HomeMy WebLinkAboutMDC C4-3 SWPP DETAILSS
z'
¢
RELEASED FOR CONS
Su6jec��o compliance with al
04 S�a�e antl Local C�
City of Carmel
�sv�� �\o�v�N�c
\
01 /21 /20
DATE:
�12" FBER ROLL PERIMEfER i._�"_"'�� (nP) "'_ _.._�.._.._IL.._..�_., ..`
PROTEQION FOR PAVEMENT U
APPLICATIONS i ___________________ �.
� � � STOCKPILE MATERIAL �
� (sEE PUN Foa �ocanoN nNo sizE) i
1 � . .. ... .. .. .. .. �
�}�t INSTALLWEIGHTORSTOPPHY
MANUFACTURER
� RECOMM ENDATIONS � %
., ,
._.._.._.._ y.._.._. _.._.. . . �
// � --- r�.--- �- - ---
I�
NOTE:
1. INSTALL TEMPORARY AND PERAIANENT SE�IAIENT AND EROSION CONTROL PRACiICES
IAI�AE�IAiELY ARER CONSTRUCiION OF STOCNPILE. REFER i0 THE STORMWATER
POLLUTION PREVENTION PNN (SWPPP) fOR ADDITIONAL WPoRMATION.
2, CONSTRUCT TEMPORARY DIVERSION AS NEEDED TO MAINTAIN OR DNERT SITE RUNOFf
FROM SiOCKPILE MAiERIAL PROVIDE POSITIVE OUTLEf FOR FLOW.
3. MSiALL ROCK CHECK �AMS AND TEMPORARY SEDIMENT iRPP IN iEMPORARY �NERSION.
REFER TO REFERENCED DETAILS FOR A��ITIONAL WfORMATION.
O PERIMETER PROTECTION ON PAVEMENT DETAIL OSTOCKPILE SEDIMENT CONTROL DETAIL
N� SGIE
1W0-STACNE� 2'%17' S4NDBAG ` S1AKE
ROUGH W00� FRAME� �0 AIIL PUSTIC LINWG � NON-WOVEN FlLTER FABRIC
��atH nrvo NorEs:
CLEAN OUi LEVEL FUGGING 1. PORTIAN� CONCREfE CEMENT WASTE SHALL NOT BE AILOWE� ID ENTER —�q7ry
B B SiORM �RAINS OR WATERCOURSES.
' 2 TEMPORARY CONCRETE WASHOUT FAQLI➢ES SHALL BE LOCAiED AT LEAST 50 '„
\ FEEf FR0�1 OPEN DRAINAGE FACILITIES AND WATERCOORSES EACH FAQLIIY ACCUMOIATE�
I n'�I ` BERM SHALL BE LOCATED AWAY fROM CONSTRUCTION TRAFFlC OR ACCESS AREAS TO FlLTERE� �SE�IMENi SEDIMENT-U�EN
PREVENT �ISTl1RBANCE OR TRACKING. WATER RUNOFF WATER
3. PERFORM WASHOOT OF AII% TRl1CK CHUIES IN DESIGNATED ARFAS ONLY. SLOPE
A A 4. HOLES, �EPRESSIONS OR OTHER GROl1N� �ISTl1R&4NCE CAUSE� BV THE �
SECTION A-A REMOVAL OF THE TEMPORARY CONCRETE WASHOl1T FAQLItt SHALL BE �
RESTORE� TO ORIGINAL GROUN� WITH BERM AN� SIMIIAR SOIL A1AlERIALS.
— _ 5. TEMPORARY CONCRETE WASHOl1T FACILI➢ES SHALL BE AIAMTAWED TO PROVIDE I
A�EQl1AlE HOLDING CAPACIiY WITH A�AINI�AOA1 FREEBOAR� OF 12 INCHES. COMPACTE� FlLL
�AAINTNNING TE�APORARY WASHOOT FAQLITIES SHAl1 INCWDE RE�AONNG ANO g'
W00� fRAME SEWRELY LEGALLY DISPOSING Of HARDENED CONCREfE AND REfURNING THE FAQLItt i — —
FASTENE� AROIIN� ENTIRE A NNC710NAL CONDITION.
I �PINISHE� GRADE pERIMETER WITH PNO STAKES 6. E%ISTING FAQLI➢ES MUST BE CLEANE�, OR NEW FAQLITIES CONSTRl1CTE� AND
READY fOR IISE ONCE iHE WASHOl1T IS 75% Fl1LL.
r10 MIL PUSTIC 7. TEMPORARY CONCRETE WASHOl1T FACILITIES SHALL BE INSPECiE� �AILY FOR NOiES:
I DAMAGE (TEARS IN THE LINER, MISSINC S4NDBAGS, EfC.). DAMAGED fACILITIES 1. INSTALL TEMPORARY AN� PERMANENT SE�IMENT AN� EROSION COMROL
li i „ SHALL BE REPNRED BEFORE FURTHER USE. PRACTICES PRIOR TO COMMENCING WJ� �ISTURBING ACTIVITIES.
b �' I'� 8. CONTRACTOR TO INSTALL TEMPORARY SIGNAGE OF SUFFICIENT MATERIALS TO 2 REFER TO SPEQFlCAPONS FOR SILT FENCE INFORMATION. INSTALL AN�
PLAN SECTION B-B INDICATE THE LOCATION OF THE WASHOUT AREA TO MI% iRUCK DRNERS. MAINTAIN PER MANUFACTUftER'S RECOMMEN�ATIONS.
5 CONCRETE WASHOUT AREA DETAIL 3 SILT FENCE DETAIL
150' MIN
8" MIN �2 STONE �
� � I � ` GEOTEATILE FABRIC NOlES:
1. WNiRAC10R SHALL AWUIRE ALL
PROFlLE PERMIIS AN� APPROVAL FROM AGENCY
HANNG JURIS�IC710N OF ROADWAY.
2sP 2 RESHAPE PAD AS NEEDED FOR RUNOFF
CONTROL TOP DRESS Y�1H CLEAN STONE
AS NEE�ED.INSPECi WEEKLY.
50' MIN 3. IMME�IAiELY REMOVE MU� AND SEOIMENT
1RACKE� OR WASHE� ON ID E%ISiING
ROA�WAY.
SLOPE SLOPE a 4. REPAIR �AMAGE ID E%ISiING PAVEMENT
� 1.0% 2_09 IMME�IAiELY.
- — 5. INSTALL IEMPORARY CULVERT PIPE IF
— REQUIRED TO MAINTAW E%IS11NG RUNOFF
— PATIERNS.
PLAN
�CONSTRUCTION ENTRANCE DETAIL
� L � N� SCALE
���
SE�IMENT-UDEN
RONOFf WATER rIWLEf CASTING
� I �
nccuu�uuTEo � � �iN��r srRucruRE
SEDIMENT ��
�� -�� �
Fi�rEREo wnrER
STORM INLET
NOTES:
1. INSTALL iEMPORARY AND PERMANENT SEDIMENT AND EROSION CONTROL
PancncEs aRiore to uNo oistuReiNc ncnvmEs oR iuMEoutE�r
ARER CONSiRUCiION OF NEW MLEf SiRUCiURE.
2 PROVIDE CAiCH BASIN INSERi PER SPECIFlCAiIONS. INSiALL ANO
TRUCTION MAIMNN PER MANl1FAC7URER'S RECOMMEN�APONS.
regula�ions
de5 BASKET INLET PROTECTION DETAIL
�:; � No S�A�E
�.J
z
�
a
�
z
�
z
0
d' J
Wc W
C �
� C
G
� L6A
� �
�.ri
�
N
�
V
�
�
W
z
��
�
W
�
c
N
�
.�
�
�
�
L!'1
Li 1
01
N
i--I
� �
� s
c-I N
� �
� c
� .�
O C
O N �
�� �
��o•Y
� Z N 3
�
7 0 ~ O
O fl-� Q
V � n •
�n fo m 3
m�r 3
Ol � O_ 3
N
M
O
�
�
Z
N
�
V
CONSTRUCTION
DOCU M ENTS
PQQROVC NS �v��pN
N�� F�R
Z
O
s
N
0
ti
0
s
�
z
\
�
V o 06vyW'. ��
DO W Q�.Q_
z f 6 O: p_
� w Vi?:h�i �
� a ;.��
���NQ..,.,.Q�p4 �.
�
�
STORMWATER
POLLUTION
PREVENTION
D ETA I LS
$[/{�E: AS NOTED
DATE: 19 Au�usr zai9
PROJECT #: 19�Pscze
DRAWN: Nsv
COORD: Nav
APPROVED: Nsv
C4-3