Loading...
HomeMy WebLinkAboutMP-001-HVAC-LEGEND-&-PROJECT-NOTES-Rev.1Z � � m � � J a x U w � N m @ N C� v 0 rn v r m K � � c U 0 Q a` 1 2 �i � 7 HVAC ABBREVIATION LEGEND A AMPS MC MECHANICALCONTRACTOR ACC AIRCOOLEDCONDENSINGl1NIT MCA MINIMUMQRCUITAMPS ACR ACR COPPER REFRIG PIPE MD MANUAL DAMPER AFF ABOVE RNISHED FLOOR MFF MATT FACED FlBERGLA55 AWM AWMINUM MI MALLEABLEIRON APD AIR PRESSl1RE DROP Ml1A MAKE 11P AIR ASJ ALL SERVICE INSULATION JACKET NC NOISE CRITERIA LEVEL B STEAMBOILER OA OUTSIDEAIR BAS BUILDING AUTOMATION SVSTEM OBD OPPOSED BLADE DAMPER BDD BACKDRAFTDAMPER O.C. ON CENTER BHP BRAKEHORSEPOWER ODU OUTDOORUNIT BOD BOTTOMOFDUCT PC PWMBINGCONTRACTOR BOP BOTTOM OF PIPE PD PRESSURE DROP BR BRAZED PGGS PAWTGRIPGALVANIZEDSTEEL C-AL CORRUGATEDAWMINUM PP POLVPROPVLENE CAL CALQUM SILICATE WSULATION PPM PARTS PER MILLION CCP CALQUM CARBONATEPOWDER PRESS. PRESSURE CF Cl1BIC FEET PRV PRESSURE REGULATING VALVE CFM CUBIC FEET PER MINUTE PS PRESSURE SENSOR CH CHILLER PVC POLV VINVL CHLORIDE CHP CHILLEDWATERPUMP PVCGS PVCCOATEDGAWANIZEDSTEEL CHW CHILLEDWATER RA RETURNAIR CHWR CHILLEDWATERRETURN RC ROOMCRITERWLEVEL CHWS CHILLEDWATERSUPPLV RECT RECTANGULAR Q CASTIRON REFRIG. REFRIGERANT CL CENTERLWE RL REFRIGERANTLIpl11D CLP CENTERLWEOFPIPE RF RETURNORRELIEFFAN CMC CEILING MOUNTED CENTRIFUGAL FAN RMC ROOF MOUNTED CENTRIFUGAL FAN CONG CONCRETE RMP ROOFMOUNTEDPROPELLERFAN CPVC CHLORINATED PVC RTII ROOF TOP 11NIT CR STFAM CONDENSATE RETURN RV RELIEF VALVE CRP CONDENSATERETURNPIPE 5 SWITCH CS CARBON STEEL SA SUPPLV AIR CT COOLINGTOWER SC SENSIBLECAPACITV CU COPPER SCH SCHEDULE CW CONDENSERWATER SCR SCREWED�THREADED) CWP CONDENSERWATERPUMP SF SUPPLVFAN D DRAIN 50 SHl1TOFFVALVETERMINAL DB DEQBELS 50 SOUARE DCW DOMESTIC COLD WATER 55 STAWLESS STEEL DDC DIRECTDIGITALCONTROLS SW SWEATCONNECTION DHW DOMESTICHOTWATER SWLD SOLVENTWELD DMPR DAMPER T THERMOSTAT DS DUCTSILENCER�SOUNDATTENUATOR) TC TOTALCAPAQTV DT DUALTEMPERATURE TEMR TEMPERATURE DTP Dl1ALTEMPERATl1REPl1MP TH THICKNE55 DTR DUALTEMPERATURERETURN THRD THRFADED DTS DUALTEMPERATURESUPPLV TOD TOPOFDUCT EAL EMBOSSEDAWMINUM TOJ TOPOFJOIST EAT ENTERINGAIRTEMPERATl1RE TOS TOPOFSTEEL EC ELECTRICALCONTRACTOR TS TEMPERATURESENSOR EDB ENTERING DRV BULB TEMPERATURE T/5 PIPE TVPE OR SCHEDULE EF EXHAUSTFAN UBC UPBLASTCENTRIFUGALFAN EH ELECTRICHEATER 11C REXIBLEl1NICELWLAR EWB ENTERINGWETBULBTEMPERATURE UH UNITHEATER EWT ENTERINGWATERTEMPERATURE W UNINENTILATOR EXH EXHAUST V VOLTS F Fl1RNACE VAV VARIABLEAIRFLOW FCU FANCOIL UNIT VC VENTILATING CONTRACTOR FD FlREDAMPER WCS WROUGHTCARBONSTEEL FFJ FOILFACEDJACKET WCU WROUGHTCOPPER FG FlBERGLA55 WLD WELDEDCONNECTION FGB FlBERGLA55 BOARD INSULATION WMP WALL MOUNTED PROPELLER FAN FGW FlBERGLASSWRAP WPD WATERPRESSUREDROP FLA FULLLOADAMPS WT WEIGHT�ORDENSITV) FLG FLANGE FLGD FLANGED FMG FOAM GLA55 FPM FEETPERMINUTE FPP FAN POWERED PARALLEL VAV FPS FANPOWEREDSERIESVAV FS FLOW SWITCH FW FEEDWATER . G NATURALGAS GA GAGE�GAUGE) GALV GALVANIZED GC GENERALCONTRACTOR GPH GALLONS PER HOl1R GPM GA�LONSPERMINUTE GRV GROOVED PIPE GS GALVANIZEDSTEEL H Hl1MIDIRER(Hl1MIDIT� HC HEATING CONTRACTOR HF HEAT FUSION , HG HOTGAS�REFRIGERANT) HP H�RSEP�WER � HPS HIGHPRESSURESTEAM HRC HEATRECLAIMWATER HS HUMIDITVSENSOR HV HEATINGNENTILATINGl1NIT HW HEATINGHOTWATER HWB HOTWATERBOILER HWP HOTWATERPUMP HWR HOTWATERRETl1RN HWS HOTWATERSUPPLV ILC WLWECENTRIFUGALFAN LAT LEAVINGAIRTEMPERATURE . LDB LEAVINGDRVBULBTEMPERATURE LP LIpUIDPROPANE LPS LOWPRESSURESTEAM LVR LOWER LWB LEAVINGWETBULBTEMPERATURE LWT LEAVINGWATERTEMPERATURE M MOTORIZED MAT. MATERIAL MBH 1000BTUH DESIGN CRITERIA GENERAL DESIGN INFORMATION INDOOR DESIGN CONDITIONS BUILDING STAIRW ELL W MTER DRV BULB'. 60 0°F LOCATION: CARMEL, INDIANA LATITt1DE: 39.9] LONGITUDE: 86.13 ELEVATION'. 853 OUTDOOR DESIGN CONDITIONS SUMMER �RV 91.3°F (04% ASHRAE DESIGN BULB�. WNDITION) SUMMERWET ]50°F(04%ASHRAEDESIGN BULB�. CONDITION) WINTERDRV 2.6°F (996%ASHRAEDESIGN BULB: CONDITION) RELEASED FOR CONSTRl1CTI0N Su6jec� �o compliance with all regula�ions of Sla�e antl Local Codes City of Carmel Y�, : m v.i \ o;, v�Ativ. J�.�. DATE: OIIZZIZO PIPE SYMBOL LEGEND t-CHWS-t CHILLEDWATERSUPPLVPIPE �C� PIPEDOWN t-CHWR-1 CHILLEDWATERRETURNPIPE �� PIPEUP t-CWS-1 CON�ENSERWATERSUPPLYPIPE Y � TEEDOWN CWR T � TEEUP t- -t CONDENSER WATER RETURN PIPE �i�� t-DCW-t DOMESTIC COLD WATER PIPE PIPE BREAK (FOR CLARITV) t-HWS-1 HEATMGHOTWATERSUPPLVPIPE 1 CAPPEDPIPE t-HWR-t HEATING HOT WATER RETURN PIPE ��.r-,,� GAS SHUT-OFF VALVE t-GLYS� ICEWATERSUPPLYPIPE �� BALLVAWE t-GLYR-1 ICE WATER RETURN PIPE ��I�F� BUTTERFLV VALVE �DTS� DUALTEMPERATURESUPPLVPIPE ? '�i 11NION �DTR-t DUAL TEMPERATURE RETURN PIPE �T�i CALIBRATED BALANCE VAWE t-DHW-1 DOMESTIC HOT WATER PIPE PH-i PRESSURE REGULATING VAVLE t-V-t VENTPIPE "�✓:r�' GLOBEVALVE �G� NATURAL GAS PIPE �-, GATE VAVLE t-LPG-1 LIQl11D PROPANE GAS PIPE �� STRAMER WITH BLOW DOWN VALVE t-RL-� REFRIGERANTLIpUIDPIPE �� STRAINER t-RS-t REFRIGERANT SUCTION PIPE �� BLIN� FLANGE t-RHG-1 REFRIGERANT HOT GAS PIPE , 9 i MOTORIZED &WAV VAWE t-LPS-t LOW PRESSURE STEAM PIPE p �--�-+ MOTORIZED3-WAYVALVE �MPS� MEDIl1MPRESSl1RESTEAMPIPE { �HPS� HIGH PRESSURE STEAM PIPE �.t PRESSURE RELIEF VAWE t-CR-t CONDENSATE RETURN PIPE t-FW� FEEDWATERPIPE � PRESSURE �GAGE �n� THERMOMETER t ��� DUCTWORK SYMBOL LEGEND N I �, SUPPLV OR Ol1TSIDE AIR Dl1CT 11P � RADIl1S RECTANGl1LAR ELBOW C1U � RETURNOREXHAUSTAIRDUCTUP .�..-� (� SUPPLVOROUTSIDEAIRROUND ._ L'�' DUCT UP � SUPPLV OR OUTSIDE AIR DUCT DOW N � RETURN OR EXHAUST AIR ROUND DUCT UP I.� I �, RETURNOREXHAUSTAIRDUCTDOWN '�� ROUNDDUCTDOWN W �� SUPPLV/OUTSIDEAIRDUCTOFFSET � ROUNDOFFSET � RETURN AIR DUCT OFFSET � ROUND ELBOW ��� �� MANUALBALANCMG�AMPER �-::."i ,i ROUN�WVE b�" � MOTORIZED DAMPER �� RECTANGl1LAR BRANCH TAKEOFF li� �� FlREDAMPER C�� RECTANGULARDUCTTERMINATION _y�_ � RECTANGULARTOROUNDTRANSITION C ROUNDDUCTTERMINATION �� RECTANGl1LARTRANSITION � STANDARDRECTANGULARELBOW ANNOTATION SYMBOL LEGEND T� THERMOSTATORTEMP.SENSOR H� HUMIDISTAT � SECTION SYMBOL 100 SQ SWITCH XXX KEVNOTE DESIGNATION RTU Epl11PMENT PLAN MARK e 2 POINT OF NEW CONNECTION 1-01 VAVTERMINALUNRMARK 4 DETAILSVMBOL AHU-1 EQUIPMENT MARK -100 A-e"e A-24x12 AIR DEVICE MARK- NECK S2E 250 250 AIRFLOW 8"m ROl1ND Dl1CT SIZE 24x12 RECTANGULAR DUCT SRE AIR DEVICE AND DUCT ACCESS. LEGEND RETURN AIR GRILLE T SUPPLYAIR DIFFUSER C� (HARDCONNECTION) SUPPLYAIR �IFFUSER WITH FLEXBLE � RETURN OR EXHAUST GRILLE RUNOUT AND DAMPER L�_.LC (HARD CONNECTION) _� SIDEWALLDIFFUSER - �- - 14X14TRANSFEROPENINGINWALL -J -� Sl1PPLVAIR DIFFl1SER TRANSFER OPENING IN WALL �-� (HARD GONNEGTION) � � RETURN OR EXH. GRILLE � �� (HARD CONNECTION) � SCHEMATIC SYMBOL LEGEND . MVIAV AIR VENT, MV-MANUAL VENT; AV- �' AUTOMATICVENT M AUTOMATIC2WAVCONTROLVALVE M AUTOMATIC 3-WAY CONTROL VALVE � AUTOMATIC FLOW CONTROLLER .. CHECKVALVE �-�- FLEXIBLECONNECTION TP - GAUGE,LTEMPERATURE;P-PRESSURE . .. � MANUALBALANCEVALVE I. I PIPE REDUCER/INCREASER _.�.J� PRESSURE REDUCMG VALVE _ . SHUTOFFVALVE . COMBINATION BALANCESHUTOFF VALVE T�V TRIPLEDUTVVALVE; . SHUTOFF-BALANCE-CHECK � SAFETV RELIEF VALVE � I DIRECTIONOFFLOW � PROJECT NOTES CONTROLNOTES: 1. PROVIDE PROJECT SPECIFIC CONTROL SVSTEM MANUAL FOR THE BUILDMG. THE MANUAL SHALL WNTAIN A DIAGRAM OF THE WNTROL SVSTEM ARCHITECTURE, W IRING DIAGRAMS AND A SEQUENCE OF OPERATION. THE MANUAL SHALL ALSO INC WDE AN 11 X 1] FLOOR PLAN INDICATW G THE MAJOR EQUIPMENT AND PANEL LOCATIONS. THE MANUAL SHALL BE BOUND IN A HARD BACK 3 RMG BINDER WITH DIVIDERS. BINDER SHALL BE LABELED "H V A.0 TEMPERATURE CONTROL MANUAL" AND INCLUDE THE PROJECT NAME AS W ELL AS THE BWLDMG NAME, NUMBER AND ADDRESS. 2. LABELALLWNTROLPANELS,ACTUATORS,SENSORS,ETCWITHI/8"THICKPLASTICLAMINATESIGNS. SEE DRAWMGS FOR LABEL AND LETTERMG REQUIREMENTS. LABEL DESIGNATIONS SHALL BE CONSISTENT W ITH THE DRAW MGS, TEMPERATURE CONTROL SVSTEM MANUAL AND DIAGRAMS. 3. MOUNTWALLMOUNTEDTHERMOSTATS,TEMPERATURESENSORSANDCARBONMONOXIDESENSORS 4'-0" ABOVE FlNISH FLOOR. DO NOT MOUNT THERMOSTATS OR TEMPERATURE SENSORS IN DIRECT SUNLIGHT OR NFAR HEAT PRODUQNG EQUIPMENT. 4. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDMG ANV AND ALL INTERFACE W IRING REQUIRED BETW EEN THE TEM PERATURE CONTROL SVSTEM AND THE FlRE ALARM SVSTEM. THE ELECTRICAL CONTRACTOR SHALL PROVIDE THE INTERFACE TERMINALS AS PART OF THE FIRE ALARM SYSTEM AS REQUIRED TO PROVIDE THE SPEQFlED SEQUENCE OF OPERATION. 5. THEELECTRICALCONTRACTORSHALLPROVIDEALLMOTORSTARTERSANDDISCONNECTSWITCHES FOR H V A.G EQUIPMENT UNLESS THEV ARE INCLUDED W ITH THE EQUIPMENT AS INDICATED ON THE DRAW INGS AND M THE SPEQFICATIONS. COORDINATE STARTER REQUIREMENTS W ITH THE ELECTRICAL CONTRACTOR AND TH E CONTRACTOR PRIOR TO ORDERING. 6. WHERE AUXILWRV CONTACTS ARE REQUIRED M STARTERS PROVIDED BV THE ELECTRICAL CONTRACTOR, THE MECHANICAL CONTRACTOR SHALL COORDINATE THE Ql1ANTITV AND TVPE OF CONTACTS WITH THE E.C. PRIOR TO PURCHASE. ]. THE ELECTRICAL CONTRACTOR SHALL PROVIDE CIRCUIT BREAKERS IN THE ELECTRICAL PANELS THAT ARE SPECIFICALLV DEDICATED FOR THE TEMPERATURE CONTROL SVSTEM. COORDINATE THE QUANTITY AND S RES W ITH TH E CONTRACTOR. SEE ELECTRICAL DRAW INGS FOR LOCATION. 8. THE MECHANICAL CONTRACTOR SHALL PROVIDEALL TEMPERATURE CONTROL SVSTEM W IRMG AND CONDUIT REGARDLESS OF VOLTAGE AS REQUIRED TO PROVIDE THE SPEQFlED SEQUENCE OF OPERATION OR SATISFV ANV MANl1FACTl1RER REQl11REMENTS. POW ER AND CONTROL W IRING AND CONDUR FORVALVEACTUATORS,DAMPERACTUATORS,CARBON MONOXIDESENSORS, TEMPERATURE CONTROL PANELS, RELAYS, INDICATOR LIGHTS, REMOTE CONTROL PANELS, SOLENOID VALVES AND OTHER SIMILAR DEVICES THAT ARE PART OF THE H.VAL SVSTEM SHALL BE PROVIDED BVTHE MECHANICAL CONTRACTOR. SEE ELECTRICAL DRAW WGS FOR THE LOCATION OF CIRCUIT BREAKERSSPECIFlCALLVDEDICATEDFORTEMPERATURECONTROLSYSTEM COMPONENTS.ALL120V CONTROL WIRMG SHALL BE INSTALLED IN CONDUIT. CONCEALEDABOVE CEILMG PLENUM RATED LOW VOLTAGE (24 VOLTS OR LESS) CONTROL WIRMG DOES NOT REQUIRE TO BE INSTALLED IN CONDUIT. 9. THE MECHANICAL CONTRACTOR SHALL PROVIDEALL CONTROLS, RELAVS, SENSORS, CONTROLLERS, CONTROLTRANSFORMERS,CONTROLINTERFACECOMPONENTS,SOFTWARE,HARDWARE, ACTUATORS, SW ITCHES AND ANV OTHER WNTROL COMPONENTS REQUIRED TO PROVIDE THE SPECIFIED SEQUENCE OF OPERATIONS ON PLANS, TO INTEGRATE PROJECT CONTROLS AND SVSTEM, AND TO MEET EQUIPMENT MANUFACTURER'S INSTALLATION AND OPERATION REQUIREMENTS, UNLESS NOTED OTHERWISE ON PLANS. 10. IT SHALL BE THE MECHANICAL CONTRACTORS RESPONSIBILITY TO COORDINATE ALL TEM PERATURE CONTROL SVSTEM REQUIREMENTS WITH THE ELECTRICAL CONTRACTOR PRIOR TOTHE PURCHASE OR INSTALLATION OF ANV OF THE ELECTRICAL POW ER OR TEMPERATURE CONTROL SVSTEM COMPONENT. 11. ALL DAMPERS ON THE MLET OR OUTLET OF THE FAN SHALL BE OPEN PRIOR TO STARTING THE FAN. PROVIDE ANY TIME DELAYS OR END SW ITCHES AS REQUIRED. 12. PROVIDE CLEAR PLASTIC VENTED IMPACT RESISTANT LOCKABLE GUARDS ON ALL WALL MOUNTED THERMOSTATS OR SENSORS WITH ADJUSTABLE SET-POINTS. IDENTIFICATION: 1. PROVIDE PLASTIC LAMINATE IDENTIFICATION LABELS ON ALL EQUIPMENT SCHEDULED ON THE DRAWINGS. THE IDENTIFICATION SHALL BE CONSISTENT WITH THE PLANMARKS SHOWN ON THE DRAWINGS AND THE BAS SVSTEM USER MTERFACE SEE DETAILS ON DRAWINGS REGARDING COLOR, SIZE, TEXT HEIGHT, ETC. 2. PROVIDE PLASTIC LAMINATE IDENTIFICATION LABELS ON ALL TEMPERATURE CONTROL COMPONENTS SUCH AS CONTROL PANELS, TEMPERATURE SENSORS, HUMIDITV SENSORS, ETC. THE IDENTIFICATION SHALL BE CONSISTENT WITH THE PLANMARKS SHOWN ON THE DRAWINGS WHERE AVAILABLE AND THE BAS SVSTEM USER MTERFACE SEE DETAILS ON DRAWINGS REGARDING COLOR, SRE, TEXT HEIGHT,ETC. 3. PLASTICLAMINATESIGNSANDLABELSONOUTDOOREQUIPMENTSHALLBEFIXEDTOEQUIPMENT W ITH STAMLESS STEEL OR AW MINl1M RNETS OR STAMLESS STEEL OR PLATED SCREWS. 4. CLEANEQUIPMENTANDPIPINGPRIORTOAFFIXINGADHESNETYPELABELSANDSIGNS. �i � PROJECT NOTES GENERAL: 1. INSTALL THE H V.0.G SYSTEM AS INDICATED IN AC W RDANCE WRH ALL STATE NJD LOCAL CODES. 2. COORDINATEALLWORKWITHOTHERTRADES.REWORKOFPIPMG DUCTWORK E�UIPMENTLOCATION CONDUIT ETC.AS A RESULT OF POOR PIANNING W ORDINATION OR SCHEDUl1NG SHALL BE THE RESPONSIBILRY OF THE INVOLVED COMRACTORS. NOTIFY THE ARCHRECTiENGMEER OF ANY CONFLICTS PRIOR TO START OF WORK. 3. THEMECHANICALWNTRACTORSHALLBERESPONSIBLEPoRTHECOORDINATIONOFANYFRAMINGREVISIONS, EOIIIPMEM LOCATIONS, ADDITION OF COMROLS, ELECTRICAL QRCIIRING REVISIqJS, EiC. THAT RESIILT FROM 4. USINGE�UIPMENTOTHERTHANTHOSEINDICATEDONTHEDRAWINGS.APPROVALOFTHESHOPDRAWINGSBYTHE ARCHITECTIENGMEER WILLNOT WNVETHE CONTRACTOR OFTHIS RESPONSIBILRY. 5. THEMECHANICALCONTRACTORSHALLHAVETHEFlNALRESPONSIBNTYFORSYSTEMSTARTUP,TRAININGWARRANTY AND TURN OVERTO THE OWNER. THE WNTRACTOR SHALL BE RESPONSIBLE FOR INSTRUCTINGTHE OWNER ON ANY ROl1TME MAIMENANCE REpl11RE� �l1RINGTHE WARRANTY PERIO�. 6. ALLREMSINCLUDEDONTHESEDRAWINGSANDTHESPECIFlCATIONSSHALLBEINCLUDEDINTHEWNTRACTORSBID.ANY ITEMSTHATAREl1NCLEARORFOl1N�TOBEINCORRECTBYTHECOMRACTORSHALLBEBROl1GHTTOTHEATTEMIpJ OF THE ARCHITECTIENGMEER PRIOR TO THE BID DUE DATE EXCW SIONS OF WORK FROM THE BID ARE NOT ACCEPiABLE. ]. ALLWORKIN�ICATE�ONTHEMECHANICAL�RAWINGSSHALLBEPROVI�E�BYTHEMECHANICALCONTRAQORl1NLE55 SPECIFICALLV NOTED OTHERWISE. 0. THEMECHANICALCONTRACTORSHALLPROVI�EALLFIRESTOPPINGFOR�l1QAN�PIPEPENETRATI0N5THAT PENETRATE FIRE RATED ASSEMBl1E5. SEE ARCHITECTl1RAL DRAWINGS OR REFER TO THE OWNERS RECORD DRAWINGS FOR LOCATIONS OF FlRE RATED ASSEMBLIES. ALL FLOOR PENEiRATI0N5 SHALL BE FlRESTOPPED AND SEALED WATER TIGHT WRH AFLEXIBLE SEALANT. INSTALLPERMFG. RECOMMEN�ATIONS. 9. THEMECHANICALCOMRACTORSHALLCOOR�INATEANYROOFPATCHINGFORANYMECHANICALROOFPENETRATIONS NOT SPECIFICALLV I�ENTIFIE� ON THE ARCHRECTl1RAL �RAWINGS. ALL PATCHING SHALL BE PROVI�E� BV GENERAL CONTRACTOR AND BE PERFORMED IN A MANNER CONSISTENT WITH THE ROOF SVSTEMS CURRENT WARRANTV REOIIIREMEMS AND MANIIFACTIIRERS RECOMMENDATIONS. 10. THEMECHANICALCONTRACTORSHALLNOTPERFORMANVWELDINGORTORCHCUTTINGOPERATIONSWRHINTHE OCCIIPIED BIIILDING WITHOIIT OBTAINING PERMISSION OR A BI1RN PERMIT FROM THE OWNER. DUCTWORK-GENERAL: 1. ALLDl1CTWORKSHALLBECON5TRl1CTED, INSTALLEDANDSl1PPORTEDPERTHELATESTVER510NOFTHESMACNA. H V A.C. DUCT CqJSTRUCTION STANDARDS. UNLESS SPECIFIED MORE STRINGEMLV IN THESE CONSTRUCTION DOCUMEMS. 2 COORDINATIONOFDUCTSVSTEMINSTALLATIONWITHOTHERTRADESSHALLBEPERFORMEDPRIORTOTHEFABRICATION OF ANV Dl1QWORK. VERIFV Dl1CT CLEARANCES PRIOR TO FABRICATION. NOTIFV THE ARCHITECTIENGMEER OF ANY CONFlICTS THAT REpUIRE DIMENSIONAL CHANGES OR REpUIRE MAJOR RELOCATION OF DUCTWORK. 3. ALLDl1QWORKSHALLBE5l1PPORTEDFROMR00FORFL00R5TRl1CTl1REABOVEDl1QWORKSHALLNOTlAYONTOP OF CEILING OR LIGHT FIXTURES. 4. ALL�l1QWORK5RE55HOWNAREEXTERNAL�IMEN510N5.ALLOWANCEHASBEENMA�EFOR1"�l1QLMERWHEREAN� IF REpWRED. 5. RECTANC�JLARIXICTWORKSHALLBESl1PPORTEDPERTHES.M.A.CN.A.STANDARDSANDATEACHCHANGEINDIRECTION. EQUIPMENT- GENERAL 1. THEHVA.GEpUIPMENTANDSVSTEMSHALLNOTBEUSEDTODURINGCON$TRUCTION.THEWARRANTVPERIODSHALL NOT BEGIN UNTIL SUBSTnNTIAL COMPLEf10N. THE CONTRACTOR SHALL EXTEN� THE E�UIPMENT WARRANTY PER10� AS NECESSARV WHEN EpUIPMENT IS USED ARER INITIAL START UP AND PRIOR TO SUBSTANTIAL COMPLETIqJ. 02/22/18 - GARAGE PERMIT ,._ ��S� + ♦ 1 V WQ�i3LRE C2T ]RCXRECTVRE�HpMEERIHpIpEWPfiIfL 76351nteractive Way Suite 100 � Indianapolis, IN 462%a 317.299.7500 FAX: 317.291.5805 �y �� ��: ty �:3 ��1 -.�.1 n PiJ(, ?,FGISi�q. P F i��U � �� �(lii`�1'r�l(' L�. �li � �^` W � � O � � � � U � J•� J � � K y--� � U � N N � � � N Q O � � � C � � N � � �o Q £� N� � U � � � O N co � � � o� L L � - y � U � c� �' � �U Proi. No.: 074904 Date: 02/22/18 Sheet Name: HVAC LEGEND & PROJECT NOTES N❑ P-001 `�Jssuances: