Loading...
HomeMy WebLinkAboutMEP COMcheckCOMcheck Software Version COMcheckWeb Interior Lighting Compliance Certificate Project Title: 90.1 (2007) Standard Project Type:Alteration Construction Site: 1424 West Carmel Drive, Suite 110 Carmel, Indiana 46032 Owner/Agent:Designer/Contractor: Donald Spencer D. Spencer Engineering, LLC 1533 East Northfield Drive, Suite 400 Brownsburg, Indiana 46112 317-858-9970 Project Information Energy Code: Naf Naf - Carmel Allowed Interior Lighting Power A Area Category B Floor Area (ft2) C Allowed Watts / ft2 D Allowed Watts 1-Common Space Types:Dining Area - General 1430 0.90 1287 2-Common Space Types:Food Preparation 950 1.20 1140 3-Common Space Types:Restrooms 125 0.90 112 2540Total Allowed Watts = Proposed Interior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixture Common Space Types: Dining Area - General (1430 sq.ft.) LED: A: Other:1 14 26 364 LED: B: Other:1 18 14 261 Common Space Types: Food Preparation (950 sq.ft.) Linear Fluorescent: C: 48" T8 32W: Electronic:3 12 96 1152 LED: B: Other:1 33 14 478 LED: Y: Other:1 8 12 96 Common Space Types: Restrooms (125 sq.ft.) LED: B: Other:1 8 14 116 2468Total Proposed Watts = Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 90.1 (2007) Standard requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Interior Lighting PASSES Project Title: Data filename: Naf Naf - Carmel 10/31/19Report date: 111 ofPage Name - Title Signature Date Project Title: Data filename: Naf Naf - Carmel 10/31/19Report date: 112 ofPage Donald E. Spencer, P.E. (President)11/1/19 COMcheck Software Version COMcheckWeb Mechanical Compliance Certificate Project Title: 90.1 (2007) Standard Project Type:Alteration Location:Carmel, Indiana Climate Zone:5a Construction Site: 1424 West Carmel Drive, Suite 110 Carmel, Indiana 46032 Owner/Agent:Designer/Contractor: Donald Spencer D. Spencer Engineering, LLC 1533 East Northfield Drive, Suite 400 Brownsburg, Indiana 46112 317-858-9970 Project Information Energy Code: Naf Naf - Carmel Mechanical Systems List Quantity System Type & Description Heating: 1 each - Other, Gas, Capacity = 224 kBtu/h No minimum efficiency requirement applies Cooling: 1 each - Single Package DX Unit, Capacity = 125 kBtu/h, Air-Cooled Condenser Proposed Efficiency = 11.00 EER, Required Efficiency: 11.00 EER SYSTEM VERIFICATION REQUIRED. 1 AC-1 Heating: 1 each - Other, Gas, Capacity = 180 kBtu/h No minimum efficiency requirement applies Cooling: 1 each - Single Package DX Unit, Capacity = 90 kBtu/h, Air-Cooled Condenser Proposed Efficiency = 11.00 EER, Required Efficiency: 11.00 EER SYSTEM VERIFICATION REQUIRED. 1 AC-2 Heating: 1 each - Other, Gas, Capacity = 281 kBtu/h No minimum efficiency requirement applies SYSTEM VERIFICATION REQUIRED. 1 MUA-1 Gas Storage Water Heater, Capacity: 60 gallons, Input Rating: 75 kBtu/h Proposed Efficiency: 0.95 EF, Required Efficiency: 0.56 EF SWH COMPLIANCE REQUIRED. 1 Water Heater Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 90.1 (2007) Standard requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Project Title: Data filename: Naf Naf - Carmel 10/31/19Report date: 113 ofPage Donald E. Spencer, P.E. (President)11/1/19 Inspection Checklist Requirements: 100.0% were addressed directly in the COMcheck software COMcheck Software Version COMcheckWeb Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 90.1 (2007) Standard Section # & Req.ID Plan Review Complies?Comments/Assumptions 4.2.2, 6.4.2 [PR2]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the mechanical systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. Complies Does Not Not Observable Not Applicable Requirement will be met. 4.2.2, 7.4.1 [PR3]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the service water heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. Complies Does Not Not Observable Not Applicable Requirement will be met. 4.2.2 [PR4]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.7.2.4 [PR5]1 Detailed instructions for HVAC systems commissioning included on the plans or specifications for projects >=50,000 ft2. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 8.4.1.1, 8.4.1.2 [PR6]2 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the electrical systems and equipment and document where exceptions are claimed. Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Naf Naf - Carmel 10/31/19Report date: 114 ofPage Section # & Req.ID Footing / Foundation Inspection Complies?Comments/Assumptions 6.4.3.8 [FO9]3 Freeze protection and snow/ice melting system sensors for future connection to controls. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Naf Naf - Carmel 10/31/19Report date: 115 ofPage Section # & Req.ID Plumbing Rough-In Inspection Complies?Comments/Assumptions 7.4.3 [PL1]2 Service hot-water piping systems insulated. Where piping is installed in or under a slab, verification may need to occur during Foundation Inspection. Complies Does Not Not Observable Not Applicable Requirement will be met. 7.4.4.1 [PL2]3 Temperature controls installed on service water heating systems (<=120ºF to maximum temperature for intended use). Complies Does Not Not Observable Not Applicable Requirement will be met. 7.4.6 [PL4]3 Heat traps installed on non-circulating storage water tanks. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Naf Naf - Carmel 10/31/19Report date: 116 ofPage Section # & Req.ID Mechanical Rough-In Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 6.4.1.4, 6.4.1.5 [ME1]2 HVAC equipment efficiency verified. Non-NAECA HVAC equipment labeled as meeting 90.1. Efficiency:_____Efficiency:_____Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. 6.4.3.4.1 [ME3]3 Stair and elevator shaft vents have motorized dampers that automatically close. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.4.3.4.2, 6.4.3.4.3, 6.4.3.4.4 [ME4]3 Outdoor air and exhaust systems have motorized dampers that automatically shut when not in use and meet maximum leakage rates. Check gravity dampers where allowed. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.3.4.5 [ME5]3 Ventilation fans >0.75 hp have automatic controls to shut off fan when not required. Complies Does Not Not Observable Not Applicable Exception: HVAC systems intended to operate continuously. 6.4.3.9 [ME6]1 Demand control ventilation provided for spaces >500 ft2 and >40 people/1000 ft2 occupant density and served by systems with air side economizer, auto modulating outside air damper control, or design airflow >3,000 cfm. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.4.1.1 [ME7]3 Insulation exposed to weather protected from damage. Insulation outside of the conditioned space and associated with cooling systems is vapor retardant. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.4.1.2 [ME8]2 HVAC ducts and plenums insulated. R-_____R-_____Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.4.1.3 [ME9]2 HVAC piping insulation thickness._____ in._____ in.Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.4.2.1 [ME10]2 Ducts and plenums sealed based on static pressure and location. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.4.2.2 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.4.2.2 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.4.2.2 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable Requirement will be met. 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Naf Naf - Carmel 10/31/19Report date: 117 ofPage Section # & Req.ID Mechanical Rough-In Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 6.5.2.3 [ME19]3 Dehumidification controls provided to prevent reheating, recooling, mixing of hot and cold airstreams or concurrent heating and cooling of the same airstream. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.5.4.1 [ME25]3 HVAC pumping systems >10 hp designed for variable fluid flow. Complies Does Not Not Observable Not Applicable Exception: Systems with three or fewer control valves. 6.5.6.1 [ME30]1 Exhaust air energy recovery on systems >=5,000 cfm and 70% of design supply air. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.5.7.1 [ME32]2 Kitchen hoods >5,000 cfm have make up air >=50% of exhaust air volume. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.5.7.2 [ME33]1 Fume hoods exhaust systems >=15,000 cfm have VAV hood exhaust and supply systems, direct make-up air or heat recovery. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.5.8.1 [ME34]3 Unenclosed spaces that are heated use only radiant heat. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.5.9 [ME35]1 Hot gas bypass limited to: <=240 kBtu/h – 50% >240 kBtu/h – 25% Complies Does Not Not Observable Not Applicable Requirement will be met. 6.5.9 [ME35]1 Hot gas bypass limited to: <=240 kBtu/h – 50% >240 kBtu/h – 25% Complies Does Not Not Observable Not Applicable Requirement will be met. 7.4.2 [ME36]2 Service water heating equipment meets efficiency requirements. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Naf Naf - Carmel 10/31/19Report date: 118 ofPage Section # & Req.ID Rough-In Electrical Inspection Complies?Comments/Assumptions 9.4.1.1 [EL1]2 Automatic controls to shut off all building lighting installed in buildings >5,000 ft2. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.4.1.2 [EL2]2 Independent lighting controls installed per approved lighting plans and all manual controls readily accessible and visible to occupants. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.4.1.4 [EL4]1 Separate lighting control devices for specific uses installed per approved lighting plans. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.4.2 [EL5]3 Ballasted one and three lamp fixtures with >30 W/lamp have two lamp tandem wired ballasts when >=2 fixtures in same space on same control. Complies Does Not Not Observable Not Applicable Exception: Electronic high-frequency ballasts. 9.4.3 [EL6]1 Exit signs do not exceed 5 watts per face. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.6.2 [EL8]1 Additional interior lighting power allowed for special functions per the approved lighting plans and is automatically controlled and separated from general lighting. Complies Does Not Not Observable Not Applicable Requirement will be met. 10.4.1 [EL9]2 Electric motors meet requirements where applicable. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Naf Naf - Carmel 10/31/19Report date: 119 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions 6.4.3.1.1 [FI2]2 Heating and cooling to each zone is controlled by a thermostat control. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.3.1.2, 6.4.3.2, 6.4.3.3, 6.4.3.3.1, 6.4.3.3.2 [FI3]2 Thermostatic controls have a 5 °F deadband. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.3.7 [FI6]3 When humidification and dehumidification are provided to a zone, simultaneous operation is prohibited. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.7.2.1 [FI7]3 Furnished HVAC as-built drawings submitted within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.7.2.2 [FI8]3 Furnished O&M manuals for HVAC systems within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.7.2.3 [FI9]1 An air and/or hydronic system balancing report is provided for HVAC systems serving zones >5,000 ft2 of conditioned area. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.7.2.4 [FI10]1 HVAC control systems have been tested to ensure proper operation, calibration and adjustment of controls. Complies Does Not Not Observable Not Applicable Requirement will be met. 7.4.4.3 [FI11]3 Public lavatory faucet water temperature <=110°F. Complies Does Not Not Observable Not Applicable Requirement will be met. 8.7.1 [FI16]3 Furnished as-built drawings for electric power systems within 30 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. 8.7.2 [FI17]3 Furnished O&M instructions for systems and equipment to the building owner or designated representative. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.2.2.3 [FI18]1 Interior installed lamp and fixture lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Complies Does Not Not Observable Not Applicable See the Interior Lighting fixture schedule for values. 6.4.3.2 [FI20]1 Temperature controls have setpoint overlap restrictions. Complies Does Not Not Observable Not Applicable Requirement will be met. 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Naf Naf - Carmel 10/31/19Report date: 1110 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions 6.4.3.3.1 [FI21]1 HVAC systems equipped with at least one automatic shutdown control. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.4.3.3.2 [FI22]1 Setback controls allow automatic restart and temporary operation as required for maintenance. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Naf Naf - Carmel 10/31/19Report date: 1111 ofPage