HomeMy WebLinkAboutSephora-Clay Terrace- Water Plumbing Response Letter REV1
Structural Mechanical Electrical Technology
750 Brooksedge Boulevard, Westerville, Ohio 43081 614-839-4639 614-839-2222 Fax www.mengineering.us.com
January 8, 2020
Plan Review
RE: Sephora-Clay Terrace-City of Carmel: Water Correction/Redlines
Attn: Steve Cook– Plumbing Reviewer
Mr. Cook,
This letter is in response to the plan review comments sent to this office concerning the above project.
Below is an outlined response to the concerns.
Plumbing Comments:
1. Attached is the Property Building Domestic Water Test for the Sephora space at this
current location. The property building is D1. Please reference page 7 of 13 of the attached
for the approved test.
Please contact this office with any additional questions or comments.
Sincerely,
Eric L. Burwell
Sr. Mechanical Designer
eburwell@mengineering.us.com
01-08-2
0
2
0