HomeMy WebLinkAboutC504 - PLAN & PROFILE (STORM) (V2)OHUOHUOHUOHUOHUOHUOHUOHUOHUOHUBUSONLY6''SSD 6''SSD
6''SSD6''SSD
6''SS
D
6''SSD6''SSD
6''SSD
6'
'SSD
6''SSD 6''SSD
6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD 6''SSD6''SSD6''SSDRD
RDR
D
R
D
RDRD
R
D
RDRD
R
D
R
D
R
D
R
D
R
D
R
D
R
D
R
D
R
D
NO PARKING
C
.O
.
T
Y
P
E
I
C
.O
.
T
Y
P
E
I
C
.O
.
T
Y
P
E
I
C
.O
.
T
Y
P
E
I
730
RIM=855.10
722
RIM=854.80
725
RIM=854.75
729
RIM=854.30
719
RIM=854.20
721
RIM=854.10
728
RIM=854.00
727
RIM=854.00
720
RIM=852.90
718
RIM=852.90
24' OF 15" RCP
73' OF 12"
R
CP
@0.55
%
75'
O
F
1
2
"
R
C
P
@
0
.
5
3
%106' OF 18"
R
CP
@0.38
%105' OF 24"
R
CP
@0.29
%116' OF 24" RCP@0.30%7
4
'
O
F
1
2
"
H
D
P
E@0.
8
1%54' OF 12" HDPE@0.56
%
9
8
'
O
F
1
2
"
R
C
P@0
.
6
1%
5
3
'
O
F
1
2
"
H
D
P
E@1
.
1
3%427' OF 8"
H
DPE
@0.50
%
26
1
'
O
F
8
"
H
D
P
E
STR. #730 24 INCH NYLOPLAST STRUCTURE, OPEN GRATETC: 855.10INV. OUT 851.10 (12" HDPE (SE))STR. #722 MANHOLE, 4' DIA.; R-1772TC: 854.80INV. OUT 849.90 (12" RCP (NE))STR. #721 MANHOLE, 4' DIA.; R-1772TC: 854.10INV. IN 850.50 (12" HDPE (NW))INV. IN 849.50 (12" RCP (SW))INV. OUT 849.40 (12" RCP (SE))STR. #720 MH 4' DIA; R-3405TC: 852.90INV. IN 849.00 (12" RCP (NW))INV. OUT 848.60 (18" RCP (NE)) 74' 0.81% 12" HD
P
E
73' 0.55% 12" RCP
75' 0.53% 12" RCP
106' 0.38% 18" RCP STR. #729 24 INCH NYLOPLAST STRUCTURE, OPEN GRATETC: 854.30INV. OUT 850.30 (12" HDPE (SE)) 53' 1.13% 1
2
"
H
D
P
E STR. #727 MH 4' DIA; R-3405TC: 854.00INV. IN 849.70 (12" HDPE (NE))INV. IN 849.70 (12" HDPE (NW))INV. OUT 849.60 (12" RCP (SE))STR. #728 24 INCH NYLOPLAST STRUCTURE, OPEN GRATETC: 854.00INV. OUT 850.00 (12" HDPE (SW)) 54' 0.56% 12" HDPE STR. #727 MH 4' DIA; R-3405TC: 854.00INV. IN 849.70 (12" HDPE (NE))INV. IN 849.70 (12" HDPE (NW))INV. OUT 849.60 (12" RCP (SE)) 98' 0.61% 12" RCP
STRUCTURE 730,721 STRUCTURE 722-719 STRUCTURE 729,727 STRUCTURE 728-727,719STR. #721 MANHOLE, 4' DIA.; R-1772TC: 854.10INV. IN 850.50 (12" HDPE (NW))INV. IN 849.50 (12" RCP (SW))INV. OUT 849.40 (12" RCP (SE))STR. #719 MANHOLE, 4' DIA.; R-1772TC: 854.20INV. IN 848.20 (18" RCP (SW))INV. IN 849.00 (12" RCP (NW))INV. OUT 848.10 (24" RCP (NE))STR. #719 MANHOLE, 4' DIA.; R-1772TC: 854.20INV. IN 848.20 (18" RCP (SW))INV. IN 849.00 (12" RCP (NW))INV. OUT 848.10 (24" RCP (NE))10 - YEAR HGL
10 - YEAR HGL
10 - YEAR HGL
10 - YEAR HGL
FG
EG
FG
EG
FG
EG
FG
EG
(PRIVATE)
(PRIVATE)
(PRIVATE)
(PRIVATE)
(PRIVATE)(PRIVATE)
(PRIVATE)
1. TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION
TO CONFORM TO APPLICABLE LOCAL AND STATE
STANDARDS.
2. ALL CONSTRUCTION ACTIVITY ON THIS SITE TO BE
PERFORMED IN COMPLIANCE WITH APPLICABLE 0.S.H.A.
STANDARDS FOR WORKER SAFETY.
3. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD
VERIFY ALL UTILITY LOCATIONS BEFORE CONSTRUCTION
BEGINS.
4. CONTRACTORS SHALL MINIMIZE DAMAGE TO EXISTING
TREES.
Project Number:
Drawing Number:
Certified By:
Checked ByDrawn ByIssue Date
Revisions:PROJECT:Scope Drawings:CARMEL, INDIANAFORCARMEL CLAY SCHOOLSNEW ELEMENTARY SCHOOLSDrawing Title:
11-19-19 SO MK
18094
Rev. #Revision
Description
Issue
Date
STORM SEWER PLAN
SCALE:HORZ.: 1"=30'
VERT.: 1"=3'
GENERAL NOTES
LEGEND
Existing Grade New Grade Granular Backfill
SCALE: 1" = 30'
PLAN & PROFILE
(STORM)
C504
1 TAC COMMENTS 12/20/2019
The storm sewer system shall be constructed per design specified
and as approved by the City of Carmel on the final approved
construction plans. Deviations from the approved design shall only
be permitted due to special circumstances or difficulty during
construction and will require prior field approval from a designated
representative of the City of Carmel in addition to supplemental
approval by the design engineer. An explanation of any such
deviation shall be included as a requirement on as-built/record
drawings submitted for release of performance guarantees.
Approved design slopes identified as generating velocities of 2.5
fps or less or 10 fps or greater (at full flow capacity) shall require
as-built certification at the time of construction, prior to backfilling
the pipe. The contractor is instructed to as-built each section of
storm pipe as it is being installed to ensure compliance with the
design plans and as approved by the City of Carmel.
AS-BUILT NOTES
2 TAC COMMENTS 1/3/2020
2
GRANULAR BACKFILL NOTES
·For RCP storm pipe granular backfill, refer to detail 3, sheet C601.
·For HDPE storm pipe granular backfill, refer to detail 4, sheet
C601.
·For PVC sanitary sewer, see Carmel Utilities Trench Detail &
Trench Schedule on sheet C606.