Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
C8.2 Construction Details
BELLEVUE CARMEL, INC8.2REVISIONSCONSTRUCTIONDETAILSCONSTRUCTION DETAILS 48" DIA. STORM SEWER MANHOLE INLET TYPE ASIZEB(ft)La(ft)W(ft)Thickness(in)12"36912"15"3.75811.7512"18"4.51014.512"24"6131912"30"7.51618.518"36"9202318"42"10.52225.518"RIP-RAP PLACEMENTPRE CAST CONCRETE END SECTIONPERMEABLE PAVERSWATER QUALITY DIVERSIONSTRUCTURE #220INDIANAPOLIS - TERRE HAUTELAFAYETTE - MUNCIE - NEW ALBANYwww.hwcengineering.comCONCRETE CURB TURNOUT (WITH DEPRESSED GUTTER)