Loading...
HomeMy WebLinkAboutPn NT NOTE: aN UNHEATED BUILDING. ALL PLUMBING �ALL BE INSTALLED SO DRAINAGE CAN PLETE FOR ANNUAL WINTERIZING. PLUMBING PLAN SCNLE: L4" - 1'-O" PLUMBING - GENERAL NOTES AND SPECIFICATIONS: PLUMBING CONTRACTOR SHALL CONFIRM SIZES OR ESTABLISH SIZES OF WASTE, VENT AND SUPPLY AS REQUIRED TO MAKE A COMPLETE AND WORKING SYSTEM. THE SCOPE OF THE PLUMBING WORK INCLUDES FURNISHING, INSTALLING TESTING AND WARRANTY OF ALL PLUMBING WORK SHOWN ON THE PLUMBING DRAWINGS. THE PLUMBING CONTRACTOR ACKNOWLEDGES THAT HE IS AWARE THAT PWMBING DRAWINGS ARE SCHEMATIC IN NATURE AND DO NOT SHOW ALL EQUIPMENT OR FITTINGS REQUIRED. LOCATIONS ARE DIAGRAMMATIC. PWMBING CONTRACTOR SHALL ADJUST LOCATION OF PIPING AS REQUIRED. CONFIRM DETAILED LOCATIONS WITH OWNER IF CRITICAL. THIS PROJECT SHALL BE COMPLETE, OPERATIONAL AND MEET CURRENT STATE AND LOCAL CODES AND ORDINANCES IN EVERY WAY. THE CURRENT CODE IS THE 2012 INDIANA PLUMBING CODE (2006 INTERNATIONAL PLUMBING CODE WITH 2O12 INDIANA AMENDMENTS) COORDINATE WORK WITH OTHER TRADES AND CONFIRM THAT CLEARANCES AND FITTING REQUIREMENTS ARE KEPT. MATERIALS AND WORKMANSHIP: ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND FIRST QUALITY. PROVIDE ALL NECESSARY CLIPS, HANGERS, FASTENERS, AND OTHER DEVICES REQUIRED FOR A COMPLETE JOB. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED AND SUPPORTED IN A FIRST-CLASS AND WORKMANLIKE MANNER BY MECHANICS SKILLED IN THEIR PARTICULAR TRADES. A LICENSED PLUMBING CONTRACTOR SHALL PERFORM WORK. SANITARY SEWER SYSTEMS: PROVIDE CLEANOUTS WHERE REQUIRED, WHETHER SHOWN ON DRAWINGS OR NOT. PIPE IN GRADE BELOW FLOOR SLABS SHALL BE RIGID PVC SCHEDULE 40, TYPE 1, GRADE 1, COMPLYING WITH ASTM D2665 AND D-1784. PRESSURE TEST AND REPLACE DEFECTIVE MATERIALS AND CONNECTIONS. WASTE AND VENTS: C SOIL, WASTE AND VENT LINES SHALL BE PVC SCHEDULE 40 ASTM D1785 WITH ASTM D2665 DWV SOCKET FITTINGS; OR, SERVICE WEIGHT CAST IRON, OR AS REQUIRED BY LOCAL CODES. SLOPE WASTE PIPING UNIFORMLY 1/8" PER FOOT MINIMUM. SLOPE VENT PIPING TO PREVENT CONDENSATION FROM SYSTEM. TEST SOIL, WASTE, AND VENT PIPING SHALL BE TESTED TO A MINIMUM 10 FEET OF HEAD MAINTAINED FOR A MINIMUM 15 MINUTES. REPLACE DEFECTIVE PIPE AND JOINTS AT NO ADDITIONAL COST TO OWNER. FLOOR DRAINS SHALL BE EQUAL TO SMITH 2O10-A. FLOOR CLEANOUTS SHALL BE EQUAL TO SMITH 4021 OR 4021 Y. WALL CLEANOUTS SHALL BE EQUAL TO SMITH 4710. PROVIDE AND INSTALL ALL REQUIRED OR SHOWN BACK-FLOW PREVENTERS. DOMESTIC WATER SYSTEM: WATER SUPPLY LINES SHALL BE OF TYPE "L" OR "K" COPPER AS REQUIRED BY LOCAL PLUMBING CODES. ALL WATER SUPPLY LINES SHALL BE RUN UNDER FLOOR SLAB AND UP PLUMBING WALLS. SIZE WATER SUPPLY AS REQUIRED FOR BUILDING USAGE. BACKFLOW PREVENTERS SHALL BE INSTALLED IF REQUIRED BY STATE AND LOCAL ORDINANCES. INSTALL WARM WATER LWES ON WARM SIDE OF CEILING INSULATION. BACKFLOW PREVENTERS SHALL BE INSTALLED IF REQUIRED BY STATE AND LOCAL ORDINANCES. INSTALL WARM WATER LINES ON WARM SIDE OF CEILING INSULATION. PRESSURE TEST TO 50 PSIG ABOVE OPERATING PRESSURE (125 PSIG MIN.) AND MAINTAIN PRESSURE FOR 15 MINUTES MINIMUM WITH NO PRESSURE LOSS. REPLACE DEFECTIVE MATERIALS AND CONNECTIONS. CLEAN, FWSH AND DISINFECT ALL WATER PIPING IN ACCORDANCE WITH AWWA C601. INSTALL PID RATED SHOCK ABSORBERS IN COLD WATER LWES WHERE REQUIRED. ALL WATER SUPPLY (BOTH HOT AND COLD) LINES ABOVE FLOOR SLAB SHALL BE INSULATED WITH 3l4" ARMA FLEX TYPE INSULATION. INSTALL DIELECTRIC UNIONS WHERE DISSIMILAR METALS ARE CONNECTED. PLUMBING FIXTURES: FIXTURES SHALL BE COMPLETE WHEN FULLY INSTALLED, INCWDING TRIM, VAWES, SUPPLIES AND ESCUTCHEONS. TRIM SHALL BE BRASS CHROME PLATED; FIXTURES SHALL BE WHITE, UNLESS OTHERWISE NOTED. SEAL CRACKS AROUND EACH FIXTURE AT WALL AND FLOOR WITH PERMANENTLY PLIABLE WHITE SILICONE SEALANT. STRICTLY FOLLOW ACCESSIBILITY STANDARDS NOTED BELOW. DOMESTIC WATER HEATING: PROVIDE GAS FIRED STORAGE WATER HEATER COMPLETE WITH POWER BURNER OR ELECTRIC WATER HEATER TO SIZE REQUIRED. TANK SHALL BE CONSTRUCTED IN ACCORDANCE WITH ASME CODE, STAMPED AND TESTED. TANK SHALL BE INSULATED. THE COMPLETE WATER HEATER SHALL BE LISTED BY UL, WITH LABEL ATTACHED. VENTING FOR GAS WATER HEATERS: UL APPROVED TYPE B DOUBLE-WALL GAS VENT PIPING. VENT EXTENDED 3 FEET ABOVE THE ROOF, MINIMUM TWO FEET HIGHER THAN ANY PORTION OF BUILDING WITHIN 10 FEET. ACCESSIBILITY STANDARDS: STRICTLY COMPLY WITH THE REQUIREMENTS OF UNIFORM FEDERAL ACCESSIBILITY STANDARDS (UFAS), THE ADA, AND IBC, INDIANA CODE CHAPTER 11. PROVIDE RAISED SEAT FOR THE ACCESSIBLE WATER CLOSETS, PROVIDE FWSH ON ACCESS SIDE OF WC'S, TRAP TIGHT TO THE WALL UNDER LAVATORIES, INSULATE ALL WASTE AND WATER PIPING BELOW LAVATORIES, AS WELL AS ALL OTHER ADA REQUIREMENTS. THE ARCHITECT SHALL BE NOTIFIED IMMEDIATELY IF REQUIRED DIMENSIONS, CLEARANCES, OR STRUCTURAL CONDITIONS EXIST THAT COULD PREVENT THE ABOVE ACCESSIBILITY REQUIREMENTS FROM BEING STRICTLY FOLLOWED. TESTING: ALL PIPES SHALL BE PRESSURE TESTED PER STANDARD PRACTICE. REPLACE ALL DEFECTIVE LINES AND CONNECTIONS AT NO ADDITIONAL COST TO OWNER. MANUALS: TWO COPIES OF OPERATION AND MAINTENANCE MANUALS FOR MATERIALS INSTALLED PER WORK OF THIS SECTION SHALL BE DELIVERED TO OWNER PRIOR TO ACCEPTANCE OF THESE SPACES FOR OCCUPANCV. � w � z 0 � U m � o O ry K � N � O 'U ■���■ �NN �+ U y(ON �1_ U � N � � � N N � o � � ^ O 3 �r� c�� � . Y � N � j� N �Qo�U mma"� 0 � N � W 'p 7 C Q Q F U W H _ U K Q Y � a J U Z O 0 � � � � � � � J � O d 0 Z � Z � J � m Q W�/ L.L � � � Z WC C Q � U Q W J W 2 � Q Z ¢ 0 Z � � z � � Z � J � a _ JULY 1 L 2019 � e' No. e AR0003i SiAiE P1.1