Loading...
HomeMy WebLinkAboutM0.0 - MECHANICAL COVER SHEETVIEW KEY NAME- LEVELNAME iQ- INDICATESNOTEUSEDTODESCRBE � 10'-0"�HEIGHTABOVE ADDITIONALINFORMATIONABOUT PROJECTO'-0" WORKREQUIRED,SPECIFICTOTHE SHEET AND/OR DETAIL -INDICATES DIRECTION OF TRUE NORTH PLAN OR DETAIL NUMBER PLAN OR DETAIL NAME /'` � VIEW NAME 11 � „8._,.0. - PLAN OR DETAIL SCALE N�Rj� INDICATES SIMILAR DETAIL SIMr� REFERENCED IN MULTIPLE LOCATIONS �-DETAIL REFERRED TO BV SECTION CUT 1 �`. M101 .�SHEET DETAIL IS LOCATED ON INDICATES SIMILAR DETAIL SIM ����� REFERENCED IN MULTIPLE LOCATIONS � DETAIL REFERRED TO BV ELEVATION 14 2"5........ o T101� SHEET DETAIL IS LOCATED ON LINE TVPE KEV: NEW WORKBYTHISCONTRACTOR (DARK SOLID LINE) NEW W ORK UNDERFLOOR OR UNDERGROUND BY THIS CONTRACTOR (DARK LONG DASHED LINE) NEW W ORK BV OTHERS AND/OR EXISTING TO REMAIN (LIGHT SOLID LINE) EXISTING TO BE REMOVED BV THIS CONTRACTOR (DARK BHORT DABHED LINE) FIRE / SMOKE BARRIER DESIGNATIONS THE LME TYPES SHOW N ARE FOR THE CONVEMENCE OF THE CONTRACTOR. THE CONTRACTOR SHALL VERIFV RATINGS W ITH THE LATEST SET OF ARCHITECTURAL PLANS AND FURNISH ALL MATERIALS REQUIRED TO COM PLV W ITH THOSE RATINGS W HETHER SHOW N OR NOT. ALL [FLOOR, FLOOR CEILING, AND ROOF CEILING] ASSEMBLIES SHALL BE DESIGNATED AS [i], [2], [3y [4] HOUR FIRE [/SMOKEy BARRIER(S), UNLESS NOTED OTHERW ISE ON THE PLANS. RATMGS W ERE ACQUIRED FROM THE ARCHITECTURAL PLANS DATED ["P'P']. NTD: COORDINATE W ITH ARCHITECT 1 HOUR FIRE BARRIER 2 HOUR FIRE BARRIER 3 HOUR FIRE BARRIER 4 HOUR FlRE BARRIER iHOURSHAFTENCLOSURE 2HOURSHAFTENCLOSURE SMOKE BARRIER 1 HOUR FIRE/SMOKE BARRIER 2 HOUR FIRE/SMOKE BARRIER 3 HOUR FIRE/SMOKE BARRIER 4 HOUR FlRE/SMOKE BARRIER 1 HOUR FlRE/SMOKE SHAFT ENCLOSURE 2 HOUR FlRE/SMOKE SHAFT ENCLOSURE CONTRACTOR ABBREVIATION KEY ABBR: DESCRIPTION: A.C. ASBESTOSABATEMENTCONTRACTOR ALC. AUTOMATICTEMPERATURECONTROLCONTRACTOR A.V.C. AUDIONISUALCONTRACTOR C.C. CNIL CONTRACTOR C.M. CONSTRUCTION MANAGER EC. ELECTRICALCONTRACTOR F.P.C. FIREPROTECTIONCONTRACTOR F.S.C. FOOD SERVICE CONTRACTOR G.C. GENERALCONTRACTOR H.C. HEATING CONTRACTOR M.C. MECHANICALCONTRACTOR N.C.C. NURSECALLCONTRACTOR P.C. PWMBINGCONTRACTOR S.C. SECURITV CONTRACTOR T.G TECHNOLOGVCONTRACTOR T.C.G TEMPERATURECONTROLSCONTRACTOR V.C. VENTILATIONCONTRACTOR MECHANICAL SYMBOL LIST NOT ALL SVM BOLS MAV APPLV. SYMBOL: DESCRIPTION: -BD- BOILERBLOW DOWN -BF- BOILER FEED WATER -CA- COMPRESSEDAIR -CR- CONDENSER WATER RETURN �S- CONDENSERWATERSUPPLV -CS15- CLEAN STEAM - NUMBER INDICATES PRESSURE IN PSIG. -CWR- CHILLED WATER RETURN -CWS- CHILLEDWATERSUPPLV -DPP- DRAIN -G- NATURALGAS -GV- GAS REGULATOR VENT -GWR- GLVCOLWATERRETURN -GWS- GLVCOLWATERSUPPLV -HCR- HEATING/CHILLED WATER RETURN -HCS- HEATINGICHILLEDWATERSUPPLV -HG- REFRIGERANTHOTGAS -HPC- HIGH PRESSURE CONDENSATE -HPS- HIGHPRESSURESTEAM -HWR- HEATINGWATERRETURN -HWS- HEATINGWATERSUPPLV -LCS- LOW PRESSURE CLEAN STEAM -LIQ- REFRIGERANTLIQUID -LPC- LOW PRESSURECONDENSATE -LPS- LOW PRESSURESTEAM -LWR- LOOP WATER RETURN -LWS- LOOP WATER SUPPLV -MV- MEDICALVACUUM �R- OIL RETURN -OS- OILSUPPLV -PC- PUMPEDCONDENSATE -PD- PUMPEDDISCHARGE -RWR- REHEATWATERRETURN -RWS- REHEATWATERSUPPLV -SUC- REFRIGERANTSUCTION -SV- SAFETVRELIEFVENT -VAC- LABVACUUM ] PIPECAP J PIPEDOWN � PIPEUPORUP/DOWN �� PITCH PIPE IN DIRECTION � DIRECTION OF FLOW IN PIPE �i NEW CONNECTION �i� DIELECTRICCONNECTION �I� UNION/FLANGE DG SHUTOFF VALVE NORMALLV OPEN N SHUTOFF VALVE NORMALLV CLOSED tq THROTTLING VALVE Igi BALANCINGVALVE�NUMBERINDICATESGPM) CI AUTOMATIC BALANCING VALVE � MIXING VALVE � CONTROL VAWE (THREEWAV) p$ CONTROL VAWE (PNO-WAV) � SOLENOIDVAWE �'�� CHECKVALVE y'y SAFETV/RELIEFVAWE �� 8 PRESSURE REDUCING VALVE (LIQUIDIGAS) � PRESSURE REDUCMG VAWE (STEAM) � TRIPLE DUTV VALVE (ANGLE TVPE) 0 TRIPLE DUTV VALVE QN-LINE TVPE) � PUMP Y VACUUM BREAKER �� "WVE"-STRAMER � "WVE"-STRAMERW/SHUTOFFVAWEANDHOSECONNECTIONWITHCAP � BASKETSTRAINER �Q1:=� REXIBLECONNECTION � PRESSURE/TEMPERATURETESTPLUG _� REDUCER-REFERENCESPECIFICATION FOR CONCENTRIGECCENTRIC AND FOT/FOB � SUCTION DIFFUSER W ITH SUPPORT FOOT $ AUTOMATICAIRVENT + MANUALAIRVENT Ta } DRAIN VALVE W ITH HOSE CONNECTION AND CAP i �� PRESSURESENSOR(FURNISHEDWITHBALLVALVE) � PO PRESSURE GAUGE (FURNISHED W ITH BALL VALVE) �� DIFFERENTIALPRESSURESENSOR t t _ gp STATICSWITCH FM FLOW METER � FLOW SWITCH FS FLOW SENSOR �T; STEAMTRAP�REFERTOSCHEDULE) F8T STEAM TRAP ( REFER TO SCHEDULE) DT• R INVERTED BUCKET STEAM TRAP (REFER TO SCHEDULE) u T• - ALIGNMENTGUIDE PIPE ANCHOR �- EXPANSION JOINT � METER MECHANICAL SYMBOL LIST NOT ALL SVM BOLS MAV APPLV. SYMBOL: DESCRIPTION: - -- DIRECTION OF AIR FLOW �� I I I I I C- FLEXIBLE DUCT -�- MANUALVOLUMEDAMPER -- R- RISE IN DIRECTION OF AIR FLOW -� D- DROP IN DIRECTION OF AIR FLOW � DUCTCAP -�� DUCTDOWN --_� DUCT UP � SUPPLV/OUTSIDEAIRDUCTSECTION � RETURN AIR DUCT SECTION � EXHAUST/RELIEFAIRDUCTSECTION � 4-WAV DIFFUSER WITH BLANKOFF IN ONE DIRECTION CD-1 qIRTERMINALPROPERTIESSVMBOL 6/115 NECK SIZE/CFM �I###I TERMINALAIRBOX�REFERTOSCHEDULE) � ��I TERMINALAIRBOXw/REHEATCOIL�REFERTOSCHEDULE) SERIES FAN POWERED TERMINAL AIR BOX wIREHEAT COIL � (REFERTOSCHEDULE) � PARALLELFANPOWEREDTERMINALAIRBOXw/REHEAT COIL (REFER TO SCHEDULE) � �` HUMIDIFIER O OPPOSED BLADE DAMPER (REFER TO SCHEDULE) O PARALLELBLADEDAMPER(REFERTOSCHEDULE) �� DIFFERENTIALPRESSURESENSOR HQ HUMIDISTATSENSOR H❑ HUMIDISTATISENSOR CQ CARBON MONOXIDE SENSOR O CARBONDIOXIDESENSOR 2 OO OCCUPANCVSENSOR � PRESSURE SENSOR/MONITOR P� PRESSURESENSOR�DUCTMOUNTED) QRTU-X PRIMARVTHERMOSTATW/DIGITALDISPLAV QT ADDITIONALAVERAGNGTHERMOSTATISENSOR�NODISPLAV) �T TEMPERATURE SENSOR T� THERMOSTAT/SENSOR WITH HEAW DUTV ENCLOSURE 4 �� TEMPERATURESENSORWITHWELL Q THERMOMETERWITHWELL(DIALTVPE) �� 4 THERMOMETERWITHWELL�FILLEDTVPE) U � XX-V AIRFLOWMEASUREMENTSVMBOL -� XX-AHUSVMBOL V -SEQUENTIAL NUMBER ABBR: AD AFF C CO CD-E CFSD DPO (0-2") DPS EA ECFSD EFD EFSD EP ESD FD FOB FOT FSD MA MV NC N.C. NIC N.O. OA PS RA SA SD TAB TD TVP UC-1 UNO VD MECHANICAL ABBREVIATION KEY DESCRIPTION: ACCESSDOOR ABOVE FINISHED FLOOR COMMON CLEANOUT CEILMG DIFFUSER - EXISTMG CONTROIJFIRE/SMOKE DAMPER DIFFERENTIAL PRESSURE GAUGE (RANGE) DIFFERENTIAL PRESSURE SW ITCH EXHAUSTIRELIEF AIR EXISTING CONTROL FIRE SMOKE DAMPER EXISTING FIRE DAMPER EXISTING FIRE SMOKE DAMPER ELECTRICAL TO PNEUMATIC VAWE EXISTING SMOKE DAMPER FIRE DAMPER FLAT ON BOTTOM FLAT ON TOP FIRE/SMOKE DAMPER MIXEDAIR MIXMG VALVE NEW CONNECTION NORMALLVCLOSED NOT IN CONTRACT NORMALLV OPEN OUTSIDE AIR PRESSURESWITCH RETURN AIR SUPPLV AIR SMOKE DAMPER TERM INAL AIR BOX TRANSFERDUCT TVPICAL DOOR UNDERCUT BV OTHERS (1"TVPICAL) UNLESS NOTED OTHERW ISE VOLUME BALANCMG DAMPER MECHANICAL GENERAL NOTES: THESE NOTES APPLV TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIM ITED TO PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL. 1. DRAWINGSSHOWINGLOCATIONSOFEQUIPMENT,DUCTWORK,PIPING,ETC.ARE DIAGRAMMATIC AND MAV NOT ALWAVS REFLECT EXACT INSTALLATION CONDITIONS. DRAW MGS SHOW THE GENERALARRANGEMENT OF DUCTWORK, PIPMG, EQUIPMENT, ETC., AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE INSTALLATION. THEDRAWINGSSHALLBEFOLLOWEDASCLOSELVASACTUALBUILDING CONSTRUCTION AND THE W ORK OF OTHERS W ILL PERMIT. 2. DONOTSCALEDRAWINGS. VERIFYALLDIMENSIONSAND0.EARANCESFROM ARCHITECTURAL, STRUCTURAL, SUBM ITTALS, AND OTHER APPROPRIATE DRAW INGS OR PHVSICALLV ATSITE REVIEW ALL DRAWMGS, INCLUDMG THOSE OF OTHER TRADES. 3. COORDINATEALLWORKWITHALLOTHERTRADESPRIORTOINSTALLATIONTOPROVIDE CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO VERIFV NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIORTO VERIFlCATION OF NECESSARV CLEARANCES FOR ALL TRADES. BRMG ANV INTERFERENCES OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING W ITH FABRICATION OR EQUIPMENT ORDERS. 4. REVIEWSPACEREQUIREMENTSOFEQUIPMENTSPECIFIEDORSUBSTITUTEDANDMAKE REASONABLE ACCOMMODATIONS IN LAVOUT AND POSITIONING TO PROVIDE PROPER ACCESS. 5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO COORDINATE SHALL BE MADE BV THE CONTRACTOR W ITHOUT ADDITIONAL COST OR EXPENSETO OTHERS. 6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED W ITH ELECTRICAL CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF DESIGN. 1. REFERTO ARCHITECTURAL RERECTED CEILING PLAN, ELECTRICAL, TECHNOLOGV AUDIONISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING MOUNTED DEVICES, OTHER THAN SPRINKLERS. 8. EACH CONTRACTOR IS RESPONSBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS, FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS RESPONSIBLE FOR PATCHMG TO MATCH ORIGINAL CONSTRUCTION, FIRE RATMG, AND FINISH. 9. IN AREAS W ITH DRVWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS W ITH THE GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETG COORDINATE PANEL TYPE AND COLOR W ITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS PANELS PRIOR TO BIDDING. 10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONSAIRTIGHT WHERE CONDUITS, PIPMG, AND DUCTS PENETRATE PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE SEALEDAIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BV MANUFACTURER FOR OUTDOOR USE. 11. CAULK ALL PIPE AND DUCT PENETRHTIONS OF FULL HEIGHT NON-FlRE RATED WALL, PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS W ITHIN ROOMS. 12. WHEREPIPESANDDUCTSARESHOWNTOPENETRATEFLOORS,PROVIDESLEEVED OPENMGS W ITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE W ITH ALL RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT. 13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARV AMONG DIFFERENT MANUFACTURERS. CONSULTAPPROVED SHOP DRAWMGS FOR EQUIPMENT S2ESAND REQUIRED SERVICE CLEARANCES. COORDINATE W ITH LAVOUT OF EQUIPMENT PADS, PIPING, DUCTWORK, ETC. 14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES. 15. MAMTAIN MINIMUM 3'-6" CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR STARTERS, SW ITCHES, AND DISCONNECTS. i6. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL EXTEND MINIMUM 6" BEYOND ALL SIDES OF EQUIPMENT. 1]. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER NON-STRUCTURAL BUILDMG ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE CRACKED CONCRETE APPROVED IN ACCORDANCE W ITH SPECIFlCATIONS. ABBR: AD AFF BFP BT CB �� CO CS DB DF DI E EE ES ESE EWC FCO FD FM FS GD GI HB I.E. LAV MB MH MV NC NIC NT OS RD SH SK SS TD TP TYP UR VTR WC WCO WF WH WMF WM WS UB UNO VCO PLUMBING ABBREVIATION KEY DESCRIPTION: ACCESSDOOR ABOVE FINISHED FLOOR BACKFLOW PREVENTER BATHTUB CATCH BASIN CAST IRON CLEANOUT CLINICAL SINK DIALVSIS BOX DRINKING FOUNTAIN DUCTILE IRON EXISTING EMERGENCVEVEWASH EMERGENCVSHOWER EMERGENCV SHOWER/EVEWASH ELECTRIC WATER COOLER FLOORCLEANOUT FLOOR DRAIN FLOW METER FLOOR SINK GARBAGE DISPOSER GREASEINTERCEPTOR HOSE BIBB INVERTELEVATION (FOR REFERENCE ONLV) LAVATORV MOP BASIN MANHOLE MIXING VALVE NEW CONNECTION NOT IN CONTRACT NEUTRALIZATION TANK OIL SEPARATOR ROOF DRAIN SHOWER SINK SERVICE SINK TRENCH DRAIN TRAP PRIMER TYPICAL URINAL VENTTHROUGHROOF WATERCLOSET WALL CLEANOUT WASH FOUNTAIN WATERHEATER WASHING MACHINE FIMURE WATERMETER WATERSOFTENER UTILITY BOX UNLESS NOTED OTHERW ISE VARD CLEANOUT VENTILATION GENERAL NOTES: 1. ALIGNTEMPERATURESENSORSWITHLIGHTSWITCHESANDWHENINCLOSEPROXIMITVTO EACH OTHER. 2. PROVIDEACCESSDOORSATALLDUCTMOUNTEDEQUIPMENT. 3. PROVIDE A MANUAL BALANCING DAMPER ON EACH DUCT BRANCH THAT SERVES A DIFFUSER OR REGISTER. ,. THES�Meo�s PD UMBINGSGENERAL�NNOTESTHE�oNTRA�TOR. CONTRACTOR SHALL VERIFY QUANTITIESAND FURNISH ALL MATERIALS REQUIRED FOR FULLV OPERATIONAL SVSTEMS, WHETHER SPEQFlED OR NOT. 2. CATALOGNUMBERSSHALLNOTBECONSIDEREDCOMPLETE,BUTAREGIVENASANAIDTO THECONTRACTORANDTOINDICATETHEQUALITYREQUIRED. CONTRACTORIS RESPONSIBLE FOR A COMPLETE DESCRIPTION OF MATERIAL ON THESE DRHW MGS AND IN THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER LISTED ISTHE BA515 OF DESIGN. 3. CONTRACTORSHALLVERIFVTHATFIXTURESSUPPLIEDAREAPPROVEDPERALL APPLICABLE STATE, LOCAL AND GOVERNING AUTHORITIES. 4. ALL FlXTURES SHALL CONFORM TO FEDERAL ACT 5.3814 5. INVERT ELEVATIONS ARE FROM DRAW INGS AND MAY NOT BE ACCURATE. VERIFY ALL ELEVATIONS BEFORE BEGINNING WORK. 6. VERIFVUNDERGROUNDPIPESRES,INVERTELEVATIONS,ANDLOCATIONSPRIORTO BEGINNING ANY WORK. 1. REFERTOTHEPLUMBMGROUGH-INSCHEDULEFORTHESIZESOFBRANCHPIPESTO PLUMBMG FlXTURES. 8. FOR CLARITV, NOTALL VALVES HAVE BEEN SHOWN. PROVIDE SHUTOFF VALVES IN DOMESTIC WATER PIPMG SERVMG EACH ROOM W ITH FIXTURES. ANGLE STOPS SHALL NOT BE CONSIDERED SHUTOFF VALVES. MECHANICAL SHEET INDEX M0.0 MECHANICALCOVERSHEET M1.1 FlRSTFLOORPLAN -MECHANICAL M12 ROOFPLAN-MECHANICAL M2.0 MECHANICAL DETAILS M3.0 MECHANICALSCHEDULES M4.0 MECHANICALCONTROLSWIRMG�IAGRAMS M4.1 MECHANICALCONTROLSWIRMG�IAGRAMS PLUMBING SHEET INDEX P1.0 11NDERFLOOR PWMBING PLAN P1.1 FIRSTFLOORPLAN-PLUMBING P12 ROOFPLAN-PLUMBING P2.0 PLUMBING DETAILS P2.1 PLUMBING RISERS P3.0 PLUMBINGSCHEDULES .�'i�,.%► � BANK OF AMERICA & MERRILL LYNCH 10800 N. Michigan Roatl Zionsville, IN 46077 SERIAL NUM./MANH. ID: DESIGNATION: NRSP VERSION: 2.0 BULLETIN: 07-2018 Gensler 11EMadison Te131245G0123 Suite300 Fax 312A56.0124 Chiragq IL 60602 Unitetl States Jones Lang LaSalle T: 612271.8218 Attn: Patrick Hassett �IMEG anzwc�a+eomu+oo��, nima� ossa• v�� napo-n�oox�mmisn m�a ,:a�nmoaaqnciaanomorimeccoaa �zo�simeacoAa I excesuieixw�xes o � a i�`.. Dale Descriplion 1 08.022019 ISSUE FOR PERMIT � 07,31.Zo Seal I Sigreture Praject Name CARMEL PrajectNumher 21.0352.000 DESClipfian MECHANICAL COVER SHEET Scale NOT TO SCALE RELEASED FOR CONSTRl1CTI0N Su6jec� �o compliance with all regula�ions of Sla�e antl Local Codes City of Carmel �i `��¢m�' lamn�Ml1 � onrE: 12/31/19 M0.0 � zai s ce�s e�