HomeMy WebLinkAboutC508 - PLAN & PROFILE (STORM) (V2)OHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUW WWFDC 6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD 6''SSD
6''SSD6''SSD6''SSD6''SSDR
D
RD
RD
RD
RD
R
D
R
D
R
D
NO PARK
ING6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD
6''SSD
758
RIM=855.00
759
RIM=854.50
779
RIM=854.10
748
RIM=854.20
776
RIM=852.55
778
RIM=852.40
747
RIM=851.75
760
RIM=852.25
746
RIM=852.20
777
RIM=851.90
761
RIM=851.80
756
RIM=851.30
787RIM=851.50
757
RIM=851.30
61' OF 18" RCP@0.25%189' OF 24" RCP
@0.25%95' OF 24" RCP@0.25%68' O
F
1
2
"
R
C
P
@0.5
5
%
24' OF 15" RCP
@0.85%
67' OF 18" RCP
@1.05%
10' OF 12" RCP
@1.52%
6
3
'
O
F
1
2
"
HDP
E@2
.
7
0%60' OF 12" RCP@0.84%36' OF 15"
R
CP
@0.63
%79' OF 18" RCP@0.47%
1
2
8
'
O
F
1
2
"
H
D
P
E@1
.
9
9%
199'
O
F
8"
H
D
P
E
@1.9
7
%
156' OF 8" HDPE
@0.50%
STRUCTURE 748-759, 758 STRUCTURE 756,747-748, 760
67' 1.05% 18"
R
C
P STR. #758 MANHOLE, 4' DIA.; R-1772TC: 855.00INV. OUT 850.50 (15" RCP (SW)) 24' 0.85% 15" RCPSTR. #759 INLET AM; R-3405TC: 854.50INV. IN 850.30 (15" RCP (NE))INV. OUT 850.20 (18" RCP (SW))10 - YEAR HGL
10 - YEAR HGLSTR. #756 MH 4' DIA.; R-3010TC: 851.30INV. IN 846.52 (24" RCP (S))INV. IN 847.50 (12" RCP (W))INV. IN 847.15 (12" RCP (E))INV. OUT 846.42 (24" RCP (N))STR. #747 MH 4' DIA.; R-3010TC: 851.75INV. IN 846.86 (24" RCP (S))INV. OUT 846.76 (24" RCP (N))STR. #748 MANHOLE, 5' DIA.; R-1772TC: 854.20INV. IN 849.50 (18" RCP (NE))INV. IN 847.43 (18" RCP (S))INV. IN 848.03 (12" RCP (W))INV. OUT 847.33 (24" RCP (N))STR. #760 INLET M; R-3010TC: 852.25INV. OUT 848.40 (12" RCP (E))FG
EG
FG
EGFG
EG
95' 0.25% 24" RCP
189' 0.25% 24" RCP
68' 0.55% 12" RCPSTR. #748 MANHOLE, 5' DIA.; R-1772TC: 854.20INV. IN 849.50 (18" RCP (NE))INV. IN 847.43 (18" RCP (S))INV. IN 848.03 (12" RCP (W))INV. OUT 847.33 (24" RCP (N))(PRIVATE)
(PRIVATE)
(PRIVATE)(PRIVATE)
(PRIVATE)
1. TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION
TO CONFORM TO APPLICABLE LOCAL AND STATE
STANDARDS.
2. ALL CONSTRUCTION ACTIVITY ON THIS SITE TO BE
PERFORMED IN COMPLIANCE WITH APPLICABLE 0.S.H.A.
STANDARDS FOR WORKER SAFETY.
3. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD
VERIFY ALL UTILITY LOCATIONS BEFORE CONSTRUCTION
BEGINS.
4. CONTRACTORS SHALL MINIMIZE DAMAGE TO EXISTING
TREES.
Project Number:
Drawing Number:
Certified By:
Checked ByDrawn ByIssue Date
Revisions:PROJECT:Scope Drawings:CARMEL, INDIANAFORCARMEL CLAY SCHOOLSNEW ELEMENTARY SCHOOLSDrawing Title:
11-19-19 SO MK
18094
Rev. #Revision
Description
Issue
Date
STORM SEWER PLAN
SCALE:HORZ.: 1"=30'
VERT.: 1"=3'
GENERAL NOTES
LEGEND
Existing Grade New Grade Granular Backfill
SCALE: 1" = 30'
C508
PLAN & PROFILE
(STORM)
1 TAC COMMENTS 12/20/2019
The storm sewer system shall be constructed per design specified
and as approved by the City of Carmel on the final approved
construction plans. Deviations from the approved design shall only
be permitted due to special circumstances or difficulty during
construction and will require prior field approval from a designated
representative of the City of Carmel in addition to supplemental
approval by the design engineer. An explanation of any such
deviation shall be included as a requirement on as-built/record
drawings submitted for release of performance guarantees.
Approved design slopes identified as generating velocities of 2.5
fps or less or 10 fps or greater (at full flow capacity) shall require
as-built certification at the time of construction, prior to backfilling
the pipe. The contractor is instructed to as-built each section of
storm pipe as it is being installed to ensure compliance with the
design plans and as approved by the City of Carmel.
AS-BUILT NOTES
2 TAC COMMENTS 1/3/2020
2
GRANULAR BACKFILL NOTES
·For RCP storm pipe granular backfill, refer to detail 3, sheet C601.
·For HDPE storm pipe granular backfill, refer to detail 4, sheet
C601.
·For PVC sanitary sewer, see Carmel Utilities Trench Detail &