HomeMy WebLinkAboutC3.0 - SWPPP Planool�'
I
i
i
�J� CONCRETE WASHOUT (ROLLOFF
ADJOINERS EXISTING
PROVIDED BY REPUBLIC OR EQUAL
BUILDING tNOI POSTING & PORT-O-LET LOCATIO
�____-----885
77E ,-884 = 884 885.E
-885- - - -
_--884
883--
882
- - 881
MAA.
I UU- TLAK
ELEV.
= 883.53
(1.5"
ORIFICE)
MAX.
100-YEAR
ELEV.
= 882.22
(6" ORIFICE)
EXISTING DRY
DETENTION C
POND
BOTTOM ELEV. = 880.0
1 (17. MAIN TRANI'�\/FRV �I nPF
_ -881 /
882 = -883
,------884--
884-
BMpT ESMT_-_--- I
I c,
00
ISTING CONCRETE EMERGENCY I I
ERFLOW WEIR (ELEV. = 883.54) & I
ERTOPPING ELEV. = 883.99 ' I 1 ;
I I
TREE
I
RESERVATION
ARGA I I
Br CrA _
4Br
CrA CrA � CrA
�
Br
CrA
BCrA
SOILS MAP 0
SCALE: 1 " = 200' NORTH
CONTRACTOR NOTE
NO EARTH DISTURBING ACTIVITY MAY COMMENCE
WITHOUT AN APPROVED STORM WATER
MANAGEMENT PERMIT.
SOILS DESCRIPTIONS & LIMITATIONS
1. Crosby Silt Loam (CrA - 84% Site) The Crosby series consists of very deep, somewhat poorly
drained soils that are moderately deep to dense till on till plains. These soils formed in loamy till
that can be capped with up to 22 inches of loess or silty material. Permeability is moderate or
moderately slow in and above the argillic horizon and slow or very slow below the argillic horizon.
Slope ranges from 0 to 6 percent. Subject soil does not present any foreseeable limitations to the
proposed development.
2. Brookston Silty Clay Loam (Br - 16% Site) The Brookston series consists of very deep, poorly
drained soils formed in up to 20 inches of silty material and the underlying loamy till in
depressions on till plains and moraines. Permeability is moderate in the subsoil and moderately slow
in the underlying material. Slope ranges from 0 to 3 percent. Subject soil does not present any
foreseeable limitations to the proposed development.
**IF CONSTRUCTION IS TAKING PLACE DURING WET SEASONS, SOILS MAY REQUIRE LIME STABILIZATION.
STORM SEWER INLET NOTE
ALL STORM WATER INLETS & CATCH BASIN
CASTINGS SHALL BE LABELLED WITH
ENVIRONMENTAL MESSAGING "NO DUMPING,
DRAINS TO STREAM" CAST IN RAISED OR RECESSED
LETTERS AT A MIN. 1-INCH HEIGHT. A SYMBOL OF A
FISH SHALL ALSO BE CAST WITH THE LETTERS
GENERAL NOTES
1. CONTRACTOR TO SCHEDULE A PRE -CONSTRUCTION MEETING WITH
THE CITY OF CARMEL STORM WATER ENGINEERING (DAN GRESKAMP).
PRIOR TO COMMENCING WITH CONSTRUCTION. 317-571-2441
2.
3.
4
5.
TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO
CONFORM TO APPLICABLE LOCAL AND STATE STANDARDS.
ALL CONSTRUCTION ACTIVITY ON THIS SITE TO BE PERFORMED IN
COMPLIANCE WITH APPLICABLE O.S.H.A. STANDARDS FOR WORKER
SAFETY.
IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY
ALL UTILITY LOCATIONS BEFORE CONSTRUCTION BEGINS.
IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY
ALL EXISTING ELEVATIONS BEFORE CONSTRUCTION BEGINS.
STORM SEWER SYSTEM NOTE
ALL ON -SITE STORM SEWER INFRASTRUCTURE
TO BE CONSTRUCTED WITH THIS PROJECT SHALL
BE PRIVATELY OWNED AND MAINTAINED.
�, INSTALL SILT FENCE AROUND
�g/--PERIMETER OF CONSTRUCTION
FLOOD NOTE
THIS LOT LIES ENTIRELY IN FLOOD HAZARD ZONE "X" AS SCALED
FROM THE FLOOD INSURANCE RATE MAP (FIRM) FOR HAMILTON
COUNTY, INDIANA, COMMUNITY NAME CITY OF CARMEL,
COMMUNITY NUMBER 180081, MAP NUMBER 18057CO225 G,
PANEL NUMBER 0209 G, DATED NOVEMBER 19, 2014.
REFERENCE NFIP FIRM MAP #. 18057CO225 G
EFFECTIVE DATE: NOVEMBER 19, 2014
GENERAL NOTES
CONTRACTOR TO KEEP EXISTING PAVEMENT SURROUNDING
THE SITE "BROOM CLEAN" AND FREE OF SOIL OR AGGREGATE
THAT MIGHT BE BROUGHT OFF -SITE.
DEPENDING ON THE CONSTRUCTION SEASON, MOISTURE
CONTENT AND PROPERTIES OF THE SOILS ON SITE, CHEMICAL
MODIFICATIONS AND/OR LIME STABILIZATION MAY BE
REQUIRED. SEE SHEET C11.0 FOR SPECIFICATIONS.
CONTRACTOR SHALL SUBMIT PRECAST STORM SEWER
STRUCTURE SHOP DRAWINGS TO ENGINEER FOR
REVIEW/APPROVAL PRIOR TO MANUFACTURING.
EROSION CONTROL NOTES
1. EROSION CONTROL PLAN MUST BE EXECUTED BEFORE
COMMENCING WITH CONSTRUCTION.
2. ALL EROSION CONTROL MATERIAL NEEDS TO BE APPROVED
BY THE CITY INSPECTORS PRIOR TO INSTALLATION.
FERTILIZER NOTE
E
PHOSPHOROUS CONTAINING
-12-12) UNLESS SOIL TESTS
HOSPHOROUS DEFICIENCY.
NORTH
EROSION
CONTROL CONTACT:
HEARTLAND OIL MICHIGAN ROAD, LLC
3802 WEST 96th STREET, SUITE 110
INDIANAPOLIS, IN 46240
ATTN: GAVIN HART
(317) 559-4371
20 0 10 20 PLAN NOTES:
CONTRACTOR TO REMOVE ALL
- SEDIMENT AND DEBRIS FROM BMP
( IN FEET) O USING VAC -TRUCK AFTER ALL SITE
CONSTRUCTION AND LANDSCAPING IS
1 inch = 20 ft. COMPLETE
LEGEND:
PROPERTY BOUNDARY
RIGHT-OF-WAY
- - - - - - - - EASEMENT
LIMITS OF DISTURBANCE
(CONSTRUCTION LIMITS)
EXISTING/PROPOSED CONCRETE
® PROPOSED STORM STRUCTURE
- - - - - - - - - - - ROOF DRAIN
EXISTING STORM SEWER
s` 799.23 TOP OF CURB GRADE
1798.73 PAVEMENT GRADE
PAVEMENT OR EARTH GRADE
M.E. MATCH EXISTING GRADE
EX. EXISTING GRADE
- -847- - EXISTING CONTOUR
3 PROPOSED SILT FENCE -Typical in all areas
where sediment could leave the site.
SEE DETAIL 06/C4.1
SS (8"0 Standard Duty "SILT SOCK" or approved equal)
. PROPOSED SILT SOCK -Typical in all paved
areas where sediment could leave the site.
\ PS PERMANENT SEEDING WITH STRAW MULCH OR NURSERY
SOD - TYPICAL AFTER FINAL GRADING IS COMPLETED.
Inlet Protection - "Flexstorm" inlet protection typical for all
paved area inlets AFTER pavement is installed; Silt Fence cage
& "Flexstorm" inlet protection BEFORE pavement is installed.
Point where stormwater will leave the site.
NOTE: INSTALL TEMPORARY SEEDING AFTER A SPECIFIC STAGE OF CONSTRUCTION
HAS BEEN COMPLETED (TEMPORARY OR FINAL) WHERE AREAS WILL BE IDLE OF
CONSTRUCTION ACTIVITIES FOR A PERIOD OF 15 DAYS OR MORE.
\
\ GRADING NOTES
\ 1. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO CURRENT
STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY
\ OR LOCAL REQUIREMENTS, WHICHEVER HAS JURISDICTION.
\ 2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO
\ STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
\ ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS
\ ENO TH IMACTUAL MEDIATELY. FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE
\ 3. THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN
EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT.
\ VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTORS AND/OR UTILITY
\ COMPANIES SO AS NOT TO CAUSE DAMAGE.
\ \ 4. THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE
�\ \ CONSTRUCTION IS TO START, TO VERIFY IF ANY UTILITIES ARE PRESENT ON
\ SITE. ALL VERIFICATIONS (LOCATION, SIZE AND DEPTH) SHALL BE MADE BY THE
\ APPROPRIATE UTILITY COMPANIES. WHEN EXCAVATING IS AROUND OR OVER
_ \ \ EXISTING UTILITIES, THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY
\� \� EROSION CONTROL NOTES
SEEDING NOTE
LI(DLEOF
PORARY SEEDING AFTER A SPECIFIC
ONSTRUCTION HAS BEEN COMPLETED
OR FINAL) WHERE AREAS WILL BE
NSTRUCTION ACTIVITIES FOR A PERIOD
OR MORE.
MULCHING NOTE
WHERE REQUIRED. CRIMPED/ANCHORED MULCH OR
MULCH WITH A TACKING AGENT SHALL BE USED. THE
APPLICATION RATE SHOULD MEET GUIDELINES PER
PRACTICE 3.15 OF THE INDIANA HANDBOOK FOR
EROSION CONTROL IN DEVELOPING AREAS.
DEVELOPMENT SUMMARY
ETOTAL SITE AREA = 3.56 ACRES
TOTAL DISTURBED AREA = 0.19 ACRES +/-
ADDITIONAL EROSION CONTROL
MEASURES MAY BE REQUIRED IN THE
FIELD BY THE INSPECTOR
THERE SHALL BE NO DIRT, DEBRIS, OR
STORAGE OF MATERIAL IN THE STREET
\ \ 1. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO CURRENT
\ STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY OR
LOCAL REQUIREMENTS, WHICHEVER HAS JURISDICTION.
2. LAND ALTERATION WHICH STRIPS THE LAND OF VEGETATION, INCLUDING
REGRADING, SHALL BE DONE IN A WAY THAT WILL MINIMIZE EROSION.
3. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE CONTRACTOR
t\ SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT
FROM LEAVING THE SITE. ADDITIONAL EROSION AND SEDIMENT CONTROL
MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ON -SITE INSPECTION.
4. SEDIMENT LADEN WATER SHALL BE DETAINED BY EROSION CONTROL
PRACTICES AS NEEDED TO MINIMIZE SEDIMENTATION IN THE RECEIVING
STREAM. NO STORM WATER SHALL BE DISCHARGED FROM THE SITE IN A
MANNER THAT CAUSES EROSION AT THE POINT OF DISCHARGE.
5. WASTES AND UNUSED BUILDING MATERIALS SHALL NOT BE ALLOWED TO BE
CARRIED FROM THE SITE BY STORMWATER RUNOFF. PROPER DISPOSAL OF
ALL WASTES AND UNUSED BUILDING MATERIALS IS REQUIRED.
6. SEDIMENT BEING TRACED ONTO PUBLIC OR PRIVATE ROADWAYS SHALL BE
MINIMIZED. CLEARING OF ACCUMULATED SEDIMENT SHALL NOT INCLUDE
FLUSHING WITH WATER. CLEARED SEDIMENT SHALL BE RETURNED TO THE
SITE FOR DISPOSAL.
7. SOIL WHICH HAS ACCUMULATED NEXT TO EROSION CONTROL DEVICES SHALL
BE COLLECTED AND REDISTRIBUTED ON SITE AFTER EACH RAINFALL EVENT,
AND AT LEAST ONCE A WEEK.
8. IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY
WEATHER OR NIGHTFALL, THE PIPE ENDS SHALL BE COVERED WITH FILTER
FABRIC.
9. ALL EXISTING STRUCTURES, FENCING, TREES AND ETC., WITHIN CONSTRUCTION
AREA SHALL BE REMOVED AND DISPOSED OF OFF SITE. BURNING IS NOT
ALLOWED ON -SITE.
10. SCHEDULE OF EARTHWORK ACTIVITIES:
a) THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE
KEPT TO A PRACTICAL MINIMUM. THE AREA SHALL BE STABILIZED
SOON AS POSSIBLE. TEMPORARY VEGETATION OR MULCHING SHALL
BE USED TO PROTECT EXPOSED AREAS IF PERMANENT VEGETATION
CANNOT BE SEEDED WITHIN 14 DAYS OR ACTIVITY CEASES FOR MORE
THAN 21 DAYS OR AS DIRECTED BY THE ENGINEER.
b) TOPSOIL REPLACEMENT SHALL TAKE PLACE FROM MARCH 1 TO
OCTOBER 31. STOCKPILE TOPSOIL AT ALL OTHER TIME OF THE YEAR.
PERMANENT AND FINAL VEGETATION AND STRUCTURAL EROSION
CONTROL DEVICES SHALL BE INSTALLED WITHIN SEVEN (7) DAYS AFTER
FINAL GRADING OR AS SOON AS POSSIBLE.
U _ Z
a
..0 O
r1 0 t�
o -Z N
I�
CY)
I
�A � . c� o
U� Z�
Waft N I`7
Q0 i-1 Q, f`r) X
(0 �
O T✓� Cd 0 >
0 (D
Cd 0
�--�ftft 00
00
♦`��G P � G L EIS ,���
•oo 00o S�,i
44/�" o��G\STER�oa• �� =
o NO •s ►
s PE10403858 e =
STATE OF
00 o
X,/ P
. �Lp I • `� .
"O•000Po,o•° G\
DATE: 01 /07/2020
O
N
W
�-+
��D
c
Q o W
r
08
Q�� a
N
� W
�U) N
00
O
O
tr
nO
V1
PROJECT NUMBER
HHR.002
DRAWING NUMBER
C&O
SHEET 6 OF 12
DWN BY:
KPB
CHKD. BY:
EAG
SCALE:
1 to = 20'
DATE:
12 11 19