HomeMy WebLinkAboutCarmel Eng Trans 12.11.19
LETTER OF TRANSMITTAL
TO: City of Carmel
DATE: 12/11/19
Department of Engineering
RE: Bear Creek South
Once Civic Square, 1st Floor
Construction Plans and Secondary Plat
Carmel, IN 46032
HWC#: 2015-165-S
ATTN: Alex Jordan
FROM: Brandon T. Burke, P.E.
WE ARE SENDING YOU:
COPIES
DATE
NO.
DESCRIPTION
1 Revised: Construction Plans and Plat
1 Revised: Drainage Report
1 Revised: O&M Manual
1 Crossroad Engineers Response Letter (From 8/3/17 letter)
1 Carmel Engineering Updated Waiver Request
REMARKS:
Alex- Project has been idle while securing an offsite drainage outfall easement.
- Section1 Plat has been split into a Section 1A and 1B. To be built in 1
construction season.
- Offsite Outfall: Changed location, reduced to 1 outfall pipe, elevations raised.
Sincerely, Brandon