HomeMy WebLinkAboutStormwater Management Permit��y os eat
i City of Carmel
J STORMWATER MANAGEMENT PERMIT APPLICATION
�NPIp��
Permit #:
Submission of this application constitutes notice that the project site owner is applying for coverage under the Carmel City Code §6-180
through §6-209 for stormwater discharges associated with construction activity dis€urbing,',! acre or more of land. Permitted project site
owners are required to comply with all terms and conditions of the Carmel City Code.
Project Dame:
Intuitive Health Riverview Health
Urgent Care & Emergency Room
Project Location:
10830 N Michigan Rd, Zionsville,
IN 46077, approximately 400 ft north of Nottingham Way on the west side of Michigan Rd
Quarter: Section:
Township: Range:
SW 6
17N 3E
Project Site Owner Name:
Title/Position:
Steve Wathen
Company:
EQ 106 Michigan, LLC
Address:
4653 irueman Boulevard, Suite 100
City:
State: Zip:
Hilliard
Ohio 43026
Phone:
Fax: E-mail Address:
614 334-7823
azerrer@equity.com
SWPPP Contact Person:
Company Name:
Anthony Zerrer
EQ 106 Michigan, LLC
Affiliation to Project Site Owner:
Address (If different from above):
City:
State: Zip:
Phone:
Fax: E-mail Address:
Estimated Project Duration:
October 2019 to October 2024
By sinning this application, I certify the following:
A. The storm water quality measures included in the Storm Water Pollution Prevention Plan (SWPPP) comply with the requirements of
§6-180 through §6-209 of the Carmel City Code, the City of Carmel Stormwater Technical Standards Manual, and all applicable
federal, state, and local stormwater requirements;
13. The measures required by the Stormwater Pollution Prevention Plan (SWPPP) shall be implemented;
C. Stormwater quality measures beyond those specified in the Stormwater Pollution Prevention Plan (SWPPP) will be implemented
during, the life of the permit if necessary to comply with the Carmel City Code; and
D. Implementation of stormwater duality measures will be inspected by trained individuals;
E. Pursuant to CarNel City Code § 6-205, the City reserves the right to inspect and/or implement the stormwater quality measures
outlined in heormwatcr Pollution Prevention Plan (SWPPP) or provide maintenance thereto, at my expense, if not performed.
1.0
Signature of Project Owner Printed Name fate
Permit Approved: Engineering Department Gate
Approval of this application constitutes acceptance of the Storm Water Pollution Prevention Plan (SWPPP) by the City of Carmel.