Mechanical Compliance Certificate
Project Title:
2012 IECC
Project Type:New Construction
Location:Zionsville, Indiana
Climate Zone:5a
Construction Site:
Zionsville, IN
Owner/Agent:Designer/Contractor:
Project Information
Energy Code:
Bank of America - Zionsville
Unspecified
Additional Efficiency Package(s)
Mechanical Systems List
Quantity System Type & Description
Heating: 1 each - Other, Gas, Capacity = 42 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each - Single Package DX Unit, Capacity = 21 kBtu/h, Air-Cooled Condenser, Air Economizer
Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER
Fan System: FAN SYSTEM 1 | Offices -- Compliance (Brake HP method) : Passes
Fans:
FAN 1 Supply, Constant Volume, 910 CFM, 1.0 motor nameplate hp, 0.4 design brake hp (0.4 max. BHP)
1 RTU-1 (Single Zone):
Heating: 1 each - Other, Gas, Capacity = 61 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each - Single Package DX Unit, Capacity = 34 kBtu/h, Air-Cooled Condenser, Air Economizer
Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER
Fan System: FAN SYSTEM 2 | BOH -- Compliance (Brake HP method) : Passes
Fans:
FAN 3 Supply, Constant Volume, 1270 CFM, 1.0 motor nameplate hp, 0.5 design brake hp (0.9 max. BHP)
FAN 4 Exhaust, Constant Volume, 350 CFM, 0.1 motor nameplate hp, 0.1 design brake hp (0.1 max. BHP)
1 RTU-2 (Single Zone):
Heating: 1 each - Other, Gas, Capacity = 50 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each - Single Package DX Unit, Capacity = 38 kBtu/h, Air-Cooled Condenser, Air Economizer
Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER
Fan System: FAN SYSTEM 3 | Central -- Compliance (Brake HP method) : Passes
Fans:
FAN 6 Supply, Constant Volume, 1505 CFM, 1.5 motor nameplate hp, 0.8 design brake hp (1.4 max. BHP)
1 RTU-3 (Single Zone):
Heating: 1 each - Other, Gas, Capacity = 20 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each - Single Package DX Unit, Capacity = 29 kBtu/h, Air-Cooled Condenser, Air Economizer
Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER
Fan System: FAN SYSTEM 4 | ATM Work Room -- Compliance (Brake HP method) : Passes
Fans:
FAN 7 Supply, Constant Volume, 1175 CFM, 1.0 motor nameplate hp, 0.5 design brake hp (0.5 max. BHP)
1 RTU-4 (Single Zone):
Project Title:
Data filename:
Bank of America - Zionsville
\\files\Active\Projects\2018\18002541.00\CAD-BIM Folders\LKPB\Design\Mechanical\BoA Carmel -
7_31_2019.cck
07/31/19Report date:
121 ofPage
Quantity System Type & Description
Heating: 1 each - Other, Gas, Capacity = 50 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each - Single Package DX Unit, Capacity = 52 kBtu/h, Air-Cooled Condenser, Air Economizer
Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER
Fan System: FAN SYSTEM 5 | Work Stations -- Compliance (Brake HP method) : Passes
Fans:
FAN 8 Supply, Constant Volume, 1835 CFM, 1.5 motor nameplate hp, 1.0 design brake hp (1.5 max. BHP)
FAN 11 Exhaust, Constant Volume, 120 CFM, 0.1 motor nameplate hp, 0.0 design brake hp (0.0 max. BHP)
1 RTU-5 (Single Zone):
Heating: 1 each - Other, Gas, Capacity = 44 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each - Single Package DX Unit, Capacity = 24 kBtu/h, Air-Cooled Condenser, Air Economizer
Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER
Fan System: FAN SYSTEM 6 | Vestibule -- Compliance (Brake HP method) : Passes
Fans:
FAN 9 Supply, Constant Volume, 910 CFM, 1.0 motor nameplate hp, 0.4 design brake hp (0.4 max. BHP)
1 RTU-6 (Single Zone):
Heating: 1 each - Other, Gas, Capacity = 50 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each - Single Package DX Unit, Capacity = 32 kBtu/h, Air-Cooled Condenser, Air Economizer
Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER
Fan System: FAN SYSTEM 7 | Offices -- Compliance (Brake HP method) : Passes
Fans:
FAN 10 Supply, Constant Volume, 1125 CFM, 1.5 motor nameplate hp, 0.7 design brake hp (1.1 max. BHP)
1 RTU-7 (Single Zone):
Heating: 1 each - Other, Gas, Capacity = 39 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each - Single Package DX Unit, Capacity = 20 kBtu/h, Air-Cooled Condenser, Air Economizer
Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER
Fan System: FAN SYSTEM 8 | Offices -- Compliance (Brake HP method) : Passes
Fans:
FAN 12 Supply, Constant Volume, 910 CFM, 1.0 motor nameplate hp, 0.4 design brake hp (0.4 max. BHP)
1 HVAC System 8 (Single Zone):
Electric Storage Water Heater, Capacity: 6 gallons
No minimum efficiency requirement applies
1 Water Heater 1:
Electric Storage Water Heater, Capacity: 6 gallons
No minimum efficiency requirement applies
1 Water Heater 2:
Project Title:
Data filename:
Bank of America - Zionsville
\\files\Active\Projects\2018\18002541.00\CAD-BIM Folders\LKPB\Design\Mechanical\BoA Carmel -
7_31_2019.cck
07/31/19Report date:
122 ofPage
08/02/2019
Inspection Checklist
Requirements: 100.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.1.1.0
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2012 IECC
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
C103.2
[PR2]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the mechanical
systems and equipment and
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C103.2
[PR3]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the service water
heating systems and equipment and
document where exceptions to the
standard are claimed. Hot water
system sized per manufacturer's
sizing guide.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C406
[PR9]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the additional energy
efficiency package options.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Bank of America - Zionsville
\\files\Active\Projects\2018\18002541.00\CAD-BIM Folders\LKPB\Design\Mechanical\BoA Carmel -
7_31_2019.cck
07/31/19Report date:
123 ofPage
Section
#
& Req.ID
Footing / Foundation Inspection Complies?Comments/Assumptions
C403.2.4.
5
[FO9]3
Freeze protection and snow/ice
melting system sensors for future
connection to controls.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Bank of America - Zionsville
\\files\Active\Projects\2018\18002541.00\CAD-BIM Folders\LKPB\Design\Mechanical\BoA Carmel -
7_31_2019.cck
07/31/19Report date:
124 ofPage
Section
#
& Req.ID
Plumbing Rough-In Inspection Complies?Comments/Assumptions
C404.3
[PL5]3
Temperature controls installed on
service water heating systems (110 F
for dwelling units and lavatories in
public restrooms and 90 F for other
occupancies.)
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C404.3
[PL5]3
Temperature controls installed on
service water heating systems (110 F
for dwelling units and lavatories in
public restrooms and 90 F for other
occupancies.)
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C404.2
[PL4]3
Heat traps installed on non-circulating
storage water tanks.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C404.2
[PL4]3
Heat traps installed on non-circulating
storage water tanks.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Bank of America - Zionsville
\\files\Active\Projects\2018\18002541.00\CAD-BIM Folders\LKPB\Design\Mechanical\BoA Carmel -
7_31_2019.cck
07/31/19Report date:
125 ofPage
Section
#
& Req.ID
Mechanical Rough-In Inspection Complies?Comments/Assumptions
C403.2.3
[ME55]2
HVAC equipment efficiency verified.Complies
Does Not
Not Observable
Not Applicable
See the Mechanical Systems list for values.
C403.2.5.
1
[ME59]1
Demand control ventilation provided
for spaces >500 sq.ft. and >25
people/1000 sq.ft. occupant density
and served by systems with air side
economizer, auto modulating outside
air damper control, or design airflow
>3,000 cfm.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.7
[ME60]2
HVAC ducts and plenums insulated.
Where ducts or plenums are installed
in or under a slab, verification may
need to occur during Foundation
Inspection.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.8.
1
[ME7]3
Piping Insulation exposed to weather
is protected from damage (due to sun,
moisture, wind, etc.).
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.8
[ME41]3
Thermally ineffective panel surfaces of
sensible heating panels have
insulation >= R-3.5.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.7
[ME10]2
Ducts and plenums sealed based on
static pressure and location.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.7.
1.3
[ME11]3
Ductwork operating >3 in. water
column requires air leakage testing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.7.
1.3
[ME11]3
Ductwork operating >3 in. water
column requires air leakage testing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.7.
1.3
[ME11]3
Ductwork operating >3 in. water
column requires air leakage testing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.7.
1.3
[ME11]3
Ductwork operating >3 in. water
column requires air leakage testing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.7.
1.3
[ME11]3
Ductwork operating >3 in. water
column requires air leakage testing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.7.
1.3
[ME11]3
Ductwork operating >3 in. water
column requires air leakage testing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Bank of America - Zionsville
\\files\Active\Projects\2018\18002541.00\CAD-BIM Folders\LKPB\Design\Mechanical\BoA Carmel -
7_31_2019.cck
07/31/19Report date:
126 ofPage
Section
#
& Req.ID
Mechanical Rough-In Inspection Complies?Comments/Assumptions
C403.2.7.
1.3
[ME11]3
Ductwork operating >3 in. water
column requires air leakage testing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.7.
1.3
[ME11]3
Ductwork operating >3 in. water
column requires air leakage testing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.3.1,
C403.3.1.
1
[ME62]1
Air economizers provided where
required, meet the requirements for
design capacity, control signal,
ventilation controls, high-limit shut-off,
integrated economizer control, and
provide a means to relieve excess
outside air during operation.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.3.1,
C403.3.1.
1
[ME62]1
Air economizers provided where
required, meet the requirements for
design capacity, control signal,
ventilation controls, high-limit shut-off,
integrated economizer control, and
provide a means to relieve excess
outside air during operation.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.3.1,
C403.3.1.
1
[ME62]1
Air economizers provided where
required, meet the requirements for
design capacity, control signal,
ventilation controls, high-limit shut-off,
integrated economizer control, and
provide a means to relieve excess
outside air during operation.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.2.
1
[ME53]3
Air outlets and zone terminal devices
have means for air balancing.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.4.2
[ME66]2
VAV fan motors >=7.5 hp to be driven
by variable speed drive, have a vane-
axial fan with variable pitch blades, or
have controls to limit fan motor
demand.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.4.2
[ME66]2
VAV fan motors >=7.5 hp to be driven
by variable speed drive, have a vane-
axial fan with variable pitch blades, or
have controls to limit fan motor
demand.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.4.2
[ME66]2
VAV fan motors >=7.5 hp to be driven
by variable speed drive, have a vane-
axial fan with variable pitch blades, or
have controls to limit fan motor
demand.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.4.2
[ME66]2
VAV fan motors >=7.5 hp to be driven
by variable speed drive, have a vane-
axial fan with variable pitch blades, or
have controls to limit fan motor
demand.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.4.2
[ME66]2
VAV fan motors >=7.5 hp to be driven
by variable speed drive, have a vane-
axial fan with variable pitch blades, or
have controls to limit fan motor
demand.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Bank of America - Zionsville
\\files\Active\Projects\2018\18002541.00\CAD-BIM Folders\LKPB\Design\Mechanical\BoA Carmel -
7_31_2019.cck
07/31/19Report date:
127 ofPage
Section
#
& Req.ID
Mechanical Rough-In Inspection Complies?Comments/Assumptions
C403.4.2
[ME66]2
VAV fan motors >=7.5 hp to be driven
by variable speed drive, have a vane-
axial fan with variable pitch blades, or
have controls to limit fan motor
demand.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.4.2
[ME66]2
VAV fan motors >=7.5 hp to be driven
by variable speed drive, have a vane-
axial fan with variable pitch blades, or
have controls to limit fan motor
demand.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.4.2
[ME66]2
VAV fan motors >=7.5 hp to be driven
by variable speed drive, have a vane-
axial fan with variable pitch blades, or
have controls to limit fan motor
demand.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.4.2
[ME66]2
VAV fan motors >=7.5 hp to be driven
by variable speed drive, have a vane-
axial fan with variable pitch blades, or
have controls to limit fan motor
demand.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.4.2
[ME66]2
VAV fan motors >=7.5 hp to be driven
by variable speed drive, have a vane-
axial fan with variable pitch blades, or
have controls to limit fan motor
demand.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.6
[ME57]1
Exhaust air energy recovery on
systems meeting Table C403.2.6
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.11
[ME71]2
Unenclosed spaces that are heated
use only radiant heat.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Bank of America - Zionsville
\\files\Active\Projects\2018\18002541.00\CAD-BIM Folders\LKPB\Design\Mechanical\BoA Carmel -
7_31_2019.cck
07/31/19Report date:
128 ofPage
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C403.2.4.
1
[FI47]3
Heating and cooling to each zone is
controlled by a thermostat control.
Minimum one humidity control device
per installed
humidification/dehumidification
system.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
1
[FI47]3
Heating and cooling to each zone is
controlled by a thermostat control.
Minimum one humidity control device
per installed
humidification/dehumidification
system.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
1
[FI47]3
Heating and cooling to each zone is
controlled by a thermostat control.
Minimum one humidity control device
per installed
humidification/dehumidification
system.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
1
[FI47]3
Heating and cooling to each zone is
controlled by a thermostat control.
Minimum one humidity control device
per installed
humidification/dehumidification
system.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
1
[FI47]3
Heating and cooling to each zone is
controlled by a thermostat control.
Minimum one humidity control device
per installed
humidification/dehumidification
system.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
1
[FI47]3
Heating and cooling to each zone is
controlled by a thermostat control.
Minimum one humidity control device
per installed
humidification/dehumidification
system.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
1
[FI47]3
Heating and cooling to each zone is
controlled by a thermostat control.
Minimum one humidity control device
per installed
humidification/dehumidification
system.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
1
[FI47]3
Heating and cooling to each zone is
controlled by a thermostat control.
Minimum one humidity control device
per installed
humidification/dehumidification
system.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
2
[FI38]3
Thermostatic controls have a 5 °F
deadband.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
2
[FI20]3
Temperature controls have setpoint
overlap restrictions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
3
[FI39]3
Each zone equipped with setback
controls using automatic time clock or
programmable control system.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Bank of America - Zionsville
\\files\Active\Projects\2018\18002541.00\CAD-BIM Folders\LKPB\Design\Mechanical\BoA Carmel -
7_31_2019.cck
07/31/19Report date:
129 ofPage
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C403.2.4.
3
[FI40]3
Automatic Controls: Setback to 55°F
(heat) and 85°F (cool); 7-day clock, 2-
hour occupant override, 10-hour
backup
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.4.
3.3
[FI41]3
Systems include optimum start
controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
3.3
[FI41]3
Systems include optimum start
controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
3.3
[FI41]3
Systems include optimum start
controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
3.3
[FI41]3
Systems include optimum start
controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
3.3
[FI41]3
Systems include optimum start
controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
3.3
[FI41]3
Systems include optimum start
controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
3.3
[FI41]3
Systems include optimum start
controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
3.3
[FI41]3
Systems include optimum start
controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.5.
1
[FI7]3
Furnished HVAC as-built drawings
submitted within 90 days of system
acceptance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C303.3,
C408.2.5.
3
[FI8]3
Furnished O&M manuals for HVAC
systems within 90 days of system
acceptance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.5.
3
[FI43]1
An air and/or hydronic system
balancing report is provided for HVAC
systems.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.3.
2
[FI10]1
HVAC control systems have been
tested to ensure proper operation,
calibration and adjustment of controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Bank of America - Zionsville
\\files\Active\Projects\2018\18002541.00\CAD-BIM Folders\LKPB\Design\Mechanical\BoA Carmel -
7_31_2019.cck
07/31/19Report date:
1210 ofPage
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C404.3
[FI11]3
Public lavatory faucet water
temperature <=110°F.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C404.3
[FI11]3
Public lavatory faucet water
temperature <=110°F.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C404.5
[FI45]2
First 8 ft of outlet piping is insulated Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C404.5
[FI45]2
First 8 ft of outlet piping is insulated Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.2
[FI27]3
HVAC systems and equipment
capacity does not exceed calculated
loads.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.1
[FI28]1
Commissioning plan developed by
registered design professional or
approved agency.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.4
[FI29]1
Preliminary commissioning report
completed and certified by registered
design professional or approved
agency.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.5.
4
[FI30]1
Final commissioning report due to
building owner within 90 days of
receipt of certificate of occupancy.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.3.
1
[FI31]1
HVAC equipment has been tested to
ensure proper operation.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.3.
3
[FI32]1
Economizers have been tested to
ensure proper operation.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Bank of America - Zionsville
\\files\Active\Projects\2018\18002541.00\CAD-BIM Folders\LKPB\Design\Mechanical\BoA Carmel -
7_31_2019.cck
07/31/19Report date:
1211 ofPage
Project Title:
Data filename:
Bank of America - Zionsville
\\files\Active\Projects\2018\18002541.00\CAD-BIM Folders\LKPB\Design\Mechanical\BoA Carmel -
7_31_2019.cck
07/31/19Report date:
1212 ofPage