Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
77JGW - Truss Placement Guide
8-06-00 TOP 8-06-00 TOP 8-06-00 TOP 7-06-00 TOP 7-06-00 TOP 7-02-00 TOP 8-06-00 TOP below floor for attic trusses. Attic truss form floor. Ladder frame joists Stick frame Stick frame No brick loads on trusses Stick frame Stick frame Stick frame HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HGUS26-2 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HGUS26-2 HGUS26-2 HGUS26-2 HGUS26-2 Stick frame GE01 MG01 GE02 T01 T03 TG01 GE03 AG01 AG01 TG02 TG03 GE04 GE05 GE06 GE07 TG04 T06 TG05 TG05 TG06 T08 TG07 TG08 T09 T10 TG07 TG08 TG06 TG09 TG10 GE08 GE09 TG11 T13 T07 T13 AT01 GE10 TG12 GE12 V01 V02 V03 V04 V05 V06 V07 V08 V09 V10 V11 V12 V13 V14 GE11 V15 V16 GE11 V15 V16 PBE01 PBE02 PBE03 M01(7) T02(5) AT01(5) T04(3) M02(3) M03(2) T11(6) T12(4) T15(2) M04(2) PB01(7) M05(7) PB02(22) AT02(5) T05(2) PB01(6) T06(2) 23-07-00 20-09-00 14-07-00 2-08-00 1-04-00 31-07-00 10-04-00 16-00-00 17-04-00 20-00-00 14-07-00 7-00-00 59-11-00 2-00-00 61-11-00 9-00-00 21-07-00 8-11-00 7-06-00 8-07-00 7-06-00 9-03-08 35-04-00 15-03-08 9-08 7-00-00 9-08 1-10-08 3-00-00 4-00-00 3-00-00 4-00-00 3-00-00 1-10-08 2-01-08 2-06-00 4-06-00 2-06-00 4-06-00 2-06-00 2-01-08 IRC 2006 TPI 2002 20TLL - 10TDL - 10BDL Wedgewood Building Company WFBW1 77 Jackson's Grant 1/4"=1' December 4, 2019 PH B19903391 CUSTOMER: LOCATION: MODEL: JOB #: DATE: DESIGNER: DESIGN INFORMATION: SCALE: 9028 Old SR 67 South Mooresville, IN 46158 (317) 834-5380 Truss Placement Guide 1) This layout is intended for the purpose of truss location and placement only. Refer to the building plans for actual building construction. 2) All dimensions shown 00-00-00 are in feet-inches-sixteenths. 3) Trusses are spaced 24" on center unless otherwise noted. 4) Do not cut or modify trusses. 5) Refer to the individual truss design drawings for the location of member bracing, uplift and truss end reactions. 6) Installation of all temporary and permanent bracing is essential. See truss drawings, BCSI-B2 Summary Sheet and building designer requirements. 7) Non-bearing walls may not be shown on layout. Left end of truss, as shown on engineering drawing, is indicated by the triangle symbol