Loading...
HomeMy WebLinkAboutC403 - SWPP (FINAL) (V2)OHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHU4TH AVENUENPDES Xref .\ Xr ef\Car mel_Gro un d Fl oor _20 19-0 9-12.d wgSTOPSTOPDO NOTENTERS T O P 1234567891012345678910STOP STOPBUSONLYDETENTION: 7' CMP FL / INV 843.8 (FLAT: 0% SLOPE) (TOP OF PIPE 850.8) HW100= 850.7 DRIVE AND WALK TO BE CONSTRUCTED BY OTHERSPROPOSED BMP & ACCESS EASEMENT P R O P O S E D A C C E S S E A S EM E N T UNDERGROUND DETENTION Xref .\Xref\FloorPlan-SITEPLANCE-ELECTRICAL 11-18-19.dwgDETENTION: 7' CMP FL / INV 843.8 (FLAT: 0% SLOPE) (TOP OF PIPE 850.8) HW 10-YR= 847.31 HW 100-YR= 850.56 FUTURE LIBRARY DRIVEPROPOSED BMP & ACCESS EASEMENT P R O P O S E D A C C E S S E A S EM E N T NO PARKINGNO PARK ING NO PARKINGH.Pt. PUBLIC POSTING BOARD CONCRETE WASHOUT CONSTRUCTION ENTRANCE STAGING AREA TOPS OIL STOCKPILE DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIP DIPDIPDIP DIPSFSFSF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SFSFSFSFSFSFSF S F S F SFDIP DIP DIP DIPDIPDIP DIP DIP DIP DIP DIP DIP DIP DIP DIPDIP DIP 1 1 Project Number: Drawing Number: Certified By: Checked ByDrawn ByIssue Date Revisions:PROJECT:Scope Drawings:CARMEL, INDIANAFORCARMEL CLAY SCHOOLSNEW ELEMENTARY SCHOOLSDrawing Title: 11-19-19 SO MK 18094 Rev. #Revision Description Issue Date EROSION CONTROL NOTES LINE TYPE / SYMBOL TREE PROTECTION FENCE SILT FENCE (SEDIMENT FENCE) EROSION CONTROL LEGEND LINE TYPE / SYMBOLDESCRIPTION DESCRIPTION CONCRETE WASHOUT TEMPORARY DROP INLET PROTECTIONDIP SCALE: 1" = 60' 1.THE EROSION AND SEDIMENT CONTROL MEASURES SHOWN ON THE DRAWINGS ARE CONSIDERED THE MINIMUM PRACTICES NECESSARY FOR COMPLIANCE WITH THE NPDES GENERAL PERMIT FOR STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY AS IDENTIFIED UNDER SECTION 327-IAC-15-5 OF THE INDIANA ADMINISTRATIVE CODE. HOWEVER, SITE CONDITIONS, CONSTRUCTION METHODS, SEQUENCING OF WORK AND GENERAL PRACTICE MAY WARRANT VARIATION AND/OR ADDITIONS TO THE QUANTITIES AND LOCATIONS OF MEASURES AS SHOWN. 2.UNLESS OTHERWISE SHOWN, TEMPORARY CONTROL MEASURES SHALL BE REMOVED UPON SATISFACTORY ESTABLISHMENT OF PERMANENT VEGETATION. 3.SEE SHEET C403 FOR DETAILS AND SPECIFICATIONS REFERENCED ON THIS SHEET. 4.PERIMETER CONTROL MEASURES (I.E. SILT FENCE, DIVERSION DITCHES, TREE PROTECTION FENCING) SHALL BE INSTALLED PRIOR TO COMMENCING EARTHWORK ACTIVITIES. 5.IN ADDITION TO THE MAINTENANCE REQUIREMENTS IDENTIFIED FOR INDIVIDUAL MEASURES, ALL EROSION CONTROL MEASURES INSTALLED UNDER THIS PROJECT SHALL BE INSPECTED WEEKLY TO ENSURE THEY ARE FUNCTIONING PROPERLY. MEASURES FOUND TO BE DEFICIENT SHALL BE REPAIRED OR REPLACED IMMEDIATELY THEREAFTER. 6.THE CONTRACTOR SHALL MAINTAIN A STABLE CONSTRUCTION ENTRANCE AT ALL TIMES AND SHALL MAKE EFFORTS TO MINIMIZE THE ACCUMULATION OF SOIL, MUD AND DEBRIS ON ADJOINING ROADWAYS. 7.SYMBOLS FOR INLET PROTECTION MEASURES AND DITCH CHECKS ARE SHOWN LARGER THAN ACTUAL SIZE. 8.DISTURBED AREAS AND STOCKPILES THAT ARE TO REMAIN IDLE FOR MORE THAN 14 DAYS SHALL BE STABILIZED WITH TEMPORARY SEEDING. 9.ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BY THE INSPECTOR. 10.PORTABLE TOILETS SHALL BE ANCHORED TO THE GROUND TO PREVENT TIPPING AND SPILLS. THERE SHALL BE NO DIRT, DEBRIS, OR STORAGE OF MATERIAL IN THE STREET ADJACENT ROADS MUST BE SWEPT DAILY SF TP NPDES PUBLIC NOTICE POSTINGNPDES C403 SWPP PLAN (FINAL) TEMPORARY CONSTRUCTION ENTRANCE 6 INCHES OF 2"-3" COARSE AGGREGATE (20'W x 50'L) Minimum EROSION CONTROL BLANKET WITH SEEDING PERMANENT SEEDING WITH MULCH. (SEE LANDSCAPE PLAN FOR EXCLUDED AREAS SUCH AS PLANTING BEDS AND PLAYGROUNDS 1.REPAIR OR REPLACE ALL EXISTING SILT FENCE, CHECK DAMS OR INLET PROTECTION DAMAGED DURING EARTHWORK OR CONSTRUCTION ACTIVITIES. 2.DESIGNATE THE PERSON RESPONSIBLE FOR COMPLYING WITH THE ON-SITE SWPPP INSPECTIONS UNTIL ALL DISTURBED AREAS ON SITE SITE HAVE REACHED 70 PERCENT VEGETATIVE COVER DENSITY. 3.IF WORK OR CONSTRUCTION HAS STOPPED FOR 2 WEEKS OR MORE BEFORE PERMANENT SEED IS APPLIED, INSTALL TEMPORARY SEED AND MULCH AS DESCRIBED ON SHEET C403. COORDINATE RESPONSIBILITY FOR COMPLETING THE SITE REVIEW AFTER EACH 12" RAINFALL AND A MINIMUM OF ONE TIME A WEEK. 4.FOR ALL PHASES, COMPLETE MASS GRADING AND EXCAVATION. INSTALL ALL UTILITIES AS INDICATED. HAUL ALL EXCESS EXCAVATION SPOILS OFFSITE. 5.THIS SITE DRAINS TO AN UNDERGROUND DETENTION SYSTEM. THE UNDERGROUND DETENTION SYSTEM AND THE UPSTREAM AQUASWIRL STRUCTURES (3) SHALL BE INSPECTED MONTHLY THROUGHOUT THE PROJECT CONSTRUCTION. ALL VISIBLE SEDIMENT, IF PRESENT, SHALL BE REMOVED BY VACUUM TRUCK AFTER EACH INSPECTION. 8. COMPLETE FILL, BACKFILL, AND ROUGH GRADING REQUIRED TO RETURN ALL AREAS WITHIN CONSTRUCTION ZONE TO SUBGRADE GRADE ELEVATION INDICATED ON PLANS. ALL FILL MATERIAL UNDER PAVEMENT OR BUILDINGS SHALL BE APPROVED BY ON-SITE GEOTECHNICAL ENGINEER. 9. PREPARE ALL PAVEMENT SUBGRADES PER PLANS AND SPECIFICATIONS. 10. MAINTAIN ALL INLET PROTECTION, CHECK DAMS AND SILT FENCING IN THE SITE PROJECT BY CLEANING OUT EVERY WEEK AND AFTER EVERY RAIN EVENT OF 1/2" OR GREATER DEPTH. 11. PERFORM FINAL GRADING AND SEEDBED PREPARATION. 12. PLACE PERMANENT SEEDING AND MULCH OR EROSION CONTROL BLANKET WITHIN 30 HOURS OF SEEDBED PREPARATION. INSTALL EROSION CONTROL BLANKETS INDICATED ON PLANS. 13. FINAL STABILIZATION IS CONSIDERED COMPLETE WHEN ALL LAND DISTURBING ACTIVITIES HAVE BEEN COMPLETED AND A UNIFORM VEGETATED SURFACE WITH 70% DENSITY IS ACHIEVED ON ALL DISTURBED/DENUDED AREAS AND AREAS NOT HAVING A PERMANENT STRUCTURE. THE CONTRACTOR SHALL OVER-SEED AS REQUIRED TO OBTAIN 70 PERCENT VEGETATIVE DENSITY IF REQUIRED. 14. AFTER SITE HAS REACHED 70% VEGETATIVE COVER, CONTRACTOR SHALL REMOVE REMAINING TEMPORARY BMP STRUCTURES AND REPAIR AND RE-SEED ANY DISTURBED AREAS AS REQUIRED. 15. ONCE THE CONSTRUCTION ACTIVITY IS COMPLETED (BY RULE LANGUAGE, WHEN FINAL STABILIZATION HAS OCCURRED), A COMPLETED RULE 5 NOTICE OF TERMINATION (NOT) MUST BE SUBMITTED TO IDEM. CONSTRUCTION & POST CONSTRUCTION SEQUENCING NOTES NOTES: 1. ALL DISTURBED AREAS SHALL BE STABILIZED WITH SEED AND MULCH, SEED AND EROSION CONTROL BLANKET, PAVEMENT OR LANDSCAPE BEDS WHETHER INDICATED ON THESE PLANS OR NOT. 2.SEE LANDSCAPE PLANS FOR SPECIFIC STABILIZATION METHODS AND MATERIALS IN PARKING LOT BEDS, AND AREAS AROUND THE BUILDING. 3.SEE LANDSCAPE PLANS FOR PLAYGROUND AREAS. 1 TAC COMMENTS 12/20/20191