Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
C1-02-SITE-DEMOLITION-PLAN-Rev.2
DRAWING NO.DATEGSB PROJECT NO.DRAWING TITLECopyright © GSB, Inc ISSUED FOR CONSTRUCTION 06/04/18171528CARMEL, IN HOTELCARMICHAELAT CITYCENTER2017NO. DATE DESCRIPTIONCARMEL, INARCHITECTGSB, INC3555 NW 58th Street, Suite 700WOklahoma City, OK 73112405 / 848-9549CIVIL ENGINEERCircle Design Group9229 Delegates Row, Suite 150Indianapolis, IN 46240317 / 706-2075STRUCTURAL ENGINEERStructurePoint7260 Shadeland StationIndianapolis, IN 46256317 / 547-5580MEP ENGINEERCircle Design Group9229 Delegates Row, Suite 150Indianapolis, IN 46240317 / 706-2075INTERIOR DESIGNERHBA Hirsch Bedner Associates171 17th Street NW, Suite 600Atlanta, GA 30363404 / 873-4379FOOD SERVICE CONSULTANTRicca Design Studios5325 South Valentia WayGreenwood Village, CO 80111303 / 928-1333AT CITY CENTERSITE DEMOLITIONPLANC1-02 1" = 20'-0"C1-021SITE DEMOLITION PLAN