Loading...
HomeMy WebLinkAboutStormwater Management Permit��y os eat i City of Carmel J STORMWATER MANAGEMENT PERMIT APPLICATION �NPIp�� Permit #: Submission of this application constitutes notice that the project site owner is applying for coverage under the Carmel City Code §6-180 through §6-209 for stormwater discharges associated with construction activity dis€urbing,',! acre or more of land. Permitted project site owners are required to comply with all terms and conditions of the Carmel City Code. Project Dame: Intuitive Health Riverview Health Urgent Care & Emergency Room Project Location: 10830 N Michigan Rd, Zionsville, IN 46077, approximately 400 ft north of Nottingham Way on the west side of Michigan Rd Quarter: Section: Township: Range: SW 6 17N 3E Project Site Owner Name: Title/Position: Steve Wathen Company: EQ 106 Michigan, LLC Address: 4653 irueman Boulevard, Suite 100 City: State: Zip: Hilliard Ohio 43026 Phone: Fax: E-mail Address: 614 334-7823 azerrer@equity.com SWPPP Contact Person: Company Name: Anthony Zerrer EQ 106 Michigan, LLC Affiliation to Project Site Owner: Address (If different from above): City: State: Zip: Phone: Fax: E-mail Address: Estimated Project Duration: October 2019 to October 2024 By sinning this application, I certify the following: A. The storm water quality measures included in the Storm Water Pollution Prevention Plan (SWPPP) comply with the requirements of §6-180 through §6-209 of the Carmel City Code, the City of Carmel Stormwater Technical Standards Manual, and all applicable federal, state, and local stormwater requirements; 13. The measures required by the Stormwater Pollution Prevention Plan (SWPPP) shall be implemented; C. Stormwater quality measures beyond those specified in the Stormwater Pollution Prevention Plan (SWPPP) will be implemented during, the life of the permit if necessary to comply with the Carmel City Code; and D. Implementation of stormwater duality measures will be inspected by trained individuals; E. Pursuant to CarNel City Code § 6-205, the City reserves the right to inspect and/or implement the stormwater quality measures outlined in heormwatcr Pollution Prevention Plan (SWPPP) or provide maintenance thereto, at my expense, if not performed. 1.0 Signature of Project Owner Printed Name fate Permit Approved: Engineering Department Gate Approval of this application constitutes acceptance of the Storm Water Pollution Prevention Plan (SWPPP) by the City of Carmel.