Loading...
HomeMy WebLinkAboutBasement Floor PlanFloor Plan (Permit #19120103) Light $ Light Switch Scale: =6"x6" Electric Outlet Existng Crawl Space (Conditioned) Existng Crawl Space (Conditioned) New Wall B Batt insulation in 2x4 framing and drywall Furnace Furnace Exteriror of House sump Return pump $ *wall light *Existing Smoke & CO detector (Battery) New Door to mechanical room *wall light New Wall A (run along floor joist) Batt insulation in 2x4 framing and drywall New Wall C 2" Foam Board Insulation behind 2x4 framing & drywall Water Heater Fire Blocking at top with 2x4s Water Softener $ $ Existing Wall D Batt Insulation in 2x4 framing, will add drywall to unfinished side Existing Door to finished basement Finished Basement with smoke detectors Finished Basement Notes with smoke detectors 1. Room to be used as gym. 2. Ceiling to be drop ceiling 2x2 tiles with 6 recessed lights at 7'6". Current room has 2 lights. 3. Wall D just needs drywall on unfinished side. 12/31/19 Mike Sheeks