Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A-500
ROOF ASSEMBLIES 4 7/8" 7 1/4" IW1 WALL ASSEMBLY - 3 5/8" FRAMED WALL IW2 WALL ASSEMBLY - 6" FRAMED WALL SYMBOL KEY E I # ASSEMBLY TAG (SEE PLANS AND SECTIONS FOR LOCATIONS) EXTERIOR SIDE INTERIOR SIDE GARAGE SIDE NOTES · WRB: TK-AIRMAX 2103, OR EQUAL, WITH THE FOLLOWING PERFORMANCE CRITERIA: ·· AIR PERMEANCE: <- .004 CFM/FT² ·· VAPOR PERMEANCE: <- .1 PERMS ·· UV STABILITY: 12 MONTHS · ENSURE COMPATIBILITY BETWEEN PRODUCTS IF DIFFERENT WRB'S ARE USED AT WALL AND ROOF · USE CEMENT BACKERBOARD IN LIEU OF DRYWALL @ WALL TILE. SEE INTERIOR ELEVATIONS FOR LOCATIONS. · INSTALL ACOUSTIC BATT INSULATION @ BEDROOM AND BATHROOM WALLS, TYP. G W1 WALL ASSEMBLY - STEEL FRAMED w/ FIBER CEMENT PANELS E I W3 WALL ASSEMBLY - TYPICAL BELOW-GRADE FOUNDATION WALL F3 FLOOR ASSEMBLY - SLAB-ON-GRADE W/ FLOOR FINISH FLOOR ASSEMBLY - MAIN & UPPER LEVEL FLOOR, W/ CEILING W2 W4 ROOF ASSEMBLY - UPPER ROOF, INTERIOR EXPOSED STRUCTURE R2.1 ROOF ASSEMBLY - 4" GREEN ROOF, INTERIOR EXPOSED STRUCTURE ROOF ASSEMBLY - ROOF DECK, INTERIOR EXPOSED STRUCTURE E I E I E I ROOF ASSEMBLY - 4" GREEN ROOF, FINISHED CEILING E E I F2 FLOOR ASSEMBLY - MAIN & UPPER LEVEL OVER EXTERIOR SPACE ROOF ASSEMBLY - 12" GREEN ROOF, INTERIOR EXPOSED STRUCTURE E FLOOR ASSEMBLIES FLOOR ASSEMBLY - ROOF DECK, EXTERIOR SOFFIT E E E E ROOF ASSEMBLY - UPPER ROOF @ OVERHANGS I E F1.2 FLOOR ASSEMBLY - MAIN & UPPER LEVEL FLOOR, EXPOSED STRUCTURE F4 FLOOR ASSEMBLY - SLAB-ON-GRADE F1.1 WALL ASSEMBLY - ABOVE-GRADE FDN WALL W/ FIBER CEMENT PANELS E R1.2 R1.1 R2.3 R2.4 ROOF ASSEMBLY - 4" GREEN ROOF, EXTERIOR SOFFIT E R2.2 I E R3.1 EXTERIOR WALL ASSEMBLIES INTERIOR WALL ASSEMBLIES 4 7/8" IW3 WALL ASSEMBLY - 3-5/8" FRAMED WALL GARAGE INTERIOR I I I I I I I I ROOF ASSEMBLY - UPPER ROOF, FINISHED CEILING E I · 60 MIL TPO ROOFING MEMBRANE - FULLY ADHERED · TAPERED INSULATION. SLOPE 1/4" PER 12". (SEE ROOF PLAN FOR LAYOUT) ·7" XPS INSULATION, R-35 MIN. ·VAPOR RETARDER (SAME OR COMPATIBLE WITH WRB AT WALL, TYP.) · ACOUSTIC ROOF DECKING, PAINTED. SEE STRUCTURAL PLANS & DETAILS. · STEEL FRAMING. REFER TO STRUCTURAL. PAINTED R1.3 · 60 MIL TPO ROOFING MEMBRANE - FULLY ADHERED · TAPERED INSULATION. SLOPE 1/4" PER 12". (SEE ROOF PLAN FOR LAYOUT) ·7" XPS INSULATION, R-35 MIN. ·VAPOR RETARDER ·ROOF DECKING. SEE STRUCTURAL PLANS & DETAILS ·FILL SPACE W/ CELLULOSE INSUL. ·STEEL FRAMING. REFER TO STRUCTURAL ·LIGHT-GAGE STEEL FURRING ·1/2" DENS GLASS EXTERIOR SHEATHING ·WATER-RESISTANT BARRIER / AIR BARRIER · 4" XPS INSULATION - R-20 (STAGGER SEAMS BTWN LAYERS) BTWN NON-CUNDUCTIVE Z-GIRTS · F.C. PANEL ON FURRING · @ SIM - REDUCE INSUL. ON TOP TO 2", ADD SILL CANT & FLASHING · 60 MIL TPO ROOFING MEMBRANE - FULLY ADHERED · TAPERED INSULATION. SLOPE 1/4" PER 12". (SEE ROOF PLAN FOR LAYOUT) ·7" XPS INSULATION, R-35 MIN. ·VAPOR RETARDER ·ACOUSTIC ROOF DECKING, PAINTED. SEE STRUCTURAL PLANS & DETAILS. ·STEEL FRAMING. REFER TO STRUCTURAL ·MEDIUM DENSITY SPRAY FOAM INSULATION (2.5" MIN DEPTH - MIN R-15) ·LIGHT-GAGE STEEL FURRING ·5/8" GYP BD. - REFER TO CEILING PLANS FOR EXTENT · OMNI ECOSYSTEMS 4" GREEN ROOF SYSTEM ··PLANT MATERIAL ··INFINITY GROWING MEDIA ··DRIP IRRIGATION SYSTEM ··DRAINAGE & FILTER FABRIC ··ROOT BARRIER ·60 MIL TPO ROOFING MEMBRANE ·COVER BOARD ·TAPERED INSULATION. SLOPE 1/4" PER 12". (SEE ROOF PLAN FOR LAYOUT) ·VAPOR RETARDER ·7" XPS INSULATION, R-35 MIN. ·VAPOR RETARDER ·ACOUSTIC ROOF DECKING, PAINTED. SEE STRUCTURAL PLANS & DETAILS. · STEEL FRAMING. REFER TO STRUCTURAL · @ SIM: OMIT GREEN ROOF · OMNI ECOSYSTEMS 4" GREEN ROOF SYSTEM ··PLANT MATERIAL ··INFINITY GROWING MEDIA ··DRIP IRRIGATION ··DRAINAGE & FILTER FABRIC ··ROOT BARRIER ·60 MIL TPO ROOFING MEMBRANE ·COVER BOARD ·TAPERED INSULATION. SLOPE 1/4" PER 12". (SEE ROOF PLAN FOR LAYOUT) ·7" XPS INSULATION, R-35 MIN. ·VAPOR RETARDER ·ROOF DECKING. SEE STRUCTURAL PLANS & DETAILS ·STEEL FRAMING. REFER TO STRUCTURAL ·FILL VOID WITH CELLULOSE INSUL. ·LIGHT-GAGE STEEL FURRING ·1/2" DENS GLASS EXTERIOR SHEATHING ·WATER-RESISTANT BARRIER / AIR BARRIER · 2" XPS INSULATION, R-10 BTWN NON-CUNDUCTIVE Z-GIRTS · F.C. PANEL ON FURRING · OMNI ECOSYSTEMS 4" GREEN ROOF SYSTEM ··PLANT MATERIAL ··INFINITY GROWING MEDIA ··DRIP IRRIGATION ··DRAINAGE & FILTER FABRIC ··ROOT BARRIER ·60 MIL TPO ROOFING MEMBRANE ·COVER BOARD ·TAPERED INSULATION. SLOPE 1/4" PER 12". (SEE ROOF PLAN FOR LAYOUT) ·7" XPS INSULATION, R-35 MIN. ·VAPOR RETARDER ·ROOF DECKING. SEE STRUCTURAL PLANS & DETAILS ·STEEL FRAMING. REFER TO STRUCTURAL ·LIGHT-GAGE STEEL FURRING ·5/8" GYP BD. - REFER TO CEILING PLANS FOR EXTENT · @ SIM: OMIT GREEN ROOF · OMNI ECOSYSTEMS 8" GREEN ROOF SYSTEM ··PLANT MATERIAL ··INFINITY GROWING MEDIA ··DRIP IRRIGATION ··DRAINAGE & FILTER FABRIC ··ROOT BARRIER ·60 MIL TPO ROOFING MEMBRANE ·COVER BOARD ·TAPERED INSULATION. SLOPE 1/4" PER 12". (SEE ROOF PLAN FOR LAYOUT) ·7" XPS INSULATION, R-35 MIN. ·VAPOR RETARDER ·ACOUSTIC ROOF DECKING, PAINTED SEE STRUCTURAL PLANS & DETAILS. · STEEL FRAMING. REFER TO STRUCTURAL. PAINTED. ·THIN PORCELAIN PAVERS ON PEDESTALS ·60 MIL TPO ROOFING MEMBRANE - FULLY ADHERED ·COVER BOARD ·TAPERED INSULATION. SLOPE 1/4" PER 12". (SEE ROOF PLAN FOR LAYOUT) ·7" XPS INSULATION, R-35 MIN. ·VAPOR RETARDER ·ROOF DECKING. SEE STRUCTURAL PLANS & DETAILS · STEEL FRAMING. REFER TO STRUCTURAL. PAINTED BLACK ·THIN PORCELAIN PAVERS ON PEDESTALS ·60 MIL TPO ROOFING MEMBRANE - FULLY ADHERED ·COVER BOARD ·TAPERED INSULATION. SLOPE 1/4" PER 12". (SEE ROOF PLAN FOR LAYOUT) ·2" XPS INSULATION, R-10 MIN. ·VAPOR RETARDER ·ROOF DECKING. SEE STRUCTURAL PLANS & DETAILS ·STEEL FRAMING. REFER TO STRUCTURAL. ·FILL VOID WITH CELLULOSE INSUL. ·LIGHT-GAGE STEEL FURRING ·1/2" DENS GLASS EXTERIOR SHEATHING ·WATER-RESISTANT BARRIER / AIR BARRIER · 2" XPS INSULATION, R-10 BTWN NON-CUNDUCTIVE Z-GIRTS · F.C. PANEL ON FURRING ·FLOOR TILE ·SOUND AND CRACK ISOLATION MAT ·COMPOSITE CONCRETE/STEEL DECK. REFER TO STRUCTURAL FOR DESIGN. ·· RADIANT HEAT TUBING ·1 1/2" SPRAY INSULATION FOR RADIANT HEAT ·STEEL FRAMING. REFER TO STRUCTURAL. ·LIGHT-GAGE STEEL FURRING ·CEILING FINISH. REFER TO CEILING PLANS FOR EXTENT ·FLOOR TILE ·SOUND AND CRACK ISOLATION MAT ·COMPOSITE CONCRETE/STEEL DECK. REFER TO STRUCTURAL FOR DESIGN. ·· RADIANT HEAT TUBING ·· ACOUSTIC STEEL DECK. PAINTED · STEEL FRAMING. REFER TO STRUCTURAL. PAINTED W/ STEEL DECK. ·FLOOR TILE ·SOUND AND CRACK ISOLATION MAT ·COMPOSITE CONCRETE/STEEL DECK. REFER TO STRUCTURAL FOR DESIGN. ·· RADIANT HEAT TUBING ·FILL VOID W/ CELLULOSE INSULATION ·STEEL I-JOIST FRAMING. REFER TO STRUCTURAL. ·LIGHT-GAGE STEEL FURRING ·1/2" DENS GLASS EXTERIOR SHEATHING ·WATER-RESISTANT BARRIER / AIR BARRIER ·4" XPS INSULATION - R-20 (STAGGER SEAMS BTWN LAYERS) BTWN NON-CUNDUCTIVE Z-GIRTS · F.C. PANEL ON FURRING · @SIM (GARAGE) - 5/8" GYP. BD. CLG. IN LIEU OF EXTERIOR SOFFIT ·TILE FLOOR ·SOUND AND CRACK ISOLATION MAT ·CONCRETE SLAB PER STRUCTURAL ·RADIANT IN-FLOOR HEAT TUBING ·10mil POLY VAPOR BARRIER, LAPPED SEAMS ·2" XPS FOAM INSULATION ·4" COMPACTED GRANULAR BASE (NO FINES) ·4" CONCRETE SLAB PER STRUCTURAL ·RADIANT IN-FLOOR HEAT TUBING ·10mil POLY VAPOR BARRIER, LAPPED SEAMS ·2" XPS FOAM INSULATION ·4" COMPACTED GRANULAR BASE (NO FINES) ·5/8" NICHIHA FIBER CEMENT PANELS (DARK COLOR) ·FURRING CHANNELS / AIR SPACE ·4" XPS INSULATION - R-20 (STAGGER SEAMS BTWN LAYERS) BTWN NON-CUNDUCTIVE Z-GIRTS · WATER-RESISTANT BARRIER / VAPOR RETARDER / AIR BARRIER ·1/2" DENS GLASS EXTERIOR GYPSUM SHEATHING ·6" STEEL STUDS - SPACING PER STRUCTURAL ·5/8" PAINTED DRYWALL · @ SIM: 3-5/8" STEEL STUDS ·2" XPS INSULATION, R-10 ·FOUNDATION WATERPROOFING: TK-HYDROMAX 2003 · POURED CONCRETE WALL - REFER TO STRUCTURAL FOR DESIGN · 2" CLOSED CELL SPF INSUL., R-14 BEHIND & BTWN STUDS; ALSO AS VAPOR RETARDER · 3 5/8" STEEL STUD FURRING, SPACING PER STRUCTURAL, HOLD OFF WALL 1-1/2" · 5/8" PAINTED DRYWALL · @ SIM: FROST FOUNDATION ONLY (NO INTERIOR) ·5/16" SILBONIT FIBER CEMENT PANELS (LIGHT COLOR) ·FURRING CHANNELS / AIR SPACE ·2" XPS INSULATION, R-10 ·FOUNDATION WATERPROOFING: TK-HYDROMAX 2003 ·POURED CONCRETE WALL - REFER TO STRUCTURAL FOR DESIGN · 2" CLOSED CELL SPF INSUL., R-14 BTWN & BEHIND STUDS; ALSO AS VAPOR RETARDER · 3 5/8" STEEL STUD FURRING, SPACING PER STRUCTURAL, HOLD OFF WALL 1-1/2" · 5/8" PAINTED DRYWALL · @ SIM: FROST FOUNDATION / RETAINING WALL ONLY (NO INTERIOR) ·5/8" PAINTED DRYWALL ·3-5/8" MTL STUDS @ 16" O.C. ·5/8" PAINTED DRYWALL ·5/8" PAINTED DRYWALL ·6" MTL STUDS @ 16" O.C. ·5/8" PAINTED DRYWALL ·5/8" PAINTED DRYWALL ·3-5/8" MTL STUDS @ 16" O.C. ·1" SPF INSUL. AT GARAGE SIDE ·BLOWN CELLULOSE INSUL. (R-21 MIN.) ·6 MIL. POLY. VAPOR RETARDER ·5/8" PAINTED DRYWALL ROOF ASSEMBLY - ROOF DECK, FINISHED CEILING E I R3.3 ·THIN PORCELAIN PAVERS ON PEDESTALS ·60 MIL TPO ROOFING MEMBRANE - FULLY ADHERED ·COVER BOARD ·TAPERED INSULATION. SLOPE 1/4" PER 12". (SEE ROOF PLAN FOR LAYOUT) ·2" XPS INSULATION, R-10 MIN. ·ROOF DECKING. SEE STRUCTURAL PLANS & DETAILS ·STEEL FRAMING. REFER TO STRUCTURAL. ·FILL VOID WITH CELLULOSE INSUL. ·LIGHT-GAGE STEEL FURRING ·VAPOR RETARDER ·5/8" GYP BD. REFER TO CEILING PLANS FOR EXTENT WALL ASSEMBLY - STEEL FRAMED w/ FIBER CEMENT PANELS E I ·5/16" SILBONIT FIBER CEMENT PANELS (LIGHT COLOR) ·FURRING CHANNELS / AIR SPACE ·4" XPS INSULATION - R-20 (STAGGER SEAMS BTWN LAYERS) BTWN NON-CUNDUCTIVE Z-GIRTS · WATER-RESISTANT BARRIER / VAPOR RETARDER / AIR BARRIER ·1/2" DENS GLASS EXTERIOR GYPSUM SHEATHING ·6" STEEL STUDS - SPACING PER STRUCTURAL ·5/8" PAINTED DRYWALL · @ SIM: 3-5/8" STEEL STUDS R3.2 W5 WALL ASSEMBLY - STEEL FRAMED w/ FIBER CEMENT PANELS E E · 5/16" SILBONIT FIBER CEMENT PANELS (LIGHT COLOR), BOTH SIDES ·FURRING CHANNELS / AIR SPACE ·WATER-RESISTANT BARRIER ·1/2" DENS GLASS EXTERIOR GYPSUM SHEATHING - BOTH SIDES · (2) ROWS 6" STEEL STUDS - SPACING PER STRUCTURAL HATCH PATTERN KEY CONCRETE GRAVEL EARTH RIGID INSULATION SPRAY FOAM INSULATION CELLULOSE INSULATION GYPSUM SHEATHING CEMENT FIBER WALL PANEL INTERIOR GYPSUM BOARD SEE PLAN A-500 DESCRIPTION DATE 2919 JAMES AVENUE SOUTH MINNEAPOLIS, MINNESOTA 55408 612.353.4920 © 2019 PETERSSEN/KELLER PATEL RESIDENCE10209 Ditch RoadCarmel, Indiana 4603205.14.18DESIGN REVIEW PANEL 07.09.18SD MEETING 04.11.19DD PROGRESS 06.21.19CD PROGRESS 03.18.19DD PROGRESS 06.27.19PERMIT QA SET 07.10.19ISSUED FOR PERMIT 08/23/19 David Rutti