HomeMy WebLinkAboutPD1.0-2 Plumbing Demolition Plan- 2nd FloorO KEYED NOTES:
1. REMOVE 1-1/2" SANIiARY WASiE UP 1HROUGH ROOR AND BACK i0 2" MAIN.
2 REMOVE TEE FlTTING. REPLACE WITH SiRAIGHT PIPING.
PflOJEGT
�
�
id;�RCJP
2641 IRVING BLVD.
DALLAS,TEXAS 75207
TEL 214-638-6800
AFCHITECT/ENGMEEF
1 1 '
MUSSETT NICHOLAS
+ A S S O C I A I t S
Engineers +Architecis
502 S. wESi SiREEi
INDIANAPOLIS INDIANA 46225
3 V-631 9241
5974 SIX FORKS ROAD, SUIiE B
RALEIGH, NORiH CAROLINA D609
919 ]03 4028
sEn�
Na.
10505672
sure or
�,
PROJECT NO_
DRAWN BY'
CHECKEDBY�.
TRAVELER'S PROJECT IX�.
FL
i �
�
�
J
W
�
a
�
�
INDIANAPOLIS
2019222
DDfl
JMF
P18-0312
SEVEN PARKWOOD
CROSSING
280 E. 96TH STREET
1 ST, 2ND, & 3RD FLOOR
INDIANAPOLIS, IN 46240
li����:��������i,���i���i��������i
Su6jec��o compliance with allregula�ions
of Sla�e antl Local Codes
City of Carmel
�i
`��¢m�' lamn�Ml1 �
onrE: 12/09/19
�oRTH
PLUMBING DEMOLITION PLAN - 2ND FLOOR
s�A�E:,iB.=„o. �n�'1..r�
0 T 4 6' A'
DRAW ING TITLE�.
PLUMBING DEMOLITION
PLAN - 2ND FLOOR
�RAWINGNUMBER'.
PD1.0-2
�02019 idGROUP, LLC
LANDLORD REVIEW ISSUE DATE�. 10.14.19
TENANTREVIEW ISSUE �ATE�. 10.08]9
BIDISSUEDATE' 10.10.19
PERMIT ISSUE DATE�. 10.14.19
CONSTRUCTIONISSUE�ATE�. %%�%%�2019