Loading...
HomeMy WebLinkAboutC000.11 (2)RELEASEU FOR CONSTRl1CTI0N Su6jec��o compliance with allregula�ions 04 S�a�e antl Local Codes City of Carmel `�j sv�� �\'��v�N�nl.� � SANIiARY SEWER UiERAI NOiES 1. SANIiARY SEWER CONSiRUC➢ON SHALL WNGORM i0 iRICO SPECIRCAiIONS ANO SHALL PREVAIL AS i0 AIAiERIALS AND MEiHODS OF CONSiRUCiiON. P. SANiiARv SEWER UiERAlS SrvOWN WERE �ESiGNED WiiH PVC PiPE iN ACCORpANCE WiiH ASiM D-3034 (SDR JS) ANO SLOPE A MiNiMUM OF I GEEi/10� GEEi. E. ALL PVC JOWiS SNALL BE PRENOLOED, MANUFqCiURE� AND MSiALLED iN ACCOROANCE WrtN pSiM C-425-6 Oi. 4. WHERE WAiER LMES ANO SANIiART SEWER LINES RUN PARALLEL WIiH ONE ANOiHER, A MINIMUM OG 10 FEEi HORIZONiAL SEPARAiION SHALL 6E MAINiAME�. 5. NO RWG ORAINS, GOOiING DRAINS AND/OR SURGACE DRAINS MAT BE CONNECiEO i0 iHE SANIiARY SEWER ST4EM INCWDING iEMPORARY CONNECilONS �URING CONSiRUC➢ON. 6. Bl➢LOiNG SNALL BE SERViCED Br A 6" MWiMl1M SANrtARv SEWER LAiERAL. iNE ENDS SNqLL BE PWGGED ANO SEALED WiiH WAiER ➢GNi PIASiiC D6C. WVES ARE i0 BE ➢LiED UP 45 �EGREES PROM NORRONiAL WiiH SUIiABLE RiiINGS GOR ALL CHANGES IN DIRECiION. ). CLEAN O11i5 SEE �EiARS iN iRiCO SiAN�AR�S SNALL BE PROViOE� EVERT 10� LWEAL FEEi 0� LAiERAL AN� Ai EALN BEND GREAiER iHAN a5 DEGREES. SUMMARY OF LATERAL INSTALL4TION REQUIREMENTS 1. Only one builtling may ronnect to the sewer main per lateral unless otherwise approved 6y TriCo. 2. Foundationdrains,sumpdrains,downspoutsandotherstormwaterdrainsshallneverbeconnectedmthe sanitary sewec Site dewatering systems shall never be discharged to the sanitary sewer. 3. The existing sewer line from the building to the septic tank may only be reused it it is located under a building addition, patio, porch or paved driveway, and [he line passes an air tes[ that is observed by TriCo. Cantact TriCa for more informatian about air testing requirements. The property owner is respansible for testing costs. 4. TriCoshallinspec[allnewlateralsorlateralrepairsinffieirentirety.Finalmnnectionmffiesanitarysewermustbe observed by Trim. The pmperty owner or mnhactor must notify TriCo prior m backfilling. InspeRions must be soheduled at least 24 hours in advance. If an inspection fails and subsequent inspections are required, or if the mntractor is not on site tor the scheduled inspection, a 5100 fee will be assessed and must be paid priorto scheduling the reinspection. 5. Septic system contents or effluent shall never be discharged ro the sanitary sewer. Be advised that your mwty healffi department regulates septic systems. Upom m�nection m sanitary sewer, a sep[ic tank must typically be abandoned, pumped dean, and filled completely with earthen materiaL Contact yaur rounty health department for more information on septic rystem and abandonment requirements, and m notify ffie department of any abandonment. 6. Thefollowingmaterialsareacceptableforuseingravirysewerlateralinstallationorrepair: PVC pipe: SDR 35 or SDR 26, ASTM D3034, 6" diameter PVC pipe, pressure rated:SDR 21, ASTM D2241, 6" diameter PVC restrained joint pipe for directional drilling: Certatlo Greenline SDR 21, ASTM D2241, 6" diameter All gasketed joints shall meet ASTM D3212 All fittings shall be SDR26 or better Duotile imn mechanical joint fittings with praper hardware SDR 26 gasketed repair sleeves or Indiana Seal shear guard Femm and similar flexible muplings are only ameptable in certain circumstances antl shall not be used without prior approval trom TriCo Cleanouts:6"threaded PVC caps Bedding: Use #8 crushedstone orfracturedface aggregate The following materials are acceptable for use in low-pressure sewer lateral installation or repair: HDPE pipe for directional drilling: �R 11 IPS, L25" diameter, PE4]10 Connections shall be made via electmfusion or using polypropylene or s[ainless sieel rompression fittings Electrofusion high volume tapping tee, rated 200 psi, PE4]10 115" IPS full port 1/4 tum fusi6le PE 6all valve, rated 200 psi Threaded swing check valve, 316 stainless steel, rated 200 psi Contact TriCo for acreptable pump station materials, equipment, pumps and other requirements Z For gravity and low-pressure systems, the line leaving the building shall not exceed 3' in length betore a deanout must be added and the line is transitioned to 6" diamerer SDR 35 PVC pipe. Glued joints are not allowed afrer 3'. No additional glued fittings are allowed between the building and the transition/deanout For all gravity lines, deanouts shall not be spaced more [han ID�' apart between ffie building and the sewer main. See TriCo's standard drawings for more information on deanout installation. 8. eedding material shall be placed fmm at least 6 inches below m 12 inches above ffie pipe wrface. The trench shall be a minimum of 18" wide with at least 6" of dearanre on both sides of the pipe. Material shall be plared over the pipe and tracer wire after inspection. Soft, unstable or unsuitable material found below and near the lateral, induding any fill or toundation backfill material, must be removed and replaced with #8 stone. The contractor is solely responsible for establishing stable pipe bedding conditions. 9. #10-AWG solid mppertracerwire shall be laid on top of and run the entire length of the lateral. All splicingottracer wire shall use 3M splice kit model DBR/V-6, King Innovation Drymnn Direct Bury Lug Aqua catalog p90220, or TriCo approvedequal. 10. Lacerals shall be installed at least 20' from water wells unless PVC pressure grade pipe is used. Any proposed installation requiring pressure pipe shall be reviewed by TriCo prior m installation. W here a transition is made between SDR 35 pipe and preswre grade SDR 21 pipe, a ductile imn gasketed meohanical couplings must be used. 11. Laterals less than 5' deep shall be at least 24" from the property line. Laterals more than 5' deep shall be at least 36" from the properry line. W here the lateral runs in dose proximiry to the property line the property mmers must be accurately staked by a professional land surveyor prior to inspeaion. 12. Laterals running parallel to a building or structure shall be at least 36" from the tace of a crawl space or slab on grade toundation and 60" from the face of a basement foundation wall. Spacing requirements also apply wiffi respect to ffie ancillary structure's foundation depth. Ancillary shuctures (e.g. window wells) and offier utilities shall not be placed aver or near the lateral. TriCo may adjust requirements where future acress m ffie lateral may be obstmcted by other utilities. The rontractor should call m discuss further if he/she believes this muld be an issue. 13. All infrastmcmre mnnected m TriCo's sewer rystem may be tested, inspected, or televised at TriCo's discretion, and must remain acressible and properly maintained. 14. Call 811 or 1-800-382-5544 before you dig. For more information go to www.indiana811.org. If you have any questions or if you want to request an exception to standards and specifications, please mntaa TriCo during normal business hours at 3ll-844-9200 prior to wmpleting the work and scheduling an inspection. Go to www.trim.em to view standard drawings and specifications. Revised 3/19/2019 NOTE:ALL SLAB AND CRAV4 SPACE CONNEC710N5 MUST BE A MINIMUM OF 3" BELOW 1HE FOOIER AND EXIT 1HE BUILDING AT 7HE FRONT OF 1HE SiRUCNRE TO PRONDE THE SHOR7EST, MOSi DIRECT ROUiE 6' PVC CAP FROM 7HE BUINING TO iHE 3' MAXIMUAI EXISPNG LAIERAL SNB. le � FINAL GRADE TEMPORARY GLUED CAP 4' FOUNDAPON "'n�� " (FOOIER) 6' PVC PIPE %�'3' MINIMUM 1RACER N7RE 3" MINIMUM '�� (6' X 6' X 6') ffE-WYE RIGID CLEANOUT TYPE 1 (ONLY LANDSCAPED SURFACES YA7HIN 1HREE FEET Of BUIIDING) No. 19300219 STAIE OF �nn!NDiAN?� �� Schneider 1NfNp1 BO% qi O1HEA IOSHA ACCfPiPfA£ iRENCH 5.1fEtt S15hY I/P D+ 17 PoA PYC PiPE i/zo+s'�aaa SENER IAiERAL TRICO REGIONAL SEWER UTILITY TYPE 1 CLEANOUT DETAIL Ai iW OF IXCAVATW 'CLEAN' BACKfILL YAIEPoAL fPEE Oi POCKS, EiC.IARGFR 1HPN fi� pt OiHER E%1PPNEWS MAIEPL (CpAPPCi i0 PRE4fNi SEiIIfMENn. IN APERS MiT11N 5' OL ROPD 91RLACE, BACKRLL PFR PEWIRFl1ENR OL INOIANA OEPARIIAFNi OF iRPNSPPGTM ANU WNPACi FlLL i0 95R MOUIFlE� PROCiOP OEN9tt. NUXBEII 8 CRU91E0 SfONE pl NUMHP BfPACNPm iM£ ��z p ��� u �,�� nu wnmau is ro¢ num ma� s ixa6 e¢aw ro ---�/ / is ixwes eeou� me rirc mE w�a sraio eE n uxuuw a ie ixa¢ �nor. �ooiuc�ue� eaow �\\ ____ _ ___ /� �o�u vcEu, xnno rn�a�o nxo wnum w. / � �.. �.., ' ;_" ,�\� p�cRusim smxc sxo��sucm, ___. _._'�. __.._..._:��� NAND iAYPm AND WAIXm IN. iP SiONE AS PEWII�D BT � �r � C.��� (BELL Hp£ E%CAVAIED) ENqNEER FW ONSLIBI£ >����������� sa� caxom�s - o�vm m /i. /i. /i. /i /i / �rne� amuxo rw aanmc sEwfR ns PER CONSIRIICTON PlANS FlRST LAYER BEDDING TABLE pIPE SIZE A B %PE 93E 8' TO IS' IB' k O�fR UP i01B 1-0 2-6 BEDDINC BELOIV ME MINiMUM = 6' A1INIMUY = 10' �B' M'U pEA1EP 0 4 P1' D i IB' PIPE 9APPEL PNO BELL No. 19300219 srn� oF �NDIANP �� Schneider Oate SANITARY SEWER TRENCHING, BEDDING AND BACKFILL DETAIL CLAY TOWNSHIP REGIONAL WASTE DISTRICT SANITARY SEWER BEDDING AND BACKFILL DETAIL tve T:�ea�s�ss�om�uxcs�uarens�w-m�s.oRc TRICO DETAILS ,...��g.,P.T M��'",,, : 1P:'P�'G REO���: . PE�IX132 : " STAiE OF e ` `-•p'�. . 6 : �'.,,o fssi!!01 sN?�G2�",.,: o„ �NAI E �� � a � 3 3 � w w z `z U u � _ _ � � � w � � � � � U � O � E r� N o t� F' a � � s M F�. � �+--i m 6 w d w � .� o 0 � p i � e � � � [� � � N W �' �` "� � .N � a ` n � "i n W � _, "n W����� ox � Ci 4 V d a z O U �� � ~ N � � ry N � ~ ¢ � � � Z Y J O `" ar QU �> Z� � ZW W mJ � N oz o � �N W rri � � W � \ W � �rT� 1-�--� � O � N Y O Q a v w �, � C/� 3 m O � � T C O�/ � � N I-^i-i O � ��" rn U DRqWN Bv: TEN cNEckEo er: a�o aaaEcr rvo 1903-016 SHEEi NO. C/ onrE: 12/26/19