HomeMy WebLinkAboutS102 - 15GODNHB
UP HBID1 1
ID12
PANTRY
MASTER
BATH
MASTER
BEDROOM
GREAT
ROOM
FLEX ROOM
W.I.C.
BEDROOM #2
D.W.
36" COOKTOP
OVENS9'-1 1/8" CLG.10'-1 1/8" CLG.LINE OF 9'-7 1/8" CEILING
9'-1 1/8" CLG.
17'-10" x 17'-0"
18'-4" x 12'-0"
14'-2" x 10'-0"
8'-3" x 4'-1"
21'-0" x 24'-4"
15'-4" x 12'-1"/14'-1"
13'-4" x 13'-0"
LINE OF 9'-7 1/8" CEILING
2 CAR
GARAGE
1 CAR
GARAGE
13'-8" x 21'-4"OPENBELOW18" H. SEAT
WALL42" VANITY 42" VANITYDINING
W.I.C.
LAUNDRY
8'-5" x 9'-8"
W
D
RETURN AIR CHASE
PWDR.
FOYER
KITCHEN
FAMILY
ENTRY 9'-1 1/8" CLG.
13'-4" x 18'-0"
9'-9" x 8'-6"
PORCH
6'-0" x 14'-6"
COVERED
LANAI
BULKHEAD @9'-1 1/8"
BATH #2
10'-1 1/8" CLG.
9'-1 1/8" CLG.
BUTLER'S
PANTRY
5060 FX 3060DH
3020FX3020FX 2860DH 2020FX 3/0-8/0
2/8
2/8 2/82/42-2/0
2/8 2/6
2/6 CO 2860DH 2/6ISPD29802/6
2/4 3020FX2/4
2/6 PKT
9'-0" X 7'-0" 16'-0" x 7'-0"3060DH5060 FX 2/6 CO2/6
21"D BASE CABINETS WITH (1)
FIXED SHELF ABOVE AND TV
SPACE
21"D BASE CABINETS WITH (3)
FIXED SHELVES ABOVE
3060DH
3060DH3060DH 3060DH
2/62-2/6REFR.
18R 17T @ 10" R.C.
16R 15T @ 10" R.C.
2/6
2/6 CO
9'-1 1/8" H
BULKHEAD
3060DH 244DH2850WALL LOCATION ABOVE
2860DH2860DH 2860DH
CN14 (1/9-4/0)2020FX CN14 (1/9-4/0)CN14 (1/9-4/0)
BOARD AND BATTEN
SIDING
LAP SIDING
w/BRICK
WAINSCOT
2/8
SOAP DISH
NICHE
42" D.V.F.P.
42" W.B.F.P.
2860DH 2860DH 2860DH
WOOD RAILING NEXT TO WELLS
GAS GRILL STUB-OUTS
6' - 1 1/2"5' - 11"BASE CABINETS
w/FLOATING
SHELVES ABOVE CUSTOMER:
PROJECT NAME:LOCATION:DRAWING TITLE: DRAWN BY:Wedgewood
Building Co., LLC
317.669.6300
32 First Street NE
Carmel, IN 46032
www.wedgewoodbc.com
Copyright c 2019 Wedgewood Building Co. LLC. 1/2/2020
9:45:31 AM
A10
Spec Residence
Lot 15 Gray Oaks - Spec
4760 Gray Oaks Drive, Carmel, IN 46033MAIN LEVEL INTERIOR FINISH SBS 1/4" = 1'-0"1 1ST FLOOR INTERIOR FINISH PLAN Rev.No. Date DescriptionFINISH PLAN NOTES:
1. REFER TO COVER PAGE FOR SPANISH TRANSLATIONS = REFERIRSE A LA PORTADA DE LAS TRADUCCIONES AL ESPAÑOL.
By Andrew Lund at 9:46 am, Jan 02, 2020
01/13/20
David Rutti