Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
I39314847.6_Heritage_at_Spring_Mill
16023 Swingley Ridge Rd Chesterfield, MO 63017 314-434-1200 MiTek USA, Inc. Re: The truss drawing(s) referenced below have been prepared by MiTek USA, Inc. under my direct supervision based on the parameters provided by ProBuild (CarterLee Bldg Components). November 18,2019 Liu, Xuegang Pages or sheets covered by this seal: I39314847 thru I39314947 My license renewal date for the state of Indiana is July 31, 2020. 6_Heritage_at_Spring_Mill 6 Heritage at Spring Mill IMPORTANT NOTE: The seal on these truss component designs is a certification that the engineer named is licensed in the jurisdiction(s) identified and that the designs comply with ANSI/TPI 1. These designs are based upon parameters shown (e.g., loads, supports, dimensions, shapes and design codes), which were given to MiTek or TRENCO. Any project specific information included is for MiTek's or TRENCO's customers file reference purpose only, and was not taken into account in the preparation of these designs. MiTek or TRENCO has not independently verified the applicability of the design parameters or the designs for any particular building. Before use, the building designer should verify applicability of design parameters and properly incorporate these designs into the overall building design per ANSI/TPI 1, Chapter 2. 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss CG01 Truss Type DIAGONAL HIP GIRDER Qty 2 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314847 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:21:39 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-MsPzNtxJeQDmoSKXTAYx2LiGeZz7BFu_uOK21vyHzxg Scale = 1:22.3 1 2 3 5 4 2x4 3x4 2x4 3x4 0-1-150-1-15 2-8-72-6-8 -1-2-13 1-2-13 2-8-7 2-8-7 1-7-03-9-122-9-130-11-50-11-159.90 12 4.95 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.15 0.07 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 -0.00 (loc) 4-5 4-5 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 14 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 2-8-7 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=202/0-3-8, 4=78/Mechanical Max Horz 5=104(LC 5) Max Uplift 5=-15(LC 4), 4=-65(LC 5) Max Grav 5=202(LC 1), 4=82(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Bearing at joint(s) 5 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss GE01 Truss Type GABLE Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314848 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:21:40 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-q3zLaDyxPkMdQbvj0u3AaYEJnzENwgp7624bZMyHzxf Scale = 1:64.7 Sheet Back Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 6 7 8 9 10 11 12 23 2221 20 19 18 17 16 15 14 13 3x4 3x6 3x6 3x8 3x8 3x6 2x4 6x6 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 18-3-018-3-0 -1-3-8 1-3-8 14-5-10 14-5-10 18-3-0 3-9-6 1-1-010-6-710-8-1210-6-78.00 12 Plate Offsets (X,Y)-- [12:0-3-8,Edge], [13:0-3-8,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.64 0.39 0.18 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 0.00 (loc) 1 1 13 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 349 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud *Except* 12-13: 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 10-12. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 12-13, 10-15, 9-16, 11-14 REACTIONS.All bearings 18-3-0. (lb) - Max Horz 23=319(LC 5) Max Uplift All uplift 100 lb or less at joint(s) 13, 15, 16, 17, 18, 19, 20, 14 except 23=-117(LC 4), 22=-175(LC 6) Max Grav All reactions 250 lb or less at joint(s) 13, 15, 16, 17, 18, 19, 20, 22, 14 except 23=261(LC 5) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-4=-294/173 NOTES-(11-12) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Provide adequate drainage to prevent water ponding. 5) Gable requires continuous bottom chord bearing. 6) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 7) Gable studs spaced at 2-0-0 oc. 8) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 13, 15, 16, 17, 18, 19, 20, 14 except (jt=lb) 23=117, 22=175. 10) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 11) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 12) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss GE02 Truss Type Hip Supported Gable Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314849 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:21:42 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-nR56?uzBxLcKfv268I5efzKh9nzcOakQaMZidEyHzxd Scale = 1:69.0 Sheet Front Full Sheathing1 Ply 7/16OSB8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 30 29 28 27 26 25 24 23 22 21 20 19 18 17 3x4 3x6 4x6 3x4 3x6 4x6 2x4 6x6 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 23-3-023-3-0 -1-0-0 1-0-0 8-2-0 8-2-0 15-1-0 6-11-0 23-3-0 8-2-0 24-3-0 1-0-0 1-7-011-1-51-7-011-1-514.00 12 Plate Offsets (X,Y)-- [7:0-2-11,Edge], [11:0-2-11,Edge], [25:0-3-0,0-1-4], [25:0-0-0,0-1-12], [26:0-1-4,0-0-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.46 0.22 0.15 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.01 0.01 (loc) 16 16 17 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 512 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud OTHERS 2x3 SPF No.2 *Except* 11-21,10-22,9-23,8-24: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 7-11. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 11-21, 10-22, 9-23, 8-24, 6-26, 12-20 REACTIONS.All bearings 23-3-0. (lb) - Max Horz 30=-283(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 22, 23, 26, 28, 20, 19 except 30=-376(LC 4), 17=-143(LC 5), 27=-126(LC 6), 29=-341(LC 5), 18=-200(LC 7) Max Grav All reactions 250 lb or less at joint(s) 17, 21, 22, 23, 24, 26, 27, 28, 20, 19, 18 except 30=439(LC 5), 29=300(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-30=-269/251, 2-3=-300/287, 5-6=-50/300, 6-7=-48/283, 11-12=-49/334 NOTES-(11-12) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Provide adequate drainage to prevent water ponding. 5) Gable requires continuous bottom chord bearing. 6) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 7) Gable studs spaced at 2-0-0 oc. 8) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 22, 23, 26, 28, 20, 19 except (jt=lb) 30=376, 17=143, 27=126, 29=341, 18=200. 10) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 11) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 12) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss GE03 Truss Type GABLE Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314850 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:21:44 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-jqCsQa?RTzs2uDCVFj76lOP6_ag_rWwj1g2pi7yHzxb Scale = 1:29.5 Sheet Back Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 9 8 7 6 2x4 3x4 3x4 2x4 2x4 2x4 2x4 2x4 -0-11-0 0-11-0 6-0-0 6-0-0 1-1-05-1-08.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.18 0.09 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.00 (loc) 1 1 6 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 62 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud *Except* 5-6: 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 6-0-0. (lb) - Max Horz 9=150(LC 5) Max Uplift All uplift 100 lb or less at joint(s) 9, 6, 7 except 8=-105(LC 6) Max Grav All reactions 250 lb or less at joint(s) 9, 6, 7, 8 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 3) Gable requires continuous bottom chord bearing. 4) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 5) Gable studs spaced at 2-0-0 oc. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 9, 6, 7 except (jt=lb) 8=105. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss GE04 Truss Type GABLE Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314851 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:21:46 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-fDKcrG0i?a6m8WMtN8AaqpUSAOMwJQc0V_Xwn0yHzxZ Scale = 1:27.9 Sheet Front Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 9 8 7 6 2x4 2x4 3x4 2x4 2x4 2x4 2x4 2x4 2x4 6-1-46-1-4 4-9-0 4-9-0 6-1-4 1-4-4 1-3-144-5-141-7-02-10-148.00 12 6.00 12 Plate Offsets (X,Y)-- [4:0-2-0,0-2-3] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.13 0.06 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a -0.00 (loc) - - 6 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 43 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 4-5. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 6-1-4. (lb) - Max Horz 9=94(LC 6) Max Uplift All uplift 100 lb or less at joint(s) 9, 6 except 8=-113(LC 6) Max Grav All reactions 250 lb or less at joint(s) 9, 6, 7, 8 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(12-13) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 3) Provide adequate drainage to prevent water ponding. 4) Gable requires continuous bottom chord bearing. 5) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 6) Gable studs spaced at 2-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) Bearing at joint(s) 9, 6, 7, 8 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 9, 6 except (jt=lb) 8=113. 10) Beveled plate or shim required to provide full bearing surface with truss chord at joint(s) 6, 7, 8. 11) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 12) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 13) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss GE05 Truss Type GABLE Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314852 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:21:48 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:ErDeBhooCW6W7KTmKQR8snz73g9-bbSNGy2yXBMUNqWGUZC2vEZmqC1rnCfJyH00ruyHzxX Scale = 1:52.5 Sheet Front Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 6 7 8 9 16 15 14 13 12 11 10 3x4 3x6 4x6 3x4 3x6 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 11-11-011-11-0 -1-0-0 1-0-0 5-11-8 5-11-8 11-11-0 5-11-8 12-11-0 1-0-0 1-7-08-6-71-7-014.00 12 Plate Offsets (X,Y)-- [5:Edge,0-1-14] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.32 0.16 0.57 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.01 0.00 (loc) 9 9 10 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 182 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.All bearings 11-11-0. (lb) - Max Horz 16=-218(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 14, 12 except 16=-154(LC 4), 10=-140(LC 5), 15=-184(LC 6), 11=-181(LC 7) Max Grav All reactions 250 lb or less at joint(s) 16, 10, 14, 15, 12, 11 except 13=296(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 4-5=-49/283, 5-6=-49/283 WEBS 5-13=-354/0 NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable requires continuous bottom chord bearing. 5) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 6) Gable studs spaced at 2-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 14, 12 except (jt=lb) 16=154, 10=140, 15=184, 11=181. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss J01 Truss Type Jack-Open Qty 22 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314853 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:21:49 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-4o0lTI3aHVUL?_5S2HjISS6yDbNAWmkSBxlaNKyHzxW Scale = 1:34.6 1 2 5 4 3 2x4 5x6 3x4 4-0-04-0-0 -1-0-0 1-0-0 4-0-0 4-0-0 1-7-06-3-05-7-146-3-014.00 12 Plate Offsets (X,Y)-- [2:Edge,0-2-7] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.21 0.16 0.07 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.03 -0.01 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 18 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)5=230/0-3-8, 3=106/Mechanical, 4=39/Mechanical Max Horz 5=214(LC 6) Max Uplift 3=-103(LC 6), 4=-46(LC 6) Max Grav 5=230(LC 1), 3=106(LC 1), 4=78(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. BOT CHORD 4-5=-259/13 WEBS 2-4=-14/274 NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4 except (jt=lb) 3=103. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss J02 Truss Type Jack-Open Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314854 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:21:49 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-4o0lTI3aHVUL?_5S2HjISS6wVbNMWnnSBxlaNKyHzxW Scale = 1:21.8 1 2 6 5 3 4 3x6 3x4 3x4 1-11-131-11-13 4-0-02-0-3 -0-11-0 0-11-0 1-11-13 1-11-13 4-0-0 2-0-3 1-1-03-9-02-11-143-3-130-9-28.00 12 6.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.32 0.15 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.02 -0.03 -0.03 (loc) 5 5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 13 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)6=224/0-5-8, 3=118/Mechanical, 4=53/Mechanical Max Horz 6=124(LC 6) Max Uplift 3=-99(LC 6), 4=-14(LC 6) Max Grav 6=224(LC 1), 3=118(LC 1), 4=97(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Bearing at joint(s) 6 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3, 4. 6) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 49 lb down and 67 lb up at 3-11-4 on top chord, and 25 lb down and 16 lb up at 3-11-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 7) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 2-3=-60, 5-6=-20, 4-5=-20 Concentrated Loads (lb) Vert: 3=-17(B) 4=-11(B) November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss J03 Truss Type Jack-Open Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314855 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:21:50 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-Y_a7ge4C2pcCd8fec_EX_ff5F?jbFE1bPbV7wnyHzxV Scale = 1:21.8 1 2 5 3 4 3x6 3x4 3-11-133-11-13 -0-11-0 0-11-0 4-0-0 4-0-0 1-1-03-9-01-11-123-3-131-9-48.00 12 6.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.32 0.15 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.02 -0.03 -0.03 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 13 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)5=224/0-5-8, 3=101/Mechanical, 4=42/Mechanical Max Horz 5=124(LC 6) Max Uplift 3=-64(LC 6) Max Grav 5=224(LC 1), 3=101(LC 1), 4=72(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Bearing at joint(s) 5 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss J04 Truss Type Jack-Open Qty 6 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314856 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:21:51 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-0A7Vuz4qp6k3EIErAhlmXtBG_P2q_hHleFEhSDyHzxU Scale = 1:21.8 1 2 5 3 4 3x6 3x4 -0-11-0 0-11-0 4-0-0 4-0-0 1-1-03-9-01-11-123-3-131-9-48.00 12 6.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.32 0.15 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.02 -0.03 -0.03 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 13 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)5=224/0-5-8, 3=101/Mechanical, 4=42/Mechanical Max Horz 5=124(LC 6) Max Uplift 3=-64(LC 6) Max Grav 5=224(LC 1), 3=101(LC 1), 4=72(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Bearing at joint(s) 5 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss J05 Truss Type Jack-Open Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314857 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:21:51 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-0A7Vuz4qp6k3EIErAhlmXtBGzP2p_hHleFEhSDyHzxU Scale = 1:21.8 1 2 6 5 3 4 3x6 3x4 3x4 1-8-21-8-2 4-0-02-3-14 -0-11-0 0-11-0 1-8-2 1-8-2 4-0-0 2-3-14 1-1-03-9-03-1-113-3-130-7-58.00 12 6.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.32 0.15 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.02 -0.03 -0.03 (loc) 5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 13 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)6=224/0-5-8, 3=101/Mechanical, 4=42/Mechanical Max Horz 6=124(LC 6) Max Uplift 3=-64(LC 6) Max Grav 6=224(LC 1), 3=101(LC 1), 4=72(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Bearing at joint(s) 6 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss J06 Truss Type JACK-OPEN Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314858 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:21:52 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-UMhu5J5SaQswsRp1jPG?34kQRpOgj8Xutv_E_fyHzxT Scale = 1:21.5 1 2 5 3 4 3x12 3x6 -1-8-14 1-8-14 3-7-10 3-7-10 1-7-03-8-40-4-153-3-52-11-80-8-126.95 12 2.98 12 Plate Offsets (X,Y)-- [5:0-0-0,0-0-10] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.40 0.17 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.02 -0.04 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 13 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 3-7-10 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)5=281/0-8-7, 3=76/Mechanical, 4=30/Mechanical Max Horz 5=132(LC 6) Max Uplift 5=-25(LC 6), 3=-53(LC 6), 4=-5(LC 6) Max Grav 5=281(LC 1), 3=76(LC 1), 4=64(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Bearing at joint(s) 5 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 3, 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss J07 Truss Type JACK-OPEN Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314859 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:21:53 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-yZFGJf65Lk_nUbODH6oEcIHYiDjOSan26ZjnW6yHzxS Scale = 1:21.6 1 2 5 3 4 4x6 3x8 -2-5-11 2-5-11 2-11-6 2-11-6 1-11-123-8-43-1-93-3-50-6-116.95 12 2.98 12 Plate Offsets (X,Y)-- [5:0-1-8,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.63 0.20 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.01 -0.01 -0.05 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 12 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-11-6 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)5=342/0-8-7, 3=21/Mechanical, 4=13/Mechanical Max Horz 5=144(LC 6) Max Uplift 5=-46(LC 6), 3=-35(LC 6), 4=-20(LC 6) Max Grav 5=342(LC 1), 3=24(LC 4), 4=48(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-5=-301/117 NOTES-(6-7) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Bearing at joint(s) 5 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 3, 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss J08 Truss Type JACK-OPEN Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314860 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:21:53 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-yZFGJf65Lk_nUbODH6oEcIHfaDlQSan26ZjnW6yHzxS Scale = 1:15.0 1 2 5 3 4 2x4 3x4 2-9-152-9-15 -1-2-13 1-2-13 2-9-15 2-9-15 1-1-02-5-00-4-92-0-72-5-05.66 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.19 0.07 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 -0.01 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 9 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-9-15 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=209/0-4-9, 3=59/Mechanical, 4=24/Mechanical Max Horz 5=79(LC 6) Max Uplift 5=-34(LC 6), 3=-31(LC 6) Max Grav 5=209(LC 1), 3=59(LC 1), 4=48(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 3. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss J09 Truss Type JACK-OPEN Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314861 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:21:54 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-QlpeW?7j616e5lzQrqJT9VpqKc5fB11BKDTL3YyHzxR Scale = 1:15.0 1 2 5 3 4 2x4 3x4 2-9-152-9-15 -1-2-13 1-2-13 2-9-15 2-9-15 1-1-02-5-00-4-92-0-72-5-05.66 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.19 0.07 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 -0.01 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 9 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-9-15 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=209/0-4-9, 3=59/Mechanical, 4=24/Mechanical Max Horz 5=79(LC 6) Max Uplift 5=-34(LC 6), 3=-31(LC 6) Max Grav 5=209(LC 1), 3=59(LC 1), 4=48(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 3. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss J10 Truss Type Jack-Open Qty 2 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314862 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:21:54 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-QlpeW?7j616e5lzQrqJT9Vpquc6rB11BKDTL3YyHzxR Scale = 1:15.1 1 2 5 3 42x4 3x4 2-0-02-0-0 -0-11-0 0-11-0 2-0-0 2-0-0 1-1-02-5-01-11-132-5-08.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.15 0.06 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.00 (loc) 5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 7 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=156/0-3-8, 3=39/Mechanical, 4=16/Mechanical Max Horz 5=82(LC 6) Max Uplift 5=-7(LC 6), 3=-33(LC 6), 4=-6(LC 6) Max Grav 5=156(LC 1), 3=39(LC 1), 4=34(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 3, 4. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss J11 Truss Type JACK-OPEN Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314863 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:21:55 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-uxN0kL7LtLEUjvYcPXqihjMzS0RdwUGLZtCub_yHzxQ Scale = 1:15.0 1 2 4 6 3 5 3x4 2x4 1-4-61-3-12 -1-8-14 1-8-14 1-4-6 1-4-6 1-7-02-4-86.95 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.29 0.09 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 -0.01 (loc) 6 6 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 7 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 1-4-6 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=-2/Mechanical, 3=-45/Mechanical, 6=253/0-5-12 Max Horz 6=90(LC 6) Max Uplift 5=-29(LC 6), 3=-45(LC 1), 6=-35(LC 6) Max Grav 5=19(LC 2), 3=14(LC 4), 6=253(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 3, 6. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss J12 Truss Type JACK-OPEN Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314864 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:21:55 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-uxN0kL7LtLEUjvYcPXqihjMzS0RdwUGLZtCub_yHzxQ Scale = 1:15.0 1 2 4 6 3 5 3x4 2x4 1-4-61-3-12 -1-8-14 1-8-14 1-4-6 1-4-6 1-7-02-4-86.95 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.29 0.09 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 -0.01 (loc) 6 6 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 7 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 1-4-6 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=-2/Mechanical, 3=-44/Mechanical, 6=253/0-5-12 Max Horz 6=90(LC 6) Max Uplift 5=-29(LC 6), 3=-44(LC 1), 6=-35(LC 6) Max Grav 5=19(LC 2), 3=14(LC 4), 6=253(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 3, 6. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss J25 Truss Type Jack-Closed Qty 6 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314865 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:21:56 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-M8xOxh8zefNLL37oyFLxEwvACQonfx1UoXyS7QyHzxP Scale = 1:22.9 1 2 3 5 4 2x4 3x6 3x4 3x4 -0-11-0 0-11-0 2-0-0 2-0-0 1-7-03-11-02-11-10-11-10-11-1514.00 12 7.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.10 0.03 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.00 (loc) 5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 13 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-5: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=153/0-3-8, 4=82/Mechanical, 3=33/Mechanical Max Horz 5=106(LC 5) Max Uplift 5=-48(LC 4), 4=-141(LC 6), 3=-37(LC 5) Max Grav 5=153(LC 1), 4=123(LC 11), 3=50(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(9-10) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Bearing at joint(s) 5 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 3 except (jt=lb) 4=141. 6) Gap between inside of top chord bearing and first diagonal or vertical web shall not exceed 0.500in. 7) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 75 lb down and 73 lb up at 1-10-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 8) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 2-3=-60, 4-5=-20 Concentrated Loads (lb) Vert: 4=-65(F) November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss J26 Truss Type Jack-Open Qty 4 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314866 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:21:57 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-rKVn819bPyVCyDi?WysAm8RIHq5VOOmd1Bh?ftyHzxO Scale: 3/4"=1' 1 2 5 3 4 3x4 3x6 0-10-00-10-0 -0-11-0 0-11-0 0-10-0 0-10-0 1-7-02-6-111-11-92-6-1114.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.27 0.13 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 -0.01 (loc) 5 5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 6 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 0-10-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=141/0-5-8, 3=-22/Mechanical, 4=-1/Mechanical Max Horz 5=99(LC 6) Max Uplift 5=-2(LC 4), 3=-38(LC 6), 4=-85(LC 6) Max Grav 5=141(LC 1), 3=14(LC 4), 4=11(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 3, 4. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss J27 Truss Type JACK-OPEN Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314867 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:21:57 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-rKVn819bPyVCyDi?WysAm8RICq6lOOmd1Bh?ftyHzxO Scale: 3/4"=1' 1 2 5 3 4 3x4 3x6 1-2-21-1-12 -1-2-13 1-2-13 1-2-2 1-2-2 1-7-02-6-102-0-142-6-109.90 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.27 0.11 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 -0.00 -0.01 (loc) 5 5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 6 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 1-2-2 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=180/0-7-0, 3=-16/Mechanical, 4=1/Mechanical Max Horz 5=96(LC 6) Max Uplift 3=-28(LC 7), 4=-47(LC 6) Max Grav 5=180(LC 1), 3=12(LC 4), 4=17(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3, 4. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss J28 Truss Type JACK-OPEN Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314868 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:21:58 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-JW29MNADAGd3aMHB4gNPJL_TyES_7r0nFrRYCJyHzxN Scale: 3/4"=1' 1 2 5 3 4 3x4 3x6 1-2-21-2-2 -1-2-13 1-2-13 1-2-2 1-2-2 1-7-02-6-100-5-122-0-142-6-109.90 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.27 0.11 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 -0.00 -0.01 (loc) 5 5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 6 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 1-2-2 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=180/0-7-6, 3=-16/Mechanical, 4=1/Mechanical Max Horz 5=96(LC 6) Max Uplift 3=-28(LC 7), 4=-47(LC 6) Max Grav 5=180(LC 1), 3=12(LC 4), 4=17(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3, 4. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss J29 Truss Type Jack-Closed Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314869 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:21:59 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-njcXZjArxalwCWsNeNvesZXbDdkPsIbwUVA6klyHzxM Scale = 1:31.7 1 2 3 5 4 2x4 3x6 2x4 3x4 6-1-46-1-4 -1-5-8 1-5-8 6-1-4 6-1-4 1-3-145-4-112-5-132-9-22-10-148.00 12 6.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.50 0.36 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.08 -0.20 -0.00 (loc) 4-5 4-5 4 l/defl >892 >357 n/a L/d 240 180 n/a PLATES MT20 Weight: 26 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-5: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=344/0-3-8, 4=221/Mechanical Max Horz 5=152(LC 6) Max Uplift 5=-29(LC 6), 4=-61(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-5=-285/165 NOTES-(6-7) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Bearing at joint(s) 5 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss M01 Truss Type Monopitch Qty 3 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314870 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:21:59 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-njcXZjArxalwCWsNeNvesZXh8dpGsIGwUVA6klyHzxM Scale = 1:16.8 1 2 3 5 4 2x4 2x4 2x4 2x4 2-6-02-6-0 -0-11-0 0-11-0 2-6-0 2-6-0 1-1-02-9-08.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.12 0.05 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.00 (loc) 5 4-5 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 10 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-5: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-6-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)4=75/Mechanical, 5=169/0-3-8 Max Horz 5=79(LC 5) Max Uplift 4=-32(LC 5), 5=-25(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4, 5. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss M02 Truss Type Monopitch Qty 3 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314871 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:00 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-FvAvn2BUittnpgQZB4QtOm3on17yblW4j9wfGCyHzxL Scale: 1"=1' 1 2 3 5 4 3x6 2x4 3x6 4-8-84-8-8 -0-1-8 0-1-8 4-8-8 4-8-8 0-8-01-10-23.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.38 0.14 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.03 0.00 (loc) 4-5 4-5 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 12 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-5: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-8-8 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)4=178/Mechanical, 5=184/0-3-8 Max Horz 5=49(LC 5) Max Uplift 4=-19(LC 6), 5=-16(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4, 5. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss PB01 Truss Type GABLE Qty 8 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314872 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:00 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-FvAvn2BUittnpgQZB4QtOm3sJ19QblK4j9wfGCyHzxL Scale = 1:22.0 2 3 4 6 1 5 4x6 2x4 2x4 2x4 5-4-115-4-11 2-8-6 2-8-6 5-4-11 2-8-6 -0-0-43-1-83-1-120-1-00-1-814.00 12 Plate Offsets (X,Y)-- [3:Edge,0-1-14] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.09 0.05 0.01 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 4 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 16 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-4-11 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 5-4-11. (lb) - Max Horz 1=-70(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 1, 5 except 2=-158(LC 6), 4=-139(LC 7) Max Grav All reactions 250 lb or less at joint(s) 1, 5, 2, 4, 6 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(10-11) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable requires continuous bottom chord bearing. 5) Gable studs spaced at 4-0-0 oc. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) Bearing at joint(s) 1, 5, 2, 4 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 5 except (jt=lb) 2=158, 4=139. 9) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss PB02 Truss Type GABLE Qty 6 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314873 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:01 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-j5kH_OC6TB?eRq?mlox6x_c1rRUPKCVDxpfDoeyHzxK Scale: 3/4"=1' 2 3 4 6 1 5 4x6 2x4 2x4 2x4 6-6-06-6-0 3-3-0 3-3-0 6-6-0 3-3-0 -0-0-42-1-122-2-00-1-00-1-88.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.10 0.07 0.02 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 4 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 16 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 6-6-0. (lb) - Max Horz 1=46(LC 5) Max Uplift All uplift 100 lb or less at joint(s) 1, 5, 2, 4 Max Grav All reactions 250 lb or less at joint(s) 1, 5, 2, 4, 6 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable requires continuous bottom chord bearing. 5) Gable studs spaced at 4-0-0 oc. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 5, 2, 4. 8) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss PB03 Truss Type GABLE Qty 6 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314874 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:01 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-j5kH_OC6TB?eRq?mlox6x_c0ORU9KCmDxpfDoeyHzxK Scale = 1:15.0 2 3 4 1 2x4 2x4 2x4 3-8-03-8-0-0-0-42-5-52-5-12-3-130-1-88.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.13 0.08 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 4 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 10 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-8-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=-102/3-8-0, 4=94/3-8-0, 2=270/3-8-0 Max Horz 1=62(LC 5) Max Uplift 1=-102(LC 1), 4=-10(LC 6), 2=-96(LC 6) Max Grav 1=84(LC 6), 4=94(LC 1), 2=270(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(9-10) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 3) Gable requires continuous bottom chord bearing. 4) Gable studs spaced at 4-0-0 oc. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) Bearing at joint(s) 1, 2 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4, 2 except (jt=lb) 1=102. 8) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss PB04 Truss Type GABLE Qty 2 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314875 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:02 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-BIIgCkDkEV7V3_ayJVSLTB9CzrqP3ftNATPmL4yHzxJ Scale = 1:14.0 2 3 4 5 7 1 6 3x4 2x4 2x4 2x4 4x6 6-6-06-6-0 6-6-0 6-6-0 -0-0-41-9-101-9-140-1-00-1-81-8-68.00 12 Plate Offsets (X,Y)-- [3:0-2-0,0-2-3], [4:0-4-4,0-2-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.08 0.08 0.01 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 6 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 15 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except 2-0-0 oc purlins (6-0-0 max.): 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 6-6-0. (lb) - Max Horz 1=-38(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 1, 6, 2, 5 Max Grav All reactions 250 lb or less at joint(s) 1, 6, 5, 7 except 2=264(LC 10) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(11-12) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Provide adequate drainage to prevent water ponding. 5) Gable requires continuous bottom chord bearing. 6) Gable studs spaced at 4-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 6, 2, 5. 9) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. 10) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 11) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 12) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss PB05 Truss Type GABLE Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314876 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:03 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-fUs2P4EM_oFMg898tDza0PhJuF8po6cWP78JtWyHzxI Scale = 1:23.2 2 3 4 6 1 5 4x6 3x4 3x4 2x4 10-2-010-2-0 5-1-0 5-1-0 10-2-0 5-1-0 -0-0-43-4-73-4-110-1-00-1-88.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.33 0.20 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 26 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 10-2-0. (lb) - Max Horz 1=74(LC 5) Max Uplift All uplift 100 lb or less at joint(s) except 1=-279(LC 1), 5=-279(LC 1), 2=-220(LC 6), 4=-209(LC 7) Max Grav All reactions 250 lb or less at joint(s) 1, 5 except 2=527(LC 1), 4=527(LC 1), 6=271(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable requires continuous bottom chord bearing. 5) Gable studs spaced at 4-0-0 oc. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 279 lb uplift at joint 1, 279 lb uplift at joint 5, 220 lb uplift at joint 2 and 209 lb uplift at joint 4. 8) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss PB06 Truss Type GABLE Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314877 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:04 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-7gQQcQE_l6NDIHkLQwUpZcEWEeU4XZpfenutPzyHzxH Scale = 1:18.0 2 3 4 5 6 9 8 1 7 3x4 2x4 2x4 2x4 4x6 2x4 2x4 10-2-010-2-0 10-2-0 10-2-0 -0-0-41-2-121-3-00-1-00-1-81-1-88.00 12 Plate Offsets (X,Y)-- [3:0-2-0,0-2-3], [5:0-4-4,0-2-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.22 0.13 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 7 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 23 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except 2-0-0 oc purlins (6-0-0 max.): 3-5. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 10-2-0. (lb) - Max Horz 1=-25(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 1, 7, 2, 6, 8, 9 Max Grav All reactions 250 lb or less at joint(s) 1, 7, 2, 6, 8 except 9=341(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. WEBS 4-9=-254/127 NOTES-(11-12) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Provide adequate drainage to prevent water ponding. 5) Gable requires continuous bottom chord bearing. 6) Gable studs spaced at 4-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 7, 2, 6, 8, 9. 9) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. 10) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 11) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 12) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss PB08 Truss Type GABLE Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314878 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:05 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-ct_oqmFcWQV4wRJX_e?25qnfv2rhG?9psRdQyPyHzxG Scale = 1:42.5 2 3 4 5 6 7 8 9 16 15 14 13 12 11 10 1 3x6 2x4 2x4 3x6 3x6 2x4 4x6 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 24-10-224-10-2 6-7-2 6-7-2 21-7-8 15-0-6 24-10-2 3-2-10 4-4-122-3-02-1-80-1-84-3-48.00 12 Plate Offsets (X,Y)-- [2:0-2-11,0-1-8], [4:0-3-0,0-0-2], [8:0-3-12,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.36 0.11 0.10 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 10 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 74 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 4-8. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 24-10-2. (lb) - Max Horz 1=120(LC 5) Max Uplift All uplift 100 lb or less at joint(s) 10, 12, 13, 14, 16 except 1=-285(LC 1), 2=-139(LC 6) Max Grav All reactions 250 lb or less at joint(s) 1, 10 except 2=531(LC 1), 11=289(LC 1), 12=332(LC 10), 13=323(LC 1), 14=316(LC 11), 16=362(LC 10) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. WEBS 7-12=-251/107, 3-16=-267/100 NOTES-(11-12) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Provide adequate drainage to prevent water ponding. 5) Gable requires continuous bottom chord bearing. 6) Gable studs spaced at 4-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 10, 12, 13, 14, 16 except (jt=lb) 1=285, 2=139. 9) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. 10) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 11) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 12) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss PB09 Truss Type GABLE Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314879 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:05 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-ct_oqmFcWQV4wRJX_e?25qnjw2rrG0epsRdQyPyHzxG Scale = 1:13.5 2 3 4 5 7 1 6 3x4 2x4 2x4 2x4 5x6 5-4-115-4-11 1-6-5 1-6-5 3-10-7 2-4-2 5-4-11 1-6-5 1-9-50-1-40-1-81-7-1314.00 12 Plate Offsets (X,Y)-- [3:0-1-5,Edge], [4:0-4-8,0-1-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.10 0.10 0.01 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 6 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 14 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-4-11 oc purlins, except 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 5-4-11. (lb) - Max Horz 1=-40(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 1, 6, 2, 5 Max Grav All reactions 250 lb or less at joint(s) 1, 6, 2, 5, 7 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(11-12) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Provide adequate drainage to prevent water ponding. 5) Gable requires continuous bottom chord bearing. 6) Gable studs spaced at 4-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 6, 2, 5. 9) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. 10) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 11) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 12) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss PB10 Truss Type GABLE Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314880 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:06 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-43XA16GEHjdxXbujYLXHe1JupSCp?Tpy55NzUryHzxF Scale = 1:22.1 2 3 4 6 1 5 4x6 2x4 2x4 2x4 5-4-115-4-11 2-8-6 2-8-6 5-4-11 2-8-6 3-1-120-1-40-1-814.00 12 Plate Offsets (X,Y)-- [3:Edge,0-1-14] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.09 0.05 0.01 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 4 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 16 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-4-11 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 5-4-11. (lb) - Max Horz 1=-71(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 1, 5 except 2=-151(LC 6), 4=-131(LC 7) Max Grav All reactions 250 lb or less at joint(s) 1, 5, 2, 4, 6 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(10-11) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable requires continuous bottom chord bearing. 5) Gable studs spaced at 4-0-0 oc. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) Bearing at joint(s) 1, 5, 2, 4 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 5 except (jt=lb) 2=151, 4=131. 9) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T01 Truss Type Hip Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314881 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:07 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-YF5ZFSHt21ln9lTw632WAFsrPsORkj56Kl6X0IyHzxE Scale = 1:64.9 1 2 3 4 5 6 7 81413121110 9 6x6 4x6 4x6 3x6 3x4 3x6 6x10 5x12 3x8 3x4 3x8 3x12 4x6 4x8 6-8-106-8-10 14-9-08-0-6 23-10-129-1-12 30-0-06-1-4 6-8-10 6-8-10 10-8-13 4-0-3 14-9-0 4-0-3 19-3-14 4-6-14 23-10-12 4-6-14 30-0-0 6-1-4 4-1-48-4-1111-5-141-3-142-10-148-4-118.00 12 6.00 12 Plate Offsets (X,Y)-- [6:0-1-0,0-2-0], [8:0-4-3,0-0-0], [9:0-2-14,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 1.00 0.67 0.84 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.21 -0.68 0.30 (loc) 10-11 10-11 9 l/defl >999 >524 n/a L/d 240 180 n/a PLATES MT20 Weight: 133 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 *Except* 9-10: 2x4 SPF 2100F 1.8E WEBS 2x3 SPF No.2 *Except* 1-14: 2x4 SPF-S Stud, 8-9,6-9: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-0-8 oc purlins, except end verticals, and 2-0-0 oc purlins (5-5-12 max.): 2-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 3-13, 6-9 REACTIONS.(lb/size)14=1188/0-3-8, 9=1188/0-3-8 Max Horz 14=-297(LC 4) Max Uplift 14=-8(LC 6), 9=-59(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-1027/155, 2-3=-772/174, 3-4=-1115/188, 4-5=-1410/189, 5-6=-3253/287, 6-8=-610/181, 1-14=-1123/119, 8-9=-493/145 BOT CHORD 13-14=-175/287, 11-13=-35/998, 10-11=0/1551, 9-10=-40/2988 WEBS 2-13=-0/275, 3-13=-571/125, 3-11=-24/276, 4-11=-9/484, 5-11=-664/146, 5-10=-115/1669, 6-10=-3/292, 1-13=-38/832, 6-9=-2973/0 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Bearing at joint(s) 9 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 14, 9. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T02 Truss Type Piggyback Base Qty 4 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314882 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:08 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-0RfxSnHVpKtenv26fmZljSO5yGfWT9hFYPs4YkyHzxD Scale = 1:71.4 1 2 3 4 5 6 7131211109 8 6x6 5x10 MT18HS 4x6 3x6 3x6 3x6 8x10 5x12 3x6 3x8 3x12 4x6 4x8 7-5-137-5-13 13-11-136-6-0 23-10-129-10-15 30-0-06-1-4 7-5-13 7-5-13 13-11-13 6-6-0 18-11-4 4-11-7 23-10-12 4-11-7 30-0-0 6-1-4 4-1-49-1-212-0-01-3-142-10-149-1-28.00 12 6.00 12 Plate Offsets (X,Y)-- [2:0-6-0,0-1-8], [3:0-3-4,0-2-4], [5:0-1-4,0-1-12], [7:0-4-3,0-0-0], [8:0-2-14,Edge], [12:0-2-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.69 1.00 0.95 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.32 -0.94 0.33 (loc) 9-10 9-10 8 l/defl >999 >378 n/a L/d 240 180 n/a PLATES MT20 MT18HS Weight: 135 lb FT = 20% GRIP 197/144 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-10,1-13,7-8,5-8: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 2-11-10 oc purlins, except end verticals, and 2-0-0 oc purlins (5-4-1 max.): 2-3. BOT CHORD Structural wood sheathing directly applied. WEBS 1 Row at midpt 2-12, 5-8 REACTIONS.(lb/size)13=1188/0-3-8, 8=1188/0-3-8 Max Horz 13=-311(LC 4) Max Uplift 13=-13(LC 7), 8=-61(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-1065/164, 2-3=-1033/191, 3-4=-1319/189, 4-5=-3279/280, 5-7=-579/185, 1-13=-1105/128, 7-8=-475/148 BOT CHORD 12-13=-184/317, 10-12=-58/784, 9-10=0/1499, 8-9=-27/3012 WEBS 2-12=-258/98, 2-10=-72/494, 3-10=-0/416, 4-10=-693/162, 4-9=-105/1742, 5-9=0/299, 1-12=-51/793, 5-8=-3029/0 NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are MT20 plates unless otherwise indicated. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) Bearing at joint(s) 8 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 13, 8. 8) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T03 Truss Type Half Hip Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314883 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:09 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-UeDJg7I7ae?VO3cIDT4_FgxGhf6sClKOn3be5AyHzxC Scale = 1:81.8 1 2 3 4 5 6 7 12 11 10 9 8 13 3x6 8x14 MT18HS 3x6 3x6 3x8 3x6 3x4 3x6 4x8 3x6 8-11-12 8-11-12 17-9-0 8-9-4 18-2-8 0-5-8 18-6-0 0-3-8 18-6-8 0-0-8 -1-3-8 1-3-8 8-11-12 8-11-12 17-9-0 8-9-4 18-2-8 0-5-8 18-6-8 0-4-0 1-1-012-8-1112-11-012-5-39-5-412-8-118.00 12 Plate Offsets (X,Y)-- [2:0-2-12,0-2-0], [5:0-9-0,0-0-14] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.69 0.54 0.35 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.10 -0.30 0.30 (loc) 9-10 9-10 13 l/defl >999 >724 n/a L/d 240 180 n/a PLATES MT20 MT18HS Weight: 112 lb FT = 20% GRIP 169/123 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 *Except* 5-7: 2x6 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x6 SPF No.2 *Except* 4-10,2-10: 2x3 SPF No.2, 4-9: 2x4 SPF No.2 OTHERS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 5-8-12 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 5-7. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 4-9 REACTIONS.(lb/size)12=808/0-3-8, 13=739/0-3-8 Max Horz 12=412(LC 6) Max Uplift 13=-192(LC 6) Max Grav 12=808(LC 10), 13=739(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-4=-803/0, 2-12=-725/33 BOT CHORD 8-13=-269/340, 6-13=-548/0, 10-12=-431/429, 9-10=-169/551 WEBS 4-10=0/359, 4-9=-643/201, 2-10=-7/264, 5-9=0/480 NOTES-(10-11) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are MT20 plates unless otherwise indicated. 5) The Fabrication Tolerance at joint 5 = 8%, joint 5 = 8% 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) Bearing at joint(s) 13 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 13=192. 9) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T04 Truss Type Piggyback Base Qty 5 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314884 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:09 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-UeDJg7I7ae?VO3cIDT4_FgxCDf8BCkHOn3be5AyHzxC Scale = 1:62.3 1 2 3 4 5 6 11 10 9 8 7 12 13 3x6 6x6 4x8 3x6 3x6 3x6 3x4 3x4 6x8 6x6 3x6 7-6-87-6-8 14-10-87-4-0 18-6-83-8-0 -1-3-8 1-3-8 7-6-8 7-6-8 14-10-8 7-4-0 18-6-8 3-8-0 1-1-011-0-09-1-1211-0-08.00 12 Plate Offsets (X,Y)-- [5:0-4-8,0-1-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.91 0.39 0.41 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.07 -0.19 0.11 (loc) 8-9 8-9 13 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 103 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF No.2 *Except* 4-9,4-8,2-9: 2x3 SPF No.2, 2-11: 2x4 SPF-S Stud OTHERS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 5-9-15 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 5-6. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 4-8, 5-7 REACTIONS.(lb/size)11=819/0-3-8, 13=703/0-3-8 Max Horz 11=313(LC 5) Max Uplift 11=-43(LC 6), 13=-95(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-4=-858/48, 4-5=-384/102, 7-12=-87/710, 6-12=-87/710, 2-11=-746/104 BOT CHORD 9-11=-278/326, 8-9=-108/613 WEBS 4-9=0/290, 4-8=-505/157, 5-8=-89/470, 5-7=-716/131, 2-9=0/290, 6-13=-710/100 NOTES-(7-8) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Provide adequate drainage to prevent water ponding. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Bearing at joint(s) 13 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 11, 13. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T05 Truss Type Half Hip Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314885 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:10 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-yqnhtTJlLy7M0CBUnBbDotUZU3Z?xHYY0jLBdcyHzxB Scale = 1:22.1 1 2 3 4 7 6 5 4x8 2x4 3x4 2x4 3x4 3x6 1-11-01-11-0 4-0-02-1-0 -0-11-0 0-11-0 1-11-0 1-11-0 4-0-0 2-1-0 1-7-03-8-03-9-133-8-014.00 12 Plate Offsets (X,Y)-- [3:0-5-3,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.17 0.03 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.00 (loc) 6 6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 23 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=141/Mechanical, 7=223/0-3-8 Max Horz 7=115(LC 5) Max Uplift 5=-55(LC 5), 7=-15(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T06 Truss Type Half Hip Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314886 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:10 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-yqnhtTJlLy7M0CBUnBbDotUW63XExGPY0jLBdcyHzxB Scale = 1:28.9 1 2 3 4 7 6 5 4x6 4x6 2x4 3x4 3x4 3x6 3-0-113-0-11 4-0-00-11-5 -0-11-0 0-11-0 3-0-11 3-0-11 4-0-0 0-11-5 1-7-05-0-05-1-135-0-014.00 12 Plate Offsets (X,Y)-- [3:0-3-3,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.33 0.15 0.10 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.01 -0.01 0.00 (loc) 6-7 6-7 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 25 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=141/Mechanical, 7=223/0-3-8 Max Horz 7=155(LC 5) Max Uplift 5=-89(LC 5), 7=-20(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T07 Truss Type Piggyback Base Qty 7 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314887 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:11 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-Q0L35pKN6FFDeMmhLu6SL50djToPgXwhFM4k93yHzxA Scale = 1:67.7 1 2 3 4 5 6 78 13 12 11 10 9 4x6 6x6 3x6 3x8 3x6 3x4 3x6 3x4 5x8 5x8 3x4 8-11-28-11-2 14-3-145-4-11 23-3-08-11-2 -1-0-0 1-0-0 4-6-13 4-6-13 8-11-2 4-4-5 14-3-14 5-4-11 18-8-3 4-4-5 23-3-0 4-6-13 24-3-0 1-0-0 1-7-012-0-01-7-012-0-014.00 12 Plate Offsets (X,Y)-- [4:0-3-2,0-2-0], [5:0-3-0,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.59 0.47 0.85 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.13 -0.33 0.02 (loc) 9-10 9-10 9 l/defl >999 >843 n/a L/d 240 180 n/a PLATES MT20 Weight: 136 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF No.2 *Except* 3-11,6-10,3-13,6-9: 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 4-5. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 5-11 REACTIONS.(lb/size)13=987/0-3-8, 9=987/0-3-8 Max Horz 13=303(LC 5) Max Uplift 13=-46(LC 6), 9=-46(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-384/153, 3-4=-771/212, 4-5=-443/195, 5-6=-771/212, 6-7=-385/153, 2-13=-403/172, 7-9=-403/172 BOT CHORD 11-13=-168/495, 10-11=-37/442, 9-10=0/495 WEBS 4-11=-69/290, 5-10=-87/290, 3-13=-588/97, 6-9=-587/98 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 13, 9. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T08 Truss Type Piggyback Base Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314888 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:12 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-uDvSI9L?tZO4FWLtucdhtIZnSt8dPz7rT0qIhVyHzx9 Scale = 1:67.7 1 2 3 4 5 6 7 12 11 10 9 8 4x6 6x6 3x6 3x6 3x8 3x6 3x4 3x6 3x4 5x8 5x8 8-11-28-11-2 14-3-145-4-11 23-3-08-11-2 -1-0-0 1-0-0 4-6-13 4-6-13 8-11-2 4-4-5 14-3-14 5-4-11 18-8-3 4-4-5 23-3-0 4-6-13 1-7-012-0-01-7-012-0-014.00 12 Plate Offsets (X,Y)-- [4:0-3-2,0-2-0], [5:0-3-0,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.59 0.47 0.86 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.13 -0.33 0.02 (loc) 8-9 8-9 8 l/defl >999 >845 n/a L/d 240 180 n/a PLATES MT20 Weight: 134 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF No.2 *Except* 3-10,6-9,3-12,6-8: 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 4-5. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 5-10 REACTIONS.(lb/size)12=989/0-3-8, 8=917/0-3-8 Max Horz 12=317(LC 5) Max Uplift 12=-45(LC 6), 8=-15(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-384/152, 3-4=-773/211, 4-5=-444/194, 5-6=-775/211, 6-7=-395/124, 2-12=-403/172, 7-8=-357/114 BOT CHORD 10-12=-182/496, 9-10=-51/444, 8-9=-2/500 WEBS 4-10=-68/291, 5-9=-85/292, 3-12=-590/97, 6-8=-557/109 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 12, 8. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T09 Truss Type Roof Special Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314889 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:13 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-NPSqVVLeetWxtgw3SJ9wQW6zvHX68YX_igZrExyHzx8 Scale = 1:47.0 1 2 3 6 5 4 3x6 6x6 4x8 3x6 3x6 3x4 1-9-111-9-11 7-1-85-3-13 1-9-11 1-9-11 7-1-8 5-3-13 7-9-71-7-07-9-714.00 12 Plate Offsets (X,Y)-- [2:0-4-12,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.55 0.26 0.33 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.03 -0.06 0.00 (loc) 4-5 4-5 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 39 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 3-4: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 1-2. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)6=275/Mechanical, 4=275/0-3-8 Max Horz 6=-224(LC 4) Max Uplift 6=-120(LC 4), 4=-7(LC 5) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-6=-288/217 WEBS 1-5=-236/321 NOTES-(7-8) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Provide adequate drainage to prevent water ponding. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4 except (jt=lb) 6=120. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T10 Truss Type Roof Special Qty 2 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314890 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:13 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-NPSqVVLeetWxtgw3SJ9wQW6_1HYL8Sq_igZrExyHzx8 Scale = 1:58.2 1 2 3 4 5 6 10 9 8 7 3x6 4x6 5x6 5x12 3x12 3x6 3x6 3x6 3x6 4-1-04-1-0 8-4-04-3-0 12-8-04-4-0 4-1-0 4-1-0 6-2-8 2-1-8 8-4-0 2-1-8 12-8-0 4-4-0 13-7-0 0-11-0 1-10-149-1-131-7-00-0-63-0-614.00 12 9.00 12 Plate Offsets (X,Y)-- [3:Edge,0-1-14] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.47 0.25 0.76 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.03 -0.08 0.11 (loc) 8-9 8-9 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 69 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-10,5-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)10=492/Mechanical, 7=561/0-3-8 Max Horz 10=-248(LC 4) Max Uplift 10=-29(LC 7), 7=-33(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-262/188, 2-3=-356/69, 3-4=-706/160, 4-5=-272/242, 1-10=-257/167, 5-7=-334/248 BOT CHORD 9-10=-184/546, 8-9=-135/419, 7-8=-27/551 WEBS 2-9=-53/398, 2-8=-269/140, 3-8=-170/655, 4-8=-92/334, 2-10=-591/0, 4-7=-589/52 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Bearing at joint(s) 7 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 10, 7. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T11 Truss Type Common Qty 3 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314891 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:14 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-rb0CjrMGPAeoVqVG01g9yje4Sgutt2v8xKJPmOyHzx7 Scale = 1:57.7 1 2 3 4 7 6 5 6x8 4x8 3x4 3x4 3x8 6x8 6-2-86-2-8 12-8-06-5-8 6-2-8 6-2-8 12-8-0 6-5-8 13-7-0 0-11-0 1-10-89-1-71-7-014.00 12 Plate Offsets (X,Y)-- [1:Edge,0-1-5], [2:0-4-12,0-2-0], [3:Edge,0-1-5] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.82 0.23 0.13 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.03 -0.07 0.00 (loc) 5-6 5-6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 58 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-7,3-5: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)7=492/Mechanical, 5=561/0-3-8 Max Horz 7=-248(LC 4) Max Uplift 7=-30(LC 7), 5=-31(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-443/121, 2-3=-452/119, 1-7=-431/85, 3-5=-497/120 BOT CHORD 6-7=-259/308 WEBS 3-6=-131/261 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 7, 5. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T12 Truss Type Hip Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314892 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:15 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-JoaawBNuAUmf7_4SakBOVxBM64AacRGH9_2yIqyHzx6 Scale = 1:33.9 1 2 3 4 5 6 7 13 12 11 10 9 8 4x8 4x8 3x6 2x4 5x8 5x12 2x4 3x6 3x4 2x4 3x6 3x6 3-0-03-0-0 5-11-02-11-0 12-4-06-5-0 15-7-13-3-1 18-3-02-7-15 -0-11-0 0-11-0 3-0-0 3-0-0 5-11-0 2-11-0 12-4-0 6-5-0 15-7-1 3-3-1 18-3-0 2-7-15 1-7-04-11-35-1-01-11-122-8-122-2-714.00 12 6.00 12 Plate Offsets (X,Y)-- [3:0-5-3,0-2-0], [6:0-5-3,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.37 0.46 0.45 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.07 -0.23 0.17 (loc) 10-11 10-11 8 l/defl >999 >952 n/a L/d 240 180 n/a PLATES MT20 Weight: 75 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-13,7-8: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (4-3-7 max.): 3-6. BOT CHORD Structural wood sheathing directly applied or 9-7-12 oc bracing. REACTIONS.(lb/size)13=784/0-5-8, 8=716/0-5-8 Max Horz 13=155(LC 5) Max Uplift 13=-48(LC 5), 8=-49(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-860/173, 3-4=-1551/328, 4-5=-1569/267, 5-6=-1570/268, 6-7=-749/88, 2-13=-761/138, 7-8=-699/74 BOT CHORD 11-12=-198/586, 10-11=-374/1568, 9-10=-92/513 WEBS 3-11=-231/1249, 4-11=-349/161, 5-10=-342/142, 6-10=-263/1296, 6-9=-255/77, 2-12=-36/493, 7-9=-78/446 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Bearing at joint(s) 13, 8 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 13, 8. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T13 Truss Type Hip Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314893 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:16 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-n_8y8XOWwouWk7fe7Rid28kWfUY_LwEQOeoVqGyHzx5 Scale = 1:39.0 1 2 3 4 5 6 7 13 12 11 10 9 8 4x8 4x8 4x6 3x4 5x8 5x12 2x4 3x6 3x4 2x4 3x6 5x6 4-1-114-1-11 5-11-01-9-5 12-4-06-5-0 14-5-62-1-6 18-3-03-9-10 -0-11-0 0-11-0 4-1-11 4-1-11 5-11-0 1-9-5 12-4-0 6-5-0 14-5-6 2-1-6 18-3-0 3-9-10 1-7-06-3-36-5-01-11-122-8-123-6-714.00 12 6.00 12 Plate Offsets (X,Y)-- [2:0-3-0,0-2-1], [3:0-5-3,0-2-0], [6:0-5-3,0-2-0], [7:0-2-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.39 0.32 0.27 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.05 -0.15 0.09 (loc) 10-11 10-11 8 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 82 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-13,7-8: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 5-11-11 oc purlins, except end verticals, and 2-0-0 oc purlins (5-6-11 max.): 3-6. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)13=784/0-5-8, 8=716/0-5-8 Max Horz 13=187(LC 5) Max Uplift 13=-33(LC 6), 8=-15(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-938/166, 3-4=-921/201, 4-5=-930/136, 5-6=-932/138, 6-7=-850/85, 2-13=-766/141, 7-8=-696/84 BOT CHORD 11-12=-205/626, 10-11=-248/929, 9-10=-85/562 WEBS 3-11=-122/791, 4-11=-357/189, 5-10=-333/147, 6-10=-186/784, 2-12=-6/495, 7-9=-82/450 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Bearing at joint(s) 13, 8 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 13, 8. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T14 Truss Type Hip Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314894 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:16 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-n_8y8XOWwouWk7fe7Rid28kVKUYJLyrQOeoVqGyHzx5 Scale = 1:45.1 1 2 3 4 5 6 10 9 8 7 4x6 4x6 6x8 3x4 6x10 6x8 3x4 3x4 5x8 5-11-05-11-0 12-4-06-5-0 18-3-05-11-0 -0-11-0 0-11-0 5-3-7 5-3-7 9-3-9 4-0-2 13-3-10 4-0-2 18-3-0 4-11-6 1-7-07-7-37-9-01-11-122-8-124-10-714.00 12 6.00 12 Plate Offsets (X,Y)-- [2:Edge,0-1-5], [3:0-3-3,0-2-0], [5:0-3-3,0-2-0], [6:Edge,0-1-5] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.47 0.30 0.17 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.04 -0.11 0.06 (loc) 8-9 8-9 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 80 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-10,6-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 5-8-4 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 3-5. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)10=784/0-5-8, 7=716/0-5-8 Max Horz 10=220(LC 5) Max Uplift 10=-36(LC 6), 7=-4(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-998/139, 3-4=-628/138, 4-5=-624/100, 5-6=-945/90, 2-10=-774/156, 6-7=-698/98 BOT CHORD 9-10=-266/266, 8-9=-176/702 WEBS 3-9=-10/413, 5-8=-52/391, 2-9=0/491, 6-8=-109/476 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Bearing at joint(s) 10, 7 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 10, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T15 Truss Type Hip Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314895 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:17 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-FAiKLsO8h50NMHErh9DsaMGamutA4MhadIX3NjyHzx4 Scale = 1:52.8 1 2 3 4 8 7 6 5 3x8 5x12 5x8 6x8 6x6 3x4 6x10 3x6 5-11-05-11-0 12-4-06-5-0 18-3-05-11-0 6-5-2 6-5-2 12-1-15 5-8-13 18-3-0 6-1-1 1-7-08-11-39-1-01-11-122-8-126-2-714.00 12 6.00 12 Plate Offsets (X,Y)-- [2:0-9-0,0-1-12], [3:0-5-8,0-2-4], [4:Edge,0-1-5] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.87 0.32 0.32 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.04 -0.11 0.07 (loc) 6-7 6-7 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 87 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-8,4-5: 2x4 SPF-S Stud, 2-8: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-8-14 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 2-3. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-6, 2-8 REACTIONS.(lb/size)5=718/0-5-8, 8=718/0-5-8 Max Horz 8=234(LC 5) Max Uplift 5=-8(LC 6), 8=-6(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-410/364, 2-3=-519/122, 3-4=-935/68, 1-8=-391/315, 4-5=-713/112 BOT CHORD 7-8=-213/655, 6-7=-177/531 WEBS 2-7=-12/462, 3-6=-31/347, 2-8=-671/0, 4-6=-109/424 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Bearing at joint(s) 5, 8 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 8. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T16 Truss Type Hip Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314896 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:18 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-jNGjZCPmSP8E_Ro1Fsk57ZplVIDoplKjsyHcv9yHzx3 Scale = 1:60.3 1 2 3 4 5 6 12 11 10 9 8 7 3x8 4x8 4x6 3x8 5x6 5x6 4x10 4x6 4x8 4x10 4x6 4x6 5-11-05-11-0 7-6-141-7-14 11-0-33-5-6 12-4-01-3-13 18-3-05-11-0 5-11-0 5-11-0 7-6-14 1-7-14 11-0-3 3-5-6 12-4-0 1-3-13 18-3-0 5-11-0 1-7-010-3-310-5-01-11-122-8-127-6-714.00 12 6.00 12 Plate Offsets (X,Y)-- [3:0-5-3,0-2-0], [4:0-3-3,0-2-0], [7:0-2-13,Edge], [10:0-2-8,0-2-0], [12:0-2-13,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.88 0.36 0.62 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.03 -0.09 0.10 (loc) 7-8 11-12 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 108 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-12,6-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-12, 5-7 REACTIONS.(lb/size)12=718/0-5-8, 7=718/0-5-8 Max Horz 12=266(LC 5) Max Uplift 12=-16(LC 7), 7=-18(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-431/303, 2-3=-729/229, 3-4=-435/128, 4-5=-716/242, 5-6=-357/289, 1-12=-407/262, 6-7=-349/249 BOT CHORD 11-12=-220/621, 10-11=-183/538, 9-10=-129/436, 8-9=-47/508, 7-8=-68/580 WEBS 2-11=-34/372, 2-10=-375/244, 3-10=-210/403, 4-9=-177/386, 5-9=-331/218, 5-8=0/346, 2-12=-620/0, 5-7=-659/124 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Bearing at joint(s) 12, 7 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 12, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T17 Truss Type Hip Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314897 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:19 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-BZq5mYQODjG4bbNDpaFKfnMwQhZ7YCet4c09RbyHzx2 Scale = 1:67.9 1 2 3 4 5 6 12 11 10 9 8 7 3x8 4x8 4x6 3x8 5x6 5x6 3x12 3x4 4x8 4x10 4x6 4x6 5-11-05-11-0 8-8-92-9-9 9-10-81-1-15 12-4-02-5-8 18-3-05-11-0 5-11-0 5-11-0 8-8-9 2-9-9 9-10-8 1-1-15 12-4-0 2-5-8 18-3-0 5-11-0 1-7-011-7-311-9-01-11-122-8-128-10-714.00 12 6.00 12 Plate Offsets (X,Y)-- [3:0-5-3,0-2-0], [4:0-3-3,0-2-0], [7:0-2-13,Edge], [12:0-2-13,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.86 0.35 0.61 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.03 -0.09 0.10 (loc) 7-8 7-8 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 113 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-12,6-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 3-9, 2-12, 5-7 REACTIONS.(lb/size)12=718/0-5-8, 7=718/0-5-8 Max Horz 12=299(LC 5) Max Uplift 12=-28(LC 7), 7=-30(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-425/304, 2-3=-657/198, 3-4=-378/143, 4-5=-656/217, 5-6=-363/299, 1-12=-401/265, 6-7=-354/257 BOT CHORD 11-12=-219/631, 10-11=-181/541, 9-10=-97/373, 8-9=-35/503, 7-8=-53/581 WEBS 2-11=-37/399, 2-10=-379/218, 3-10=-144/319, 4-9=-152/358, 5-9=-339/188, 5-8=0/366, 2-12=-632/0, 5-7=-654/103 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Bearing at joint(s) 12, 7 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 12, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T18 Truss Type Roof Special Qty 3 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314898 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:20 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-flOTzuR1_0OxDlyPMHnZC_u515vjHcL0JGmjz1yHzx1 Scale = 1:76.1 1 2 3 4 5 9 8 7 6 3x8 4x6 3x8 6x6 5x12 3x12 3x6 4x6 3x6 5-11-05-11-0 12-4-06-5-0 18-3-05-11-0 5-11-0 5-11-0 9-3-9 3-4-9 12-4-0 3-0-7 18-3-0 5-11-0 1-7-012-5-21-11-122-8-1214.00 12 6.00 12 Plate Offsets (X,Y)-- [7:0-6-4,0-2-12], [9:0-2-13,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.87 0.33 0.78 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.05 -0.15 0.11 (loc) 7-8 7-8 6 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 97 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-9,5-6: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 5-11-12 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-7, 2-9, 4-6 REACTIONS.(lb/size)9=718/0-5-8, 6=718/0-5-8 Max Horz 9=315(LC 5) Max Uplift 9=-35(LC 7), 6=-38(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-416/310, 2-3=-499/151, 3-4=-878/320, 4-5=-355/307, 1-9=-396/269, 5-6=-349/264 BOT CHORD 8-9=-212/640, 7-8=-177/546, 6-7=-44/595 WEBS 2-8=-15/455, 2-7=-374/192, 3-7=-334/813, 4-7=-195/395, 2-9=-651/0, 4-6=-674/90 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Bearing at joint(s) 9, 6 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 9, 6. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T19 Truss Type Piggyback Base Qty 2 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314899 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:20 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-flOTzuR1_0OxDlyPMHnZC_u535vKHhH0JGmjz1yHzx1 Scale = 1:55.7 1 2 3 4 5 11 10 9 8 7 6 6x6 5x10 MT18HS 4x8 6x6 3x4 3x6 3x4 3x8 3x6 3x4 3x6 7-5-137-5-13 13-11-136-6-0 19-10-115-10-13 26-0-06-1-5 7-5-13 7-5-13 13-11-13 6-6-0 19-10-11 5-10-13 26-0-0 6-1-5 4-1-49-1-21-1-09-1-28.00 12 Plate Offsets (X,Y)-- [2:0-6-0,0-1-8], [3:0-4-12,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.87 0.36 0.46 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.07 -0.17 0.03 (loc) 10-11 10-11 6 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 MT18HS Weight: 116 lb FT = 20% GRIP 169/123 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-8,1-11: 2x4 SPF No.2, 5-6: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-10-6 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 2-3. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-10 REACTIONS.(lb/size)11=1028/0-3-8, 6=1028/0-5-8 Max Horz 11=-250(LC 4) Max Uplift 11=-17(LC 6), 6=-38(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-906/155, 2-3=-774/187, 3-4=-1026/178, 4-5=-1323/130, 1-11=-949/118, 5-6=-961/105 BOT CHORD 10-11=-174/255, 8-10=-70/653, 7-8=-14/1017, 6-7=-48/303 WEBS 2-8=-100/283, 3-8=0/262, 4-8=-316/127, 1-10=-60/647, 5-7=0/721 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are MT20 plates unless otherwise indicated. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 11, 6. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T20 Truss Type Piggyback Base Qty 2 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314900 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:21 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-8yxrBESflKWorvXcw?IolCRIiVFZ08dAYwVGWUyHzx0 Scale = 1:56.2 1 2 3 4 5 6 12 11 10 9 8 7 6x6 5x10 MT18HS 4x8 3x4 3x6 3x4 3x8 3x6 3x6 12x12 7-5-137-5-13 13-11-136-6-0 19-10-115-10-13 26-0-06-1-5 7-5-13 7-5-13 13-11-13 6-6-0 19-10-11 5-10-13 26-0-0 6-1-5 26-11-0 0-11-0 4-1-49-1-21-1-09-1-28.00 12 Plate Offsets (X,Y)-- [2:0-6-0,0-1-8], [3:0-4-12,0-2-0], [7:Edge,0-10-2], [7:0-1-12,0-0-0], [8:0-2-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.75 0.36 0.45 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.07 -0.17 0.03 (loc) 11-12 11-12 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 MT18HS Weight: 117 lb FT = 20% GRIP 169/123 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-9,1-12: 2x4 SPF No.2, 5-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-10-10 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 2-3. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-11 REACTIONS.(lb/size)12=1027/0-3-8, 7=1093/0-5-8 Max Horz 12=-261(LC 4) Max Uplift 12=-17(LC 6), 7=-71(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-905/155, 2-3=-772/186, 3-4=-1024/178, 4-5=-1316/130, 1-12=-948/118, 5-7=-1026/140 BOT CHORD 11-12=-165/266, 9-11=-62/652, 8-9=0/1012, 7-8=-18/271 WEBS 2-9=-100/281, 3-9=0/262, 4-9=-311/127, 1-11=-60/646, 5-8=0/748 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are MT20 plates unless otherwise indicated. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 12, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T21 Truss Type Piggyback Base Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314901 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:22 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-c8VDOaSHWeefS26oUip1HP_QxvaElcVJmaFq2wyHzx? Scale = 1:62.3 1 2 3 4 5 6 11 10 9 8 7 12 13 3x6 6x6 4x8 3x6 3x6 3x6 3x4 3x4 6x8 6x6 3x6 7-6-87-6-8 14-10-87-4-0 18-6-83-8-0 -1-3-8 1-3-8 7-6-8 7-6-8 14-10-8 7-4-0 18-6-8 3-8-0 1-1-011-0-09-1-1211-0-08.00 12 Plate Offsets (X,Y)-- [5:0-4-8,0-1-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.91 0.39 0.41 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.07 -0.19 0.11 (loc) 8-9 8-9 13 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 103 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF No.2 *Except* 4-9,4-8,2-9: 2x3 SPF No.2, 2-11: 2x4 SPF-S Stud OTHERS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 5-9-15 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 5-6. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 4-8, 5-7 REACTIONS.(lb/size)11=819/0-3-8, 13=703/0-3-8 Max Horz 11=313(LC 5) Max Uplift 11=-43(LC 6), 13=-95(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-4=-858/48, 4-5=-384/102, 7-12=-87/710, 6-12=-87/710, 2-11=-746/104 BOT CHORD 9-11=-278/326, 8-9=-108/613 WEBS 4-9=0/290, 4-8=-505/157, 5-8=-89/470, 5-7=-716/131, 2-9=0/290, 6-13=-710/100 NOTES-(7-8) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Provide adequate drainage to prevent water ponding. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Bearing at joint(s) 13 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 11, 13. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T22 Truss Type Hip Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314902 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:23 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-4K3ccwTvHxmW4Ch_2QKGqdWbMJpQUx_S?E_NaMyHzx_ Scale = 1:79.7 1 2 3 4 5 6 7 8 9 10 18 17 16 15 14 13 12 11 5x6 3x6 3x6 3x6 3x8 3x4 3x4 3x6 4x6 5x12 6x10 3x4 3x4 12x12 6x8 11-3-011-3-0 18-0-116-9-11 28-4-1210-4-1 31-8-03-3-4 42-11-011-3-0 -0-11-0 0-11-0 5-8-12 5-8-12 11-3-0 5-6-4 18-0-11 6-9-11 24-10-5 6-9-11 31-8-0 6-9-11 37-2-4 5-6-4 42-11-0 5-8-12 1-1-08-4-118-7-01-1-08-4-118.00 12 Plate Offsets (X,Y)-- [2:Edge,0-3-8], [2:0-1-12,0-1-3], [8:0-5-4,0-1-0], [13:0-0-0,0-1-12], [14:0-1-12,0-3-4], [15:0-2-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.93 0.78 0.91 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.28 -0.70 0.04 (loc) 11-12 11-12 11 l/defl >619 >245 n/a L/d 240 180 n/a PLATES MT20 Weight: 185 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 5-17,7-15,2-18,10-11: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-3-8 oc purlins, except end verticals, and 2-0-0 oc purlins (5-11-5 max.): 4-8. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing, Except: 6-0-0 oc bracing: 12-14. WEBS 1 Row at midpt 7-14, 8-14 REACTIONS.(lb/size)14=1997/0-3-8, 18=1096/0-3-8, 11=381/0-3-8 Max Horz 18=210(LC 5) Max Uplift 14=-119(LC 5), 18=-66(LC 6), 11=-42(LC 7) Max Grav 14=1997(LC 1), 18=1107(LC 10), 11=415(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-702/13, 3-4=-1103/170, 4-5=-853/180, 5-7=-763/172, 7-8=-67/342, 9-10=-638/9, 2-18=-524/77, 10-11=-416/43 BOT CHORD 17-18=-187/995, 15-17=-132/763 WEBS 4-17=0/312, 5-15=-533/172, 7-15=-90/920, 7-14=-1219/270, 8-14=-792/94, 8-12=-13/368, 9-12=-313/154, 3-18=-728/159, 9-11=0/474 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 18, 11 except (jt=lb) 14=119. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T23 Truss Type Hip Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314903 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:24 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-YWd_pGUX2FuNiMGBb7rVMq3q9iDYDS8cEukw5pyHzwz Scale = 1:79.2 1 2 3 4 5 6 7 8 9 10 11 12 21 20 19 18 17 16 15 14 13 3x6 5x6 5x6 3x6 3x6 3x6 3x6 3x4 3x8 3x4 4x6 4x6 4x8 3x6 3x4 3x4 4x10 4x8 3x6 3x6 7-5-127-5-12 14-9-07-3-4 19-2-114-5-11 28-2-08-11-5 28-6-80-4-8 35-5-46-10-12 42-11-07-5-12 -0-11-0 0-11-0 7-5-12 7-5-12 14-9-0 7-3-4 19-2-11 4-5-11 23-8-5 4-5-11 28-2-0 4-5-11 33-0-3 4-10-3 37-10-5 4-10-3 42-11-0 5-0-11 1-1-010-8-1110-11-01-1-010-8-118.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.67 0.53 0.66 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.14 -0.36 0.03 (loc) 16-17 16-17 13 l/defl >999 >931 n/a L/d 240 180 n/a PLATES MT20 Weight: 220 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 5-19,6-19,6-17,7-17,7-16,8-16: 2x4 SPF No.2, 2-21: 2x6 SPF No.2 12-13: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-9-2 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 5-8. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 4-19, 6-17, 7-16, 8-16, 9-16 REACTIONS.(lb/size)21=1066/0-3-8, 16=2076/0-3-8, 13=331/0-3-8 Max Horz 21=265(LC 5) Max Uplift 21=-84(LC 6), 16=-7(LC 7), 13=-43(LC 7) Max Grav 21=1089(LC 10), 16=2076(LC 1), 13=375(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-4=-1292/137, 4-5=-880/193, 5-6=-634/207, 6-7=-486/187, 7-8=0/318, 8-9=0/462, 10-12=-331/80, 2-21=-1014/152, 12-13=-281/78 BOT CHORD 20-21=-259/357, 19-20=-184/975, 17-19=-141/486 WEBS 4-19=-444/147, 6-19=-80/386, 6-17=-588/116, 7-17=-30/798, 7-16=-1101/168, 8-16=-493/29, 9-16=-478/155, 9-14=-33/379, 10-14=-252/134, 2-20=0/623 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 21, 16, 13. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T24 Truss Type Piggyback Base Qty 2 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314904 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:25 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-0jBM1bV9pZ0EJWrN9qMkv2cxc6Ygyw2lTYTUeFyHzwy Scale = 1:83.1 1 2 3 4 5 6 7 8 9 10 11 12 21 20 19 18 17 16 15 14 13 3x6 5x6 5x6 3x6 3x6 3x4 3x4 3x6 3x8 3x4 12x20 3x4 3x4 5x8 3x4 12x12 4x6 3x6 8-3-88-3-8 16-4-88-1-0 26-6-810-2-0 28-4-121-10-4 35-6-107-1-14 42-11-07-4-6 -0-11-0 0-11-0 5-7-3 5-7-3 10-11-13 5-4-11 16-4-8 5-4-11 21-5-8 5-1-0 26-6-8 5-1-0 31-11-3 5-4-11 37-3-13 5-4-11 42-11-0 5-7-3 1-1-012-0-01-1-012-0-08.00 12 Plate Offsets (X,Y)-- [2:Edge,0-3-8], [2:0-1-12,0-1-3], [6:0-3-12,0-2-0], [8:0-3-12,0-2-0], [16:0-0-0,0-1-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.95 0.60 0.62 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.20 -0.53 0.06 (loc) 17-18 17-18 13 l/defl >999 >635 n/a L/d 240 180 n/a PLATES MT20 Weight: 220 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 6-18,7-18,7-17,8-17,9-15: 2x4 SPF No.2, 2-21,12-13: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-9-11 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 6-8. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing, Except: 6-0-0 oc bracing: 15-17. WEBS 1 Row at midpt 5-18, 7-17, 8-17, 9-15, 4-21 REACTIONS.(lb/size)15=1619/0-3-8, 21=1221/0-3-8, 13=634/0-3-8 Max Horz 21=292(LC 5) Max Uplift 15=-33(LC 7), 21=-80(LC 6), 13=-33(LC 7) Max Grav 15=1619(LC 1), 21=1221(LC 1), 13=649(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-4=-490/93, 4-5=-1375/195, 5-6=-960/217, 6-7=-725/217, 7-8=-256/179, 8-9=-403/171, 9-10=-643/144, 10-12=-416/113, 2-21=-454/123, 12-13=-343/101 BOT CHORD 20-21=-197/1150, 18-20=-156/979, 17-18=-119/552, 15-17=-402/159, 14-15=0/307, 13-14=0/551 WEBS 5-20=-32/340, 5-18=-457/172, 6-18=-10/261, 7-18=-41/443, 7-17=-782/150, 9-17=-54/1155, 9-15=-1661/167, 9-14=-57/392, 4-21=-1065/61, 10-13=-362/0 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 15, 21, 13. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T25 Truss Type Half Hip Qty 2 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314905 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:26 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-UvlkExVnas85xgQZjYuzSF8HmW00hWdvhCD1AhyHzwx Scale = 1:21.8 1 2 3 4 7 6 5 4x8 2x4 3x4 2x4 2x4 3x4 1-10-51-10-5 4-0-02-1-11 -0-11-0 0-11-0 1-10-5 1-10-5 4-0-0 2-1-11 1-7-03-7-33-9-03-7-314.00 12 Plate Offsets (X,Y)-- [3:0-5-3,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.22 0.08 0.02 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.00 (loc) 6 6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 21 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=141/Mechanical, 7=223/0-3-8 Max Horz 7=113(LC 5) Max Uplift 5=-54(LC 5), 7=-16(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T26 Truss Type Half Hip Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314906 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:26 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-UvlkExVnas85xgQZjYuzSF8GEW?4hVqvhCD1AhyHzwx Scale = 1:28.6 1 2 3 4 7 6 5 4x8 2x4 3x6 3x4 2x4 3x6 3-0-03-0-0 4-0-01-0-0 -0-11-0 0-11-0 3-0-0 3-0-0 4-0-0 1-0-0 1-7-04-11-35-1-04-11-314.00 12 Plate Offsets (X,Y)-- [3:0-5-3,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.32 0.14 0.07 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.01 -0.01 0.00 (loc) 6-7 6-7 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 25 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=141/Mechanical, 7=223/0-3-8 Max Horz 7=154(LC 5) Max Uplift 5=-87(LC 5), 7=-17(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T27 Truss Type Half Hip Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314907 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:27 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-y5J6RHWQLAHyZq?mHFPC_ThQ4wL_Qx32wsybi7yHzww Scale = 1:31.3 1 2 3 4 7 6 5 5x6 2x4 3x6 3x4 2x4 3x4 2-0-02-0-0 4-0-02-0-0 -0-11-0 0-11-0 3-5-7 3-5-7 4-0-0 0-6-9 1-7-05-5-85-7-55-5-814.00 12 Plate Offsets (X,Y)-- [3:0-3-10,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.37 0.16 0.14 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.01 0.00 (loc) 5-6 5-6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 27 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=141/Mechanical, 7=223/0-3-8 Max Horz 7=170(LC 5) Max Uplift 5=-103(LC 5), 7=-29(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 7 except (jt=lb) 5=103. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T28 Truss Type Half Hip Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314908 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:28 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-QIsVfdX26UPpAzZyqzwRXgDcrKi79QxB9Wi8FayHzwv Scale = 1:24.5 1 2 3 4 7 6 5 4x8 2x4 3x6 3x4 2x4 3x4 2-3-112-3-11 4-0-01-8-5 -0-11-0 0-11-0 2-3-11 2-3-11 4-0-0 1-8-5 1-7-04-1-84-3-54-1-814.00 12 Plate Offsets (X,Y)-- [3:0-5-3,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.24 0.10 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.00 (loc) 6 6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 23 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=141/Mechanical, 7=223/0-3-8 Max Horz 7=129(LC 5) Max Uplift 5=-66(LC 5), 7=-10(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T29 Truss Type Roof Special Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314909 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:29 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-vUQtszYgtnXgo788OgRg3umcAjwrunoLNARhn0yHzwu Scale = 1:50.8 1 2 3 4 5 6 7 13 12 11 10 9 8 5x8 4x6 5x6 5x6 4x6 3x4 3x6 3x8 3x4 4x8 3x6 5x8 2x4 6-8-106-8-10 14-9-08-0-6 23-2-88-5-8 25-10-82-8-0 6-8-10 6-8-10 10-8-13 4-0-3 14-9-0 4-0-3 18-11-12 4-2-12 23-2-8 4-2-12 25-9-8 2-7-0 25-10-8 0-1-0 4-1-48-4-112-9-08-7-02-9-08-4-118.00 12 Plate Offsets (X,Y)-- [1:Edge,0-1-14] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.91 0.52 0.44 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.11 -0.31 0.03 (loc) 9-10 9-10 8 l/defl >999 >997 n/a L/d 240 180 n/a PLATES MT20 Weight: 123 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 *Except* 4-6: 2x6 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-13,7-8: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 5-9-6 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 2-4, 6-7. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 3-12, 3-10 REACTIONS.(lb/size)13=1023/0-3-8, 8=1023/Mechanical Max Horz 13=-235(LC 4) Max Uplift 13=-13(LC 6), 8=-37(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-870/148, 2-3=-642/169, 3-4=-819/173, 4-5=-1044/175, 5-6=-1201/162, 6-7=-927/79, 1-13=-959/112, 7-8=-1022/66 BOT CHORD 10-12=-82/782, 9-10=-18/954 WEBS 3-12=-388/136, 4-10=-9/325, 6-9=-797/135, 7-9=-55/1285, 1-12=-48/680 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 13, 8. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T30 Truss Type Half Hip Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314910 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:29 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-vUQtszYgtnXgo788OgRg3umkEj04usWLNARhn0yHzwu Scale = 1:30.3 1 2 3 4 7 6 5 6x10 3x4 3x4 2x4 3x6 3-3-83-3-8 4-0-00-8-8 -0-11-0 0-11-0 3-3-8 3-3-8 4-0-0 0-8-8 1-7-05-5-114.00 12 Plate Offsets (X,Y)-- [3:Edge,0-1-12], [4:0-1-4,0-0-0], [5:Edge,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.40 0.19 0.08 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.02 -0.02 0.00 (loc) 6-7 6-7 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 22 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=141/Mechanical, 7=223/0-5-8 Max Horz 7=169(LC 5) Max Uplift 5=-104(LC 5), 7=-27(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(7-8) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Provide adequate drainage to prevent water ponding. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 7 except (jt=lb) 5=104. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T31 Truss Type Common Qty 2 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314911 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:30 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-Ng_F4JZId5fXQHjKyOyvc5JvL7LCdI9UcqBFJSyHzwt Scale = 1:32.5 1 2 3 6 5 4 5x12 3x4 3x4 2x4 3x4 2-0-02-0-0 4-0-02-0-0 -0-11-0 0-11-0 3-7-12 3-7-12 4-0-0 0-4-4 1-7-05-10-15-5-114.00 12 *** Design Problems *** REVIEW REQUIRED Analog warning - check design Plate Offsets (X,Y)-- [3:Edge,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.44 0.19 0.11 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.01 0.00 (loc) 4-5 4-5 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 24 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud *Except* 3-5: 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)6=221/0-5-8, 4=139/Mechanical Max Horz 6=186(LC 5) Max Uplift 6=-48(LC 4), 4=-123(LC 5) Max Grav 6=221(LC 1), 4=152(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 6 except (jt=lb) 4=123. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T32 Truss Type Roof Special Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314912 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:30 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-Ng_F4JZId5fXQHjKyOyvc5Jou7HHd82UcqBFJSyHzwt Scale = 1:49.4 1 2 3 6 5 4 6x10 3x6 4x6 3x6 3x4 6x6 9-2-69-2-6 11-10-02-7-10 9-2-6 9-2-6 11-10-0 2-7-10 4-11-07-2-108-11-113.00 12 8.00 12 Plate Offsets (X,Y)-- [1:0-3-0,0-2-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.85 0.51 0.76 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.14 -0.33 -0.00 (loc) 5-6 5-6 4 l/defl >999 >422 n/a L/d 240 180 n/a PLATES MT20 Weight: 59 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-6: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)4=463/Mechanical, 6=463/0-3-8 Max Horz 6=258(LC 5) Max Uplift 4=-74(LC 6), 6=-98(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-268/107, 1-6=-367/145 WEBS 2-5=0/286, 2-4=-578/183 NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4, 6. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T33 Truss Type Half Hip Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314913 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:31 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-rtYdHfZwOPnO1RIXW5T89Jr5VXkjMmTerUworvyHzws Scale = 1:28.9 1 2 3 6 5 4 4x6 2x4 2x4 3x8 5x8 6x6 2-7-02-7-0 3-6-80-11-8 2-7-0 2-7-0 3-6-8 0-11-8 2-1-75-1-91-8-10-3-84-10-15-1-914.00 12 Plate Offsets (X,Y)-- [1:Edge,0-1-5], [2:0-4-8,0-1-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.35 0.05 0.05 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.00 (loc) 5-6 5-6 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 25 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-6: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 3-6-8 oc purlins, except end verticals, and 2-0-0 oc purlins: 2-3. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)4=-2/Mechanical, 6=23/Mechanical, 1=125/Mechanical, 3=118/Mechanical Max Horz 6=39(LC 5), 1=105(LC 5) Max Uplift 4=-12(LC 2), 1=-10(LC 6), 3=-38(LC 5) Max Grav 6=43(LC 2), 1=125(LC 1), 3=118(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(9-10) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Provide adequate drainage to prevent water ponding. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4, 1, 3. 6) Non Standard bearing condition. Review required. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Gap between inside of top chord bearing and first diagonal or vertical web shall not exceed 0.500in. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T34 Truss Type Hip Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314914 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:32 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:ErDeBhooCW6W7KTmKQR8snz73g9-J36?V?aY9ivEfbtj3p_NhWOBZxzl50dn48gLOLyHzwr Scale = 1:70.2 1 2 3 4 5 6 7 8 910 15 14 13 12 11 3x6 4x6 6x6 3x6 3x6 3x8 3x6 3x4 3x6 3x6 5x8 5x8 3x6 9-3-119-3-11 13-11-54-7-9 23-3-09-3-11 -1-0-0 1-0-0 4-9-2 4-9-2 9-3-11 4-6-10 13-11-5 4-7-9 18-5-14 4-6-10 23-3-0 4-9-2 24-3-0 1-0-0 1-7-012-5-51-7-012-5-514.00 12 Plate Offsets (X,Y)-- [5:0-3-2,0-2-0], [6:0-3-0,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.65 0.51 0.88 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.15 -0.39 0.02 (loc) 11-12 11-12 11 l/defl >999 >713 n/a L/d 240 180 n/a PLATES MT20 Weight: 138 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF No.2 *Except* 4-13,7-12,4-15,7-11: 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 5-6. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 4-13, 6-13, 7-12 REACTIONS.(lb/size)15=987/0-3-8, 11=987/0-3-8 Max Horz 15=-314(LC 4) Max Uplift 15=-46(LC 6), 11=-46(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-4=-412/155, 4-5=-764/217, 5-6=-432/199, 6-7=-764/217, 7-9=-413/155, 2-15=-418/176, 9-11=-419/176 BOT CHORD 13-15=-167/496, 12-13=-36/431, 11-12=0/496 WEBS 5-13=-80/290, 6-12=-96/290, 4-15=-566/108, 7-11=-565/109 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 15, 11. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T35 Truss Type Piggyback Base Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314915 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:32 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-J36?V?aY9ivEfbtj3p_NhWOA7xzz58tn48gLOLyHzwr Scale = 1:71.1 1 2 3 4 56 11 10 9 8 7 6x10 4x10 3x6 3x6 3x4 3x8 5x12 3x6 5x12 8-11-28-11-2 14-3-145-4-11 23-3-08-11-2 -1-0-0 1-0-0 8-11-2 8-11-2 14-3-14 5-4-11 23-3-0 8-11-2 24-3-0 1-0-0 1-7-012-0-01-7-012-0-014.00 12 Plate Offsets (X,Y)-- [2:0-5-8,0-1-8], [3:0-6-4,0-1-0], [4:0-6-4,0-1-0], [5:0-5-8,0-1-8], [7:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.74 0.49 0.36 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.11 -0.28 0.02 (loc) 9-11 9-11 7 l/defl >999 >960 n/a L/d 240 180 n/a PLATES MT20 Weight: 127 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF No.2 *Except* 2-11,5-7: 2x6 SPF No.2, 2-9,5-8: 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 4-9-4 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 3-4. BOT CHORD Structural wood sheathing directly applied or 9-6-15 oc bracing. WEBS 1 Row at midpt 3-8 REACTIONS.(lb/size)11=985/0-3-8, 7=985/0-3-8 Max Horz 11=304(LC 5) Max Uplift 11=-48(LC 6), 7=-48(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-898/156, 3-4=-448/208, 4-5=-898/156, 2-11=-889/153, 5-7=-889/153 BOT CHORD 9-11=-369/450, 8-9=-108/448, 7-8=-176/354 WEBS 3-9=0/256, 4-8=-58/256, 2-9=-179/396, 5-8=-184/399 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) The Fabrication Tolerance at joint 3 = 12%, joint 4 = 16% 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 11, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T36 Truss Type Piggyback Base Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314916 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:33 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-nFgOiLbAw015HlSvdWWcEkxLtLJCqb7xIoPvwnyHzwq Scale = 1:71.1 1 2 3 4 56 11 10 9 8 7 6x10 4x10 3x6 3x6 3x4 3x8 5x12 3x6 5x12 8-11-28-11-2 14-3-145-4-11 23-3-08-11-2 -1-0-0 1-0-0 8-11-2 8-11-2 14-3-14 5-4-11 23-3-0 8-11-2 24-3-0 1-0-0 1-7-012-0-01-7-012-0-014.00 12 Plate Offsets (X,Y)-- [2:0-5-8,0-1-8], [3:0-6-4,0-1-0], [4:0-6-4,0-1-0], [5:0-5-8,0-1-8], [7:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.74 0.49 0.36 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.11 -0.28 0.02 (loc) 9-11 9-11 7 l/defl >999 >960 n/a L/d 240 180 n/a PLATES MT20 Weight: 127 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF No.2 *Except* 2-11,5-7: 2x6 SPF No.2, 2-9,5-8: 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 4-9-4 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 3-4. BOT CHORD Structural wood sheathing directly applied or 9-6-15 oc bracing. WEBS 1 Row at midpt 3-8 REACTIONS.(lb/size)11=985/0-3-8, 7=985/0-3-8 Max Horz 11=304(LC 5) Max Uplift 11=-48(LC 6), 7=-48(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-898/156, 3-4=-448/208, 4-5=-898/156, 2-11=-889/153, 5-7=-889/153 BOT CHORD 9-11=-369/450, 8-9=-108/448, 7-8=-176/354 WEBS 3-9=0/256, 4-8=-58/256, 2-9=-179/396, 5-8=-184/399 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) The Fabrication Tolerance at joint 3 = 12%, joint 4 = 16% 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 11, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T37 Truss Type Hip Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314917 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:34 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-FSEmvgcphK9yuu16BD1rmxTeBkiUZyQ4XR9SSDyHzwp Scale = 1:36.3 1 2 3 4 5 6 10 9 8 7 5x12 5x8 5x8 5x12 3x4 3x6 3x4 3x6 3-3-43-3-4 9-7-126-4-7 12-11-03-3-4 -0-11-0 0-11-0 4-0-0 4-0-0 8-11-0 4-11-0 12-11-0 4-0-0 13-10-0 0-11-0 1-7-06-3-01-7-02-2-134-0-314.00 12 9.00 12 Plate Offsets (X,Y)-- [3:0-9-4,0-2-0], [4:0-5-0,0-2-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.25 0.30 0.74 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.06 -0.16 0.10 (loc) 8-9 8-9 7 l/defl >999 >932 n/a L/d 240 180 n/a PLATES MT20 Weight: 64 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-10,5-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)10=569/0-3-8, 7=569/0-3-8 Max Horz 10=-166(LC 4) Max Uplift 10=-34(LC 6), 7=-34(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 3-4=-378/78, 2-10=-265/233, 5-7=-263/235 BOT CHORD 9-10=-179/591, 8-9=-132/377, 7-8=-54/593 WEBS 3-9=-38/492, 4-8=-24/495, 3-10=-723/0, 4-7=-728/94 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Bearing at joint(s) 10, 7 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 10, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T38 Truss Type Hip Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314918 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:35 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-jeo870cRSdHpW2cIlxY4J90la81DIPODm5u0_gyHzwo Scale = 1:49.5 1 2 3 4 5 6 7 13 12 11 10 9 8 3x6 4x6 6x6 5x6 5x6 3x12 3x8 3x4 3x12 3x6 3x6 3x6 4-1-04-1-0 5-9-01-8-0 6-8-00-11-0 8-4-01-8-0 12-8-04-4-0 4-1-0 4-1-0 5-9-0 1-8-0 6-8-0 0-11-0 8-4-0 1-8-0 12-8-0 4-4-0 13-7-0 0-11-0 1-10-148-7-61-7-00-0-63-0-65-6-1014.00 12 9.00 12 Plate Offsets (X,Y)-- [3:0-3-2,0-2-0], [4:0-2-11,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.47 0.27 0.75 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.02 -0.06 0.10 (loc) 9 9 8 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 78 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-13,6-8: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)13=492/Mechanical, 8=561/0-3-8 Max Horz 13=-235(LC 4) Max Uplift 13=-24(LC 7), 8=-33(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-268/185, 2-3=-500/102, 3-4=-300/65, 4-5=-501/101, 5-6=-273/233, 1-13=-262/164, 6-8=-333/239 BOT CHORD 12-13=-191/522, 11-12=-140/405, 10-11=-60/285, 9-10=-19/418, 8-9=-36/542 WEBS 2-12=-68/328, 2-11=-252/159, 4-10=-64/252, 5-10=-308/112, 5-9=0/366, 2-13=-567/0, 5-8=-583/64 NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Bearing at joint(s) 8 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 13, 8. 8) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T39 Truss Type Half Hip Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314919 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:35 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-jeo870cRSdHpW2cIlxY4J90fj8?DIXUDm5u0_gyHzwo Scale = 1:53.4 1 2 3 6 5 4 3x6 4x10 3x8 3x6 3x8 2x4 3-6-123-6-12 7-1-83-6-12 6-5-8 6-5-8 7-1-8 0-8-0 1-7-09-1-714.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.84 0.40 0.24 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.04 -0.04 0.00 (loc) 4-5 4-5 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 39 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 *Except* 2-3: 2x6 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF No.2 *Except* 2-5: 2x3 SPF No.2, 1-6: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 2-3. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 3-4 REACTIONS.(lb/size)4=273/Mechanical, 6=273/0-3-8 Max Horz 6=261(LC 5) Max Uplift 4=-152(LC 5), 6=-36(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-6=-267/126 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 6 except (jt=lb) 4=152. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss T40 Truss Type Half Hip Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314920 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:36 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-BqLWKMd3DxPg8CBUIe3JsMZxeYPp11VN_leZX6yHzwn Scale = 1:29.6 1 2 3 4 7 6 5 4x6 3x6 2x4 3x4 2x4 3x6 3-2-13-2-1 4-0-00-9-15 -0-11-0 0-11-0 3-2-1 3-2-1 4-0-0 0-9-15 1-7-05-3-714.00 12 Plate Offsets (X,Y)-- [3:0-4-8,0-1-12], [4:Edge,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.38 0.18 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.02 -0.02 0.00 (loc) 6-7 6-7 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 22 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=141/Mechanical, 7=223/0-3-8 Max Horz 7=165(LC 5) Max Uplift 5=-100(LC 5), 7=-24(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(7-8) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Provide adequate drainage to prevent water ponding. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 7. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss TG01 Truss Type Half Hip Girder Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314921 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:37 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-g1vuYieh_FXXlMlhsMaYOa5ARynGmTAWDPN63YyHzwm Scale = 1:15.3 1 2 3 4 7 6 5 5x6 2x4 3x4 3x4 2x4 3x4 2-0-02-0-0 4-0-02-0-0 -0-11-0 0-11-0 0-9-5 0-9-5 4-0-0 3-2-11 1-7-02-4-02-5-132-4-014.00 12 Plate Offsets (X,Y)-- [3:0-3-10,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.19 0.04 0.10 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.00 (loc) 6 6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 21 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=240/Mechanical, 7=322/0-3-8 Max Horz 7=75(LC 4) Max Uplift 5=-68(LC 4), 7=-59(LC 5) Max Grav 5=244(LC 10), 7=322(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(10-11) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 201 lb down and 73 lb up at 2-0-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 9) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 2-3=-60, 3-4=-60, 5-7=-20 Concentrated Loads (lb) Vert: 6=-201(B) November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss TG02 Truss Type Hip Girder Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314922 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:38 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-8DTHl2fJlYfONWKtQ35nxneFWMwtVpagS37gb?yHzwl Scale = 1:33.8 1 2 3 4 5 6 7 8 14 13 12 11 10 9 15 16 17 18 19 20 21 22 23 24 25 26 27 5x12 5x12 3x6 2x4 6x10 6x10 2x4 3x6 2x4 3x12 2x4 3x6 3x6 1-10-51-10-5 4-1-82-3-3 14-1-810-0-0 16-8-132-7-5 18-3-01-6-3 -0-11-0 0-11-0 1-10-5 1-10-5 4-1-8 2-3-3 9-1-8 5-0-0 14-1-8 5-0-0 16-8-13 2-7-5 18-3-0 1-6-3 1-7-03-7-33-9-01-11-121-10-01-9-314.00 12 6.00 12 Plate Offsets (X,Y)-- [3:0-9-10,0-2-8], [5:0-2-4,0-1-8], [7:0-9-10,0-2-8], [11:0-5-4,0-3-12], [12:0-5-4,0-3-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.55 0.85 0.53 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.16 -0.46 0.26 (loc) 11-12 11-12 9 l/defl >999 >474 n/a L/d 240 180 n/a PLATES MT20 Weight: 88 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x6 SPF No.2 WEBS 2x4 SPF-S Stud *Except* 3-12,7-11: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-8-14 oc purlins, except end verticals, and 2-0-0 oc purlins (3-3-0 max.): 3-7. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)14=1085/0-5-8, 9=999/0-5-8 Max Horz 14=119(LC 12) Max Uplift 14=-287(LC 4), 9=-277(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-1043/400, 3-4=-2467/697, 4-5=-2509/720, 5-6=-2392/585, 6-7=-2366/570, 7-8=-809/264, 2-14=-1054/368, 8-9=-974/314 BOT CHORD 12-13=-302/727, 11-12=-1115/3227, 10-11=-192/583 WEBS 3-13=-479/39, 3-12=-504/2180, 4-12=-428/240, 5-12=-739/435, 5-11=-880/522, 6-11=-274/154, 7-11=-461/2137, 7-10=-593/124, 2-13=-207/656, 8-10=-234/618 NOTES-(10-11) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Bearing at joint(s) 14, 9 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 14=287, 9=277. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 77 lb down and 100 lb up at 1-10-5, 55 lb down and 63 lb up at 3-11-1, 55 lb down and 63 lb up at 5-11-1, 55 lb down and 63 lb up at 7-11-1, 55 lb down and 63 lb up at 9-4-6, 55 lb down and 63 lb up at 10-7-10, 55 lb down and 63 lb up at 12-7-10, and 55 lb down and 63 lb up at 14-7-10, and 99 lb down and 87 lb up at 16-8-13 on top chord, and 57 lb down and 26 lb up at 1-11-1, 32 lb down at 4-1-8, 32 lb down at 5-11-1, 32 lb down at 7-11-1, 32 lb down at 9-4-6, 32 lb down at 10-7-10, 32 lb down at 12-7-10, and 32 lb down at 14-7-10, and 35 lb down and 23 lb up at 16-7-10 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 9) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard Continued on page 2 November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss TG02 Truss Type Hip Girder Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314922 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:38 2019 Page 2 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-8DTHl2fJlYfONWKtQ35nxneFWMwtVpagS37gb?yHzwl LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 2-3=-60, 3-7=-60, 7-8=-60, 12-14=-20, 11-12=-20, 9-11=-20 Concentrated Loads (lb) Vert: 3=-58(F) 7=-41(F) 12=-22(F) 13=-33(F) 10=-13(F) 15=-41(F) 16=-41(F) 17=-41(F) 18=-41(F) 19=-41(F) 20=-41(F) 21=-41(F) 22=-22(F) 23=-22(F) 24=-22(F) 25=-22(F) 26=-22(F) 27=-22(F) 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss TG03 Truss Type Half Hip Girder Qty 2 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314923 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:38 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-8DTHl2fJlYfONWKtQ35nxneMPM7QVxwgS37gb?yHzwl Scale = 1:15.1 1 2 3 4 6 5 7 3x4 2x4 2x4 2x4 2x4 2-6-02-6-0 -0-11-0 0-11-0 2-0-0 2-0-0 2-6-0 0-6-0 1-1-02-5-08.00 12 Plate Offsets (X,Y)-- [3:0-2-0,0-2-3] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.11 0.04 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.00 (loc) 6 5-6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 10 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-6-0 oc purlins, except end verticals, and 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=95/Mechanical, 6=168/0-3-8 Max Horz 6=72(LC 4) Max Uplift 5=-51(LC 4), 6=-28(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(9-10) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) Provide adequate drainage to prevent water ponding. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 6. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 17 lb down and 34 lb up at 2-4-4 on top chord, and 13 lb down at 2-0-0 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 8) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 2-3=-60, 3-4=-60, 5-6=-20 Concentrated Loads (lb) Vert: 4=-17(F) 7=-6(F) November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss TG04 Truss Type Hip Girder Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314924 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:40 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-4bb1AkgZHAv6cpUFXU8F0CjXj9gYzeZzvNcngtyHzwj Scale = 1:79.0 1 2 3 4 5 6 7 8 9 10 11 19 18 17 16 15 14 13 12 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 5x8 3x6 8x8 4x8 4x8 4x6 3x6 4x6 4x6 6x6 3x8 4x10 4x6 10x10 5x6 4x8 7-9-07-9-0 18-0-1410-3-14 28-4-1210-3-14 35-2-06-9-4 42-11-07-9-0 -0-11-0 0-11-0 4-0-4 4-0-4 7-9-0 3-8-12 14-7-4 6-10-4 21-5-8 6-10-4 28-3-12 6-10-4 35-2-0 6-10-4 38-10-12 3-8-12 42-11-0 4-0-4 1-1-06-0-116-3-01-1-06-0-118.00 12 Plate Offsets (X,Y)-- [2:Edge,0-3-8], [2:0-1-12,0-1-3], [4:0-4-9,Edge], [8:0-3-8,0-1-8], [11:Edge,0-2-0], [11:0-1-12,0-1-3] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.83 0.58 0.89 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.19 -0.28 0.04 (loc) 16-18 16-18 15 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 216 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x6 SPF No.2 *Except* 14-17: 2x6 SP 2400F 2.0E WEBS 2x4 SPF-S Stud *Except* 5-18,6-15,8-13: 2x4 SPF No.2, 2-19,11-12: 2x4 SPF 2100F 1.8E BRACING- TOP CHORD Structural wood sheathing directly applied or 3-8-5 oc purlins, except end verticals, and 2-0-0 oc purlins (4-2-4 max.): 4-9. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 5-18, 6-15, 8-15 REACTIONS.(lb/size)15=2932/0-3-8, 19=1615/0-3-8, 12=668/0-3-8 Max Horz 19=153(LC 12) Max Uplift 15=-1859(LC 4), 19=-765(LC 5), 12=-190(LC 6) Max Grav 15=2932(LC 1), 19=1619(LC 9), 12=684(LC 10) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-824/375, 3-4=-1814/1062, 4-5=-1501/925, 5-6=-1424/966, 6-8=-398/628, 8-9=-331/194, 9-10=-421/174, 10-11=-703/286, 2-19=-627/288, 11-12=-474/192 BOT CHORD 18-19=-870/1459, 16-18=-1169/1697, 15-16=-714/978, 13-15=-650/472, 12-13=-86/441 WEBS 4-18=-300/584, 5-18=-324/370, 5-16=-526/338, 6-16=-546/906, 6-15=-2059/1402, 8-15=-1381/860, 8-13=-643/1234, 3-19=-1120/651, 10-12=-191/276 NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 15=1859, 19=765, 12=190. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 61 lb down and 101 lb up at 8-0-12, 67 lb down and 101 lb up at 10-0-12, 67 lb down and 101 lb up at 12-0-12, 67 lb down and 101 lb up at 14-0-12, 67 lb down and 101 lb up at 16-0-12, 67 lb down and 101 lb up at 18-0-12, 67 lb down and 101 lb up at 20-0-12, 67 lb down and 101 lb up at 22-0-12, 67 lb down and 101 lb up at 24-0-12, 67 lb down and 101 lb up at 26-0-12, 67 lb down and 101 lb up at 28-0-12, 67 lb down and 101 lb up at 30-0-12, and 67 lb down and 101 lb up at 32-0-12, and 67 lb down and 101 lb up at 34-0-12 on top chord, and 118 lb down and 65 lb up at 2-0-12, 121 lb down and 66 lb up at 4-0-12, 121 lb down and 99 lb up at 6-0-12, 38 lb down and 58 lb up at 8-0-12, 38 lb down and 58 lb up at 10-0-12, 38 lb down and 58 lb up at 12-0-12, 38 lb down and 58 lb up at 14-0-12, 38 lb down and 58 lb up at 16-0-12, 38 lb down and 58 lb up at 18-0-12, 38 lb down and 58 lb up at 20-0-12, 38 lb down and 58 lb up at 22-0-12, 38 lb down and 58 lb up at 24-0-12, 38 lb down and 58 lb up at 26-0-12, 38 lb down and 58 lb up at 28-0-12, 38 lb down and 58 lb up at 30-0-12, 38 lb down and 58 lb up at 32-0-12, 38 lb down and 58 lb up at 34-0-12, 121 lb down and 115 lb up at 36-0-12, 121 lb down and 78 lb up at 38-0-12, and 121 lb down and 66 lb up at 38-10-4, and 118 lb down and 65 lb up at 40-10-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 8) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). Continued on page 2 November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss TG04 Truss Type Hip Girder Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314924 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:40 2019 Page 2 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-4bb1AkgZHAv6cpUFXU8F0CjXj9gYzeZzvNcngtyHzwj 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 2-4=-60, 4-9=-60, 9-11=-60, 12-19=-20 Concentrated Loads (lb) Vert: 17=-19(F) 16=-19(F) 8=-46(F) 20=-46(F) 21=-46(F) 22=-46(F) 23=-46(F) 24=-46(F) 25=-46(F) 26=-46(F) 27=-46(F) 28=-46(F) 29=-46(F) 30=-46(F) 31=-46(F) 32=-46(F) 33=-118(F) 34=-121(F) 35=-121(F) 36=-19(F) 37=-19(F) 38=-19(F) 39=-19(F) 40=-19(F) 41=-19(F) 42=-19(F) 43=-19(F) 44=-19(F) 45=-19(F) 46=-19(F) 47=-19(F) 48=-121(F) 49=-121(F) 50=-121(F) 51=-118(F) 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss TG05 Truss Type Half Hip Girder Qty 2 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314925 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:41 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-Yo9PN4hC2T1zEz3S5CfUZQGrLZ9DiIw681LKCJyHzwi Scale = 1:14.9 1 2 3 4 7 6 5 8 9 5x6 2x4 3x4 3x4 2x4 3x4 2-0-02-0-0 4-0-02-0-0 -0-11-0 0-11-0 0-8-9 0-8-9 4-0-0 3-3-7 1-7-02-3-32-5-02-3-314.00 12 Plate Offsets (X,Y)-- [3:0-3-10,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.19 0.04 0.05 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.00 (loc) 6 6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 20 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)5=133/Mechanical, 7=190/0-3-8 Max Horz 7=73(LC 4) Max Uplift 5=-52(LC 4), 7=-90(LC 5) Max Grav 5=138(LC 10), 7=190(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(10-11) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 34 lb down and 113 lb up at 0-8-9, and 43 lb down and 27 lb up at 1-11-4 on top chord, and 5 lb down and 33 lb up at 0-8-9, and 3 lb down and 16 lb up at 1-11-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 9) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 2-3=-60, 3-4=-60, 5-7=-20 Concentrated Loads (lb) Vert: 3=36(F) 6=1(F) November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss TG06 Truss Type Roof Special Girder Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314926 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:42 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-0_jnbQiqpn9qs7eefvAj5dp_1zOxRXnFNh5tkmyHzwh Scale = 1:46.6 1 2 3 4 5 6 7 8 16 15 14 13 12 11 10 91718 6x6 5x6 5x12 6x6 4x6 2x4 4x6 4x8 3x6 3x6 3x6 4x8 2x4 4x6 2x4 4x8 3-2-103-2-10 10-8-137-6-3 18-3-07-6-3 19-8-81-5-8 23-9-84-1-0 25-10-82-1-0 3-2-10 3-2-10 8-2-12 5-0-2 13-2-14 5-0-2 18-3-0 5-0-2 19-8-8 1-5-8 23-9-8 4-1-0 25-10-8 2-1-0 4-1-46-0-115-1-06-3-02-10-36-0-118.00 12 14.00 12 Plate Offsets (X,Y)-- [7:0-4-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.33 0.39 0.90 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.04 -0.12 0.03 (loc) 14 12-14 9 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 148 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 *Except* 5-6: 2x6 SPF No.2 BOT CHORD 2x6 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (5-2-5 max.): 2-5, 6-7. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 3-15 REACTIONS.(lb/size)16=1056/0-3-8, 9=1325/Mechanical Max Horz 16=-177(LC 3) Max Uplift 16=-157(LC 4), 9=-379(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-683/151, 2-3=-550/141, 3-4=-1221/258, 4-5=-1168/315, 5-6=-1366/346, 6-7=-569/223, 7-8=-854/289, 1-16=-1046/162, 8-9=-1321/403 BOT CHORD 14-15=-306/1085, 12-14=-355/1290, 11-12=-395/1225, 10-11=-401/1230 WEBS 3-15=-840/234, 3-14=-51/351, 4-12=-291/192, 5-12=-119/506, 6-12=-223/274, 6-10=-1036/286, 7-10=-177/424, 1-15=-149/826, 8-10=-312/867 NOTES-(10-11) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 16=157, 9=379. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 25 lb up at 1-7-4, 142 lb down and 135 lb up at 19-7-4, and 142 lb down and 135 lb up at 21-7-4, and 121 lb down and 116 lb up at 23-7-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 9) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 2-5=-60, 5-6=-60, 6-7=-60, 7-8=-60, 9-16=-20 Continued on page 2 November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss TG06 Truss Type Roof Special Girder Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314926 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:42 2019 Page 2 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-0_jnbQiqpn9qs7eefvAj5dp_1zOxRXnFNh5tkmyHzwh LOAD CASE(S) Standard Concentrated Loads (lb) Vert: 11=-119(F) 10=-121(F) 17=25(F) 18=-119(F) 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss TG07 Truss Type Hip Girder Qty 1 Ply 2 6 Heritage at Spring Mill Job Reference (optional) I39314927 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:43 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-UAGAoljSa5IhUHDqDchyerLAINjQA8cPbLqRGCyHzwg Scale = 1:17.9 1 2 3 4 7 6 5 8 9 10 11 12 13 14 15 3x6 4x6 4x6 3x6 2x4 2x4 6x16 3-7-123-7-12 7-3-83-7-12 0-10-0 0-10-0 6-5-8 5-7-8 7-3-8 0-10-0 1-7-02-6-111-7-02-6-1114.00 12 Plate Offsets (X,Y)-- [2:0-4-8,0-1-12], [3:0-4-8,0-1-12], [6:0-8-0,0-3-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.29 0.50 0.29 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.02 -0.04 0.00 (loc) 5-6 5-6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 76 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x6 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 2-3. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)7=925/0-5-8, 5=1773/0-3-8 Max Horz 7=-65(LC 3) Max Uplift 7=-502(LC 3), 5=-572(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-985/426, 2-3=-1459/535, 3-4=-985/426, 1-7=-1002/427, 4-5=-1002/426 WEBS 2-6=-340/1067, 3-6=-339/1067, 1-6=-298/656, 4-6=-298/656 NOTES-(10-11) 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-7-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 7=502, 5=572. 8) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 9) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 65 lb down and 157 lb up at 0-10-0, 38 lb down and 82 lb up at 2-10-12, and 38 lb down and 82 lb up at 4-4-12, and 63 lb down and 157 lb up at 6-5-8 on top chord, and 10 lb down and 138 lb up at 0-10-0, 6 lb down and 87 lb up at 2-10-12, 1305 lb down and 391 lb up at 4-0-12, 6 lb down and 87 lb up at 4-4-12, and 1003 lb down and 49 lb up at 6-0-12, and 10 lb down and 138 lb up at 6-3-11 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Continued on page 2 November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss TG07 Truss Type Hip Girder Qty 1 Ply 2 6 Heritage at Spring Mill Job Reference (optional) I39314927 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:43 2019 Page 2 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-UAGAoljSa5IhUHDqDchyerLAINjQA8cPbLqRGCyHzwg LOAD CASE(S) Standard Uniform Loads (plf) Vert: 1-2=-60, 2-3=-60, 3-4=-60, 5-7=-20 Concentrated Loads (lb) Vert: 2=52(F) 3=52(F) 8=27(F) 9=27(F) 10=6(F) 12=-1305(B) 14=-1003(B) 15=6(F) 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss TG08 Truss Type Flat Girder Qty 1 Ply 2 6 Heritage at Spring Mill Job Reference (optional) I39314928 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:44 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-yNqY05j4KOQX5Ro1mKCBA2uOdmACvfLYq?a_peyHzwf Scale: 1"=1'1 2 4 3 5 2x4 3x4 2x4 4x6 2-10-02-10-0 2-10-0 2-10-0 1-9-15LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.06 0.02 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.00 (loc) 4 4 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 26 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x6 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD 2-0-0 oc purlins: 1-2, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)4=103/0-3-8, 3=103/0-3-8 Max Horz 4=-42(LC 3) Max Uplift 4=-20(LC 3), 3=-20(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(9-10) 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-9-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 4) Provide adequate drainage to prevent water ponding. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4, 3. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 3 lb down at 1-2-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 3-4=-20 Concentrated Loads (lb) Vert: 5=-3(F) November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss TG14 Truss Type Hip Girder Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314929 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:45 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-RZOwDRki5iYOjbNDK1jQjGRQfAOaezAi3fJYL5yHzwe Scale = 1:25.0 1 2 3 4 5 6 7 11 10 9 8 12 13 14 15 16 17 6x16 10x10 10x10 3x4 6x16 3x6 5x6 3x6 5x6 1-8-101-8-10 11-2-69-5-12 12-11-01-8-10 -0-11-0 0-11-0 2-0-0 2-0-0 6-5-8 4-5-8 10-11-0 4-5-8 12-11-0 2-0-0 13-10-0 0-11-0 1-7-03-11-01-7-01-0-132-10-314.00 12 9.00 12 Plate Offsets (X,Y)-- [3:0-7-0,0-3-0], [5:0-7-0,0-3-0], [8:0-2-8,0-2-8], [11:0-2-8,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.62 0.52 0.61 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.32 -0.27 -0.09 (loc) 9-10 9-10 8 l/defl >476 >562 n/a L/d 240 180 n/a PLATES MT20 Weight: 68 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x6 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 3-5. BOT CHORD Structural wood sheathing directly applied or 6-3-6 oc bracing. REACTIONS.(lb/size)11=806/0-3-8, 8=806/0-3-8 Max Horz 11=-106(LC 3) Max Uplift 11=-579(LC 4), 8=-579(LC 3) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-265/339, 3-4=-561/608, 4-5=-561/565, 5-6=-265/325, 2-11=-303/329, 6-8=-303/318 BOT CHORD 10-11=-1074/981, 9-10=-726/858, 8-9=-989/949 WEBS 3-10=-1300/1178, 4-10=-343/188, 4-9=-343/190, 5-9=-1283/1169, 3-11=-1224/1203, 5-8=-1224/1233 NOTES-(10-11) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Bearing at joint(s) 11, 8 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 11=579, 8=579. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 66 lb down and 82 lb up at 1-8-10, 111 lb down and 154 lb up at 2-0-12, 111 lb down and 154 lb up at 4-0-12, 111 lb down and 154 lb up at 6-0-12, 111 lb down and 154 lb up at 6-10-4, 111 lb down and 154 lb up at 8-10-4, and 111 lb down and 154 lb up at 10-10-4, and 66 lb down and 82 lb up at 11-2-6 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 9) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 2-3=-60, 3-5=-60, 5-6=-60, 6-7=-60, 10-11=-20, 9-10=-20, 8-9=-20 Continued on page 2 November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss TG14 Truss Type Hip Girder Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314929 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:45 2019 Page 2 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-RZOwDRki5iYOjbNDK1jQjGRQfAOaezAi3fJYL5yHzwe LOAD CASE(S) Standard Concentrated Loads (lb) Vert: 10=-50(B) 9=-50(B) 12=-62(B) 13=-62(B) 14=-62(B) 15=-62(B) 16=-62(B) 17=-62(B) 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss TG15 Truss Type Hip Girder Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314930 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:46 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-vlyIRnlKs0gFLlxPulEfFTzcuaf3NLhrIJ35tXyHzwd Scale = 1:58.1 1 2 3 4 5 6 7 16 15 14 13 12 11 10 9 8 17 18 19 20 21 22 6x6 4x8 4x8 3x4 8x8 3x6 6x10 4x10 3x8 2x4 3x8 2x4 5x8 4x6 2x4 5x6 3-2-63-2-6 6-1-42-10-14 11-9-05-7-12 16-9-115-0-11 21-8-114-10-15 26-9-65-0-11 30-0-03-2-10 6-1-4 6-1-4 11-9-0 5-7-12 16-9-11 5-0-11 21-8-11 4-10-15 26-9-6 5-0-11 30-0-0 3-2-10 1-3-149-1-144-1-42-10-146-3-08.00 12 6.00 12 Plate Offsets (X,Y)-- [3:0-4-12,0-2-0], [6:0-6-4,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.53 0.89 0.91 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.19 -0.41 0.28 (loc) 13-14 13-14 8 l/defl >999 >860 n/a L/d 240 180 n/a PLATES MT20 Weight: 141 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud *Except* 1-16: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-5-5 oc purlins, except end verticals, and 2-0-0 oc purlins (4-6-6 max.): 3-6. BOT CHORD Structural wood sheathing directly applied or 5-8-15 oc bracing. WEBS 1 Row at midpt 2-13 REACTIONS.(lb/size)16=1242/0-3-8, 8=1284/0-3-8 Max Horz 16=245(LC 15) Max Uplift 16=-199(LC 5), 8=-369(LC 4) Max Grav 16=1243(LC 11), 8=1285(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-2366/599, 2-3=-1949/603, 3-4=-1564/531, 4-5=-1317/489, 5-6=-1317/489, 6-7=-811/272, 1-16=-1304/326, 7-8=-1259/391 BOT CHORD 15-16=-321/249, 14-15=-1033/3173, 13-14=-901/2741, 11-13=-656/1610, 10-11=-656/1610, 9-10=-260/626 WEBS 2-15=-1463/404, 2-14=-382/1475, 2-13=-1287/368, 3-13=-234/741, 4-13=-212/276, 4-11=-88/273, 4-10=-469/164, 5-10=-310/128, 6-10=-449/1078, 6-9=-647/256, 1-15=-381/1665, 7-9=-379/987 NOTES-(10-11) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Bearing at joint(s) 16 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 16=199, 8=369. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 38 lb down and 58 lb up at 12-2-0, 38 lb down and 58 lb up at 14-2-0, 38 lb down and 58 lb up at 16-2-0, 38 lb down and 58 lb up at 18-2-0, 38 lb down and 58 lb up at 20-2-0, 38 lb down and 58 lb up at 22-2-0, and 38 lb down and 58 lb up at 24-2-0, and 38 lb down and 58 lb up at 26-2-0 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 9) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard Continued on page 2 November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss TG15 Truss Type Hip Girder Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314930 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:46 2019 Page 2 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-vlyIRnlKs0gFLlxPulEfFTzcuaf3NLhrIJ35tXyHzwd LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-3=-60, 3-6=-60, 6-7=-60, 14-16=-20, 8-14=-20 Concentrated Loads (lb) Vert: 12=-19(F) 13=-19(F) 17=-19(F) 18=-19(F) 19=-19(F) 20=-19(F) 21=-19(F) 22=-19(F) 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss V01 Truss Type GABLE Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314931 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:47 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-NyWge7mydJo6yuWcSSmuohWr0_Bl6_b_WzoeQzyHzwc Scale = 1:44.9 1 2 3 4 5 8 7 63x4 6x6 3x4 2x4 2x4 2x4 2x4 2x4 12-4-1312-4-13 6-2-7 6-2-7 12-4-13 6-2-7 0-0-47-2-130-0-414.00 12 Plate Offsets (X,Y)-- [3:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.31 0.09 0.16 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 38 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 12-4-13. (lb) - Max Horz 1=-168(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 1, 5 except 8=-172(LC 6), 6=-172(LC 7) Max Grav All reactions 250 lb or less at joint(s) 1, 5, 7 except 8=283(LC 10), 6=283(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 5 except (jt=lb) 8=172, 6=172. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss V02 Truss Type GABLE Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314932 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:47 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-NyWge7mydJo6yuWcSSmuohWpW_896_5_WzoeQzyHzwc Scale = 1:38.4 1 2 3 44x8 6x6 4x8 2x4 10-1-610-1-6 5-0-11 5-0-11 10-1-6 5-0-11 0-0-45-10-130-0-414.00 12 Plate Offsets (X,Y)-- [1:0-6-10,Edge], [2:0-1-12,0-2-0], [3:0-4-11,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.41 0.26 0.13 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 28 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=211/10-1-6, 3=211/10-1-6, 4=344/10-1-6 Max Horz 1=-136(LC 4) Max Uplift 1=-15(LC 7), 3=-9(LC 6), 4=-11(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3, 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss V03 Truss Type GABLE Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314933 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:48 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-r843sTmbOdwza25o?AH7Lu2zWOT2rSQ8ldYCyQyHzwb Scale = 1:31.2 1 2 3 42x4 3x4 2x4 2x4 7-9-157-9-15 3-11-0 3-11-0 7-9-15 3-11-0 0-0-44-6-130-0-414.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.45 0.28 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 19 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=183/7-9-15, 3=183/7-9-15, 4=223/7-9-15 Max Horz 1=-105(LC 4) Max Uplift 1=-35(LC 7), 3=-29(LC 6) Max Grav 1=183(LC 1), 3=183(LC 1), 4=228(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss V04 Truss Type GABLE Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314934 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:48 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-r843sTmbOdwza25o?AH7Lu21EOP5rSO8ldYCyQyHzwb Scale = 1:22.6 1 2 3 2x4 2x4 2x4 5-6-85-6-8 2-9-4 2-9-4 5-6-8 2-9-4 0-0-43-2-130-0-414.00 12 Plate Offsets (X,Y)-- [2:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.22 0.53 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 11 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-6-8 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=204/5-6-8, 3=204/5-6-8 Max Horz 1=-72(LC 4) Max Uplift 1=-8(LC 7), 3=-8(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss V05 Truss Type Valley Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314935 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:49 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:ErDeBhooCW6W7KTmKQR8snz73g9-JKeR3pnD9x2qCCg_ZtoMt6bEInr6aveH_HHlUsyHzwa Scale = 1:12.4 1 2 3 2x4 2x4 2x4 0-0-30-0-3 3-3-23-2-14 1-7-9 1-7-9 3-3-2 1-7-9 0-0-41-10-130-0-414.00 12 Plate Offsets (X,Y)-- [2:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.07 0.16 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 6 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-3-2 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=112/3-2-11, 3=112/3-2-11 Max Horz 1=-40(LC 4) Max Uplift 1=-4(LC 7), 3=-4(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss V06 Truss Type GABLE Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314936 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:50 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-nXCpG9orwEAhpMFA7aJbQJ8K_B6GJMuRCx1I0IyHzwZ Scale = 1:28.8 1 2 3 2x4 2x4 2x4 7-4-77-4-7 3-8-4 3-8-4 7-4-7 3-8-4 0-0-44-3-100-0-414.00 12 Plate Offsets (X,Y)-- [2:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.39 0.49 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 17 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=273/7-4-7, 3=273/7-4-7 Max Horz 1=97(LC 5) Max Uplift 1=-10(LC 7), 3=-10(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss V07 Truss Type Valley Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314937 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:50 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-nXCpG9orwEAhpMFA7aJbQJ8OHB7_JMuRCx1I0IyHzwZ Scale = 1:21.2 1 2 3 2x4 2x4 2x4 5-0-135-0-13 5-1-00-0-3 2-6-8 2-6-8 5-1-0 2-6-8 0-0-42-11-100-0-414.00 12 Plate Offsets (X,Y)-- [2:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.18 0.44 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 10 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-1-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=185/5-0-10, 3=185/5-0-10 Max Horz 1=-66(LC 4) Max Uplift 1=-7(LC 7), 3=-7(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss V08 Truss Type Valley Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314938 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:51 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-FjlBUUpThYIYRWqNhIqqyXgb5bYK2p8aRbmsZkyHzwY Scale = 1:11.0 1 2 3 2x4 2x4 2x4 0-0-30-0-3 2-9-102-9-6 1-4-13 1-4-13 2-9-10 1-4-13 0-0-41-7-100-0-414.00 12 Plate Offsets (X,Y)-- [2:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.05 0.12 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 5 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 2-9-10 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=94/2-9-3, 3=94/2-9-3 Max Horz 1=-33(LC 4) Max Uplift 1=-4(LC 7), 3=-4(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss V09 Truss Type GABLE Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314939 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:52 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-jvJZhqq5SsQP3gPZE?L3VkDhc?utnDQkgFWP5ByHzwX Scale = 1:46.7 1 2 3 4 5 9 8 7 6 2x4 2x4 6x6 3x4 2x4 2x4 2x4 2x4 2x4 10-9-010-9-0 4-6-8 4-6-8 10-9-0 6-2-8 1-11-57-2-140-0-414.00 12 Plate Offsets (X,Y)-- [3:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.38 0.10 0.25 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 36 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 10-9-0. (lb) - Max Horz 9=-188(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 7 except 9=-214(LC 4), 5=-130(LC 5), 8=-335(LC 6), 6=-172(LC 7) Max Grav All reactions 250 lb or less at joint(s) 9, 5 except 7=299(LC 1), 8=368(LC 10), 6=284(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. WEBS 2-8=-298/331 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 7 except (jt=lb) 9=214, 5=130, 8=335, 6=172. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss V10 Truss Type GABLE Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314940 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:52 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-jvJZhqq5SsQP3gPZE?L3VkDgH?srnFXkgFWP5ByHzwX Scale = 1:40.1 1 2 3 43x8 4x6 3x8 2x4 9-7-49-7-4 4-6-8 4-6-8 9-7-4 5-0-12 0-7-55-10-140-0-414.00 12 Plate Offsets (X,Y)-- [1:0-0-0,0-0-11], [1:0-0-0,0-3-6], [1:0-3-8,Edge], [2:Edge,0-1-14], [3:0-2-15,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.40 0.23 0.12 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 30 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF-S Stud BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 WEDGE Left: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=201/9-7-4, 3=213/9-7-4, 4=317/9-7-4 Max Horz 1=-135(LC 4) Max Uplift 1=-17(LC 7), 3=-11(LC 6), 4=-7(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3, 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss V11 Truss Type Valley Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314941 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:53 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-C6tyvAqjD9YGgp_lojtI2ymqDPBCWjftvvFzddyHzwW Scale = 1:31.3 1 2 3 42x4 3x4 2x4 2x4 0-0-30-0-3 7-10-27-9-14 3-11-1 3-11-1 7-10-2 3-11-1 0-0-44-6-140-0-414.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.46 0.28 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 19 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=184/7-9-11, 3=184/7-9-11, 4=224/7-9-11 Max Horz 1=105(LC 5) Max Uplift 1=-35(LC 7), 3=-29(LC 6) Max Grav 1=184(LC 1), 3=184(LC 1), 4=229(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss V12 Truss Type Valley Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314942 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:53 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-C6tyvAqjD9YGgp_lojtI2ymuyP7DWjdtvvFzddyHzwW Scale = 1:22.7 1 2 3 2x4 2x4 2x4 0-0-30-0-3 5-6-115-6-7 2-9-5 2-9-5 5-6-11 2-9-5 0-0-43-2-140-0-414.00 12 Plate Offsets (X,Y)-- [2:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.22 0.54 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 11 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-6-11 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=204/5-6-4, 3=204/5-6-4 Max Horz 1=72(LC 5) Max Uplift 1=-8(LC 7), 3=-8(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss V13 Truss Type Valley Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314943 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:54 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:nvRCrVWLYVz8PozCMqfRhAyef5_-gIRK6WrL_Tg7IzZyMQOXa9I51oYFFAt07Z?W93yHzwV Scale = 1:12.4 1 2 3 2x4 2x4 2x4 0-0-30-0-3 3-3-43-3-0 1-7-10 1-7-10 3-3-4 1-7-10 0-0-41-10-140-0-414.00 12 Plate Offsets (X,Y)-- [2:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.07 0.17 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 6 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-3-4 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=113/3-2-13, 3=113/3-2-13 Max Horz 1=-40(LC 4) Max Uplift 1=-4(LC 7), 3=-4(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss V14 Truss Type GABLE Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314944 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:55 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-8U?iKss_lno_w778w8vm7NrCPCrZ_bOAMDk3iWyHzwU Scale = 1:40.0 1 2 3 4 5 10 9 8 7 64x6 4x6 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 16-8-416-8-4 9-7-4 9-7-4 16-8-4 7-1-0 0-0-46-4-131-8-38.00 12 Plate Offsets (X,Y)-- [1:0-1-13,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.35 0.35 0.18 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 6 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 47 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x3 SPF No.2 WEBS 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 16-8-4. (lb) - Max Horz 1=160(LC 5) Max Uplift All uplift 100 lb or less at joint(s) 1, 6, 7 except 10=-115(LC 6) Max Grav All reactions 250 lb or less at joint(s) 1, 6 except 8=259(LC 1), 10=445(LC 10), 7=312(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. WEBS 2-10=-333/164 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 6, 7 except (jt=lb) 10=115. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss V15 Truss Type GABLE Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314945 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:55 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-8U?iKss_lno_w778w8vm7Nr8?Csf_cSAMDk3iWyHzwU Scale = 1:25.2 1 2 3 43x12 6x8 3x12 2x4 12-2-812-2-8 6-1-4 6-1-4 12-2-8 6-1-4 0-0-44-0-130-0-48.00 12 Plate Offsets (X,Y)-- [1:0-9-13,Edge], [2:0-5-4,0-2-8], [3:0-4-15,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.63 0.28 0.11 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 30 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF-S Stud BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=209/12-2-8, 3=209/12-2-8, 4=481/12-2-8 Max Horz 1=-87(LC 4) Max Uplift 1=-18(LC 6), 3=-23(LC 7), 4=-4(LC 6) Max Grav 1=210(LC 10), 3=210(LC 11), 4=481(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. WEBS 2-4=-298/73 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3, 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss V16 Truss Type Valley Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314946 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:56 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-cgZ4XCtcW4wqXHiKTrQ?faOQycAhj4NJbtUdEyyHzwT Scale = 1:13.3 1 2 3 2x4 2x4 2x4 0-0-60-0-6 5-2-85-2-2 2-7-4 2-7-4 5-2-8 2-7-4 0-0-41-8-130-0-48.00 12 Plate Offsets (X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.17 0.42 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 9 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-2-8 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=180/5-1-12, 3=180/5-1-12 Max Horz 1=-35(LC 4) Max Uplift 1=-8(LC 6), 3=-8(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 16023 Swingley Ridge RdChesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Componentavailable from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 6_Heritage_at_Spring_Mill Truss V17 Truss Type Valley Qty 1 Ply 1 6 Heritage at Spring Mill Job Reference (optional) I39314947 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Nov 18 10:22:56 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-cgZ4XCtcW4wqXHiKTrQ?faOKmcBtj4NJbtUdEyyHzwT Scale = 1:18.1 1 2 3 2x4 2x4 2x4 4-7-0 4-7-0 0-0-43-0-118.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.57 0.35 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 10 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 WEBS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 4-7-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=165/4-6-10, 3=165/4-6-10 Max Horz 1=83(LC 5) Max Uplift 3=-28(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Gable requires continuous bottom chord bearing. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). November 18,2019 PRODUCT CODE APPROVALSLATERAL BRACING LOCATIONIndicates location where bearings(supports) occur. Icons vary butreaction section indicates jointnumber where bearings occur.Min size shown is for crushing only.Indicated by symbol shown and/orby text in the bracing section of theoutput. Use T or I bracingif indicated.The first dimension is the plate width measured perpendicular to slots. Second dimension isthe length parallel to slots.Center plate on joint unless x, yoffsets are indicated.Dimensions are in ft-in-sixteenths.Apply plates to both sides of trussand fully embed teeth.1. Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI.2. Truss bracing must be designed by an engineer. For wide truss spacing, individual lateral braces themselves may require bracing, or alternative Tor I bracing should be considered.3. Never exceed the design loading shown and never stack materials on inadequately braced trusses.4. Provide copies of this truss design to the building designer, erection supervisor, property owner and all other interested parties.5. Cut members to bear tightly against each other.6. Place plates on each face of truss at each joint and embed fully. Knots and wane at joint locations are regulated by ANSI/TPI 1.7. Design assumes trusses will be suitably protected from the environment in accord with ANSI/TPI 1.8. Unless otherwise noted, moisture content of lumber shall not exceed 19% at time of fabrication.9. Unless expressly noted, this design is not applicable for use with fire retardant, preservative treated, or green lumber.10. Camber is a non-structural consideration and is the responsibility of truss fabricator. General practice is to camber for dead load deflection.11. Plate type, size, orientation and location dimensions indicated are minimum plating requirements.12. Lumber used shall be of the species and size, and in all respects, equal to or better than that specified.13. Top chords must be sheathed or purlins provided at spacing indicated on design.14. Bottom chords require lateral bracing at 10 ft. spacing, or less, if no ceiling is installed, unless otherwise noted.15. Connections not shown are the responsibility of others.16. Do not cut or alter truss member or plate without prior approval of an engineer.17. Install and load vertically unless indicated otherwise.18. Use of green or treated lumber may pose unacceptable environmental, health or performance risks. Consult with project engineer before use.19. Review all portions of this design (front, back, words and pictures) before use. Reviewing pictures alone is not sufficient.20. Design assumes manufacture in accordance with ANSI/TPI 1 Quality Criteria.Failure to Follow Could Cause PropertyDamage or Personal Injury (Drawings not to scale)© 2012 MiTek® All Rights ReservedMiTek Engineering Reference Sheet: MII-7473 rev. 10/03/2015edge of truss.from outside"16/1-0ICC-ES Reports:ESR-1311, ESR-1352, ESR1988ER-3907, ESR-2362, ESR-1397, ESR-3282JOINTS ARE GENERALLY NUMBERED/LETTERED CLOCKWISEAROUND THE TRUSS STARTING AT THE JOINT FARTHEST TOTHE LEFT.CHORDS AND WEBS ARE IDENTIFIED BY END JOINTNUMBERS/LETTERS.W 4 - 6 W3-6W3- 7 W2-7W1-7C1-8 C5-6C6-7C7-8C4-5 C3-4C2-3C1-2TOP CHORD TOP CHORD 87654321BOTTOM CHORDSTOP CHORDSBEARING4 x 4PLATE SIZEThis symbol indicates the required direction of slots inconnector plates."16/1For 4 x 2 orientation, locateplates 0- 1"4/3PLATE LOCATION AND ORIENTATIONSymbolsNumbering SystemGeneral Safety Notes *Plate location details available in MiTek 20/20software or upon request.Industry Standards:ANSI/TPI1: National Design Specification for Metal Plate Connected Wood Truss Construction.DSB-89: Design Standard for Bracing.BCSI: Building Component Safety Information, Guide to Good Practice for Handling, Installing & Bracing of Metal Plate Connected Wood Trusses.6-4-8WEBSTrusses are designed for wind loads in the plane of the truss unless otherwise shown.Lumber design values are in accordance with ANSI/TPI 1 section 6.3 These truss designs rely on lumber values established by others.dimensions shown in ft-in-sixteenths