Loading...
HomeMy WebLinkAbout19 0731_COMcheck Report_MechCOMcheck Software Version 4.1.1.0 Mechanical Compliance Certificate Project Title: 2012 IECC Project Type:New Construction Location:Zionsville, Indiana Climate Zone:5a Construction Site: Zionsville, IN Owner/Agent:Designer/Contractor: Project Information Energy Code: Bank of America - Zionsville Unspecified Additional Efficiency Package(s) Mechanical Systems List Quantity System Type & Description Heating: 1 each - Other, Gas, Capacity = 42 kBtu/h No minimum efficiency requirement applies Cooling: 1 each - Single Package DX Unit, Capacity = 21 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER Fan System: FAN SYSTEM 1 | Offices -- Compliance (Brake HP method) : Passes Fans: FAN 1 Supply, Constant Volume, 910 CFM, 1.0 motor nameplate hp, 0.4 design brake hp (0.4 max. BHP) 1 RTU-1 (Single Zone): Heating: 1 each - Other, Gas, Capacity = 61 kBtu/h No minimum efficiency requirement applies Cooling: 1 each - Single Package DX Unit, Capacity = 34 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER Fan System: FAN SYSTEM 2 | BOH -- Compliance (Brake HP method) : Passes Fans: FAN 3 Supply, Constant Volume, 1270 CFM, 1.0 motor nameplate hp, 0.5 design brake hp (0.9 max. BHP) FAN 4 Exhaust, Constant Volume, 350 CFM, 0.1 motor nameplate hp, 0.1 design brake hp (0.1 max. BHP) 1 RTU-2 (Single Zone): Heating: 1 each - Other, Gas, Capacity = 50 kBtu/h No minimum efficiency requirement applies Cooling: 1 each - Single Package DX Unit, Capacity = 38 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER Fan System: FAN SYSTEM 3 | Central -- Compliance (Brake HP method) : Passes Fans: FAN 6 Supply, Constant Volume, 1505 CFM, 1.5 motor nameplate hp, 0.8 design brake hp (1.4 max. BHP) 1 RTU-3 (Single Zone): Heating: 1 each - Other, Gas, Capacity = 20 kBtu/h No minimum efficiency requirement applies Cooling: 1 each - Single Package DX Unit, Capacity = 29 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER Fan System: FAN SYSTEM 4 | ATM Work Room -- Compliance (Brake HP method) : Passes Fans: FAN 7 Supply, Constant Volume, 1175 CFM, 1.0 motor nameplate hp, 0.5 design brake hp (0.5 max. BHP) 1 RTU-4 (Single Zone): Project Title: Data filename: Bank of America - Zionsville \\files\Active\Projects\2018\18002541.00\CAD-BIM Folders\LKPB\Design\Mechanical\BoA Carmel - 7_31_2019.cck 07/31/19Report date: 121 ofPage Quantity System Type & Description Heating: 1 each - Other, Gas, Capacity = 50 kBtu/h No minimum efficiency requirement applies Cooling: 1 each - Single Package DX Unit, Capacity = 52 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER Fan System: FAN SYSTEM 5 | Work Stations -- Compliance (Brake HP method) : Passes Fans: FAN 8 Supply, Constant Volume, 1835 CFM, 1.5 motor nameplate hp, 1.0 design brake hp (1.5 max. BHP) FAN 11 Exhaust, Constant Volume, 120 CFM, 0.1 motor nameplate hp, 0.0 design brake hp (0.0 max. BHP) 1 RTU-5 (Single Zone): Heating: 1 each - Other, Gas, Capacity = 44 kBtu/h No minimum efficiency requirement applies Cooling: 1 each - Single Package DX Unit, Capacity = 24 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER Fan System: FAN SYSTEM 6 | Vestibule -- Compliance (Brake HP method) : Passes Fans: FAN 9 Supply, Constant Volume, 910 CFM, 1.0 motor nameplate hp, 0.4 design brake hp (0.4 max. BHP) 1 RTU-6 (Single Zone): Heating: 1 each - Other, Gas, Capacity = 50 kBtu/h No minimum efficiency requirement applies Cooling: 1 each - Single Package DX Unit, Capacity = 32 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER Fan System: FAN SYSTEM 7 | Offices -- Compliance (Brake HP method) : Passes Fans: FAN 10 Supply, Constant Volume, 1125 CFM, 1.5 motor nameplate hp, 0.7 design brake hp (1.1 max. BHP) 1 RTU-7 (Single Zone): Heating: 1 each - Other, Gas, Capacity = 39 kBtu/h No minimum efficiency requirement applies Cooling: 1 each - Single Package DX Unit, Capacity = 20 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER Fan System: FAN SYSTEM 8 | Offices -- Compliance (Brake HP method) : Passes Fans: FAN 12 Supply, Constant Volume, 910 CFM, 1.0 motor nameplate hp, 0.4 design brake hp (0.4 max. BHP) 1 HVAC System 8 (Single Zone): Electric Storage Water Heater, Capacity: 6 gallons No minimum efficiency requirement applies 1 Water Heater 1: Electric Storage Water Heater, Capacity: 6 gallons No minimum efficiency requirement applies 1 Water Heater 2: Project Title: Data filename: Bank of America - Zionsville \\files\Active\Projects\2018\18002541.00\CAD-BIM Folders\LKPB\Design\Mechanical\BoA Carmel - 7_31_2019.cck 07/31/19Report date: 122 ofPage 08/02/2019 Inspection Checklist Requirements: 100.0% were addressed directly in the COMcheck software COMcheck Software Version 4.1.1.0 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2012 IECC Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR2]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the mechanical systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. Complies Does Not Not Observable Not Applicable Requirement will be met. C103.2 [PR3]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the service water heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. Complies Does Not Not Observable Not Applicable Requirement will be met. C406 [PR9]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the additional energy efficiency package options. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Bank of America - Zionsville \\files\Active\Projects\2018\18002541.00\CAD-BIM Folders\LKPB\Design\Mechanical\BoA Carmel - 7_31_2019.cck 07/31/19Report date: 123 ofPage Section # & Req.ID Footing / Foundation Inspection Complies?Comments/Assumptions C403.2.4. 5 [FO9]3 Freeze protection and snow/ice melting system sensors for future connection to controls. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Bank of America - Zionsville \\files\Active\Projects\2018\18002541.00\CAD-BIM Folders\LKPB\Design\Mechanical\BoA Carmel - 7_31_2019.cck 07/31/19Report date: 124 ofPage Section # & Req.ID Plumbing Rough-In Inspection Complies?Comments/Assumptions C404.3 [PL5]3 Temperature controls installed on service water heating systems (110 F for dwelling units and lavatories in public restrooms and 90 F for other occupancies.) Complies Does Not Not Observable Not Applicable Requirement will be met. C404.3 [PL5]3 Temperature controls installed on service water heating systems (110 F for dwelling units and lavatories in public restrooms and 90 F for other occupancies.) Complies Does Not Not Observable Not Applicable Requirement will be met. C404.2 [PL4]3 Heat traps installed on non-circulating storage water tanks. Complies Does Not Not Observable Not Applicable Requirement will be met. C404.2 [PL4]3 Heat traps installed on non-circulating storage water tanks. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Bank of America - Zionsville \\files\Active\Projects\2018\18002541.00\CAD-BIM Folders\LKPB\Design\Mechanical\BoA Carmel - 7_31_2019.cck 07/31/19Report date: 125 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C403.2.3 [ME55]2 HVAC equipment efficiency verified.Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.2.5. 1 [ME59]1 Demand control ventilation provided for spaces >500 sq.ft. and >25 people/1000 sq.ft. occupant density and served by systems with air side economizer, auto modulating outside air damper control, or design airflow >3,000 cfm. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.7 [ME60]2 HVAC ducts and plenums insulated. Where ducts or plenums are installed in or under a slab, verification may need to occur during Foundation Inspection. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.8. 1 [ME7]3 Piping Insulation exposed to weather is protected from damage (due to sun, moisture, wind, etc.). Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.8 [ME41]3 Thermally ineffective panel surfaces of sensible heating panels have insulation >= R-3.5. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.7 [ME10]2 Ducts and plenums sealed based on static pressure and location. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.7. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.7. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.7. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.7. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.7. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.7. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Bank of America - Zionsville \\files\Active\Projects\2018\18002541.00\CAD-BIM Folders\LKPB\Design\Mechanical\BoA Carmel - 7_31_2019.cck 07/31/19Report date: 126 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C403.2.7. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.7. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.3.1, C403.3.1. 1 [ME62]1 Air economizers provided where required, meet the requirements for design capacity, control signal, ventilation controls, high-limit shut-off, integrated economizer control, and provide a means to relieve excess outside air during operation. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.3.1, C403.3.1. 1 [ME62]1 Air economizers provided where required, meet the requirements for design capacity, control signal, ventilation controls, high-limit shut-off, integrated economizer control, and provide a means to relieve excess outside air during operation. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.3.1, C403.3.1. 1 [ME62]1 Air economizers provided where required, meet the requirements for design capacity, control signal, ventilation controls, high-limit shut-off, integrated economizer control, and provide a means to relieve excess outside air during operation. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.2.2. 1 [ME53]3 Air outlets and zone terminal devices have means for air balancing. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.4.2 [ME66]2 VAV fan motors >=7.5 hp to be driven by variable speed drive, have a vane- axial fan with variable pitch blades, or have controls to limit fan motor demand. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.4.2 [ME66]2 VAV fan motors >=7.5 hp to be driven by variable speed drive, have a vane- axial fan with variable pitch blades, or have controls to limit fan motor demand. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.4.2 [ME66]2 VAV fan motors >=7.5 hp to be driven by variable speed drive, have a vane- axial fan with variable pitch blades, or have controls to limit fan motor demand. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.4.2 [ME66]2 VAV fan motors >=7.5 hp to be driven by variable speed drive, have a vane- axial fan with variable pitch blades, or have controls to limit fan motor demand. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.4.2 [ME66]2 VAV fan motors >=7.5 hp to be driven by variable speed drive, have a vane- axial fan with variable pitch blades, or have controls to limit fan motor demand. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Bank of America - Zionsville \\files\Active\Projects\2018\18002541.00\CAD-BIM Folders\LKPB\Design\Mechanical\BoA Carmel - 7_31_2019.cck 07/31/19Report date: 127 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C403.4.2 [ME66]2 VAV fan motors >=7.5 hp to be driven by variable speed drive, have a vane- axial fan with variable pitch blades, or have controls to limit fan motor demand. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.4.2 [ME66]2 VAV fan motors >=7.5 hp to be driven by variable speed drive, have a vane- axial fan with variable pitch blades, or have controls to limit fan motor demand. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.4.2 [ME66]2 VAV fan motors >=7.5 hp to be driven by variable speed drive, have a vane- axial fan with variable pitch blades, or have controls to limit fan motor demand. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.4.2 [ME66]2 VAV fan motors >=7.5 hp to be driven by variable speed drive, have a vane- axial fan with variable pitch blades, or have controls to limit fan motor demand. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.4.2 [ME66]2 VAV fan motors >=7.5 hp to be driven by variable speed drive, have a vane- axial fan with variable pitch blades, or have controls to limit fan motor demand. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.6 [ME57]1 Exhaust air energy recovery on systems meeting Table C403.2.6 Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.11 [ME71]2 Unenclosed spaces that are heated use only radiant heat. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Bank of America - Zionsville \\files\Active\Projects\2018\18002541.00\CAD-BIM Folders\LKPB\Design\Mechanical\BoA Carmel - 7_31_2019.cck 07/31/19Report date: 128 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 2 [FI38]3 Thermostatic controls have a 5 °F deadband. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 2 [FI20]3 Temperature controls have setpoint overlap restrictions. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 3 [FI39]3 Each zone equipped with setback controls using automatic time clock or programmable control system. Complies Does Not Not Observable Not Applicable Requirement will be met. 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Bank of America - Zionsville \\files\Active\Projects\2018\18002541.00\CAD-BIM Folders\LKPB\Design\Mechanical\BoA Carmel - 7_31_2019.cck 07/31/19Report date: 129 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C403.2.4. 3 [FI40]3 Automatic Controls: Setback to 55°F (heat) and 85°F (cool); 7-day clock, 2- hour occupant override, 10-hour backup Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.4. 3.3 [FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 3.3 [FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 3.3 [FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 3.3 [FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 3.3 [FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 3.3 [FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 3.3 [FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.4. 3.3 [FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.2.5. 1 [FI7]3 Furnished HVAC as-built drawings submitted within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. C303.3, C408.2.5. 3 [FI8]3 Furnished O&M manuals for HVAC systems within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.2.5. 3 [FI43]1 An air and/or hydronic system balancing report is provided for HVAC systems. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.2.3. 2 [FI10]1 HVAC control systems have been tested to ensure proper operation, calibration and adjustment of controls. Complies Does Not Not Observable Not Applicable Requirement will be met. 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Bank of America - Zionsville \\files\Active\Projects\2018\18002541.00\CAD-BIM Folders\LKPB\Design\Mechanical\BoA Carmel - 7_31_2019.cck 07/31/19Report date: 1210 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C404.3 [FI11]3 Public lavatory faucet water temperature <=110°F. Complies Does Not Not Observable Not Applicable Requirement will be met. C404.3 [FI11]3 Public lavatory faucet water temperature <=110°F. Complies Does Not Not Observable Not Applicable Requirement will be met. C404.5 [FI45]2 First 8 ft of outlet piping is insulated Complies Does Not Not Observable Not Applicable Requirement will be met. C404.5 [FI45]2 First 8 ft of outlet piping is insulated Complies Does Not Not Observable Not Applicable Requirement will be met. C403.2.2 [FI27]3 HVAC systems and equipment capacity does not exceed calculated loads. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.2.1 [FI28]1 Commissioning plan developed by registered design professional or approved agency. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.2.4 [FI29]1 Preliminary commissioning report completed and certified by registered design professional or approved agency. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.2.5. 4 [FI30]1 Final commissioning report due to building owner within 90 days of receipt of certificate of occupancy. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.2.3. 1 [FI31]1 HVAC equipment has been tested to ensure proper operation. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.2.3. 3 [FI32]1 Economizers have been tested to ensure proper operation. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Bank of America - Zionsville \\files\Active\Projects\2018\18002541.00\CAD-BIM Folders\LKPB\Design\Mechanical\BoA Carmel - 7_31_2019.cck 07/31/19Report date: 1211 ofPage Project Title: Data filename: Bank of America - Zionsville \\files\Active\Projects\2018\18002541.00\CAD-BIM Folders\LKPB\Design\Mechanical\BoA Carmel - 7_31_2019.cck 07/31/19Report date: 1212 ofPage