Loading...
HomeMy WebLinkAboutA-303LIVING ROOM ROOF PATIO MAIN LEVEL FFL 100'- 0" (= 841' A.S.L.) MAIN SOFFIT 97' - 6" LOWER PARAPET 97' - 5" LOWER LEVEL FFL 84'-11" MAIN CLG / WDW HEAD 110' - 0" MAIN PARAPET 112' - 6" UPPER LEVEL FFL 117' - 6" UPPER PARAPET 130' - 1" UPPER SOFFIT 115' - 0" R3.1 R2.3 R2.3 BRIDGE ROOF DRAIN 4" GREEN ROOF 4" GREEN ROOF ROOF DRAIN E.2 C B E 16'-6"10'-10"36" CABLE GUARDRAIL 36" CABLE GUARDRAIL EXTERIOR SUN SHADES UPPER LEVEL BEYOND SPF AROUND BEAMS, TYP. T.O. SLAB 111'- 3 1/2"12'-6" 1"2'-6" 10'-0" 2'-6" 2'-6" 2'-6" 12'-7"T.O. M.L. SLAB 99'-11" T.O. PATIO SLAB 116'- 6"<2'-6"> MAIN LEVEL FFL 100'- 0" (= 841' A.S.L.) MAIN SOFFIT 97' - 6" LOWER PARAPET 97' - 5" LOWER LEVEL FFL 84'-11" MAIN CLG / WDW HEAD 110' - 0" MAIN PARAPET 112' - 6" MASTER BEDROOM 2 BATH / CLOSET HALL R2.2 R2.1R2.4 BEDROOM BATH BATH BEDROOM F1.2 F3 R3.1 W2 W4 12" GREEN ROOF 4" GREEN ROOF4" GREEN ROOF MASTER ROOF PATIO ROOF DRAIN ROOF DRAIN ROOF DRAIN 10'-0" 2'-6"ROOF DRAIN E.2 C BD D.5 E 11'-2"14'-8"10'-10"MASTER BALCONY F.2 LOWER CLG / WDW HEAD 94'-11" 36" CABLE GUARDRAIL W3 SIM T.O. ROOF SLAB 111'- 3 1/2"10'-0" 1"2'-6" 10'-0" 2'-6"2'-6" T.O. L.L. SLAB 84'-10" T.O. M.L. SLAB 99'-11" R3.1 ROOF DRAIN ROOF ASSEMBLY - UPPER ROOF R2.1 ROOF ASSEMBLY - 4" GREEN ROOF, INTERIOR EXPOSED STRUCTURE ROOF ASSEMBLY - UPPER ROOF @ OVERHANGS R1.2 R1.1 ROOF ASSEMBLY - 4" GREEN ROOF W/ EXT. SOFFIT R2.2 ROOF ASSEMBLY - UPPER ROOF R1.3 · 60 MIL TPO ROOFING MEMBRANE - FULLY ADHERED · TAPERED INSULATION. SLOPE 1/4" PER 12". (SEE ROOF PLAN FOR LAYOUT) ·7" XPS INSULATION, R-35 MIN. ·VAPOR RETARDER (SAME OR COMPATIBLE WITH WRB AT WALL, TYP.) · ACOUSTIC ROOF DECKING, PAINTED. SEE STRUCTURAL PLANS & DETAILS. · STEEL FRAMING. REFER TO STRUCTURAL. PAINTED · 60 MIL TPO ROOFING MEMBRANE - FULLY ADHERED · TAPERED INSULATION. SLOPE 1/4" PER 12". (SEE ROOF PLAN FOR LAYOUT) ·7" XPS INSULATION, R-35 MIN. ·VAPOR RETARDER ·ROOF DECKING. SEE STRUCTURAL PLANS & DETAILS ·FILL SPACE W/ CELLULOSE INSUL. ·STEEL FRAMING. REFER TO STRUCTURAL ·LIGHT-GAGE STEEL FURRING ·1/2" DENS GLASS EXTERIOR SHEATHING ·WATER-RESISTANT BARRIER / AIR BARRIER · 4" XPS INSULATION - R-20 (STAGGER SEAMS BTWN LAYERS) BTWN NON-CUNDUCTIVE Z-GIRTS · F.C. PANEL ON FURRING · @ SIM - REDUCE INSUL. ON TOP TO 2", ADD SILL CANT & FLASHING · 60 MIL TPO ROOFING MEMBRANE - FULLY ADHERED · TAPERED INSULATION. SLOPE 1/4" PER 12". (SEE ROOF PLAN FOR LAYOUT) ·7" XPS INSULATION, R-35 MIN. ·VAPOR RETARDER ·ACOUSTIC ROOF DECKING, PAINTED. SEE STRUCTURAL PLANS & DETAILS. ·STEEL FRAMING. REFER TO STRUCTURAL ·MEDIUM DENSITY SPRAY FOAM INSULATION (2.5" MIN DEPTH - MIN R-15) ·LIGHT-GAGE STEEL FURRING ·5/8" GYP BD. - REFER TO CEILING PLANS FOR EXTENT · OMNI ECOSYSTEMS 4" GREEN ROOF SYSTEM ··PLANT MATERIAL ··INFINITY GROWING MEDIA ··DRIP IRRIGATION SYSTEM ··DRAINAGE & FILTER FABRIC ··ROOT BARRIER ·60 MIL TPO ROOFING MEMBRANE ·COVER BOARD ·TAPERED INSULATION. SLOPE 1/4" PER 12". (SEE ROOF PLAN FOR LAYOUT) ·VAPOR RETARDER ·7" XPS INSULATION, R-35 MIN. ·VAPOR RETARDER ·ACOUSTIC ROOF DECKING, PAINTED. SEE STRUCTURAL PLANS & DETAILS. · STEEL FRAMING. REFER TO STRUCTURAL · @ SIM: OMIT GREEN ROOF · OMNI ECOSYSTEMS 4" GREEN ROOF SYSTEM ··PLANT MATERIAL ··INFINITY GROWING MEDIA ··DRIP IRRIGATION ··DRAINAGE & FILTER FABRIC ··ROOT BARRIER ·60 MIL TPO ROOFING MEMBRANE ·COVER BOARD ·TAPERED INSULATION. SLOPE 1/4" PER 12". (SEE ROOF PLAN FOR LAYOUT) ·7" XPS INSULATION, R-35 MIN. ·VAPOR RETARDER ·ROOF DECKING. SEE STRUCTURAL PLANS & DETAILS ·STEEL FRAMING. REFER TO STRUCTURAL ·FILL VOID WITH CELLULOSE INSUL. ·LIGHT-GAGE STEEL FURRING ·1/2" DENS GLASS EXTERIOR SHEATHING ·WATER-RESISTANT BARRIER / AIR BARRIER · 2" XPS INSULATION, R-10 BTWN NON-CUNDUCTIVE Z-GIRTS · F.C. PANEL ON FURRING ROOF ASSEMBLIES ROOF ASSEMBLY - ROOF DECK W/ INTERIOR EXPOSED STRUCTURE ROOF ASSEMBLY - 4" GRN ROOF W/ FINISHED CEILING ROOF ASSEMBLY - 12" GREEN ROOF @ INTERIOR SPACE, EXPOSED STRUCTURE ROOF ASSEMBLY - ROOF DECK W/ EXTERIOR SOFFIT R2.3 R2.4 R3.1 · OMNI ECOSYSTEMS 4" GREEN ROOF SYSTEM ··PLANT MATERIAL ··INFINITY GROWING MEDIA ··DRIP IRRIGATION ··DRAINAGE & FILTER FABRIC ··ROOT BARRIER ·60 MIL TPO ROOFING MEMBRANE ·COVER BOARD ·TAPERED INSULATION. SLOPE 1/4" PER 12". (SEE ROOF PLAN FOR LAYOUT) ·7" XPS INSULATION, R-35 MIN. ·VAPOR RETARDER ·ROOF DECKING. SEE STRUCTURAL PLANS & DETAILS ·STEEL FRAMING. REFER TO STRUCTURAL ·LIGHT-GAGE STEEL FURRING ·5/8" GYP BD. - REFER TO CEILING PLANS FOR EXTENT · @ SIM: OMIT GREEN ROOF · OMNI ECOSYSTEMS 8" GREEN ROOF SYSTEM ··PLANT MATERIAL ··INFINITY GROWING MEDIA ··DRIP IRRIGATION ··DRAINAGE & FILTER FABRIC ··ROOT BARRIER ·60 MIL TPO ROOFING MEMBRANE ·COVER BOARD ·TAPERED INSULATION. SLOPE 1/4" PER 12". (SEE ROOF PLAN FOR LAYOUT) ·7" XPS INSULATION, R-35 MIN. ·VAPOR RETARDER ·ACOUSTIC ROOF DECKING, PAINTED SEE STRUCTURAL PLANS & DETAILS. · STEEL FRAMING. REFER TO STRUCTURAL. PAINTED. ·THIN PORCELAIN PAVERS ON PEDESTALS ·60 MIL TPO ROOFING MEMBRANE - FULLY ADHERED ·COVER BOARD ·TAPERED INSULATION. SLOPE 1/4" PER 12". (SEE ROOF PLAN FOR LAYOUT) ·7" XPS INSULATION, R-35 MIN. ·VAPOR RETARDER ·ROOF DECKING. SEE STRUCTURAL PLANS & DETAILS · STEEL FRAMING. REFER TO STRUCTURAL. PAINTED BLACK ·THIN PORCELAIN PAVERS ON PEDESTALS ·60 MIL TPO ROOFING MEMBRANE - FULLY ADHERED ·COVER BOARD ·TAPERED INSULATION. SLOPE 1/4" PER 12". (SEE ROOF PLAN FOR LAYOUT) ·2" XPS INSULATION, R-10 MIN. ·VAPOR RETARDER ·ROOF DECKING. SEE STRUCTURAL PLANS & DETAILS ·STEEL FRAMING. REFER TO STRUCTURAL. ·FILL VOID WITH CELLULOSE INSUL. ·LIGHT-GAGE STEEL FURRING ·1/2" DENS GLASS EXTERIOR SHEATHING ·WATER-RESISTANT BARRIER / AIR BARRIER · 2" XPS INSULATION, R-10 BTWN NON-CUNDUCTIVE Z-GIRTS · F.C. PANEL ON FURRING ROOF ASSEMBLY - ROOF DECK, FINISHED CEILING R3.3 ·THIN PORCELAIN PAVERS ON PEDESTALS ·60 MIL TPO ROOFING MEMBRANE - FULLY ADHERED ·COVER BOARD ·TAPERED INSULATION. SLOPE 1/4" PER 12". (SEE ROOF PLAN FOR LAYOUT) ·2" XPS INSULATION, R-10 MIN. ·ROOF DECKING. SEE STRUCTURAL PLANS & DETAILS ·STEEL FRAMING. REFER TO STRUCTURAL. ·FILL VOID WITH CELLULOSE INSUL. ·LIGHT-GAGE STEEL FURRING ·VAPOR RETARDER ·5/8" GYP BD. REFER TO CEILING PLANS FOR EXTENT R3.2 W1 WALL ASSEMBLY - STEEL FRAMED w/ NICHIHA FIBER CEMENT PANELS F3 FLOOR ASSEMBLY - SLAB-ON-GRADE W/ FLOOR FINISH FLOOR ASSEMBLY - MAIN & UPPER LEVEL FLOOR, W/ CEILING W2 F2 FLOOR ASSEMBLY - MAIN & UPPER LEVEL OVER EXTERIOR SPACE F1.2 FLOOR ASSEMBLY - MAIN & UPPER LEVEL FLOOR, EXPOSED STRUCTURE F4 FLOOR ASSEMBLY - SLAB-ON-GRADE F1.1 ·FLOOR TILE ·SOUND AND CRACK ISOLATION MAT ·COMPOSITE CONCRETE/STEEL DECK. REFER TO STRUCTURAL FOR DESIGN. ·· RADIANT HEAT TUBING ·1 1/2" SPRAY INSULATION FOR RADIANT HEAT ·STEEL FRAMING. REFER TO STRUCTURAL. ·LIGHT-GAGE STEEL FURRING ·CEILING FINISH. REFER TO CEILING PLANS FOR EXTENT ·FLOOR TILE ·SOUND AND CRACK ISOLATION MAT ·COMPOSITE CONCRETE/STEEL DECK. REFER TO STRUCTURAL FOR DESIGN. ·· RADIANT HEAT TUBING ·· ACOUSTIC STEEL DECK. PAINTED · STEEL FRAMING. REFER TO STRUCTURAL. PAINTED W/ STEEL DECK. ·FLOOR TILE ·SOUND AND CRACK ISOLATION MAT ·COMPOSITE CONCRETE/STEEL DECK. REFER TO STRUCTURAL FOR DESIGN. ·· RADIANT HEAT TUBING ·FILL VOID W/ CELLULOSE INSULATION ·STEEL I-JOIST FRAMING. REFER TO STRUCTURAL. ·LIGHT-GAGE STEEL FURRING ·1/2" DENS GLASS EXTERIOR SHEATHING ·WATER-RESISTANT BARRIER / AIR BARRIER ·4" XPS INSULATION - R-20 (STAGGER SEAMS BTWN LAYERS) BTWN NON-CUNDUCTIVE Z-GIRTS · F.C. PANEL ON FURRING · @SIM (GARAGE) - 5/8" GYP. BD. CLG. IN LIEU OF EXTERIOR SOFFIT ·TILE FLOOR ·SOUND AND CRACK ISOLATION MAT ·CONCRETE SLAB PER STRUCTURAL ·RADIANT IN-FLOOR HEAT TUBING ·10mil POLY VAPOR BARRIER, LAPPED SEAMS ·2" XPS FOAM INSULATION ·4" COMPACTED GRANULAR BASE (NO FINES) ·4" CONCRETE SLAB PER STRUCTURAL ·RADIANT IN-FLOOR HEAT TUBING ·10mil POLY VAPOR BARRIER, LAPPED SEAMS ·2" XPS FOAM INSULATION ·4" COMPACTED GRANULAR BASE (NO FINES) ·5/8" NICHIHA FIBER CEMENT PANELS (DARK COLOR) ·FURRING CHANNELS / AIR SPACE ·4" XPS INSULATION - R-20 (STAGGER SEAMS BTWN LAYERS) BTWN NON-CUNDUCTIVE Z-GIRTS · WATER-RESISTANT BARRIER / VAPOR RETARDER / AIR BARRIER ·1/2" DENS GLASS EXTERIOR GYPSUM SHEATHING ·6" STEEL STUDS - SPACING PER STRUCTURAL ·5/8" PAINTED DRYWALL · @ SIM: 3-5/8" STEEL STUDS ·5/16" SILBONIT FIBER CEMENT PANELS (LIGHT COLOR) ·FURRING CHANNELS / AIR SPACE ·4" XPS INSULATION - R-20 (STAGGER SEAMS BTWN LAYERS) BTWN NON-CUNDUCTIVE Z-GIRTS · WATER-RESISTANT BARRIER / VAPOR RETARDER / AIR BARRIER ·1/2" DENS GLASS EXTERIOR GYPSUM SHEATHING ·6" STEEL STUDS - SPACING PER STRUCTURAL ·5/8" PAINTED DRYWALL · @ SIM: 3-5/8" STEEL STUDS FLOOR ASSEMBLIES EXTERIOR WALL ASSEMBLIES WALL ASSEMBLY - STEEL FRAMED w/ SILBONIT FIBER CEMENT PANELS IW1 WALL ASSEMBLY - 3 5/8" FRAMED WALL IW2 WALL ASSEMBLY - 6" FRAMED WALL W3 WALL ASSEMBLY - TYPICAL BELOW-GRADE FOUNDATION WALL W4 WALL ASSEMBLY - ABOVE-GRADE FDN WALL W/ SILBONIT FIBER CEMENT PANELS IW3 WALL ASSEMBLY - 6" FRAMED WALL GARAGE INTERIOR ·2" XPS INSULATION, R-10 ·FOUNDATION WATERPROOFING: TK-HYDROMAX 2003 · POURED CONCRETE WALL - REFER TO STRUCTURAL FOR DESIGN · 2" CLOSED CELL SPF INSUL., R-14 BEHIND & BTWN STUDS; ALSO AS VAPOR RETARDER · 3 5/8" STEEL STUD FURRING, SPACING PER STRUCTURAL, HOLD OFF WALL 1-1/2" · 5/8" PAINTED DRYWALL · @ SIM: FROST FOUNDATION ONLY (NO INTERIOR) ·5/16" SILBONIT FIBER CEMENT PANELS (LIGHT COLOR) ·FURRING CHANNELS / AIR SPACE ·2" XPS INSULATION, R-10 ·FOUNDATION WATERPROOFING: TK-HYDROMAX 2003 ·POURED CONCRETE WALL - REFER TO STRUCTURAL FOR DESIGN · 2" CLOSED CELL SPF INSUL., R-14 BTWN & BEHIND STUDS; ALSO AS VAPOR RETARDER · 3 5/8" STEEL STUD FURRING, SPACING PER STRUCTURAL, HOLD OFF WALL 1-1/2" · 5/8" PAINTED DRYWALL · @ SIM: FROST FOUNDATION / RETAINING WALL ONLY (NO INTERIOR) ·5/8" PAINTED DRYWALL ·3-5/8" MTL STUDS @ 16" O.C. ·5/8" PAINTED DRYWALL ·5/8" PAINTED DRYWALL ·6" MTL STUDS @ 16" O.C. ·5/8" PAINTED DRYWALL ·5/8" PAINTED DRYWALL ·3-5/8" MTL STUDS @ 16" O.C. ·1" SPF INSUL. AT GARAGE SIDE ·BLOWN CELLULOSE INSUL. (R-21 MIN.) ·6 MIL. POLY. VAPOR RETARDER ·5/8" PAINTED DRYWALL INTERIOR WALL ASSEMBLIES W5 WALL ASSEMBLY - STEEL FRAMED w/ SILBONIT FIBER CEMENT PANELS · 5/16" SILBONIT FIBER CEMENT PANELS (LIGHT COLOR), BOTH SIDES ·FURRING CHANNELS / AIR SPACE ·WATER-RESISTANT BARRIER ·1/2" DENS GLASS EXTERIOR GYPSUM SHEATHING - BOTH SIDES · (2) ROWS 6" STEEL STUDS - SPACING PER STRUCTURAL 4" GREEN ROOF ROOF DRAIN E.2 E MASTER BALCONY MASTER BEDROOM 2 R2.2 MAIN LEVEL FFL 100'- 0" (= 841' A.S.L.) MAIN SOFFIT 97' - 6" MAIN CLG / WDW HEAD 110' - 0" MAIN PARAPET 112' - 6" UPPER LEVEL FFL 117' - 6" UPPER SOFFIT 115' - 0" T.O. ROOF SLAB 111'- 3 1/2"2'-6" 10'-0" 2'-6" 2'-6" 2'-6"T.O. M.L. SLAB 99'-11" T.O. PATIO SLAB 116'- 8" R3.2 A-303 DESCRIPTION DATE 2919 JAMES AVENUE SOUTH MINNEAPOLIS, MINNESOTA 55408 612.353.4920 © 2019 PETERSSEN/KELLER PATEL RESIDENCE10209 Ditch RoadCarmel, Indiana 4603205.14.18DESIGN REVIEW PANEL 07.09.18SD MEETING 04.11.19DD PROGRESS 06.21.19CD PROGRESS 03.18.19DD PROGRESS 06.27.19PERMIT QA SET 07.10.19ISSUED FOR PERMIT SCALE: 1 BUILDING SECTION 1/4"=1'-0" SCALE: 3 BUILDING SECTION 1/4"=1'-0" SCALE: 2 BUILDING SECTION (PARTIAL) 1/4"=1'-0" 08/23/19 David Rutti