Loading...
HomeMy WebLinkAboutM004.0Sht'g Ledger By Bldr. 24" HVAC Tray HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26HTU26LUS24LUS24BackNailJackConnections 2x4 Ledger By Builder 2x4 Ledger By Builder MUS262x4 Ledger By Bldr.2-TBE42-TBE4 Hardware List 5-LUS24 1-MUS26 19 - HTU26 4-TBE4 110 - H2.5A LUS24 LUS24 LUS24 To Hanger Face Girder GirderSetbackSht'g Ldgr By Bldr. 2x4 Ledger B.O.L. 9' 1 1/8" 12 8 Truss T06 2x4 Ledger B.O.L. 8' 5 7/8"9'11/8"Wall Scale: 1/4" = 1' 0" Detail 'A'2x4Ldgr.ByBldr. 2x4Ldgr.ByBldr. HG01 HG02 HG03 TG02JG01 TG03 GE01T01T01T01AT01BT01BT01CGE01AGE02 GE03 T03 T03 J01J01J02 JG02CG01J06 J05 J04 J03T04TG04JG03 JG03 CG0 2CG03J08 J09J10 J11 GE05GE05AT06 JG04 CG04J12 J13J14V01 V02 V03 V04 V05 V06 V07 V08 V09 V10 V11 V12V13T02A(3)T02(3)J07(5)T01D(7) T05(5)T05A(8) 28-00-00 7-10-00 5-05-00 10-07-00 12-00-00 7-10-0022-07-00 35-10-00 6-00-00 20-08-00 28-00-00 5-00-005-00-00 8-02-00 35-02-00 11-04-002-00-00 24-00-00 2-00-002-00-00 2-04-00 1-10-08 8-00-00 5-125-122-03-0412-00-004-00-00 2-03-04 3-08-122-00-00 2-01-04 2-00-00 3-08-12 2-00-00 10-00-001-10-08 2-00-00 10-00-00 1-00-081-03-122-00-00 2-01-042-01-124-00-00 2-00-04 10-05-08 2-00-00 6-00-00 2-00-00 2-00-00 2-00-00 2-00-00 6-11-001-00-082-00-002-00-001-10-08 5-04-08 7-04 10-00 10-04-00 17-08-00 Customer: Location: Model: Designer: Job #: Date: Scale:Design Information: 9028 Old SR 67 South Mooresville, IN 46158 (317) 834-5380 IRC 2018 TPI 2014 20TLL-10TDL-10BDL PYATT BUILDERS Lot 51 The Grove at Legacy Al-Naili - V2 TL B19903544 December 13, 2019 1/4" = 1' 0"Mike Eder Salesperson: Sheet Of: 1) This layout is intended for the purpose of truss location and placement only. Refer to the building plans for actual building construction. 2) All dimensions shown 00-00-00 are in feet-inches-sixteenths. 3) Trusses are spaced 24" on center unless otherwise noted. 4) Do not cut or modify trusses. 5) Refer to the individual truss design drawings for the location of member bracing, uplift and truss end reactions. 6) Installation of all temporary and permanent bracing is essential. See truss drawings, BCSI-B2 Summary Sheet and building designer requirements. 12/27/19 David Rutti