Loading...
HomeMy WebLinkAboutC510 - PLAN & PROFILE (STORM) (V2)OHUOHUOHUOHUOHUOHUOHUOHUW WWWWWWTP6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD 6''SSD 747 RIM=851.75 746 RIM=852.20 756 RIM=851.30 757 RIM=851.30 95' OF 24" RCP@0.25%10' OF 12" RCP @1.52% 10' 1.52% 12" RCP 128' 1. 9 9 % 1 2 " H D P E STRUCTURE 746, 756-757 STRUCTURE 788,776 STRUCTURE 734-736STR. #734 MANHOLE, 6' DIA.; R-1772TC: 854.50INV. IN 844.29 (30" RCP (SW))INV. IN 848.00 (12" RCP (N))INV. OUT 844.19 (30" HDPE (E)) 9' 1.71% 12" RCPSTR. #735 MH 4' DIA.;R-1772TC: 854.60INV. IN 848.75 (12" RCP (NE))INV. OUT 848.15 (12" RCP (S)) 64' 1.95 % 1 2 " R C P STR. #736 INLET AM; R-3405TC: 854.00INV. OUT 850.00 (12" RCP (SW))STR. #757 INLET M; R-3010TC: 851.30INV. OUT 847.30 (12" RCP (W))10 - YEA R H G L 10 - YEA R H G LSTR. #756 MH 4' DIA.; R-3010TC: 851.30INV. IN 846.52 (24" RCP (S))INV. IN 847.50 (12" RCP (W))INV. IN 847.15 (12" RCP (E))INV. OUT 846.42 (24" RCP (N))STR. #746 INLET M; R-3010TC: 852.20INV. OUT 848.40 (12" RCP (E))FG EG FG EG FG EG 10 - YEAR HGL STR. #776 MH 4' DIA.; R-3010TC: 852.55INV. IN 848.55 (12" HDPE (SE))INV. IN 846.62 (15" RCP (SW))INV. OUT 846.52 (18" RCP (NE))STR. #788 24 INCH NYLOPLAST STRUCTURE, OPEN GRATETC: 855.10INV. OUT 851.10 (12" HDPE (NW)) 48' 1.8 6 % 1 2 " R C P PROPOSED 6" WATER MAIN RELOCATION TOP OF PIPE ELEV:845.00 6" EXISTING WATER MAIN BOTTOM OF PIPE ELEV:847.54 (PRIVATE) (PRIVATE) (PRIVATE)(PRIVATE) (PRIVATE)DO NOTENTERS T O P6''SSD6''SSD 6''SSD 6''SSD6''SSD 6''SSD 6''SSDR D R D R D R D R D R D R DNO PARKING6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD 6''SSD 6''SSD6' 'SSD 6' ' SSD6''SSD788 RIM=855.10 779 RIM=854.10 776 RIM=852.55 786 RIM=852.50 778 RIM=852.40 777 RIM=851.90 787 RIM=851.50 775 RIM=851.00 782 RIM=851.00 6 3 ' O F 1 2 " HDP E@2 . 7 0%60' OF 12" RCP@0.84%36' OF 15" R CP @0.63 %79' OF 18" R CP @0.47 %144' OF 24" RCP@0.45% 1 2 8 ' O F 1 2 " H D P E@1 . 9 9% 8 0 ' O F 1 2 " R C P@0 . 5 0% 2 7 ' O F 1 2 " R C P@1. 6 5%161' OF 12" R CP @0.69 % P I 0 + 7 9 . 5 3 OHU OHU OHU OHUOHU TP TP TP TP TPTPTPTPTPTP T PTPTP STOPPROPOSED BMP & ACCESS EASEMENT 6''SSD 6''SSD 6' 'SSDFUTURE LIBRARY DRIVEPROPOSED BMP & ACCESS EASEMENT 6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD742 RIM=854.70 783 RIM=851.50 780 RIM=851.00 773 RIM=851.00 736 RIM=854.00 735 RIM=854.60 8' OF 30" HDPE @0.37%105' OF 30" HDPE@0.30%106' OF 24" RCP 9 7 ' O F 1 2 " R C P@1. 9 5 % 64' O F 1 2 " R C P @1.95 % 734 RIM=854.50 9' OF 12" RCP @1.71% 732 RIM=854.85 733 RIM=854.85 8' OF 15" RCP @0.37% 11' OF 30" RCP @0.53% 33' OF 3 0 " H D P E @0.30% 771 RIM=854.10 8' OF 15" RCP @0.38%PI3+18.41EP 4+24.10 1. TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL AND STATE STANDARDS. 2. ALL CONSTRUCTION ACTIVITY ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH APPLICABLE 0.S.H.A. STANDARDS FOR WORKER SAFETY. 3. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY ALL UTILITY LOCATIONS BEFORE CONSTRUCTION BEGINS. 4. CONTRACTORS SHALL MINIMIZE DAMAGE TO EXISTING TREES. Project Number: Drawing Number: Certified By: Checked ByDrawn ByIssue Date Revisions:PROJECT:Scope Drawings:CARMEL, INDIANAFORCARMEL CLAY SCHOOLSNEW ELEMENTARY SCHOOLSDrawing Title: 11-19-19 SO MK 18094 Rev. #Revision Description Issue Date STORM SEWER PLAN SCALE:HORZ.: 1"=30' VERT.: 1"=3' GENERAL NOTES LEGEND Existing Grade New Grade Granular Backfill SCALE: 1" = 30' C510 PLAN & PROFILE (STORM) 1 TAC COMMENTS 12/20/2019 The storm sewer system shall be constructed per design specified and as approved by the City of Carmel on the final approved construction plans. Deviations from the approved design shall only be permitted due to special circumstances or difficulty during construction and will require prior field approval from a designated representative of the City of Carmel in addition to supplemental approval by the design engineer. An explanation of any such deviation shall be included as a requirement on as-built/record drawings submitted for release of performance guarantees. Approved design slopes identified as generating velocities of 2.5 fps or less or 10 fps or greater (at full flow capacity) shall require as-built certification at the time of construction, prior to backfilling the pipe. The contractor is instructed to as-built each section of storm pipe as it is being installed to ensure compliance with the design plans and as approved by the City of Carmel. AS-BUILT NOTES 2 TAC COMMENTS 1/3/2020 2 GRANULAR BACKFILL NOTES ·For RCP storm pipe granular backfill, refer to detail 3, sheet C601. ·For HDPE storm pipe granular backfill, refer to detail 4, sheet C601. ·For PVC sanitary sewer, see Carmel Utilities Trench Detail & Trench Schedule on sheet C606.