Loading...
HomeMy WebLinkAboutMDC C4-3 SWPP DETAILSS z' ¢ RELEASED FOR CONS Su6jec��o compliance with al 04 S�a�e antl Local C� City of Carmel �sv�� �\o�v�N�c \ 01 /21 /20 DATE: �12" FBER ROLL PERIMEfER i._�"_"'�� (nP) "'_ _.._�.._.._IL.._..�_., ..` PROTEQION FOR PAVEMENT U APPLICATIONS i ___________________ �. � � � STOCKPILE MATERIAL � � (sEE PUN Foa �ocanoN nNo sizE) i 1 � . .. ... .. .. .. .. � �}�t INSTALLWEIGHTORSTOPPHY MANUFACTURER � RECOMM ENDATIONS � % ., , ._.._.._.._ y.._.._. _.._.. . . � // � --- r�.--- �- - --- I� NOTE: 1. INSTALL TEMPORARY AND PERAIANENT SE�IAIENT AND EROSION CONTROL PRACiICES IAI�AE�IAiELY ARER CONSTRUCiION OF STOCNPILE. REFER i0 THE STORMWATER POLLUTION PREVENTION PNN (SWPPP) fOR ADDITIONAL WPoRMATION. 2, CONSTRUCT TEMPORARY DIVERSION AS NEEDED TO MAINTAIN OR DNERT SITE RUNOFf FROM SiOCKPILE MAiERIAL PROVIDE POSITIVE OUTLEf FOR FLOW. 3. MSiALL ROCK CHECK �AMS AND TEMPORARY SEDIMENT iRPP IN iEMPORARY �NERSION. REFER TO REFERENCED DETAILS FOR A��ITIONAL WfORMATION. O PERIMETER PROTECTION ON PAVEMENT DETAIL OSTOCKPILE SEDIMENT CONTROL DETAIL N� SGIE 1W0-STACNE� 2'%17' S4NDBAG ` S1AKE ROUGH W00� FRAME� �0 AIIL PUSTIC LINWG � NON-WOVEN FlLTER FABRIC ��atH nrvo NorEs: CLEAN OUi LEVEL FUGGING 1. PORTIAN� CONCREfE CEMENT WASTE SHALL NOT BE AILOWE� ID ENTER —�q7ry B B SiORM �RAINS OR WATERCOURSES. ' 2 TEMPORARY CONCRETE WASHOUT FAQLI➢ES SHALL BE LOCAiED AT LEAST 50 '„ \ FEEf FR0�1 OPEN DRAINAGE FACILITIES AND WATERCOORSES EACH FAQLIIY ACCUMOIATE� I n'�I ` BERM SHALL BE LOCATED AWAY fROM CONSTRUCTION TRAFFlC OR ACCESS AREAS TO FlLTERE� �SE�IMENi SEDIMENT-U�EN PREVENT �ISTl1RBANCE OR TRACKING. WATER RUNOFF WATER 3. PERFORM WASHOOT OF AII% TRl1CK CHUIES IN DESIGNATED ARFAS ONLY. SLOPE A A 4. HOLES, �EPRESSIONS OR OTHER GROl1N� �ISTl1R&4NCE CAUSE� BV THE � SECTION A-A REMOVAL OF THE TEMPORARY CONCRETE WASHOl1T FAQLItt SHALL BE � RESTORE� TO ORIGINAL GROUN� WITH BERM AN� SIMIIAR SOIL A1AlERIALS. — _ 5. TEMPORARY CONCRETE WASHOl1T FACILI➢ES SHALL BE AIAMTAWED TO PROVIDE I A�EQl1AlE HOLDING CAPACIiY WITH A�AINI�AOA1 FREEBOAR� OF 12 INCHES. COMPACTE� FlLL �AAINTNNING TE�APORARY WASHOOT FAQLITIES SHAl1 INCWDE RE�AONNG ANO g' W00� fRAME SEWRELY LEGALLY DISPOSING Of HARDENED CONCREfE AND REfURNING THE FAQLItt i — — FASTENE� AROIIN� ENTIRE A NNC710NAL CONDITION. I �PINISHE� GRADE pERIMETER WITH PNO STAKES 6. E%ISTING FAQLI➢ES MUST BE CLEANE�, OR NEW FAQLITIES CONSTRl1CTE� AND READY fOR IISE ONCE iHE WASHOl1T IS 75% Fl1LL. r10 MIL PUSTIC 7. TEMPORARY CONCRETE WASHOl1T FACILITIES SHALL BE INSPECiE� �AILY FOR NOiES: I DAMAGE (TEARS IN THE LINER, MISSINC S4NDBAGS, EfC.). DAMAGED fACILITIES 1. INSTALL TEMPORARY AN� PERMANENT SE�IMENT AN� EROSION COMROL li i „ SHALL BE REPNRED BEFORE FURTHER USE. PRACTICES PRIOR TO COMMENCING WJ� �ISTURBING ACTIVITIES. b �' I'� 8. CONTRACTOR TO INSTALL TEMPORARY SIGNAGE OF SUFFICIENT MATERIALS TO 2 REFER TO SPEQFlCAPONS FOR SILT FENCE INFORMATION. INSTALL AN� PLAN SECTION B-B INDICATE THE LOCATION OF THE WASHOUT AREA TO MI% iRUCK DRNERS. MAINTAIN PER MANUFACTUftER'S RECOMMEN�ATIONS. 5 CONCRETE WASHOUT AREA DETAIL 3 SILT FENCE DETAIL 150' MIN 8" MIN �2 STONE � � � I � ` GEOTEATILE FABRIC NOlES: 1. WNiRAC10R SHALL AWUIRE ALL PROFlLE PERMIIS AN� APPROVAL FROM AGENCY HANNG JURIS�IC710N OF ROADWAY. 2sP 2 RESHAPE PAD AS NEEDED FOR RUNOFF CONTROL TOP DRESS Y�1H CLEAN STONE AS NEE�ED.INSPECi WEEKLY. 50' MIN 3. IMME�IAiELY REMOVE MU� AND SEOIMENT 1RACKE� OR WASHE� ON ID E%ISiING ROA�WAY. SLOPE SLOPE a 4. REPAIR �AMAGE ID E%ISiING PAVEMENT � 1.0% 2_09 IMME�IAiELY. - — 5. INSTALL IEMPORARY CULVERT PIPE IF — REQUIRED TO MAINTAW E%IS11NG RUNOFF — PATIERNS. PLAN �CONSTRUCTION ENTRANCE DETAIL � L � N� SCALE ��� SE�IMENT-UDEN RONOFf WATER rIWLEf CASTING � I � nccuu�uuTEo � � �iN��r srRucruRE SEDIMENT �� �� -�� � Fi�rEREo wnrER STORM INLET NOTES: 1. INSTALL iEMPORARY AND PERMANENT SEDIMENT AND EROSION CONTROL PancncEs aRiore to uNo oistuReiNc ncnvmEs oR iuMEoutE�r ARER CONSiRUCiION OF NEW MLEf SiRUCiURE. 2 PROVIDE CAiCH BASIN INSERi PER SPECIFlCAiIONS. INSiALL ANO TRUCTION MAIMNN PER MANl1FAC7URER'S RECOMMEN�APONS. regula�ions de5 BASKET INLET PROTECTION DETAIL �:; � No S�A�E �.J z � a � z � z 0 d' J Wc W C � � C G � L6A � � �.ri � N � V � � W z �� � W � c N � .� � � � L!'1 Li 1 01 N i--I � � � s c-I N � � � c � .� O C O N � �� � ��o•Y � Z N 3 � 7 0 ~ O O fl-� Q V � n • �n fo m 3 m�r 3 Ol � O_ 3 N M O � � Z N � V CONSTRUCTION DOCU M ENTS PQQROVC NS �v��pN N�� F�R Z O s N 0 ti 0 s � z \ � V o 06vyW'. �� DO W Q�.Q_ z f 6 O: p_ � w Vi?:h�i � � a ;.�� ���NQ..,.,.Q�p4 �. � � STORMWATER POLLUTION PREVENTION D ETA I LS $[/{�E: AS NOTED DATE: 19 Au�usr zai9 PROJECT #: 19�Pscze DRAWN: Nsv COORD: Nav APPROVED: Nsv C4-3