HomeMy WebLinkAboutC512 - PLAN & PROFILE (STORM) (V2)STR. #785 INLET M; R-3010TC: 851.00INV. OUT 847.00 (12" RCP (E)) 48' 0.41% 12" RCP STR. #784 MH 4' DIA.; R-3010TC: 851.00INV. IN 846.80 (12" RCP (W))INV. OUT 846.70 (12" RCP (E)) 79' 0.58% 12" RCP STR. #781 MH 5' DIA.; R-3010TC: 851.00INV. IN 845.40 (24" RCP (S))INV. IN 846.24 (12" RCP (W))INV. IN 845.40 (12" RCP (SW))INV. OUT 845.30 (24" RCP (NE))STRUCTURE
785-784,781
STRUCTURE 787,782-780,773
FG
FG
EG
FG
EG
10 - YEAR HGL 10 - YEAR HGLSTR. #787 INLET M; R-3010TC: 851.50INV. OUT 847.00 (12" RCP (NW))STR. #782 MH 4' DIA.; R-3010TC: 851.00INV. IN 846.60 (12" RCP (SE))INV. OUT 846.50 (12" RCP (NE))STR. #781 MH 5' DIA.; R-3010TC: 851.00INV. IN 845.40 (24" RCP (S))INV. IN 846.24 (12" RCP (W))INV. IN 845.40 (12" RCP (SW))INV. OUT 845.30 (24" RCP (NE))STR. #780 MH 4' DIA; R-3405TC: 851.00INV. IN 845.05 (24" RCP (SW))INV. IN 845.60 (12" RCP (NW))INV. OUT 844.95 (24" RCP (E))STR. #773 MH 5' DIA.;R-3405TC: 851.00INV. IN 844.52 (24" RCP (W))INV. OUT 844.42 (30" HDPE (N)) 80' 0.50% 12" RCP
161' 0.69% 12" RCP 161' 0.69% 12" RCP 161' 0.69% 12" RCP
78' 0.32% 24" RCP
106' 0.41% 24" RCP
(PRIVATE)
(PRIVATE)(PRIVATE)
(PRIVATE)
(PRIVATE)
(PRIVATE)DO NOTENTERS
T
O
P
1234567891012345678910Xref .\Xref\FloorPlan-SITEPLANCE-ELECTRICAL 11-18-19.dwg6''SSD6''SSD6''SSD6''SSD 6''SSD
6''SSDR
DNO PARKING6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD 6''SSD
6'
'SSD6''SSD
6'
'
SSD
6
'
'S
SD6''SSD6''SSD776
RIM=852.55
786
RIM=852.50
787
RIM=851.50
781
RIM=851.00
757
RIM=851.30
784
RIM=851.00
785
RIM=851.00
775
RIM=851.00
782
RIM=851.00
780
RIM=851.00
773
RIM=851.00
10' OF 12" RCP 79' OF 18"
R
CP
@0.47
%144'
OF
24"
RCP@0.45%
8
0
'
O
F
1
2
"
R
C
P@0
.
5
0%
2
7
'
O
F
1
2
"
R
C
P@1.
6
5%
48' OF 12" RCP
@0.41%
79' OF 12" RCP
@0.58%78' OF 24" RCP@0.32%106' OF 24" RCP
@0.41%161' OF 12"
R
CP
@0.69
%
P
I
0
+
7
9
.
5
3 PI2+40.10PI3+18.41EP
4+24.10
TPTPTPTPTPTP
TPTPTP
STOP6''SSD 6''SSD
6'
'SSD6''SSD6''SSD6''SSDFUTURE LIBRARY DRIVE6'
'SSD
6'
'
SSD6''SSD6''SSD772
RIM=854.00
781
RIM=851.00
RIM=851.50
783
RIM=851.50
784
RIM=851.00
780
RIM=851.00
773
RIM=851.00165' OF 30"
R
CP
@0.30
%105' OF 30" HDPE@0.30%11' OF 30" HDPE
@0.38%
48' OF 12" RCP 79' OF 12" RCP
@0.58%78' OF 24" RCP@0.32%106' OF 24" RCP
@0.41%
9
7
'
O
F
1
2
"
R
C
P@1.
9
5
%
@0.53%
770
RIM=854.20
11' OF 30" RCP
@0.53%771
RIM=854.10
8' OF 15" RCP
@0.38%PI2+40.10PI3+18.41EP
4+24.10
1. TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION
TO CONFORM TO APPLICABLE LOCAL AND STATE
STANDARDS.
2. ALL CONSTRUCTION ACTIVITY ON THIS SITE TO BE
PERFORMED IN COMPLIANCE WITH APPLICABLE 0.S.H.A.
STANDARDS FOR WORKER SAFETY.
3. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD
VERIFY ALL UTILITY LOCATIONS BEFORE CONSTRUCTION
BEGINS.
4. CONTRACTORS SHALL MINIMIZE DAMAGE TO EXISTING
TREES.
C512
Project Number:
Drawing Number:
Certified By:
Checked ByDrawn ByIssue Date
Revisions:PROJECT:Scope Drawings:CARMEL, INDIANAFORCARMEL CLAY SCHOOLSNEW ELEMENTARY SCHOOLSDrawing Title:
11-19-19 SO MK
18094
Rev. #Revision
Description
Issue
Date
STORM SEWER PLAN
SCALE:HORZ.: 1"=30'
VERT.: 1"=3'
GENERAL NOTES
LEGEND
Existing Grade New Grade Granular Backfill
SCALE: 1" = 30'
PLAN & PROFILE
(STORM)
1 TAC COMMENTS 12/20/2019
The storm sewer system shall be constructed per design specified
and as approved by the City of Carmel on the final approved
construction plans. Deviations from the approved design shall only
be permitted due to special circumstances or difficulty during
construction and will require prior field approval from a designated
representative of the City of Carmel in addition to supplemental
approval by the design engineer. An explanation of any such
deviation shall be included as a requirement on as-built/record
drawings submitted for release of performance guarantees.
Approved design slopes identified as generating velocities of 2.5
fps or less or 10 fps or greater (at full flow capacity) shall require
as-built certification at the time of construction, prior to backfilling
the pipe. The contractor is instructed to as-built each section of
storm pipe as it is being installed to ensure compliance with the
design plans and as approved by the City of Carmel.
AS-BUILT NOTES
2 TAC COMMENTS 1/3/2020
2
GRANULAR BACKFILL NOTES
·For RCP storm pipe granular backfill, refer to detail 3, sheet C601.
·For HDPE storm pipe granular backfill, refer to detail 4, sheet
C601.
·For PVC sanitary sewer, see Carmel Utilities Trench Detail &
Trench Schedule on sheet C606.