HomeMy WebLinkAboutBasement Floor PlanFloor Plan (Permit #19120103) Light
$ Light Switch
Scale: =6"x6" Electric Outlet
Existng Crawl Space (Conditioned) Existng Crawl Space (Conditioned)
New Wall B
Batt insulation in 2x4 framing and drywall
Furnace Furnace Exteriror of House
sump Return
pump
$ *wall light
*Existing Smoke & CO detector (Battery)
New Door to mechanical room *wall light
New Wall A (run along floor joist)
Batt insulation in 2x4 framing and drywall
New Wall C
2" Foam Board Insulation
behind 2x4 framing & drywall
Water Heater Fire Blocking at top with 2x4s
Water Softener
$ $ Existing Wall D
Batt Insulation in 2x4 framing, will add drywall to unfinished side
Existing Door to finished basement
Finished Basement
with smoke detectors Finished Basement
Notes with smoke detectors
1. Room to be used as gym.
2. Ceiling to be drop ceiling 2x2 tiles with 6 recessed lights at 7'6". Current room has 2 lights.
3. Wall D just needs drywall on unfinished side.
12/31/19
Mike Sheeks