Loading...
HomeMy WebLinkAboutA000.3TOP OF FOUNDATION TOP OF FLOOR TOP OF PLATE WINDOW HEAD HGT. WINDOW HEAD HGT. TOP OF PLATE TOP OF FLOOR \A1;10'-1{\H0.750000x;\S1#8;}" \A1;9'-1{\H0.750000x;\S1#8;}"\A1;8'-2{\H0.750000x;\S7#8;}" \A1;8'-2{\H0.750000x;\S7#8;}" METAL ROOF, PER SPEC 8" TRIM, PER SPEC ROOF SHINGLES, PER SPEC ROOF SHINGLES, PER SPEC STONE SILL, PER SPEC 6" FASCIA, PER SPEC 6" CORNER BOARD, PER SPEC 10" FRIEZE, PER SPEC6" FASCIA, PER SPEC 10" FRIEZE, PER SPEC 16" TAPERED COLUMN W/20" STONE BASE, PER SPEC STONE VENEER, PER SPEC STONE, PER SPECSTONE, PER SPEC FYPON BKT14X16X4 OR EQUAL BOARD & BATTEN SIDING,\PPER SPEC 4:12 3.5:12 3.5:12 6:12 4:126:12 6:12 6:12 SCALE:FRONT ELEVATION1/4" = 1'-0" 126 126 126 123 1/2 123 1/2 TOP OF PLATE TOP OF FLOOR \A1;11'-1{\H0.750000x;\S1#8;}" \A1;9'-1{\H0.750000x;\S1#8;}" \A1;10'-1{\H0.750000x;\S1#8;}" \A1;9'-1{\H0.750000x;\S1#8;}" \A1;8'-2{\H0.750000x;\S7#8;}" \A1;8'-2{\H0.750000x;\S7#8;}" \A1;8'-2{\H0.750000x;\S7#8;}" \A1;8'-2{\H0.750000x;\S7#8;}" 4:12 4:12 6:12 TOP OF FOUNDATION TOP OF SLABTOP OF FOUNDATIONWINDOW HEAD HT.\A1;8'-6" \A1;3'-4"\A1;6'-7"\A1;8'-6" \A1;3'-4"\A1;6'-7" SCALE:REAR ELEVATION1/8" = 1'-0"- 126126 126126 6:12 3.5:12 126 126126 124124 123 1/2 SCALE:LEFT ELEVATION1/8" = 1'-0"- 6:126:12 6:12 3.5:12 SCALE:RIGHT ELEVATION1/8" = 1'-0"- 124 126 126126 126126 124 123 1/2 \A1;1'-0"\PTYP.\A1;3'-0" MIN. 285 SQ. IN. OF VENTILATION REQUIRED AT EAVE FOR ROOF "E" \A1;4'-0" PROVIDE ADEQUATE OPENING FOR AIR MOVEMENT BETWEEN ATTIC SPACES TO SUPPORT REQUIRED VENTILATION\A1;4'-0" MIN. ## SQ. IN. OF VENTILATION REQUIRED AT EAVE FOR ROOF \A1;4'-0" \A1;4'-0" SCALE:ROOF PLAN1/8" = 1'-0"- 6:126:12 6:12 4:12 3.5:12 6:126:12 6:12 6:12 6:12 6:12 4:12 4:12 4:12 ROOF AREASQ. FT."A"2136 ROOF AREASQ. FT."B"277 ROOF AREASQ. FT."C"144 ROOF AREASQ. FT."D"294 6:12 6:12 6:12 6:12 3.5:12 3.5:12 4:12 PR3G ATTIC VENT SCHEDULE VENTILATION REQUIRED AND SUPPLIED IS BASED ON POT VENT VALUES AND RIDGE VENT VALUES SHOWN IN TABLE ABOVE CONTRACTORS INSTALLING VENTILATION ARE RESPONSIBLE FOR VERIFYING THAT VENTS USED WILL SUPPY VENTILATION TO MEET CODE REQUIREMENTS * SCHEDULE HAS BEEN CALCULATED ASSUMING EAVE VENTILATION AT 50-60% OF TOTAL AND RIDGE AT 40-50% OF TOTAL REQUIRED VENTILATION ROOF AREA "A"SQ FTG 2136 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 2.85 3.56 3.39 47.47 8 0 AT EAVE 4.27 3.56 3.75 52.53 0 54.00 TOTAL (MIN)7.12 7.12 7.14 100.00 3 HIGH - RIDGE VENT 2.85 3.56 2.77 42.49 3 0 12.00 AT EAVE 4.27 3.56 3.75 57.51 0 54.00 TOTAL (MIN)7.12 7.12 6.52 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ROOF AREA "B"SQ FTG 277 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 0.37 0.46 0.42 43.26 1 0 AT EAVE 0.55 0.46 0.56 56.74 0 8.00 TOTAL (MIN)0.92 0.92 0.98 100.00 3 HIGH - RIDGE VENT 0.37 0.46 0.50 47.37 0 0 4.00 AT EAVE 0.55 0.46 0.56 52.63 0 8.00 TOTAL (MIN)0.92 0.92 1.06 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ROOF AREA "C"SQ FTG 144 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 0.19 0.24 0.42 46.56 1 0 AT EAVE 0.29 0.24 0.49 53.44 0 7.00 TOTAL (MIN)0.48 0.48 0.91 100.00 3 HIGH - RIDGE VENT 0.19 0.24 0.38 43.55 0 0 3.00 AT EAVE 0.29 0.24 0.49 56.45 0 7.00 TOTAL (MIN)0.48 0.48 0.86 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE ROOF AREA "D"SQ FTG 294 AT / NEAR RIDGE AT / NEAR EAVE VENT TYPE SQ. FT. REQUIRED RANGE SQ. FT. SUPPLIED PERCENT OF TOTAL SUPPLIED POT LARGE (SQ. IN. EACH) POT SMALL (SQ. IN. EACH) RIDGE VENT (SQ. IN. PER LF) EAVE VENT (SQ. IN. EACH) CONT. VENT (SQ. IN. PER LF) 61.00 40.00 18.00 28.00 10.00 HIGH - POT VENTS ONLY 0.39 0.49 0.85 63.54 2 0 AT EAVE 0.59 0.49 0.49 36.46 0 7.00 TOTAL (MIN)0.98 0.98 1.33 100.00 3 HIGH - RIDGE VENT 0.39 0.49 0.50 50.70 0 0 4.00 AT EAVE 0.59 0.49 0.49 49.30 0 7.00 TOTAL (MIN)0.98 0.98 0.99 100.00 ADDITIONAL POT VENTS MAY BE REQUIRED IF THERE IS INSUFFICIENT RIDGE AVAILABLE PLAN NAME SHEET PRODUCTION MANAGER DATE / DESCRIPTION NPC PLAN NUMBERLAWSON PLAN ID GARAGE HANDING REV # NOTE: SCALES NOTED ON DRAWINGS RELATE TO FULL SIZE PLOTS ON 22x34 SHEETS - 11x17 SHEETS REPRESENT 1/2 SCALE PLOTS INITIAL RELEASE DATE:CURRENT RELEASE DATE: (c) Copyright Pulte Home Corporation - 2019 Joel Hampshire08/04/2014 Garage Left Truman 1702.300.00 CPM LOT 660 08/14/20191900 E. Golf Road, - Suite 300Schaumburg, Illinois 60173Midwest Zone OfficePLOTTED: August 15, 2019 / Annie Lee / 1702-TRUMAN-IN-WCLY-EL-CR4G.DWG A3-CR4G 3SB.1Craftsman 4G3 Car GarageFront, Side and Rear Elevations, Roof Plan and Ventilation Schedule12/16/19 Adam Schriner