Loading...
HomeMy WebLinkAboutC505 - PLAN & PROFILE (STORM) (V2)OHUOHUOHUOHUOHUOHUOHUOHUOHU6''SSD 6''SSD 6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD 6''SSD6''SSD6''SSDR D RD RD R D R D R D R D NO PARKING C .O . T Y P E I C .O . T Y P E I 6''SSD6''SSD6''SSD6''SSD6''SSD726 RIM=855.10 725 RIM=854.75 719 RIM=854.20 728 RIM=854.00 RIM=854.00 717 RIM=853.00 716 RIM=853.00 718 RIM=852.90 105' OF 24" R CP @0.29 %116' OF 24" RCP@0.30%52' OF 24" RCP@0.39%54' OF 12" HDPE@0.56 % 9 8 ' O F 1 2 " R C P@0 . 6 1% 6 7 ' O F 1 2 " H D P E@1. 7 9% 52' OF 12" RCP @0.97%427' OF 8" H DPE @0.50 % STRUCTURE 726-725,717 STRUCTURE 719-715STR. #726 24 INCH NYLOPLAST STRUCTURE, OPEN GRATETC: 855.10INV. OUT 851.10 (12" HDPE (SE)) 67' 1.7 9 % 1 2 " H D P E STR. #725 MH 4' DIA; R-3405TC: 854.75INV. IN 849.90 (12" HDPE (NW))INV. OUT 849.80 (12" RCP (E)) 52' 0.97% 12" R C P STR. #717 MH 5' DIA.;R-3405TC: 853.00INV. IN 847.35 (24" RCP (S))INV. IN 849.30 (12" RCP (W))INV. OUT 847.25 (24" RCP (N))STR. #719 MANHOLE, 4' DIA.; R-1772TC: 854.20INV. IN 848.20 (18" RCP (SW))INV. IN 849.00 (12" RCP (NW))INV. OUT 848.10 (24" RCP (NE)) 105' 0.29% 24" RCP STR. #718 MH 4' DIA; R-3405TC: 852.90INV. IN 847.80 (24" RCP (SW))INV. OUT 847.70 (24" RCP (N)) 116' 0.30% 24" RCP STR. #717 MH 5' DIA.;R-3405TC: 853.00INV. IN 847.35 (24" RCP (S))INV. IN 849.30 (12" RCP (W))INV. OUT 847.25 (24" RCP (N)) 52' 0.39% 24" RCP STR. #716 MH 4' DIA; R-3405TC: 853.00INV. IN 847.05 (24" RCP (S))INV. OUT 846.95 (24" RCP (N)) 142' 0.46% 24" RCP STR. #715 MH 4' DIA; R-3405TC: 851.50INV. IN 846.30 (24" RCP (S))INV. OUT 846.20 (24" RCP (N))10 - YEAR HGL 10 - YEAR HGL FG EG FG EG FG EG (PRIVATE) (PRIVATE) (PRIVATE) (PRIVATE)(PRIVATE) (PRIVATE)OHUOHUOHUOHUOHUOHUOHUOHUOHUR D R DRDRD RDR D R D R D R D R D C .O . T Y P E I 6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSDH.Pt. 726 RIM=855.10 725 RIM=854.75 717 RIM=853.00 716 RIM=853.00 715 RIM=851.50 116' OF 24" RCP@0.30%52' OF 24" RCP@0.39%142' OF 24" RCP@0.46%60' OF 24" RCP6 7 ' O F 1 2 " H D P E@1. 7 9% 52' OF 12" RCP @0.97% 1. TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL AND STATE STANDARDS. 2. ALL CONSTRUCTION ACTIVITY ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH APPLICABLE 0.S.H.A. STANDARDS FOR WORKER SAFETY. 3. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY ALL UTILITY LOCATIONS BEFORE CONSTRUCTION BEGINS. 4. CONTRACTORS SHALL MINIMIZE DAMAGE TO EXISTING TREES. Project Number: Drawing Number: Certified By: Checked ByDrawn ByIssue Date Revisions:PROJECT:Scope Drawings:CARMEL, INDIANAFORCARMEL CLAY SCHOOLSNEW ELEMENTARY SCHOOLSDrawing Title: 11-19-19 SO MK 18094 Rev. #Revision Description Issue Date STORM SEWER PLAN SCALE:HORZ.: 1"=30' VERT.: 1"=3' GENERAL NOTES LEGEND Existing Grade New Grade Granular Backfill SCALE: 1" = 30' C505 PLAN & PROFILE (STORM) 1 TAC COMMENTS 12/20/2019 The storm sewer system shall be constructed per design specified and as approved by the City of Carmel on the final approved construction plans. Deviations from the approved design shall only be permitted due to special circumstances or difficulty during construction and will require prior field approval from a designated representative of the City of Carmel in addition to supplemental approval by the design engineer. An explanation of any such deviation shall be included as a requirement on as-built/record drawings submitted for release of performance guarantees. Approved design slopes identified as generating velocities of 2.5 fps or less or 10 fps or greater (at full flow capacity) shall require as-built certification at the time of construction, prior to backfilling the pipe. The contractor is instructed to as-built each section of storm pipe as it is being installed to ensure compliance with the design plans and as approved by the City of Carmel. AS-BUILT NOTES 2 TAC COMMENTS 1/3/2020 2 GRANULAR BACKFILL NOTES ·For RCP storm pipe granular backfill, refer to detail 3, sheet C601. ·For HDPE storm pipe granular backfill, refer to detail 4, sheet C601. ·For PVC sanitary sewer, see Carmel Utilities Trench Detail & Trench Schedule on sheet C606.