESILIENT FLOOR COVERINGS'. COMPLV WITH "RECOMMENDED WORK PRACTICES FOR THE REMOVALOF RESILIEM FLOOR COVERWGS", AS PUBLISHED BVTHE RESILIENTFLOOR GWERWG INSTITUTE EXISTWG RESILIENTFLOOR GWERWG MATERIALS MAV GONTAIN ASBESTOS RBERS THAT ARE NOT REAOILV IOENTIRABLE 00 NOTSANO, ORV SGRAPE, BEAOBlASTOR MEGHANIGALLV PULVERIZE EXISTING RESILIENT FLOORING, BACKING, OR LINING FELTS. 3.3 PROTECTION A. PROVIDE TEMPORARV BARRICADES AND OTHER FORMS OF PROTECTION AS REQUIRED TO PROTECT THE OW NER'S PERSONNEL AND THE PUBLIC FROM INJURV DUE TO DEMOLITION WORK. 3.4 DISPOSAL A. REMOVE DEBRIS, RUBBISH AND OTHER MATERIALS RESULTW G FROM DEMOLITION OPERATIONS FROM BUILDWG SITE TRANSPORT AND DISPOSE OF MATERIALS OFFSRE IN A LEGAL MANNER. a.s c�EnNiNc A. UPON COMPLETION OF DEMOLITION WORK, REMOVE TOOLS, EQUIPMENT AND DEMOLISHED MATERIALS FROM THE SITE. END OF SECTION 020]0 CONCHETE WOHK SECTION 03300 PART 1 � GENERAL i.i secrioN iNcwoes n. aaovioe cnsr�iN�awce coNcaere Foa anrcHwc oF exisnNc F�ooa s�nes, COM PLETE, IN PLACE, AS SPECIFIED HEREIN, AND AS REQUIRED FOR A COMPLETE AND PROPERINSTALLATION. PART2-PRODUCTS 2] MATERIALS A. REWFORGWGBARSASTMA-6L5 GRADE60 DEFORMED. B. WEL�E�WIREFABRIC'.ASTMAL85 WEL�E�STEEL. G PORTIAN� CEMENT'. ASTM C450 TVPE I LOW ALKALI. D. NORMALWEIGHTAGGREGATES�.ASTMC33 CRUSHEDLIMESTONE GRANITEOR EQUIVALENT MATERIAL FROM A SINGLE SOURCE. MA%IMUM AGGREGATE SIZES SHALL BE NOT LARGER THAN ONEFIFTH OF THE NARROWEST DIMENSION BETWEEN SIDES OF FORMS ONE THIRD OF THE DEPTH OF SLABS OR THREE FOURTHS OF THE M INIMUM GLEAR SPAGWG BETWEEN INDIVIDUALREWFORGWG BARSOR BUNDLESOF BARS. E FlNEAGGREGATESNATURALWASHEDHARDSANDVARVWGFROMFlNETOPARTIGLES PASS W G A 3/8" SGREEN, OF W HIGH AT LEAST 12 % SHALL PASS A SO�M ESH SGREEN. R WATER'. CLEAN, �RINKABLE, AN� FREE FROM FOREIGN MATfER. G. MOISTURE BARRIER'. 8 MILS THICK POLVETHVLENE SHEET. 2.3 DESIGN MI%ES A. PROVIDE NORMAL WEIGHT CONCREfE FOR INTERIOR FLOOR SLAB WITH 4000 PSI 28 @ DAV COMPRESSIVE STRENGTH', W/C RATIO'. 0.44 MA%IMUM. PARr3 ExE��r�oN 3.1 INSTALLATION A. PLACE REWFORCEMENTTOOBTAIN THE MINIMUM CWERAGE FOR CONCRETE aaorecrioN. naanNce, sance nNo secuae ne enas nNo ana suaaoars rocerHea WITH 1fi GAUGE WIRE TO HOLD REMFORCEMENT ACCURATELV IN POSITION DURING CONCRETE PLACEMENT OPERATIONS. SEf WIRE TIES SO TW ISTED ENDS ARE AWAV FROM E%POSED SURFACES. B. INSTALL WELDED W IRE FABRIC IN AS LONG LENGTHS AS PRACTICABLE LAP ADJOINING PIEGES AT LEAST ONE FULL MESH AND LAGE SPLIGES W ITH W IRE. OFFSET END LAPS IN ADJACENT WIDTHS TO PREVENT CONTINUOUS LAPS W EITHER DIRECTION. G. GOMPLV WITH AGI30a "REGOMMENDED PRAGTIGE FOR MEASUR WG MIXWG TRHNSPORTWG NN� PIAGWG GONGRETE" HN� HS HEREIN SPEGIRE�. �. �O NOT USE CONCRETE W HICH BECOMES NON�PLlvSTIC AN� UNWORKABLE OR �OES NormeerrHeaeouweoounurvcoNrao�umils oawHicHHnseeeN � CONTAMINATED BV FOREIGN MATERIALS. REMOVE REJECTED CONCRETE FROM THE SITE AND DISPOSE OF IT IN A LOCATION APPROVED BV LOCAL AUTHORITIES. E CONSOLIDATEPLACEDCONCRETEBVMECHANICALVIBRATINGEQUIPMENT HAND- SPADING RODDINGORTAMPING INACCORDANCEWITHACIRECOMMENDEDPRACTICES. F. TROWELFlNISH'.APPLVTROWELFlNISHTOSLABSURFAGESTHATARETOBEEXPOSEDTO VI EW AND TO SLAB SURFAGES THAT ARE TO BE GOVERED W ITH RESILIENT FLOOR W G CARPET, CERAMIC OR QUARRV TILE, OR OTHER THIN�RLM RNISH COATING SVSTEM G. FlLLIN HOLES AN� OPENINGS LEFT W CONCRETE WORK FOR PlvSSAGE OF WORK BV OTHER TRADES IS IN PLACE. MI% PLACE AND CURE CONCRETE AS HEREIN SPECIFIED TO BLEND WITH IN-PLACE CONSTRUCTION. H. CURBS'. PROVIDE MONOLITHIC FINISH TO INTERIOR CURBS BV STRIPPING FORMS WHILE CONCRETE IS STILL GREEN, AND STEEL TROW ELING SURFACES TO A HARD, DENSE FINISH WITHCORNERS INTERSECTIONSANDTERMINATIONSSLIGHTLVROUNDED. 32 PROTECTION H. PROTEGTTHE FRESHLV PIAGED GONGRETE FROM PREMHTURE DRV WG FROM WIND EXGESSNE GOLO ANO HOT TEMPERATURE, ANO MAINTAW FOR A PERI00 OF TIME NECEssaav Foa HvoanrioN oF cEmENr nNo aaoaEa HnaoENiNc. END OF SECTION 03300 METAL FABRICATIONS SECTION 05500 PART 1 - GENERAL i.i secrioN iNcwoes A. PROVI�E ITEMS OF STEEL SHAPES INCLU�ING, BUT NOT NECESSARILV LIMITE� TO ROUGH HnaownaE, �oosE srEE� uNrE�s Foa NEw mnsoNav oaENiNcs �wHEN naaucne�E� STEEL FRAMING AND SUPPORTS, AND MISCELLANEOUS STEEL TRIM. 12 E%ISTINGCONDITIONS A. FIELD MEASUREMENTS'. CHECK ACTUAL LOCATIONS OF WALLS AND OTHER CONSTRUCTIONTOWHICHMETALFABRICATIONSMUSTFIT BVACCURATEFlELD MEASUREMENTS BEFORE FABRICATION', SHOW RECORDED M EASUREMENTS ON FlNAL SHOP DRAW WGS. GOORDINATE FABRIGATION SGHEDULE WITH GONSTRUGTION PROGRESS TO AVOI� �ELAV OF WORK. anarz�aaooucrs 2.1 MATERIALS A. GENERAL�. PROVIDE METAL FORMS AND TVPES THAT COMPLV WITH REQUIREMENTS OF REFERENCED STANDARDS AND THAT ARE FREE FROM SURFACE BLEMISHES WHERE EXPOSED TO VIEW IN THE FINISHED UNIL EXPOSED TO-VIEW SURFACES EXHIBITING PITfWG, SEAM MARKS, ROLLER MARKS, STAINS, DISGOLORATIONS, OR OTHER IM PERFEGTIONS ON FlNISHED UNITS ARE NOT AGGEPTABLE. B. COL6FORME� STEEL TUBING'. ASTM A 500, GRA�E A, UNLE55 OTHERW ISE IN�ICATE� G HOLFORME� STEELTUBING'. ASTM A501. D. STEEL PLATES, SHAPES AND BARS�. ASTM A 3fi. E. WELDINGELECTRODESANDFILLERMETAL'.PROVIDETVPEANDALLOVOFFILLERMETAL AND ELECTRODESAS RECOMMENDED BV PRODUCER OF METAL TO BE WELDED AND AS REQUIRED FOR COLOR MATCH, STRENGTH, AND COMPATIBILITV IN FABRICATED ITEMS. F. NON-SHRINN NONMETALLIC GROUT'. PREMIXED, FACTORV-PACKAGED, NON-STAINING, NON-CORROSIVE, NONGASEOUS GROUT COMPLVING W ITH CE CRD C62t. PROVIDE GROUT SPEQFlGNLLV REGOMMEN�E� BV MHNUFHGTURER FOR INTERIORAN� EXTERIOR naaucnrioNs oF rvaE saEciFiEo iN rHis sEcrioN. c. sHoa aaimea anwr Foa sree� nNo woN�. mnNUFncruaea�s srnNonao ausr�wHieirwc PRIMER', COMPATIBLE WITH FINISH COATSOF PAINT. COOR�INATE SELECTION OF METAL PRIMER WITH FINISH PAINT REQUIREMENTS SPEGFIED IN DIVISION 9. H. FASTENERS'. SHALL BE ZINGCOATED FASTENERS FOR E%rERIOR USE OR WHEN BUILT INTO EMERIOR WALLS AS FOLLOWS'. t. BOLTSANDNUTS'.REGULARHEXAGONHEADTVPEASTMA30],GRADEA. 2. LAG BOLTS SQUARE HEATrvPE, FS FFB-561. 3. MHGHWESGREWS'.GN�MIUMPIATE�STEEL,FSFF5�92. a. awiN wnsHEas�. aouNo cnaeoN srEE� Fs FF�w�sz. s. rocc�e ao�rs�. ruma�e wiNc rvae, Fs FF�a�see, rvae, c�ass nNo srv�e as aeo�o. fi. LOCK WASHERS'. HELICAL SPRING TVPE CARBON STEEL, FS FF��W�84. ]. DRILLED-INE%PANSIONANCHORS�.E%PANSIONANCHORSCOMPLVINGWITHFS FF-S325, GROUP VIII (ANCHORS, E%PANSION, [NON-DRILLING�), TVPE I QNTERNALLV THREADED TUBULAR E%PANSION ANCHOR)', AND MACHINE BOLTS COMPLVING WITH FS FFB-5]S,GRADES. 22 FABRIGATION n. cENEan��. usE mnrEain�s oF sizE nNo rHicKNEss iNoicnrEo oa ns aEouiaEo ro aaooucE sraENGrH nNo ouanaiury iN FiNisNEo aaooucr Foa usE iNrENOEo. PR6lvS5EMBLE ALL ITEMS POSSIBLE IN THE SHOP TO MINIMIZE FlEL� SPLICING AN� �NLV AS NECESSARV FOR SHIPMENTAND HAN�LING RELEASEDFORCONSTRl1CTI0N SSHA��BE��EAR��MARKEOFORREASSEMB��. 'INUOUSLV, COMPLVING WITH AWS Su6jec��ocompliancewithallregula�ions CONNECTIONS,GRINDSMOOTHEXPOSEDWELDSAND i ADJOINWG SURFACES FORM EXPOSED ofSla�eantlLocalCodes JTSFWSHHNDSMOOTH,USWGGONGEHLED use exaoseo FnsreNeas oF rvae sNowN oa iF Nor City of Carmel OUNiERSUNK) SGREwS OR BOLiS. �� FoawreacoNNecnoNOFHnNoani�nNoanwNs `��¢m�' lamn�MNi� 1 onrE: 12/09/19 COMPONENTS AND FOR THEIR ATTACHMENT TO OTHER WORK E%CEPT WHERE E%POSED FASTENERS ARE UNAVOIDABLE OR ARE THE STANDARD FASTENING METHOD FOR HANDRAILAND RAILING SVSTEM INDICATED. D. PROVIDE FOR ANCHORAGE OF TVPE SHOWN, COORDINATED WITH SUPPORTWG STRUGTURE FHBRIGHTE HN� SPHGE HNGHOR W G �EVIGES TO PROVI�E H�EOUNTE suaaoarFoaiNreNoeouse. E SHOP PAINTING'. SHOP PAINT MISCELLANEOUS METAL WORK E%CEPT MEMBERS OR PORTIONS OF MEMBERS TO BE EMBE��E� W CON W ETE AN� GALVANIZE� SURFACES UNLESS OTHERWISE NOTED. REMOVE RUST, SCALE AND OTHER DELETERIOUS MATERIALS BEFORE APPLVING SHOP COAT, CLEAN OFF HEAVV RUST AND LOOSE MILL SCALE IN ACCORDANCE WITH SSPC SP3 "POW ER TOOL CLEANING". REM W E OIL GREASE AND SIMILAR CONTAMINANTS IN ACCORDANCE W ITH SSPC SP-t "SOLVENT CLEANING". F. ROUGH HARDWARE' FURNISH BENTOR OTHERWISE GUSTOM FABRIGATED BOLTS, PLATES, ANGHORS, HANGERS, DOW ELS AND OTHER MISGELLAN W US STEEL AND IRON SHAPES AS REOUIRE� FOR FRAM WG, SUPPORTWG OR ANGHORWG. c. misce��nNeous sree� raim�. aaovioe sHnaes nNo sizes iNoicareo Foa aaoFi�es SHOW N. UNLE55 OTHERW ISE IN�ICATE�, FABRICATE UNITS FROM STRUCTURAL STEEL SHAPES, PLATES, AND STEEL BARS, WITH CONTINUOUSLV WELDED JOINTS AND SMOOTH E%POSED EDGES. USE CONCEALED FIELD SPLICES WHEREVER POSSIBLE. PROVIDE CUTOUTS, FITTINGS, AND ANCHORAGES AS REQUIRED FOR COORDINATION OF ASSEM BLV AND INSTALLATION WITH OTHER WORK GALVANIZE MISCELLANEOUS FRAMING AND SUPPORTS AT EXTERIOR LOGATIONS, AND AS OTHERW ISE INDIGATED. anars�ExEcunoN a.i aaorecrioN A. PROTECT FINISHES OF METALWORK DURING CONSTRUCTION PERIOD BV USE OF TEM PORARV PROTECTIVE COVERINGS. REMOVE PROTECTIVE COVERING AT TIME OF SUBSTANTIAL COM PLETION. RESTORE FINISHES DAMAGED DURING INSTALLATION AND CONSTRUCTION PERIOD SO THAT NO EVIDENCE REMAINS OF CORRECTION WORK. RETURN ITEMS THAT CANNOT BE REFINISHED IN THE FlELD TO THE SHOP', MAKE REQUIRED ALTERATIONS AND REFlNISH ENTIRE UNIT OR PROVIDE NEW UNITS. ENo oF sEcrioN ossoo HOUGH LARPENTRV SEQION 06100 PART 1 - GENERAL 1.1 SECTION INCLUDES A. PROVIDE WOOD NAILERS, BLOGKWG, BAGKWG, AND PLVWOOD REOUIRED FOR GOMPLETION OF THE WORK, WHIGH IS GENERALLV NOT EXPOSED, WHERE NOTED ON THE �RAW W GS, AN� AS SPEQFlE� HEREIN. NOTE THAT IN NON�GOMBUSTIBLE BUIL� W G5, ALL CONCEALEO WO00 BLOCKING MUST BE RRERETAROANTTREATEO. 12 �ELIVERV,STORAGE&HAN�LING A. KEEP MATERIALS UNDER COVER AND DRV. PROTECT AGAINST E%POSURE TO WEATHER AND CONTACT WITH DAMP OR WET SURFACES. STACK TO PROVIDE FOR AIR CIRCULATION W ITHIN AND AROUND MATERIALS, AND UNDER TEMPORARV COVERINGS. PART2-PRODUGTS 2.1 MATERIALS A WMBER'.GOMPLVWITHP5200F"AMERIGANSOFTWOOOWMBERSTANOARO"ANOWITH naaucna�e canoiNc au�es oF iNsaecrioN nceNcies ceanFieo av rHe n�sc aonao OF REVIEW. PROVI�E �RESSED W MBER, 545 UNLE55 OTHERW ISE NOTE�, SEFSONE� WITH 1B%MOISTURE CONTENT FOR SIZES 2' OR LESS. FOR LIGHT FRAMING, PROVIDE CONSTRUCTION GRADE OR BETTER OF ANV SPECIES. B. WALLBLOCKINGORBACKING'.MINIMUM2%fiFIRERETARDANTTREATEDLUMBER BETWEEN PARTITION STUDS, OR STUD FACE APPLIED LAVER OF Sie" THICK FlRERETARDANT TREATED APA G-D PLUGGED PLV WOOD GONGEALED BEHIND FAGE LAVER OF GVPSUM BOARO OR WALL PANELWG, AS INOIGATEO. PROVIOE W HERE INOIGATEO IN THE ORAWINGS ANO WHERE REQUIREO FOR ANGHORAGE SUPPORT AT WALL MOUNTEO SHELVES, ACCESSORIES, GRAB BARS, WALL MOUNTE� HAN� SINKS, AN� OTHER SIMILAR LOCATIONS. G PLYWOOD BACKING PANELS�. FOR MOUNTING ELECTRICAL, SECURITV, OR TELEPHONE EQUIPMENT, PROVIDE FIRE-RETARDANT TREATED PLVWOOD, APA GD PLUGGED IN W ITH E%TERIOR GLUE, 3/4" THICK. D. FASTENERS AND ANCHORS'. PROVIDE SIZE, TVPE MATERIAL AND FINISH AS REGOMMENDED BV APPLIGABLE STANDARDS. WHERE ROUGH GARPENTRV WORK IS EXPOSED TO WEATHER OR IS W GROUND GONTAGT, PROVIDE FASTENERS AND ANGHORAGES WITH A HOT-0IP ZINC COATING MEETING ASTM A453. E. aaovioEHor�oiaziNcconriNc�asrmnisa�FnsrENEasnNonNCHoancEswHEaE ROUGH CARPENTRV WORK IS E%POSED TO WEATHER, IN GROUND CONTACT, OR IN AN AREA OF HIGH RELATIVE HUMIDITV. F. FIRE-RETARDANT TREATMENT SHALL PROVIDE A FLAME SPREAD RATING OF LESS THAN 25. PROVIDE FIRERETARDANT LUMBER GRADE STAMPED BV MANUFACTURER, WHERE REOUIRED PART 3 � EXEGUTION 3.1 EXAMINATION n. oiscnaoumrsoFmnreain�wirMoeFeclswMicMmicMrimanwounurvoFwoaK AN� UNITS W HICH ARE TOO SMALL TO USE W FABRICATING WORK W ITH M INIMUM JOINTS OR OPTIMUM JOINT ARRANGEMENT. 32 INSTALLATION A. SET ROUGH CARPENTRV WORK ACCURATELV TO REQUIRED LEVELS AND LWES, WITH MEM BERS PLUM B AND TRUE AND ACCURATELV CUT AND FITTED. B. SEGURELV ATfAGH GARPENTRV WORK TO SUBSTRATE BV ANGHORWG AND FASTENWG AS REQUIRED C. USE COMMON WIRE NAILS EXCEPTAS OTHERWISE IN�ICATE�. USE FlNISHING NAILS FOR FlNISH WORK. SELECT FlvSTENERS OF SIZE THAT WILL NOT PENEfRATE MEMBERS WHERE OPPOSITE SIDE WILL BE E%POSED TOVIEW OR WILL RECEIVE FINISH MATERIALS. MAKE TIGHT CONNECTIONS BETWEEN MEMBERS. INSTALL FASTENERS WITHOUT SPLITfING OF WOOD, PREDRILL AS REQUIRED. END OF SEGTION 06100 FINISH CAHPENTHV SECTION 06200 PART 1 � GENERAL 1.1 SECTION MCLUDES A. CHAIRRAILTRIMMOLDING PICTURERAILMOLDING WHERENOTEDONTHEDRAWINGS AND AS SPECIFlED HEREIN. L2 QUALITVASSURANCE A. QUALIN STANDARDS GOM PLV WITH "GUSTOM GRADB' REQUIREMENTS OF APPLIGABLE PROVISIONSOFTHEARGHITEGTURALWOODWORKINSTITUTE AWI "QUALITVSTANDARD$^. ( ) i.a oeuveav sroance a HnNouNc A. �O NOT �ELNER RNISH CARPENTRV MATERIALS UNTIL PAINTING, WET WORK, GRIN�ING AND SIMILAR OPERATIONS WHICH COULD DAMAGE, SOIL OR DETERIORATE WOODWORK HAVE BEEN COMPLETED IN INSTALLATION AREAS. 1.4 SITE CONDITIONS A. INSTALLER SHALL ADVISE CONTRACTOR OF TEMPERATURE AND HUMIDITV REQUIREMENTS FOR FlNISH GARPENTRV INSTALLATION AREAS. DO NOT INSTALL FlNISH GARPENTRV UNTIL REQUIRED TEMPERATURE AND RELATIVE HUM IDITV CONDITIONS HAVE BEEN STABILIZED AND W ILL BE MAINTAW ED IN INSTALLATION AREAS. anarz�aaooucls 2.1 MATERIALS A. WOODTRIM�.MAPLEORBIRCH-3/4"THICK. B. FASTENERSANDANCHORAGES�.PROVIDENAILS MEETINGFSFF-N-105 SCREWS ( ) MEETINGFSFF-S-tn ANDOTHERANCHORINGDEVICESOFTHETVPE SIZE MATERIAL ( ) AND FINISH REQUIRED FOR APPLICATION INDICATED TO PROVIDE SECURE ATTACHMENT GONGEALED WHERE POSSIBLE, AND GOMPLV W G W ITH APPLIGABLE OUALIry STANDARDS. G GONDITION WOOD MATERIALS TO AVERAGE PREVAILW G HUM IDITV GONDITIONS IN INSTALLATION AREAS PRIOR TO INSTALIATION. PART 3 - E%ECUTION 3.1 E%AMINATION A. DISCARD UNITSOF MATERIAL WHICHARE UNSOUND, WARPED, BOWED, TWISTED, IMPROPERLV TREATED, NOT ADEQUATELV SEASONED OR TOO SMALL TO FABRICATE WORK WITH MINIMUM OF JOINTS OR OPTIMUM JOINTING ARRANGEMENTS OR WHICH ARE OF DEFECTIVE MANUFACTURER WITH RESPECT TO SURFACES SIZES OR PATTERNS. 32 PREPHRHTION A. BAGKPRIME WMBER WITH A SWGLE SEALER GOATOF LAGQUER OR VARNISH, GOMPLV WG wirH naaucne�E FiNisHiNc aEouiaEmENrs iN oivisioN � s sEcrioNs oF rHESE saeaFicnnoNs Foa aaimeas nNo naaucnnoN. 3.3 INSTALLATION A. INSTALL THE WORK PLUMB, LEVEL, TRUE AND STRAIGHT W ITH NO DISTORTIONS. SHIM AS REQUIRED USING CONCEALED SHIMS. INSTALL TO A TOLERANCE OF t e" IN e'U" FOR / PLUMB AND LEVEL, AND WITH t/t6" MAXIMUM OFFSET W FLUSH ADJOINING SURFACES AND 1/8" MAXIMUM OFFSETS IN REVEALED ADJOIN W G SURFAGES. a. scaiaenNocurroFirnodowwcwoaK,nNoaeFimsNcursuaFncesoaaeania �AMAGE� FlNISH AT CUTS. c nNCHoa ro e�ocKiNc oa owecr�v ro suesranre wirH couNreasuNK, coNcen�eo FASTENERSAND BLIND NAILING WHERE POSSIBLE. D. ANCHOR TO METAL STUDS (WHERE BLOCKING DOES NOT E%IST) USING ADHESIVE AND PRE- DRILLED COUNTERSUNKTRIM-HEAD SHEET-METAL SCREWS. FILL RECESS WITH WOOD PUTTV TO MATCH SURFACE FINISH OF WOOD. E INSTALL STANDWG AND RUNNING TRIM W ITH M INIMUM NUMBER OF JOINTS POSSIBLE USWG FULLLENGTH PIEGES TOTHE GREATEST EXTENT POSSIBLE. STAGGER JOINTS IN A�JAGENT AN� RELATE� MEMBERS. GOPE AT REfURNS, M RER AT GORNERS, AN� USE scnaF �oiN1s Foa ENo�ro�ENo �oiNrs, ro aaovioE ricHr FirriNc �oiNrs wirH Fu�� suaFncE coNrncr rHaoucHour �ENcrH oF �oiNr. 3.4 REPAIR A. REPAIR DAMAGED AND DEFECTIVE FINISH CARPENTRV WORK WHEREVER POSSIBLE TO ELIMINATE DEFECTS FUNCTIONALLV AND VISUALLV, WHERE NOT POSSIBLE TO REPAIR PROPERLV, REPLACE WOODWORN. ADJUST JOWERV FOR UNIFORM APPEARANCE. 3.5 GLEANWG A. GLEAN ON EXPOSED AND SEMLEXPOSED SURFAGES. TOUGH�UP SHOP APPLIED FlNISHES TO RESTORE �AMAGE� OR SOILE� AREAS. 3.fi PROTECTION A. INSTALLER OF FINISH CARPENTRV WORK SHALL ADVISE CONTRACTOR OF FINAL PROTECTION AND MAINTAINED CONDITIONS NECESS4RV TO ENSURE THAT WORK WILL BE W ITHOUT DAMAGE OR DETERIORATION AT TIME OF ACCEPTANCE. END OF SECTION 06200 INSTALLATIONOFAHCHITECTUHALCASEWOHK SECTIONO6400 anar i . ceNean� 1.1 SECTION WCLU�ES ARCHITECTURAL CASEWORK TO BE PROVIDED BV GENERAL CONTRACTOR'S M ILLWORK SUBCONTRACTOR AS NOTED IN THE DRAWINGS. L2 DELIVERV, STORAGE, & HANDLING A. DELNER INSERTS AND OTHER ANGHOR W G DEVIGES TO BE BUILT INTO SUBSTRATES, W ELL IN H�VANGE OF TIM E SUBSTRHTES NRE TO BE BUILT. GON�ITION WOO� MHTERIHLS TO nveance aaEvauNc Humioiry coNoirioNs iN iNsrn�wrioN naeas aaioa ro iNsrn��nrioN. 1.3 SITECONDITIONS A. VERIFV FIELD MEASUREMENTS AND PROVIDE DIMENSIONS FOR CASEWORK SHOP DRAWINGS BEFORE FABRICATION. anarz�aaooucrs 2.1 MATERIALS A. FASTENERS AN� ANCHORS'. PROVI�E SIZE, TVPE, AN� MATERIALAS NOTE� ON THE �RAWINGS, AN� IF NOT NOTE�, AS RECOMMEN�E� BV APPLICABLE STAN�AR�S. B. PROVIDEOTHERMATERIALS,ASINDICATEDINTHEDRAWINGSANDASOTHERWISE REQUIRED FOR COMPLETION OF THE WORK OF THIS SECTION. PART 3 - EXECUTION 3d INSiHLIAiION n. iNsrn�� rHe woaK awma �eve� raue nNo sranicNr wirH No oisroarioNs. sNim ns REQUIREO USING GONGEALEO SHIMS. INSTALLTO ATOLERANGE OF 1/8" IN 8'�0" FOR PWMB AN� LEVEL, AN� WITH 1/1fi" M!V(IMUM OFFSET W F WSH A�JOINING SURFACES AND 1/e" MA%IMUM OFFSETS IN REVEALED ADJOINING SURFACES. B. SCRIBEANDCUTTOFITADJOININGWORK,ANDREFINISHCUTSURFACESORREPAIR DAMAGED FlNISH AT CUTS. C. ANCHOR TO ANCHORS OR BLOCK W G BUILT-IN OR DIRECTLV ATTACHED TO SUBSTRATES. SEGURE TO GROUN�S, STRIPPWG NN� BLOGK W G WITH GOUNTERSUNK, GONGEHLE� FnsreNeas nNo auNo NauNc ns aeouiaeo Foa n coma�ere iNsrn��nrioN. excear WHEREPREFINISHE�MATCHINGFlvSTENERHEA�SAREREQUIRE� USEFWEFINISHING NAILS FOR E%POSE� NAILING COUNTERSUNKAN� FILLE� FWSH WITH WOW WORK AN� MATCHING FINAL FINISH W HERE TRANSPARENT FINISH IS INDICATED. D. INSTALL CABINETS WITHOUT DISTORTION SOTHAT CABINET DOORS AND DRAWERS FIT OPENINGS PROPERLV AND ARE ACCURATELV ALIGNED. ADJUST HARDWARE TO CENTER DOORS IN OPENINGS AND TO PROVIDE FREE OPERATION. COM PLETE INSTALLATION OF HARDWARE AND AGGESSORV REMS INDIGATED. E TOPS ANGHOR SEGURELV TO BASE UNITSAND OTHER SUPPORT SVSTEMS. 32 REPAIR n. aEania omm�cEo nNo oEFEcrivE cnsEwoaK ro EumiNnrE oEFEcrs FUNcrioNn��v AN� VISUALLV, OR WHERE NOT POSSIBLE, REPLACE CASEWORK. A�JUSTJOINERV FOR UNIFORM APPEARANCE. CLEAN, W BRICATE AND ADJUST HARDWARE FOR SMOOTH OPERATION. REHANG OR REPLACE DOORS WHICH DO NOT SWING OR OPERATE FREELV, AS DIRECTED BV OWNER. CLEAN CASEWORK ON E%POSED AND SEMbE%POSED SURFACES. TOUCH-UP SHOP APPLIED FlNISHES TO RESTORE DAMAGED OR SOILED AREAS B. TOUGH�UP RNISH W G AS REOUIRE� BV INSTALLATION. GOM PLV WITH REFERENGE� ounury srnNonao Foa salloiNG, Fi�uNG couNrEasuNK FnsrENEas, sEnuNG oF coNCEn�Eo suaFncEsnNo simiwa irEms. 3.3 PROTECTION A. PROVIDE FINAL PROTECTION AND MAINTAIN CONDITIONS, IN A MANNER ACCEPTABLE TO FABRICATOR AND INSTALLER, WHICH ENSURES ARCHITECTURAL WOODWORK BEING W ITHOUT DAMAGE OR DETERIORATION AT TIME OF SUBSTANTIAL COMPLETION. END OF SEGTION O6a00 FIHESTOPPING SECTION OM]0 PART 1 - GENERAL 1.1 SECTION MCLUDES A. FIRESTOPPING MATERIALSCOMPLVING WITH REQUIREMENTS INCLUDED HEREIN, IN ORDER TO MAINTAIN FIRERESISTIVE ASSEMBLIES. PART2-PRODUGTS 2.1 MATERIALS A RRE CAULK'. UL LISTEO, ONEPART, NON�SAG, ElASTOMERIq FlRESTOPPING MATERIAL INTEN�E�TO SEAL WACKS, VOI�SOR HOLES, COMPLVING WITHASTM E119AN�ASTM E 814 TO ACHIEVE REQUIRED FIRE RATING. PRODUCTS MEETING ABOVE REQUIREMENTS INCLUDE, BUT ARE NOT NECESSARILV LIMITED TO THE FOLLOW ING MATERIALS'. 1. "STI"SPECSEALSERIESt00 2. "DOW CORNING" FIRE STOP SEALANT # 2000 PART 3 - EXEGUTION 3d INSTALLATION n. c�enN suasranre suaFnces immeoinre�v aeFoae iNsrn��nrioN. aaim e oa sen� JOINT SURFACES FS RECOMMEN�E� BV THE MANUFACTURER. COMPLV WITH MANUFACTURER'S INSTRUCTIONS. CLEAN ADJACENT SURFACES BV WHATEVER MEANS MAV BE NECESSARV TO ELIMINATE EVIDENCE OF SPILLAGE OR OTHER VISUALLV OBJECTIONABLE CONDITIONS. END OF SEGTION 0]90 PART 1 - GENERAL 1.1 SECTION MCLUDES A. PROVIDE SEALANTS COMPLVING W ITH REQUIREMENTS MCLUDED HEREIN, IN ORDER TO ESTABLISH AND MAINTAIN AIRTIGHT, VERMIN PROOF, AND WATERPROOF CONTINUOUS SEALS ON A PERMANENT BASIS. FAILURES OF INSTALLED SEALANTS TO COM PLV WITH THIS REQUIREMENT W ILL BE REGOGMZED AS FAILURES OF MATERIALS AND WORKMANSHIP. anarz�aaooucls 2.1 MATERIALS A. PROVIDE SEALANTS WHERE NOTED ON THE DRAWINGSAND AT THE FOLLOWING LOCATIONS'. t. BASECABWETSTOADJACENTWALLS 2. GOUMERTOPSINKUNITSTOGOUNTERTOPS 3. GOUNTERTOPSTOLOOSEBAGKSPLASHES G. SINKUNITSTOAOJAGENTWALLS 5. COUNTERTOPBACKSPlA5HE5TOA�JACENTWALLRNISH fi. PIPES,SLEEVES,CHUTES,�UCTAN�OTHERSIMIIARPENETRATIONSTHROUGH PARTITIONS ]. NON-MOBILE FOOD SERVICE EQUIP. TO FLOOR OR TO ADJACENT COUNTER B. ACRVLIC-LATE%SEALANT�.PERMANENTLVFLIXIBLEEMULSIONTVPE,NON-STAININGAND NON-BLEEDING' RECOMMENDED BV MANUFACTURER FOR GENERAL INTERIOR E%POSURE. Q SINGLE COMPONENT SANITARVSILICON RUBBER'. MOLD MILDEW RESISTANT ACIDTVPE / SEALANT FOR APPLIGATION TO NONPOROUS SEALANT BOND SURFAGES. D. SILIGON RUBBER FOR FOOD SERVIGE EOUIPMENT INSTALLATIOM. G. E. SGS 1200 OR EQUAL SINGLECOMPONENT ONEPART SILICONERUBBER BASE� AIR�CURING NON�SAG ElASTOMERIC SEAIANT COMPLVING WITH F�A REQUIREMENTS FOR �IRECT CONTACT WITH FOOD PRODUCTS. DO NOT PROVIDE SEALANT WITH MOLD AND MILDEW-RESISTANT MATERIALS, WHEN MATERIALS W ILL BE M FOOD-PREPARATION AREAS OF THE PROJECT. E JOINTBACKER'.USEONLVTHOSEBACKUPMATERIALSWHICHARESPECIFICALLV RECOMMENDED FOR THIS INSTALLATION BV THE MANUFACTURER OR THE SEALANT USED AND WHIGH ARE NON-ABSORBENTAND NON-STAINWG. F. MASKWGTAPBFORMASKWGAROUNDJOINTS PROVIDEMASKWGTAPEGONFORMWGTO FED.SPEG.UU�T406G. G. OTHER MATERIALS'. ALL OTHER MATERIALS, NOT SPECIFlCALLV �ESCRIBE� BUT REQUIRE� FOR COMPLETE AN� PROPER CAULKING AN� INSTALLATION OF SEAlANTS SHALL BE FIRST QUALITV OF THEIR RESPECTIVE KINDS NEW AND AS SELECTED BV THE CONTRACTOR SUBJECT TO THE APPROVAL OF THE OW NER. PART 3 - E%ECUTION 3.1 INSTALLATION A. GLEAN JOINT SURFAGES IMMEDIATELV BEFORE INSTALLATION. PRIME OR SEAL JOINT SURFACES AS RECOMMENOEO BV MANUFACTURER. COMPLV WITH MANUFACTURER'S iNsraucrioNs Fi�� sEnwNr anaaer ro n sucHr�v coNcnve suaFnce, sucHr�v n BELOW ADJOINING SURFACES. W HERE HORIZONTAL JOINTS ARE BETWEEN A HORIZONTAL SURFACE AND VERTICAL SURFACE FILL JOINT TO FORM A MINIMUM 1/4" RADIUS CONVE% COVE SO THAT JOINT WILL NOT TRAP MOISTURE AND DIRT. 32 CLEANING A. DO NOT ALLOW SEALANTS TO W ERFLOW JOWTS OR TO SPILL ONTO ADJOIN WG WORK, OR TO MIGRATE INTO VOIDS OF EXPOSED FlNISHES. CLEAN ADJOINING SURFACES BV WHATEVER MEANS MAV BE NEGESSARV TO ELIMINATE EVIDENGE OF SPILLAGE. 3.3 PROTEGTION n. cuae senwNrs w comaunNce wirH mnNUFncruaea�s iNsraucrioNs nNo RECOMMEN�ATIONS, TO OBTAIN HIGH EARLV BON� STRENGTH, INTERNAL COHESNE STRENGTH AND SURFACE DURABILITV. REPLACE OR RESTORE SEALANTS WHICH ARE DAMAGED OR DETERIORATED DURING CONSTRUCTION PERIOD. PROTECT INSTALLED SEALANTS FROM DAMAGE FROM CONSTRUCTION OPERATIONS UNTIL OWNER OCCUPANCV. 34 SGHEDULEOFSEALANTS. A. DOOR FRAMES TO WALLS & PARTITIONS'. AGRVLIG LATEX. B. TOILETFlXTURESTOWALLJOINTS'. WHITESANITARVSILICONEWITHMOL�AN�MIL�EW RESISTANCE. G FOODSERVICEEQUIPMENTINSTALLATION�. CLEARSILICONESEALANTWITHOUTMOLDOR MILDEW RESISTANCE END OF SECTION 0]900 METAL OOORS & FRAMES SECTION 08100 PART 1 � GENERAL i.i secrioNwcwoes A. PROVI�E METAL �OOR FRAMES AN� HOLLOW METAL �OORS, WHERE NOTE� ON THE DRAWINGS AND AS SPECIFIED HEREIN. COMPLV W ITH APPLICABLE REQUIREMENTS OF THE STEEL DOOR INSTITUTE "RECOMMENDED SPEGFICATIONS'. STANDARD STEEL DOORS AND FRAMES." L2 PERFORMANCEREQUIREMENTS A. LABELS WHERE NOTED IN THE DRAW WGS, OR WHERE REOUIRED BV THE BUILD WG GODE ro ae coNsraucreo oF Fiae�aesisnve coNsraucnoN, aaovioe �vu� oa "WARNOCW HERSEV" TESTE� AN� LABELE� PRO�UCTS. PART 2 PRODUCTS 2.1 MATERIALS A. DRYWALL FRAMES'. 18 GAUGE COLD-ROLLED STEEL, KNOCK-DOW N TVPE, W ITH RESILIENT BUMPERS EQUALTOSTEELCRAFTSERIESDW-t6-4"EASVSET"DRYWALLFRAMES. PROVIDE te GAUGE, DRYWALL FRAME ANCHORS WELDED TO FRAME, 4 ANCHORS PER JAMB MINIMUM. B. EXTERIOR �OORS'. 13/J" THIGK INSULATWG ASSEMBLV, WITH 18 GAUGE GOLDROLLE� Hor�oiaaEo cn�vnNizEo sHEEr srEE� FncEs, FwsH rvaE wirH roa, eorrom nNo n�� eoces Fu��v we�oeo nNo caouNo smoorH. aaovioe weea Ho�es nr eorrom, ro ALLOW ESCAPE OF ENTRAPPED MOISTURE. DOOR PANEL SHALL PROVIDE THERMAL INSULATING RESISTANCE FACTOR OF NOT LESS THAN R-11. Q E%TERIOR FRAMES'. t4 GAUGE HOT-DIPPED GALVANIZED COLD-ROLLED STEEL, FULLV WELDED. PROVIDE MINIMUM OF 4 GALV. WIRE TVPE, CORRUGATED SHEET METAL, OR EXPANSIONTVPEANGHORSPERJAMB. 22 FABRIGATION A FABRICATE STEEL �OOR AN� FRAME UNITS TO BE RIGI�, NEAT IN APPEARANCE AN� FREE FROM �EFECTS, WARP OR BUCKLE W HERE POSSIBLE, FlT AN� ASSEMBLE UNITS IN MANUFACTURER'S PLANT. SHOP PRIME ALL HOLLOW METAL DOORS AND FRAMES. PART 3 - E%ECUTION 3.1 HARDWAREPREPARATION A. UNLESS OTHERWISE INDICATED, ALL DOORS AND FRAMES SHALL BE MORTISED AND REWFORCEDFORHARDWAREINTHEFACTORV. 32 INSTHLIATION n. aaeFir 000as nr Fncroav wirH aenanNce oF ve�� nr vearicn� eoces nNo nr roa, ve�� w z� eeve�nr �ocK eoce, eorrom c�enanNce �. aie�� wirHour rHaesHo�o, aia�� W ITH THRESHOL�. B. INSTALL HOLLOW METAL DOORS AND FRAMES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. SET FRAMES ACCURATELV IN POSITION, PLUM BED, ALIGNED, AND BRACED SECURELV. FIT DOORSACCURATELV WITHIN FRAMES, IN ACCORDANCE WITH CLEARANCES INDICATED HEREIN. SAND SMOOTH ALL RUST OR DAMAGED AREAS OF PRIME GOAT AND APPLV TOUGH-UP GOAT OF GOMPATIBLE PRIMER. ENo oF sEcnoN oeioo PART t - GENERAL Lt SECTIONINCLUDES A. PROVIDE FWSH WpOD DOORS, AND INSTALL WHERE INDIGATED ON THE DRAW WGS, AS saEciFiEo HEaEiN, nNo as NECEssnav Foa n coma�ErE nNo aaoaEa iNsrn�u�rioN. 12 QUALITVASSURANGE A. QUALITV STAN�AR�S FOR FWSH WOO� �OORS'. COMPLV WITH 1.5.1"IN�USTRV STAN�AR� FOR WOO� FWSH �OORS",OF NATIONAL WOW WIN�OW AN� �OOR ASSOQATION (NW WDAJ. COM PLV WITH "ARCHITECTURAL WOODWORK QUALITV STANDARDS"�, INCLUDING SECTION t 300 "ARCHITECTURAL FLUSH DOORS", OF ARCHITECTURAL WOODWORK INSTITUTE (AWI) FOR GRADE OF DOOR, CORE CONSTRUCTION, FINISH AND OTHER REQUIREMENTS EXCEEDWG THOSE OF NNM1NDA QUALITV STANDARD. B. SNFEry GIAZW G STHNDHRD�. PROVIDE SNFEry GIASS OF rvPE INDIGHTED OR REOUIRED av nurHoaines Nnvwc duaisoicrioN Foa 000as nNo sioeucNrs�, coma�v wirH nNsi Z9].1 ANO TESTING REOUIREMENTS OF 16 GFR PART 1201 FOR GATEGORV II MATERIALS E%CEPT WHERE THOSE OF CATEGORV I ARE E%PRESSLV IN�ICATE� AN� PERMITfE�. 1.3 DELIVERV, STORAGE, & HANDLING A. PROTECT DOORS DURING TRANSIT, STORAGE AND HANDLING TO PREVENT DAMAGE, SOILING AND DETERIORATION. COMPLV W ITH REQUIREMENTS OF REFERENCED STANDARDS AND RECOMMENDATIONS OF NWW DA PAMPHLET "HOW TO STORE, HANDLE, RNISH, INSTHLL, HN� MHINTHIN WOO� �OORS", NS WELL HS WITH MHNUFHGTURER'S iNsraucrioNs. e. oeuvea000asiNoaiciNnwNoaeNeocoNrnweaswirH�nee�siNrncrnNo�ecie�e ATTIME OF USE. STORE UN�ER CON�ITIONS RECOMMEN�E� BV THE MANUFACTURER. 1.4 SITE CONDITIONS A. DO NOT DELIVER OR INSTALL DOORS UNTIL CONDITIONS FOR TEMPERATURE AND RELATIVE HUMIDITV HAVE BEEN STABILIZED AND WILL BE MAINTAWED IN STORAGE AND INSTALLATION AREAS DURING REMAINDER OF CONSTRUCTION PERIOD TO COMPLV WITH REQUIREMENTS OF THE "ARGHITEGTURAL WOODWORK QUALITV STANDARDS" INGWDWG SEGTION 100-53 "MOISTURE GONTENT" OF AWI. anarz�aaooucls 2.1 MATERIALS A. SOLID DOOR FWSH WOOD DOORS�. AWI SECTION 1300, CUSTOM GRADE, CONSTRUCTION MEETING AWI SPEC STANDARD # PG5'. PARTICLEBOARD CORE W ITH 5-PLV PREMANUFACTURED FACE VENEER, NATURAL FINISHED MAPLE HARDWOOD VENEER BOTH SIDES. SUBJECT TO COMPLIANCE W ITH REQUIREMENTS INCLUDED HEREIN, PROVIDE WOOD DOORS MANUFAGTURED BV ONE OF THE FOLLOW W G. 1. ALGOMAHAR�WOO�S z. aue��000acomanNv a. ecceasiNousraies 4. ARCHITECTURALDOORDIVISION 5. GRAHAM MANUFACTURING CORP. fi. WEVERHAUSERCOMPANV 22 FABRICATION A. FABRICATE FLUSH WOOD DOORS TO PRODUCE DOORS IN SIZES INDICATED FOR JOB-SITE FlTTWG. GOMPLV WITH TOLERANGE REQUIREMENTS OF AW I. GOMPLV WITH FlNAL HARDWARE SGHEDULES AND DOOR FRAME SHOP DRAW WGSAND WITH HARDWARE TEMPLATES. a. sHoaaaimiNc�.sHoasEn�FncEsnNOEocEsoF000asFoaranNsanaENrFiNisH W ITH STAIN QF REQUIRED) AND OTHER REQUIRED PRETREATMENTS AND FIRST COAT OF FINISH AS SPECIFIED IN DIVISION-9 SECTION "PAINTING". PART 3 - E%ECUTION 3.1 INSTALLATION A. OPENWGS GUTANDTRIM OPENWGSTHROUGH DOORSTO GOMPLV WITH APPLIGABLE REQUIREMENTS OF REFERENGEO STANOAROS FOR KINO(S) OF OOORS REQUIREO. B. MANUFACTURER'S INSTRUCTIONS'. INSTALL WOOO OOORS TO COMPLV WITH MANUFACTURER'S INSTRUCTIONS AN� OF REFERENCE� AWI STAN�AR� AN� AS INDICATED. Q JOB-FIT DOORS'. ALIGN AND FIT DOORS IN FRAMES WITH UNIFORM CLEARANCESAND BEVELS AS INDIGTED BELOW', DO NOT TRIM STILES AND RAILS IN E%CESS OF LIMITS SET BV MANUFACTURER OR PERMITTED WITH FIRERATED DOORS. MACHWE DOORS FOR HARDWARE. SEAL GUT SURFAGES AFTER FlTTWG AND MAGHIN W G. PROVIDE 1/8" AT JAMBS AND HEADSI t/t6" PER LEAF AT MEETWG STILES FOR PAIRS OF DOORSI AND 1/8" FROM BOTfOM OF OOOR TO TOP OF OEGORATNE FLOOR RNISH OR GOVERING. PROVIOE RAOIUS EocEs nr mEEriNc srnEs oF anias oF w000 000as. wHEaE rHaESHo�o is sHowN OR SCHEDULE�, PROVI�E 1!4" CLEARANCE FROM BOTfOM OF �OOR TO TOP OF THRESHOLD. D. FIELD-FINISHED DOORS'. REFER TO DIVISION-9 SECTION "PAINTING" FOR FINISHING REQUIREMENTS. 32 ADJUSTWG A. REHANG OR REPLAGE DOORS WHIGH DO NOT SW W G OR OPERATE FREELV. REFlNISH OR REPLAGE �OORS �AMAGE� �UR W G INSTALLATION. 3.3 PROTEGTION A. PROTECT �OORS lv5 RECOMMEN�E� BV �OOR MANUFACTURER TO ENSURE THAT WOO� DOORS W ILL BE WITHOUT DAMAGE OR DETERIORATION AT TIME OF SUBSTANTIAL COMPLETION. END OF SECTION 082t2 ALUMINUM STOHEFHONT SVSTEM SECTION 08410 PART 1 � GENERAL i.i secrioN iNcwoes A. PROVIDE STOREFRONT FRAMING FS SHOWN ON DRAW INGS, AS REQUIRED HEREIN, AND AS NEEDED TO MEET THE REQUIREMENTS OF THE CONSTRUCTION SHOWN IN THE CONTRACTDOCUMENTS. L2 SUBMITTALS A. SUBMIT SHOP DRAW W G FOR FABRIGATION AND INSTALLATION, ING W D W G ELEVATIONS, DETAIL SEGTIONS OF TVPIGAL GOMPOSITE MEMBERS, HARDWARE MOUNTW G HEIGHTS, ANGHORAGES, RE WFORGEMENT, EXPANSION PROVISIONS, AN� GIAZWG. i.a sirecoNoirioNs A. TAKE FlEL� MEASUREMENTS PRIOR TO PREPARATION OF SHOP �RAWINGS AN� FABRICATION, ID ENSURE PROPER FITfING OF WORK. PART2-PRODUCTS 2.t MATERIALS A. DRAWINGS ARE BASED ON ONE MANUFACTURER'S STANDARD ALUMINUM ENTRANCE AND STOREFRONTSVSTEM. OTHER STANDARD SVSTEMS OF A SIMILAR AND EQUIVALENT NATURE WILL BE AGGEPTABLE WHEN DIFFERENGES DO NOT MATERIALLV DETRAGT FROM �ESIGN CONCEPT OR INTEN�E� PERFORMANCES !v5 JU�GE� SOLELV BV THE OW NER. B. TVPICAL FRAMING SVSTEM'. MATCH EXISTING OR "KAWNEER" TRIFAB II 451 1" INSUTATE� ( GUSING PREFERRED FOR NEW CONSTRUCTION) FRAMING, OR EQUIVALENT E%rRUDED ALUMINUM SVSTEMS, UTILIZING ASTM B-221 ALUMINUM FOR E%rRUSIONS, ANDASTM B-209 ALUMINUM FOR SHEETiPLATE MATERIALS. Q FASTENERS'. ALUM INUM NON-MAGNETIC STAINLESS STEEL OR OTHER MATERIALS WARRANTED BV MANUFAGTURER TO BE NON-GORROSNE AND GOMPATIBLE WITH AWMINUM GOMPONENTS EXPOSED FASTENERS SHALL MATGH FlNISH OF MEMBERS AND HARDWARE BEWG FASTENED. �. CONCEALE� FlASHING'. �EA��SOFT STAWLE55 STEEL, 2fi GAUGE MINIMUM, OR EXTRU�E� AWMINUM O.Ofi2' MINIMUM !v5 SELECTE� BV MANUFACTURER FOR COMPATIBILITV WITH OTHER COMPONENTS. E. BRACKETSANDREINFORCEMENTS�.MANUFACTURER'SHIGH-STRENGTHALUMINUMUNITS WHERE FEASIBLE', OR NON-MAGNETIC STAINLESS STEEL OR HOT-DIPPED GALVANIZED STEEL COMPLVING WITH ASTM A 38fi. E GONGRETE MASONRV INSERTS GAST IRON MALLEABLE IRON OR HOT DIPPED / GALVANIZED STEEL GOMPLVWG WITH ASTM A386. G. BITUMINOUS COATINGS'. COLO�APPLIEOlvSPHALT MASTIC COMPLVING WITH SSPGP512, comaouNoeo Foa ao�mi� rHicKNess aea conr. H. COMPRESSION WEATHER-STRIPPING�. MANUFACTURER'S STANDARD REPLACEABLE STRIPPING OF EITHER MOLDED NEOPRENE GASKETS COM PLVING WITH ASTM P2000 OR MOLDED WCGASKETSCOMPLVINGWITHASTMD228]. 22 PREFABRICATION A. GENERAL. GOMPLETE FABRIGATION, ASSEMBLV, FlNISHWG, HARDWARE APPLIGATION, AND OTHER WORK BEFORE SHIPMENT TO PROJECT SITE DISASSEMBLE COMPONENTS ONLV AS NEGESSARV FOR SHIPMENT AND INSTALLATION. GOMPLV WITH AWS REGOMMEN�HTIONS TO NVOI� �ISGOLORHTION' GRIN� IXPOSE� WEL�S SMOOTH HN� RESTORE MECHANICAL FlNISH. INSTALL RE W FORCING IF REpUIRE� FOR PERFORMANCE REQUIREMENTS', SEPARATE �ISSIMIIAR METALS W ITH BITUMINOUS PAINT OR OTHER SEPARATOR WHICH WILLPREVENT WRROSION. MHINTHINHCCURHTE RELATION OF PLANESANDANGLES WITHHAIRLINEFITOFCONTACTINGMEMBERS.CONCEAL FASTENERS WHEREVER POSSIBLE. B. WEATHER-STRIPPING'. FOR IXTERIOR DOORS PROVIDE COMPRESSION WEATHER-STRIPPWG AGAINST FlXED STOPS' AT OTHER EDGES PROVIDE SLIDWG WEATHER-STRIPPWG RETAW ED IN ADJUSTABLE STRIP MORTISED INTO DOOR EDGE. G STOREFRONTFRAMING SVSTEM FABRICATION'. PROVI�E INSI�EOUTSI�E MATCHE� RESILIENT FWSH�GLHZE� SVSTEM WITH PROVISIONS FOR G1A55 REPLACEMENT. SHOP-FABRICATE AND PRE ASSEMBLE FRAME COMPONENTS WHERE POSSIBLE. D. CLASS I COLOR ANODIZED FINISH�. AA M12C22A42/A44 MECHANICAL FINISH�. AS ( FABRICATED,NON-SPECULAR',CHEMICALFINISH'.ETCHED,MEDIUM MATTE',ANODIC COATING'. CLASS I ARCHITECTURAL, FILM THICNER THAN 0] MIL WITH IMEGRAL COLOR OR ELECTROLVTICALLV DEPOSITED COLOR COMPLVING WITH AAMA 606.t OR AAMA 608.t - ) COLOR OF TO MATCH EXISTING STOREFRONT MATERIALS IF APPLICABLE OR IF NOT ( ), EXISTWG PROVIDE"BRONZE"GOLOR. anara�execunoN 3.1 INSTALLATION A. COMPLV W ITH MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS FOR INSTALLATION OF ALUMINUM ENTRANCES AND STOREFRONTS. B. SET UNITS PLUMB, LEVEL, AND TRUE TO LWE, WITHOUT WARP OR RACN OF FRAMING MEM BERS, DOORS, OR PANELS. ANCHOR SECURELV IN PLACE, SEPARATING ALUMINUM AND OTHER GORRODIBLE METAL SURFAGES FROM SOURGES OF GORROSION OF ELEGTROLITIG NGTION HT POINTS OF GONTHGT WITH OTHER MHTERIHLS. C. �RILL AN� TAP FRAMES AN� �OORS AN� APPLV SURFACEMOUNTE� HAR�WARE REMS, coma�nNcwirH HnaownaemnNUFncruaea�siNsraucrioNsnNoremawre REQUIREMENTS. USECONCEALED FASTENERS WHEREVER POSSIBLE. D. SET SILL MEMBERS IN BED OF SEALANT AS INDICATED, OR WITH JOINT FILLERS OR GASKETS AS INDICATED TO PROVIDE W EATHERTIGHT CONSTRUCTION. COMPLV W ITH REQUIREMENTS OF DIVISION ] FOR SEALANTS, FILLERS, AND GASKETS. 32 CLEANING A. GLEAN GOMPLETED SVSTEM, INSIDE AND OUT, PROMPTLV AFTER EREGTION AND INSTALLATION OF GLASS AN� SEALANTS. REMOVE EXGESS GLHZWG AN� JOINT sEnwNls, oiar, nNo orHEa suesrnNCEs Faom nwmiNum suaFncEs. a.a aaorecrioN A. INSTITUTE PROTECTIVE MEASURES AND PRECAUTIONS REQUIRED TO ASSURE THAT ALUMINUM ENTRANCES AND STOREFRONTS W ILL BE WITHOUT DAMAGE OR DETERIORATION, OTHER THAN NORMAL WEATHERING, AT TIME OF ACCEPTANCE. END OF SEGTION OBa10 FINISH HAHOWAHE SECTION OB]10 PART 1 - GENERAL 1.1 SECTION WCWDES A. PROVIDE FINISH HARDWARE THROUGHOUT THE WORK AS INDICATED IN THE DRAWINGS, AS SPECIFIED HEREIN AND AS REQUIRED FOR A COMPLETE INSTALLATION. L2 PERFORMANCEREQUIREMENTS A. FlRERATED OPENWGS COMPLV WITH NFPA STANDARD NO. 80 AND LOCAL CODES FOR INSTHLIATION OF HHR�WHRE W RRERHTE� HSSEMBLIES. PROVI�E ONLV HHR�WHRE wHicN Nns aEEN rEsrEo nNo usrEo av u� oa Fm iN coMaunNCE wirH aEouiaEMENrs oF 000a nNo 000a FanmE weE�s. PART2-PRODUCTS 2.1 MATERIALS A. FASTENERS'. PROVIDE NECESSARV SCREWS, BOLTS AND OTHER FASTENERS OF SUITABLE SIZEANDTVPETOANCHOR HARDWARE IN POSITION FOR LONG LIFE UNDER HARD USE. PROVIDEGONGEALED FASTENERS FOR HARDWARE UNITS WHIGH ARE EXPOSED WHEN 000a is c�oseo. anara�execunoN 3.1 PREPARATION A. REMOVE E%ISTING DEADBOLTS WITH KEVED CVLINDER LOCKS INSIDE OCCUPIED SPACE. REPLACE WITH NEW DEADBOLT, OR RECONFIGURE E%ISTING UNIT, TO PROVIDEAN INSIDE THUMBTURN LATCH. 32 INSTALLATION A. INSTALL HARDWARE ITEMS AT HEIGHTS AS REGOMMENDED BV THE DOOR AND HARDWARE iNsrirure, occear as saeciFicn��v aeouiaeo ro coma�v wirH �ocn� cooes. iNsrn�� HAROWARE IN GOM PLIANGE WITH THE MANUFAGTURER'S INSTRUGTIONS ANO RECOMMEN�ATIONS. SET UNITS LEVEL, P W MB AN� TRUE CONSULT W ITH OWNER AS TO KEVING INSTRUCTIONS. A�JUST AN� CHECK OPERATION OF EVERV UNIT. REPLACE UNITS WHICH CANNOT BE ADJUSTED TO OPERATE FREELV AND SMOOTHLV. END OF SECTION OB]t0 GLASSANO GLAZING SECTION OBB00 PART 1 -GENERAL Lt SECTIONINCLUDES A. PROVIDE GLASS AND GLAZING AS SHOWN ON THE DRAWINGS, AS SPECIFlED HEREIN, AND AS NEEDED TO MEET THE REQUIREMENTS OF THE CONSTRUCTION. 12 REFERENGES A. GLHZWG STANOAROS'. GOMPLV WITH REGOMMENOATIONS OF FLAT GLASS MARKEf WG ASSOQATION FGMA 'GIAZING MANUAL" AN� "SEAIANT MANUAL" E%CEPT WHERE MORE ( ) STRINGENT REQUIREMENTS ARE IN�ICATE�. REFER TO THOSE PUBLICATIONS FOR DEFINITIONS OF GLASS AND GUSING TERMS NOT OTHERW ISE DEFINED IN THIS SECTION OR OTHER REFERENCED STANDARDS. B. SAFETV GLAZING STANDARDS'. WHERE SAFETV GLASS IS INDICATED OR REQUIRED BV AUTHORITIES HAVING JURISDICTION, PROVIDE TVPE OF PRODUCTS INDICATED WHICH GOMPLV WITH ANSI Z9].1 AND TESTWG REOUIREMENTS OF 16 GFR PART 1201 FOR GATEGORV II MATERIALS. anarz�aaooucls 2.1 MATERIALS A. FLOAT/PLATE GLASS�. NPE I, QUALITV Q3, CLEAR UNLESS OTHERWISE INDICATED. B. TEMPERED GLASS'. PROVIDE PRIME GLASS OF COLOR AND TVPE INDICATED, WHICH HAS BEEN HEAT TREATED TO STRENGTHEN GLASS IN BENDING TO NOT LESS THAN 4.5 TIMES ANNEALEDSTRENGTH. G. INSULATWG GLASS UNITS SEALED INSULATWG UNITS FABRIGATED FROM TWO PANES OF 1/J" THIGK GLASS WITH 1/2' �RV AIR SPAGE, �UAL SEALW G SVSTEM, SPAGER, �ESIGGANT, nNo coaNEa aEiNFoacEmENr. G�ass rHicKNEss nNo HEnr sraENGrHENiNG ro eE oereamweo ev mnNUFncruaea Foa wiNo �onoiNc coNoirioNs. cwss co�oa ro MATCH E%ISTING ADJACENT MATERIALS, FS APPLICABLE. 1. INSULATING GLASS WARRANTV'. 10 VEARS. D. GLAZING SEALANTS AND COMPONENTS'. L GENERAL'. PROVIDE COLOR OF EXPOSED SEALANT/COMPOUND INDICATED OR IF NOT OTHERW ISE INDICATED, AS SELECTED BV ARCHITECT FROM MANUFACTURER'S STANDARD GOLORS, OR BLAGK IF NO GOLOR IS SO SELEQED. 2. TWp-PARTPOLVSULFlDEGLAZWGSEALANT'.ELASTOMERIGPOLVSULFlDESEALANT GOMPLVING W ITH FS TR&22], G1A55 A, TVPE 2, SPEGIALLV GOMPOUNOEO ANO resreo ro sHow n miNimum oF zo venas aesisrnNce ro oereaioanrioN iN NORMAL GLFZING APPLICATIONS. PART 3 - IXECUTION 3.1 INSTALLATION A. WATERTIGHTANDAIRTIGHTINSTALLATIONOFEAGHGLASSPRODUGTISREOUIRED, EXGEPTAS OTHERWISE SHOWN. EAGH INSTALLATION MUST WITHSTAND NORMAL TEMPERATURE GHANGES, WINO LOAO WG, IMPAGT LOAOWG (FOR OPERATWG SASH ANO 000as�, wirHour Fawae wcwowc �oss oa aaeniwce oF cwss, Fawae oF w SEALANTS OR GASKETS TO REMAIN WATERTIGHT AN� AIRTIGHT, �ETERIORATION OF GLAZING MATERIALS AND OTHER DEFECTS IN THE WORK. B. CLEANGLAZINGCHANNELANDOTHERFRAMINGMEMBERSTORECEIVEGLASS, IMMEDIATELV BEFORE GLAZING. REMOVE COATINGS WHICH ARE NOT FIRMLV BONDED TO SUBSTRATE REM W E LACQUER FROM METAL SURFACES W HERE ELASTOMERIC SEALANTS AREUSED G. GOMPLV W ITH FGMA ^GLAZW G MANUAL" AND MANUFAGTURERS INSTRUGTIONS AND REGOMMENOATIONS.USE MANUFAGTURER'SREGOMMENOEOSPAGERS,BLOGKS, aaim eas, sen�eas, cnsKers nNo nccessoaies. �. INSTALL GLASS WITH UMFORMITV OF PATfERN, �RAW, BOW AN� ROLLER MARKS. INSTALL SEALANTS TO PROVIDE COMPLETE WETfING AND BOND AND TO CREATE A SUBSTANTIAL WASH AWAV FROM GLASS. INSTALL PRESSURIZED TAPES AND GASKETS TO PROTRUDE SLIGHTLV OUT OF CHANNEL, SO AS TO ELIMINATE DIRT AND MOISTURE POCKETS. E INSTALLINSULATINGGLASSUNITSTOCOMPLVWITHRECOMMENDATIONSBVSEALED INSULATWGGLASSMANUFAGTURERSASSOGIATION, EXGEPTASOTHERWISE SPEGIRGALLV INOIGATEO OR REGOM MENOEO BV GLASS ANO SEALANT MANUFAGTURERS. 32 PROTEGTION A. PROTECTE%TERIOR GLlvSSFROM BREAKAGE IMME�IATELV UPON INSTALLATION, BV USE OF WOSSED STREAMERS ATfACHED TO FRAMING AND HELD AWAV FROM GLF55. DO NOT APPLV MARKERS TO SURFACES OF GLASS. REMOVE NONPERMANENT LABELS AND CLEAN SURFACES. CURE SEALANTS FOR HIGH EARLV STRENGTH AND DURABILITV. 3.3 REPAIR A. REMOVE AND REPLACE DAMAGED GLASS AND GLAZING. WASH AND POLISH GLASS ON BOTH FAGES NOT MORE THAN 0 DAVS PRIOR TO DATE SGHEDULED FOR INSPEGTIONS INTENDED TO ESTABLISH DATE OF SUBSTANTIAL GOMPLETION. GOMPLV W ITH GLASS PROOUGTMANUFAGTURER'SREGOMMENOATIONSFOR RNALGLEANING. END OF SECTION 08800 GVPSUM ORVWALL SECTION 09250 PART t - GENERAL 1.1 SEGTIONINGLUDES A. PROVI�E SGREW�rvPE GVPSUM �RV WALL AS SHOWN ON THE �RAW W GS, AS SPEQFlE� HEaEiN, nNo as NEEOEo ro mEEr rHE aEouiaEmENrs oF rHE coNsraucrioN sHowN IN THE CONTRACT �OCUMENTS. THE WORK INCLU�ES, BUT IS NOT NECESSARILV LIMITE� TOTHE FOLLOWING'. 1. GVPSUM DRYWALL MCLUDING SCREW TVPE SUPPORT SVSTEM 2. DRYWALLFINISHING(JOINTTAPE-ANDCOMPOUNDTREATMENT) 1.3 REFERENCES A. GVPSUM BOARD STANDARDS'. GA-2t6 BV GVPSUM ASSOCIATION tA REGULATORVREOUIREMENT A. RRERESISTANGE RATWGS WHERE GVPSUM DRVWALL SVSTEMS WITH FlRE RESISTANGE RATINGS ARE IN�ICATE� OR ARE REQUIRE� TO COM PLV WITH G W ERNING REGUTATIONS PROVI�E MATERIALS AN� INSTALLATIONS I�ENTICAL W ITH APPLICABLE ASSEMBLIES WHICH HAVE BEEN TESTED AND LISTED BV RECOGNIZED AUTHORITIES, MCLUDING UL. PART2-PRODUCTS 2.t MATERIALS A. METAL SUPPORT STANDARDS ASTM G-]54 B. STUDS ASTM G 6aY 25 GAUGE UNLESS OTHERWISE NOTED. 1. DEPTH OF SEGTION'.3�5 8" OR AS NOTED. / 2 RUNNERS'. MATCH STU�S', TVPE RECOMMEN�E� BV STU� MANUFACTURER FOR FLOOR AN� CEILING SUPPORT OF STU�S AN� FOR VERTICAL ABUTMENT OF �RV WALL WORK AT OTHER WORK. G STUD SVSTEM ACCESSORIES�. PROVIDE STUD MANUFACTURER'S STANDARD CLIPS SHOES TIES, REINFORCEMENTS, FASTENERS AND OTHER ACCESSORIES AS NEEDED FOR A COMPLETE STUD SVSTEM. D. FURRWG MEMBERS ASTM G 6aY 25 GAUGE HAT-SHAPED. E. ZFURRWG MEMBERS MANUFAGTURER'SSTANDARDSGREWTVPEZ-SHAPEDFURRWG MEMBERS', OF NOT THINNER THAN 2fi GAUGE GALVANIZEO STEEL, ASTM A525, G90', OF oEarH iNoicnrEo�, oEsicNEo Foa mECHnNicn��v nrrncHmENr oF iNsuwrioN aonaos OR BLANKETSTO MONOLITHICCONCRETEAND MASONRV WALLS. PROVIDE FASTENERS OF TVPE AND SIZE RECOMMENDED INDICATED. F. E%POSED WALLBOARD'. TVPE % FIRE RESISTANT WITH TAPERED LONG EDGES 5ie" I ) THICKNESS E%CEPT W HERE OTHERWISE INDICATED IN MA%IMUM LENGTH AVAILABLE WHIGH WILL MINIMIZE END JOINTS. G. WATER-RESISTANT TVPE'. PROVIDE BEHIND ALL CERAMIC TILE WORK AND WHERE OTHERW ISE INDIGATEP 5 8" THIGK WATERAESISTANT TVPE X. / H. TRIM HGGESSORIES'. PROVI�E MHNUFHGTURER'S STHN�HR� TRIM HGGESSORIES OF rvaes iNoicnreo Foa oavwn�� woaK Foam eo oF cn�vnNizeo sree� uN�ess orHeawise iNoicnreo wirH eirHea KNua�eo nNo aeaFoanreo oa exanNoeo FLANGES FOR NAILING AND BEADED FOR CONCEALMENT OF FLANGES IN JOINT COMPOUND. PROVIDE CORNER BEADS L TVPE EDGE TRIM-BEADS U TVPE EDGE TRIM-BEADS SPECIALL-NERFTVPEEDGETRIM-BEADS. I. JOINTCOMPOUND'.ASTMC4]5-FORINTERIORWORNPROVIDESINGLEMULTI-PURPOSE GRADE, READV-MIXED VINVL rvPE, WITH PERFORATED rvPE PAPER JOINT TAPE. J. GVPSUM BOARD FASTENERS'. GVPSUM BOARD SGREWS'. ASTM G 1002. K. PROVI�EAUXILIARVMATERIALSFORGVPSUM�RVWALLWORKOFTHENPEAN�GRA�E RECOMMEN�E�BVTHEMANUFACTURERGVPSUM BOAR�S. PART 3 - E%ECUTION 3.1 INSTALLATION A. ALLOWABLE TOLERANCES'. t/tfi" OFFSETS BETWEEN PLANES OF BOARD FACES, AND t/e" INB'-0"FORPLUMB LEVEL WARPANDBOW. B.INSTALLATIONOFWAL PARTITIONSUPPORTSVSTEMS'.INSTALLSUPPLEMENTARV 4 FRHMWG BLOGKWGNNDBRHGWGTOSUPPORTFlXTURES EOUIPMENT SERVIGES HEAW TRIM, FURNISH W GS ANO SIMILAR WORK WHIGH GANNOT BE AOEQUATELV suaaoareo oN cvasum eonao n�oNe. wsrn�� auNNea rancKs nr F�ooas, ceuNcs AN� STRUCTURAL WALLS AN� COW MNS WHERE GVPSUM �RV WALL STU� SVSTEM ABUTS OTHER WORK, E%CEPT AS OTHERW ISE INDICATED. SPACE STUDS tfi" O.G, E%CEPT AS OTHERWISE INDICATED. C. ISOLATE STUDS FROM TRANSFER OF STRUCTURAL LOADING TO SVSTEM, BOTH HORIZONTALLVANDVERTICALLV. PROVIDESLIPORCUSHIONEDTVPEJOINTSTOATTAIN LATERAL SUPPORT AND AVOID AXIAL LOAD WG. �. HT OPEN W GS FOR �OORS, INSTHLL �OUBLE (2 EH) 20 GNUGE STU�S NT HLL OPEN W G5, SCREW ATfACH WEB OF BACK�TO�BACK STU�S �IRECT TO JAM B ANCHOR CLIPS NESTE� eE1wEEN FwNCE oF sruo, uN�Ess orHEawisE iNoicnrEo. FanmE oaENiNcs orHEa THAN DOOR OPENINGS IN SAME MANNER AS REQUIRED FOR DOOR OPENINGS�, AND INSTALL FRAM ING BELOW SILLS OF OPENINGS TO MATCH FRAMING REQUIRED ABOVE DOORHEADS. E INSTALLATION OF WALL FURRING'. SPACE WALL FURRING M EMBERS 24" O.C., EXCEPT AS OTHERW ISE INDICATED. ERECT THERMAL INSULATION VERTICALLV AND HOLD IN PLACE WITH 2FURR W G MEMBERS SPAGED 16" OA. EXGEPT AT EXTERIOR GORNERS, SEGURELV ATfAGH NARROW FLANGESOF FURRWG MEMBERSTO WALL WITH GONGRETE STU� NAILS oa aowea�oaive FnsreNeas sanceo i s�� o.c nr eureaioa coaNeas, nrrncH wioe F�nNCE oF FuaaiNc mEm eEas ro wn�� wirH sHoar FwNCE E�crENoiNc eEvoNo CORNER START FROM THIS FURRING MEMBER W ITH 3" WIDE STRIP OF INSULATION FOLLOW ED BV FURRING M EMBER IN THE NORMAL MANNER. AT INTERIOR CORNERS, SPACE SECOND MEMBER NO MORE THAN t2" FROM CORNER AND CUT INSULATION TO FIT. UNTIL GVPSUM BOARD IS INSTALLED, HOLD INSULATION IN PLACE W ITH t0" STAPES FABRIGATED FROM t 8 GAUGE TIE WIRE AND INSERTED THROUGH SLOT IN W EB OF MEMBER, OR BV AN EQUALLV AGGEPTABLE METHOD. F INSTALLSUPPLEMENTARVFRAMING,RUNNERS,FURRING,BLOCKINGAN�BRACINGAT OPENING AN� TERMINATIONS IN THE WORK, AN� AT LOCATIONS REQUIRE� TO SUPPORT FI%TURES, EQUIPMENT, SERVICES, HEAW TRIM, FURNISHINGSAND SIMILAR WORK WHICH CANNOT BE ADEQUATELV SUPPORTED DIRECTLV ON GVPSUM BOARD ALONE. G. INSTALL WALLiPARTITION BOARDS VERTICALLV TO AVOID END-BUTT JOINTS WHEREVER POSSIBLE. H. AT STAIRWELLS AND SIMILAR HIGH WALLS, INSTALL BOARDS HORIZONTALLV WITH END JOINTSSTAGGERED WERSTUDS. I INSTHLL EXPOSE� GVPSUM BONR� WITH FAGE SI�E OUT. �O NOT INSTALL IMPERFEGT, OAMAGEO OR OAMP BOAROS. BUTf BOAROS TOGETHER FOR A LIGHT GONTAGT AT EOGES nNo ENos wirH Nor moaE rHnN ins° oaEN sancE eE1wEEN eonaos. oo Nor FoacE INTO PLACE. J. LOCATEDEITHEREDGEORENDJOINTSOVERSUPPORTS,E%CEPTINHORIZONTAL APPLICATIONS OR WHERE INTERMEDIATE SUPPORTS OR GVPSUM BOARD BACK BLOCKING IS PROVIDED BEHIND END JOINTS. POSITION BOARDS SO THAT BOTH TAPERED EDGE JOINTS ABUT, AND MILL CUT OR FlELD-CUT END JOINTS ABUT. DO NOT PLACE TAPERED EDGES AGAINST GUT EDGES OR ENDS. STAGGER VERTIGAL JOINTS W ER DIFFERENT sruos oN oaaosire sioes oF anaririoNs. K. nrrncHcvasumeonaoroFanmiNcnNoe�ocKiNcnsaeouweoFoanooirioNn� suaaoar nr oaeNiNcs nNo curours Foam coNrao� doiNls nNo exanNsioN doiNls WITH SPACE BERNEEN E�GES OF BOAR�S, PREPARE� TO RECEIVE TRIM ACCESSORIES. COVER BOTH FACES OF STEEL STUD PARTITION FRAMING WITH GVPSUM BOARD IN CONCEALED SPACES (ABOVE CEILINGS, ETCJ, E%CEPT IN CHASE WALLS WHICH ARE PROPERLV BRACED INTERNALLV. L. ISOLATE PERIMETER OF NON-LOAD-BEARING DRVWALL PARTITIONS AT STRUCTURAL ABUTMENTS. PROVIDE 1/0" TO 1/2" SPAGE AND TRIM EDGE WITH J TVPE SEM6FlNISH W G eoce raim. sen� doiNrs wirH ncousricn� senu�Nr. oo Nor FnsreN oarwn�� OIREGTLV TO STUO SVSTEM RUNNER TRAGKS. M. SPACE FASTENERS IN GVPSUM BOAR�S IN ACCOR�ANCE WITH REFERENCE� STAN�AR�S AN� MANUFACTURER'S RECOMMEN�ATIONS. 32 GVPSUM DRVWALLAPPLICATION METHODS A. SINGLE-LAVER APPLICATION'. INSTALL E%POSED GVPSUM BOARD. B. ON PARTITIONS/WALLS APPLV GVPSUM BOARD VERTICALLV (PARALLEL), UNLESS OTHERWISE INDICATED AND PROVIDE SHEET LENGTHS WHICH WILL MINIMIZE END JOINTS. G. ON bFURR W G MEMBERS APPLV GVPSUM BOARO VERTIGALLV (PARALLEL) WITH NO ENO JOINTS LOGATE EOGEJOINTS WER FURRING MEMBERS. �. �IRECLBON�ING TO SUBSTRATE'. WHERE GVPSUM BOAR� IS IN�ICATE� TO BE �IRECTLV ADHERED TO A SUBSTRATE (OTHER THAN STUDS, JOINTS, FURRING MEMBERSOR BASE LAVER OF GVPSUM BOARD), COMPLV WITH GVPSUM BOARD MANUFACTURERS RECOMMENDATIONS, AND TEMPORARILV BRACE OR FASTEN GVPSUM BOARD UNTIL FASTEN W G ADHESNE HAS SET. E INSTHLIATIONOF�RVWHLLTRIMHGGESSORIES'.WHEREFEHSIBLE,USETHESHME FASTENERS TO ANGHOR TRIM AGGESSORV FLANGES AS REOUIRE� TO FASTEN GVPSUM eonao ro rHe suaaoars. orHeawise FasreN FwNces ev NauNc w nccoaonNce WITH MANUFACTURER'S INSTRUCTIONS AN� RECOMMEN�ATIONS. INSTALL METAL CORNER BEADS AT E%rERNAL CORNERS OF DRYWALL WORK. F. INSTALL EDGE TRIM WHENEVER EDGE OF GVPSUM BOARD WOULD OTHERW ISE BE EXPOSED OR SEMI-IXPOSED. PROVIDE TVPE WITH FACE FLANGE TO RECEIVE JOINT COMPOUND. INSTALL L TVPE TRIM WHERE WORK IS TIGHTLV ABUTTED TO OTHER WORK, AND INSTALL SPEGIAL KERF TVPE W HERE OTHER WORK IS KERFED TO REGEIVE LONG LEG OF L rvPE TRIM. INSTALL U rvPE WHERE EDGE IS EXPOSED, REVEALED, GASKETED, OR SEAIANLFlLLEO QNCLU�WG IXPANSION JOINTS7. c. iNsrn�wrioN oF oavwn�� FiNisHiNc. naa�v raenrmeNr nr cvasum aonao doiNrs (BOTH �IRECTIONS), FLANGES OFTRIM ACCESSORIES, PENETRATIONS, FASTENERS HEADS, SURFACE DEFECTS AND ELSEWHERE AS REQUIRED TO PREPARE WORK FOR DECORATION. PREFILL OPEN JOINTS AND ROUNDED OR BEVELED EDGES, USING TVPE OF COMPOUND RECOMMENDED BV MANUFACTURER. APPLV JOINT TAPE AT JOINTS BETW EEN GVPSUM BOARDS, EXCEPT WHERE A TRIM ACCESSORV IS INDICATED. APPLV JOINT GOMPOUND W THREE (3) GOATS (NOT INGLUDWG PREFlLL OF OPEN WGS IN BASEJ, AND snNo aE1wEEN u�sr 1wo (z) conrs nNo nFrEa u�sr conr. nr wnrEa�aEsisrnNr Gvasum aonao anse Foa ceanmic n�e, rnae nNo Fwisr+ dowrs wirH 1wo (z) conrs WATER�RESISTANT JOINT MATERIAL. H. PARTIAL FINISHING'. OMITTHIRD COAT QF SPEQFIED) AND SANDING ON CONCEALED DRVWALL WORK WHICH IS INDICATED FOR DRYWALL FINISHING OR WHICH REQUIRES FINISHING TO ACHIEVE FIRE RESISTANCE RATING, SOUND RATING OR TO ACT AS AIR OR SMOKE BARRIER. REFER TO SECTIONS ON PAINTING, COATING AND WALL C W ERINGS IN DIVISION 9 FOR DECORATIVE FINISHES TO BE APPLIED TO DRVWALL WORK. 3.3 PROTEGTION n. iNsrn��ea sr+n�� novise coNrancroa oF aeouiaeo aaoceouaes Foa aaorecriNG cvasum oavwn�� woaK Faom omm�ce nNo oereaioanrioN ouaiNc aemniNoea oF CONSTRUCTION PERIOD. END OF SECTION 09250 CEHAMIC TILE SECTION 09300 PART 1 � GENERAL i.i secrioNiNcwoes A. PROVI�ETILEASSHOWNONTHE�RAWINGS,ASSPEQFIE�HEREIN,AN�ASNEE�E�TO MEET THE REQUIREMENTS OF THE CONSTRUCTION SHOW N IN THE CONTRACT DOCUMENTS. 12 SUBMITTALS A. PRODUCTDATA'.SUBMIT MANUFACTURER'STECHNICALINFORMATIONANDINSTALLATION INSTRUGTIONS FOR MATERIALS REQUIREq EXGEPT BULK MATERIALS. INGWDE GERTIFlGATIONS AND OTHER DATA TO SHOW GOMPLIANGE W ITH THESE SPEQFlGATIONS. 1.3 QUALITV ASSURANGE n. HnNo�e, sroae, m ix nNo naa�v aaoaaiernav serrwc nNo caounNc mnreain�s w COMPLIANCE WITH MANUFACTURER'SINSTRUCTIONS. B. PROVIDE MATERIALS OBTAINED FROM ONE SOURCE FOR EACH NPE AND COLOR OF TILE, GROUT, AND SETTING MATERIALS. C. INSTALLER QUALIFICATIONS'. ENGAGE AN E%PERIENCED INSTALLER W HO HAS SUCCESSFULLV COMPLETED TILE INSTALLATIONS SIMILAR IN MATERIAL, DESIGN, AND EMENTTO THAT INDIGATED FOR PROJEQ. 1.J �ELNERV, STORAGE, & HAN�LWG A. OELNER MATERIALS IN ORIGINAL UNOPENEO GONTAWERS WITH LABELS INTAGTANO LEGIBLE AT TIME OF USE. STORE UN�ER CON�ITIONS RECOMMEN�E� BV THE MANUFACTURER. DO NOT RETAIN AT THE PRQIECT SITE ANV MATERIAL WHICH HAS E%CEEDED THE SHELF LIFE RECOMMENDED BV ITS MANUFACTURER. 1.5 SITECONDITIONS A. MAINTA W ENVIRONMENTAL CONDITIONS AND PROTECT WORK DURING AND AFTER INSTALLATION IN ACCORDANCE WITH REFERENCED STANDARDSAND MANUFACTURER'S PRINTED REGOMMENDATIONS. anarz�aaooucrs 2.1 MATERIALS A. TILE MATERIALS�. REFER TO THE DRAWINGS FOR THE SCHEDULE OF PRODUCTS, MANUFACTURERS AND COLORS OF TILE MATERIALS. PART 3 - E%ECUTION 3.1 INSTALLATION A. TILE INSTALLATION STANDARDS GOMPLV W ITH APPLIGABLE REQUIREMENTS OF THE ANSI 108 SERIES OF TILE INSTALIATION STANOAROS INGWOEO UNOER "AMERIGAN NATIONAL srnNonao saeciFicnrioNs Foa rHe iNsrn�wrioN oF ceanmic n�e�� rHnr naa�v ro THE TVPE OF SETfING AN� GROUTING MATERIALS AN� METHO�S IN�ICATE�. e. aaorEcrivEconriNc�.nriNsrn��Ea�soarioN,nNowHEaENEEOEoroaaEVENr ADHESION OR STAINING OF E%POSED TILE SURFACES BV GROUT, PROTECT E%POSED SURFACES OF TILE AGAINST ADHERENCE OF MORTAR AND GROUT BV PRECOATING THEM WITH A CONTINUOUS FILM OR TEMPORARV PROTECTIVE COATING TAKING CARE NOT TO COAT UNEXPOSED TILE SURFACES. G. FLOOR TILE SHALL BE THINSET IN PORTLAND GEMENT MORTAR MEETW G ANSI A118.1. USESANDEDGEMENTGROUTWITHAGRVLIGADDITNE INAGGORDANGEWITHTGA HAN�BOOK METHO� NQ R 13. �. WALLTILESHALLBETHINSETINORGANICA�HESNEMEETINGANSIA13fi.1 TVPE11. USE NON-S4NDEDPORTLANDCEMENTGROUTWITHLATE%ACRVLICADDITIVE PERTCA METHOD NO. W242. ANV E%POSED EDGES ON TILE WAINSCOT (VERTICAL OR HORIZONTAL) SHALL BE FINISHED WITH FACTORV BULLNOSE TILE TO MATCH SPECIFlED FlELD TILE. E COMPLVWITHMANUFACTURER'SINSTRUCTIONSFORMIXINGANDINSTALLATIONOF PROPRIETARV MATERIALS. E EXrENDTILEWORKINTOREGESSESANDUNDERORBEHINDWUIPMENTANDFlXTURES TOFORM AGOMPLETEGOVERWG WITHOUTINTERRUPTIONS EXGEPTASOTHERWISE SHOWN. TERMINATE WORK NEATLV AT OBSTRUCTIONS, E�GES AN� CORNERS WITHOUT �ISRUPTING PATfERN OR JOINTALIGNMENTS. G. ACCURATELV FORM INTERSECTIONS AND RETURNS. PERFORM CUTfING AND DRILLING OF TILE WITHOUT MARRING VISIBLE SURFACES. CAREFULLV GRIND CUT EDGES OF TILE ABUTTING TRIM, FINISH OR BUILT-IN ITEMS FOR STRAIGHT ALIGNED JOINTS. FIT TILE CLOSELV TO ELECTRICAL OUTLETS, PIPING, FIXTURES AND OTHER PENETRATIONS SO THATPLATES GOLORS ORGOVERSWERLAPTILE. H. JOINTWG PATfERM. UNLESS OTHERWISE SHOWN LAV TILE W GRID PATfERN. ALIGN JOINTSWHENAOJOININGTILESONFLOOR BASE WALLSANOTRIMARESAMESIZE. IAVOUTTILE WORK AN� CENTER TILE REL�S IN BOTH �IRECTIONS W EACH SPACE OR ON EACH WALLAREA. ADJUSTTO MINIMIZE TILE CUTfING. PROVIDE UNIFORM JOINT WIDTHS, UNLESS OTHER WISE SHOW N. 32 CLEANINGAND PROTECTION A. UPON COM PLETION OF PLACEMENT AND GROUTING, CLEAN ALL CERAMIC TILE SURFACES SO THEV ARE FREE OF FOREIGN MATTER. B. UNGLAZED TILE MAV BE CLEANED WITH ACID SOLUTIONS ONLV WHEN PERMITTED BV TILE ANDGROUTMANUFAGTURER'SPRINTEDINSTRUGTIONS BUTNOTSOONERTHAN1aDAV5 HFTER INSTALLHTION. PROTEGT METHL SURFHGES GNST IRON HN� VITREOUS P W MB W G FlXTURES FROM EFFECTS OF ACI� CLEANING. FWSH SURFACE WITH CLEAN WATER BEFORE AND AFTER CLEANING. G FINISHED TILE WORK�. LEAVE FINISHED INSTALLATION CLEAN AND FREE OF CRACKED, CHIPPED BROKEN UNBONDED OR OTHERWISE DEFECTIVE TILE WORK. D. PROTECTION'. W HEN RECOMMENDED BV TILE MANUFACTURER APPLV A PROTECTIVE COAT OF NEUTRAL PROTECTIVE CLEANER TO COM PLETED TILE WALLS AND FLOORS. PROTEGT INSTALLED TILE WORK W ITH KRAFT PAPER OR OTHER HEAW GOVER W G DUR W G GONSTRUGTION PERIOD TO PREVENT DAMAGE AND WEAR. E PROHIBRFOOTAN�WHEELTRAFRCFROMUSINGTILE�FLOORSFORATLElvSTTHREE(3) �AVS AFTER GROUTING IS COMPLETE�. F. BEFOREFINALINSPECTIONREMOVEPROTECTIVECOVERINGSANDRINSENEUTRAL CLEANER FROM TILE SURFACES. END OF SECTION 09300 ACOUSTICAL CEILINGS SECTION W510 PHRT 1 � GENERHL i.i secrioNiNcwoes n. aaovioe ncousncn� ceuNcs ns sHowN oN rHe oanwwcs, ns saeaFieo HeaeN, AN� AS NEE�E� TO MEET THE REQUIREMENTS OF THE CONSTRUCTION SHOWN IN THE CONTRACTDOCUMENTS. 12 QUALITVASSURANCE A. INSTALLER'. FIRM WITH NO LESS THAN THREE (3) VEARS OF SUCCESSFUL E%PERIENCE IN INSTALLATION OF ACOUSTICAL CEILINGS SIMILAR TO REQUIREMENTS FOR THIS PROJECT AND WHIGH IS AGGEPTABLE TO MANUFAGTURER OF AGOUSTIGAL UNITS, AS SHOWN BV GURRENT W RITfEN STHTEMENT FROM MHNUFHGTURER. i.a oeuveav,sroance,aHnNouNc n. oEuvEa mnrEain�s iN oaiciNn� uNoaENEo coNrniNEas nNo sroaE rHEm iN n Fu��v ENCLOSED SPACE WHERE THEV W ILL BE PROTECTED AGAINST DAMAGE FROM MOISTURE, DIRECT SUNLIGHT, SURFACE CONTAMINATION OR OTHER CAUSES. 1.4 IXTRA MATERIALS A. MAINTENANCE STOCN'. AT TIME OF COM PLETING INSTALLATION, DELIVER STOCK OF MAINTENANCE MATERIAL TO OWNER FURNISH FULL SIZE UNITS MATCHING UNITS INSTALLED, PAGKAGED WITH PROTEGTNE GWERWG FOR STORAGE, ANDIDENTIRED WITH APPROPRIATE LABELS FURNISH AMOUNT EQUAL TO 20 % OF EAGH TVPE OF THE TOTAL ncousricn�anNe�siNsrn��eo. PART2-PRODUCTS 2.1 MATERIALS A. ACOUSTICAL PANELS'. REFER TO DRA WINGS FOR SCHEDULE OF CEILING MATERIALS AND SIZES. B. KITGHEN & SERV WG AREA GEILWGS WATER RESISTANTGEILWG PANELS 2a x a8" x t/2" VINVL SURFAGED GVPSUM BOARD PANELS EQUAL TO GVPSUM GEILW G PANELS, AS MANUFACTURE� BV USG, OR VINVLROCK, !v5 MANUFACTURE� BV CAPAUL. G TVPICALCEILING GRI�'. ARMSTRONG PRELU�E SVSTEM 15/1fi T�GRI� COLOR=WHITE D. ALUMINUM CEILING GRID (FOR USE WITH WATER RESISTANTCEILING PANELS)�. ARMSTRONG PREWDE SVSTEM 15/1fi" T�GRID COLOR=WHITE 22 CEILING SUSPENSION MATERIALS A. GENERAL'. COMPLV W ITH ASTM C fi35, AS APPLIGBLE TO TVPE OF SUSPENSION SVSTEM REQUIRED FOR TVPE OF CEILING UNITS INDICATED. COORDINATE WITH OTHER WORN SUPPORTED BV OR PENETRATWG THROUGH CEILINGS, INCWDING LIGHT FlXTURES, HVAC WUIPMENT, HN� PHRTITION SVSTEM QF HNV). a. nrrncNmENr oEvicEs�. sizE Foa FivE �s) rimEs oEsicN �ono iNoicnrEo iN asrM c 5ss, rne�ei,owecrHUNc. G HANGER W IRES'. GALVANIZE� CARBON STEEL, ASTM A fi41, SOFT TEMPER, PRE� STRETCHED, VIELD-STRESS LOAD OF AT LEAST THREE (3) TIMES DESIGN LOAD, BUT NOT LESS THAN 12 GAUGE (0.108"J. D. EDGE MOLDINGS'. MANUFACTURER'S RECESSED CHANNEL MOLDING FOR EDGESAND PENETRATIONS OF CEILWG, W ITH SINGLE FLANGE OF MOLDWG IXPOSED, BAKED ENAMEL RNISH TO MATGH BALANGE OF GRID. E. ExaosEosusaENsioNsysrEm�.mnNUFncruaEa�ssrnNonaoExaosEoauNNEas, caoss�auNNeas nNo nccessoaies, oF rvaes nNo aaoFi�es iNoicnreo, wirH ExaosEo caoss auNNEas coaEo ro wv FwsH wirH mniN auNNEas. F. FINISHOFE%POSE�MEMBERS'.PROVI�EUNIFORMFACTORKAPPLIE�FINISHONE%POSE� SURFACES OF CEILING SUSPENSION SVSTEM, MCWDING MOLDINGS,TRIM, AND ACCESSORIES. G. FINISH'. MANUFACTURER'S BAKED ENAMEL FINISH, TO MATCH TVPE OF CEILING. PART 3 - EXEGUTION 3.1 EXAMINATION A EXAM W E AREAS ANO GONOITIONS UNOER WHIGH THE WORK OF THIS SEGTION W ILL BE PERFORME�. �O NOT PROCEE� IF CON�ITIONS E%IST THATARE �ETRIMENTALTO PROPER AN� TIMELV COMPLETION. COMMENCEMENT OF THIS WORK WILL BE CONSTRUE� AS ACCEPTANCE OF E%ISTING CONDITIONS OR PRIOR WORK BV OTHERS, AND ASSUMPTION OF RESPONSIBILITV FOR SATISFACTORV INSTALLATION. 32 PREPARATION A. COORDINATION'. FURNISH LAVOUTS FOR INSERTS CLIPS OR OTHER SUPPORTS REQUIRED TO BE INSTHLLED BV OTHER TRHDES FOR SUPPORT OF HGOUSTIGNL GEIL W GS. B. MEASUREEAGHGEILWGAREAAN�ESTABLISHLAVOUTOFAGOUSTIGAWNITSTO an�nNCE aoaoEa wiorHs nr oaaosirE EOGEs oF Encr+ ceuNG. nvoio usE oF �Ess� THAN�HALF WI�TH UNITS AT BOR�ERS, AN� COM PLV WITH REFLECTE� CEILING PLANS PPOJECT COOPDINATOP�DESIGN CONSOLTANi / I 1 / id 2fi41 IRVING BLVD. DALLA$ TEXAS �520� TEL: 214-638-6800 AFCHiTEcii ErvGmEEF : �' � o. ,t��'••... _' P ........ ., � P ,. ! ; Q,,P�c,�sTEpFQ y : U: 2 � I� No. AR11800031 �! � PROJECT NO.: DRAWN BY'. CHECKEDBY: iRnVe�eRs aRo�ecin: � � �1 � � J � � � � � � � � INDIANAPOLIS 10.14.19 445 030 MPNP HN/NC/CM P10 0312 SEVEN PARKWOOD CROSSING 280 E. 96TH STREET 1ST, 2ND, & 3RD FLOOR INDIANAPOLIS, IN 46240 NO. REVISIONS'. DATP. �nrvo�oROREviEwissuEonTe io.ia.is TENANT REVIEW ISSUE DATE: 1000.19 BID ISSUE DATE�. ID.1a.19 PERMITISSUE�ATE 10.14.19 CONSTRUCTIONISSUEDATH X%/X%2019 �RAWING TITLE: SPECIFICATIONS DRAWING NUMBER. G0.3 �O 2019 idGROUP, LLC