Loading...
HomeMy WebLinkAboutCarmel Eng Trans 12.11.19 LETTER OF TRANSMITTAL TO: City of Carmel DATE: 12/11/19 Department of Engineering RE: Bear Creek South Once Civic Square, 1st Floor Construction Plans and Secondary Plat Carmel, IN 46032 HWC#: 2015-165-S ATTN: Alex Jordan FROM: Brandon T. Burke, P.E. WE ARE SENDING YOU: COPIES DATE NO. DESCRIPTION 1 Revised: Construction Plans and Plat 1 Revised: Drainage Report 1 Revised: O&M Manual 1 Crossroad Engineers Response Letter (From 8/3/17 letter) 1 Carmel Engineering Updated Waiver Request REMARKS: Alex- Project has been idle while securing an offsite drainage outfall easement. - Section1 Plat has been split into a Section 1A and 1B. To be built in 1 construction season. - Offsite Outfall: Changed location, reduced to 1 outfall pipe, elevations raised. Sincerely, Brandon