We have reviewed the construcfion plans submitted to the Hamilton County Surveyor's Office on January
22, 2020, for this project and have the following comments:
1. The proposed project DOES NOT fall in a Carmel wellhead protection zone.
2. The proposed project falls in the Little Eagle Creek Regulated Drain Watershed.
3. Please provide the following procedural items necessary for the construction of a new County
Regulated drainage system: Petition for regulated drain subdivision, Subdivision outlet
connection permit, Subdivision Nonenforcement Request, engineer's estimate and all associated
bonds for 120% of construction cost.
4. Any private tile drains discovered during construction will need to be tied into the regulated drain
system.
5. Please provide the secondary plat when it becomes available.
6. Please provide any updated construction plans once all TAC comments have been addressed.
7. Please note, additional comments may be warranted at a later date.
Should you have any questions, I can be reached at Samuel.dark@hamiltoncounty.in.gov
Sincerely,
Sam Clark
Plan Reviewer
SURVEY OR'S 0pX,
.7Centon C. `Ward, C"FM
Surveyor of Namilton County
(Phone (317) 776-495
`Fax (317) 776-9629
7/14/2020
HWC Engineering
135 N Pennsylvania Street
Indianapolis, IN 46204
RE: Troy Estates
C'.
Suite r88
One,7famitton County Square
Noblesvitte, Indiana 46o6o-2230
We have reviewed the construction plans submitted to the Hamilton County Surveyor's Office on July 14,
2020 for this project and have the following comments:
1. Procedural items are still needed for the construction of a new County Regulated drainage
system: Petition for regulated drain subdivision, subdivision outlet connection permit, subdivision
nonenforcement request, engineer's estimate and all associated bonds for 120% of construction
cost.
2. Any private tile drains discovered during construction will need to be tied into the regulated drain
system.
3. A historic corner marker is located on this property and will need to be brought up to current
grade level. For guidance on how to do this, you may contact Brian Rayl at 317-776-8495 or
survey orfhamiltoncoun .in.wv-
4. Several Common Areas are designated as Landscaping Easements as well as Drainage Easements
while having stormwater infrastructure running through them. No Common Areas with
stormwater infrastructure can be designated as a variable landscaping easement as well as
drainage easement. Please revise development plans and secondary plat accordingly.
5. Several common areas show trees being planted within 15 feet of the centerline of a stormwater
drain. Please revise the landscaping plan to where no shade or evergreen tree is located within 15
feet of the centerline of a drain that is to be regulated.
Should you have any questions, I can be reached at sainuel.clari<(d,,hamiltoncounty-in.eov
Sincerely,
/ c��
Sam Clark; Plan Reviewer
CITY OF CARMEL
STORMWATER POLLUTION PREVENTION PLAN (SWPPP) REQUIREMENTS
SWPPP for Construction Sites:
1. 14 Digit Watershed Hydrologic Unit Code
2. Name of all receiving waters
If the discharge is to a municipal separate storm sewer, identify the ultimate receiving water
3. Estimate of peak discharge for post construction conditions (10-year)
4. Locations of specific points where stormwater discharge will leave the site.
5. Locations where stormwater may be directly discharged into groundwater, such as abandoned
wells or sinkholes
6. Soils map of the predominant soil types including:
a. Soil legend with descriptions of each soil type
b. Brief description of how the site has accommodated the existing soil limitations
7. Description of potential pollutant sources associated with the construction activities
8. Temporary and permanent stormwater quality measures:
a. Location
b. Dimensions
c. Detailed specifications
d. Construction details
e. Monitoring and maintenance guidelines
9. General construction sequence
Each plan should contain multiple stormwater pollution prevention measures. All measures will not be
installed at the same time. Various measures will be installed at different times throughout the
construction process. Some will be installed prior to land disturbance, and others may not be installed
until work at the site progresses to an area where they are necessary. Each proposed measure should be
identified in the sequence as to when it is to be installed in relation to the land disturbing activities.
10. Location of proposed soil stockpiles, borrow, and/or disposal areas
These areas shall be included as part of the plans whether they occur on or off site.
11. Temporary and Permanent surface stabilization methods appropriate for each season
Provide application rates for soil amendments and seed mixtures, as well as, the type and application rate
for mulch.
12. Erosion and sediment control specifications for individual building lots
13. Material handling, storage, and spill prevention plan
a. List of expected materials that may be present on the site during construction operations
b. Written description of how these materials will be handled to minimize the potential of entering
the storm sewer system
c. Procedures for the contractor to take if any spills occur during construction.
14. Contact information for the trained individual responsible for stormwater pollution prevention for
the project site
a. Name
b. Address
c. Telephone number
d. E-mail address
e. List of qualifications
15. Current revision date on all sheets
Revised 3/5/07
CITY OF CARMEL
STORMWATER POLLUTION PREVENTION PLAN (SWPPP) REQUIREMENTS
SWPPP for Post-Construction:
1. Description of potential pollutant sources associated with the proposed land use.
2. Post-construction stormwater quality measures:
a. Location
b. Dimensions
c. Sizing calculations
d. Detailed specifications
e. Construction details
3. Sequence describing stormwater quality measure implementation
Description of when the proposed post construction stormwater quality measures will be installed in
relation to the general construction sequence.
4. Stormwater quality measures to be implemented to prevent or minimize adverse impacts to stream
and riparian habitats
5. An operation and maintenance manual for all post-construction stormwater quality measures:
a. A brief description of what a water quality BMP is and does.
b. Contact information for the BMP owner
i. Name
ii. Address
iii. Telephone number
iv. E-mail address
c. A statement that the BMP owner is responsible for all maintenance and costs associated with the
BMPs
d. A right-of-entry statement allowing the City of Carmel to inspect and maintain the BMP as
necessary
e. A description of each BMP
f. Specific actions to be taken regarding routine maintenance, remedial maintenance, and
sediment/pollutant removal:
i. Sediment/pollutant removal procedures should be explained in both narrative and
graphical forms.
ii. Guidance on routine maintenance, such as mowing, litter removal, woody growth
removal, etc.
iii. Guidance on remedial maintenance, such as inlet replacement, outlet work, etc.
iv. A tabular schedule should be provided listing all maintenance activities and dates for
performing the these required activities
v. Who will actually be charged with maintaining the BMPs (maintenance staff, waste
disposal company, etc.)
g. Site drawings showing:
i. Locations of the BMPs
ii. Locations of the access easements to maintain the BMPs
iii. Locations of the points of discharge for stormwater treated by the BMPs
iv. Cross sections of BMP features
h. Requirements regarding the submittal of annual inspection reports to the City of Carmel
Engineering Department. The first report is due one year after construction is completed, with
subsequent reports due each year within the same month of the initial report. If there are any
deficiencies found during the inspection, these should be addressed. If the inspection report is
not received within the month it is due, if there are deficiencies which were not included in the
report, or if any deficiencies included in the report are not addressed in a timely manner, the
BMP owner faces enforcement action from the City.
Revised 3/5/07
From:Kyle Eichhorn
To:Warner, Caleb
Cc:Stu Huckelberry
Subject:BPW - Troy Estates
Date:Tuesday, July 7, 2020 12:39:00 PM
Attachments:Troy Estates BPW Exhibit.pdf
Caleb,
I have attached an exhibit for Troy Estates. We are requesting:
1) Open cut installation of water main, storm sewer and sanitary sewer with lane closure.
2) Mill, overlay and widen 141st Street along frontage.
3) Construction of Accel/Decel lanes
Let me know if you have any questions or need additional information.
Thanks,
Kyle Eichhorn, PE, PS
Project Manager
HWC Engineering
135 N. Pennsylvania Street, Suite 2800
Indianapolis, IN 46204
(o) 317.981.1249
(o) 317.385.1334
www.hwcengineering.com
The information contained in this communication is confidential, private, proprietary, orotherwise privileged and is intended only for the use of the addressee. Unauthorized use,disclosure, distribution or copying is strictly prohibited and may be unlawful. If you have
received this communication in error, please notify the sender immediately at 317-347-3663.
141st STREETKODIAK DRIVE
KODIAK DRIVEKODIAK DRIVEHELEN DRIVE
KODIAK DRIVEWILMUTH DR0'(IN FEET)GRAPHIC SCALE150'INDIANAPOLIS - TERRE HAUTELAFAYETTE - MUNCIE - NEW ALBANYwww.hwcengineering.comTROY ESTATESCARMEL, INDIANA141ST STREET IMPROVEMENTSSIDEWALKCLOSURENEW 8" SANITARY SEWEROPEN CUTOPEN CUT STORM/SANITARY/WATERACCEL/DECEL & MILL/OVERLAYMILL, OVERLAY & WIDENPER CONSTRUCTION PLANSACCEL. LANEDECEL. LANESIDEWALKCLOSURENEW 18" RCPSTORM SEWEROPEN CUTNEW 8"WATER MAINOPEN CUTNEW 15" RCPSTORM SEWEROPEN CUT
►���Q:,HWC
LETTER OF TRANSMITTAL
iY
AUG 1 8
Confidence in the built environment.
135 N. Pennsylvania, Suite 2800
Indianapolis, Indiana 46204
www.hwcengineering.com
TO:
City of Carmel - Planning Dept.
DATE:
August 18, 2021
One Civic Sq., 31d Floor
RE:
Windward at Legacy &
Carmel, IN 46032
Troy Estates
HWC#:
2019-287-A &
2019-305-S
ATTN:
Planning Dept.
FROM:
Kyle Eichhorn
WE ARE SENDING YOU:
COPIES
DATE
NO.
DESCRIPTION
3
Windward Secondary Plat - paper - 18x24
_
3
Windward Secondary Plat - m lar - 18x�
3
Troy Estates Secondary Plat - paper - 18x24
3
Troy Estates Secondary Plat - mylar - 18x24
-
P--
I
I ___j
REMARKS:
Plats for signatures.