HomeMy WebLinkAboutC1.2 Pre Construction SWPPPBELLEVUE
CARMEL, INC1.2REVISIONSPRE-CONSTRUCTION STORMWATERPOLLUTION PREVENTION ANDDEMOLITION PLANPRE-CONSTRUCTION STORMWATER POLLUTION
PREVENTION AND DEMOLITION PLAN INDIANAPOLIS - TERRE HAUTEMUNCIE - LAFAYETTE - NEW ALBANYwww.hwcengineering.com0'(IN FEET)GRAPHIC SCALE20'40'60'Call 811 or 800-382-5544 Before you Dig!BENCHMARK INFORMATION:LEGENDTHIS SHEET TO BE USED FOREROSION CONTROL ONLY.PERSON ONSITE RESPONSIBLE FOR EROSION CONTROL:NOTE:SEE SHEET C8.0 FOR A LIST IN SEQUENCEOF CONSTRUCTION ACTIVITIES.DEMOLITION GENERAL NOTES:CARMEL GENERAL NOTES:INDEX OF SWPPP ELEMENTSDEMOLITION KEYNOTES:#STORMWATER POLLUTIONPREVENTION NOTES:LEGEND:EXISTINGREMOVENOTE:CONTRACTOR SHALL PROTECT THE EXISTING CITY DUAL DUCTBANK IN THE RIGHT-OF-WAY. IN THE EVENT OF CONFLICT WITHTHE PROPOSED IMPROVEMENTS, RELOCATION OF THE DUAL DUCTBANK AND ALL ASSOCIATED/APPURTENANT/ANCILLARY ITEMSSHALL BE THE SOLE RESPONSIBILITY OF THE DEVELOPER SUBJECTTO REVIEW AND APPROVAL OF THE CITY.NOTE:ALL EXISTING PERIMETER ROAD DRAINAGE STRUCTURES ANDBRIDGES ACROSS THE FRONTAGE OF THIS DEVELOPMENT AREINDICATED ON THE PLANS. PROVISIONS HAVE BEEN MADE TOIMPROVE OR REPLACE ANY DRAINAGE STRUCTURES ANDBRIDGES AS NECESSARY OR AS REQUESTED BY THE CITY TOACCOMMODATE THE PAVEMENT WIDENING, AUXILIARY LANES,MULTI-USE PATH, AND ANY OTHER REQUIRED IMPROVEMENTS TOTHE PROPERTY OR THE ROADWAY. THE COST TO IMPROVE ORREPLACE ANY DRAINAGE STRUCTURES AND BRIDGES WILL BEBORNE BY THE DEVELOPER.