HomeMy WebLinkAboutLandscape Plans stamped approved 11-22-19141st StreetShelborne Road
(11) Ulm-v
(3) Bet-n
(5) Vib-x
(15) Aro-a
(3) Pic-a
(1) Que-b
(3) Nys-s
(5) Cor-s
(2) Que-r
(5) Cor-s
(3) Myr-p
(1) Que-b
(1) Que-r
(1) Gle-t
(5) Cor-s
(3) Gin-p
(2) Pic-d
(2) Que-b
(13) Vib-x
(3) Pic-d
(2) Pic-p
(2) Pic-d
(15) Ile-v
(2) Lir-t
(1) Bet-n
(7) Jun-v
(8) Die-l
(7) Jun-v
(1) Bet-n
(34) Dia-x
(5) Cla-k(4) Gle-t
(3) Pla-a
(2) Ame-x
(15) Hyd-w
(43) Dia-x
(5) Cor-c
(3) Pan-v
(10) Ite-v
(32) Spo-h
(11) Ile-v
(3) Vib-x
(3) Phy-o
(7) Bux-x
(3) Syr-r
(3) Vib-x
(9) Cal-x
(13) Bux-x
(5) Nep-x
(8) Ile-v
(6) Cal-x
(5) Ile-v
(2) Zel-s
(10) Nep-x
(17) Bux-x
(3) Syr-r
(9) Cal-x
(3) Vib-x
(7) Bux-x
(3) Phy-o
(6) Cor-c
(13) Hyd-w
(50) Dia-x
(2) Ame-x
(9) Ite-v
(3) Pan-v
(27) Spo-h
(12) Die-l
(1) Gle-t (3) Pic-a
(1) Bet-n
(7) Vib-x
(3) Pic-d
(5) Vib-x
(5) Ulm-v
(10) Vib-x
(4) Vib-x(1) Ulm-v
(12) Ite-v
(1) Zel-s
(5) Die-l
(3) Pic-o
(3) Que-x
(1) Lir-t
(3) Pic-o(3) Que-x
(9) Ile-v
(1) Pla-a
(16) Die-l
(7) Vib-x
(2) Pic-a
(2) Lir-t
(2) Que-b
(7) Vib-x
(6) Myr-p
(19) Hyd-q
(12) Aro-a
(3) Pic-p(1) Pla-a
(20) Phy-o
(2) Cer-c
(3) Bet-n
(27) Die-l
(3) Pic-o
(2) Bet-n
(2) Pic-p
(2) Pic-a
(5) Ame-x(2) Que-b
(3) Pic-a
(2) Que-b
(14) Cor-s
(3) Gle-t
(5) Zel-s
(1) Ulm-v
(12) Ite-v
(6) Cal-x
(1) Que-b
(1) Lir-t
Existing Trees, typ.
(2) Gle-t
(4) Cla-k
(4) Ame-x
(1) Que-b
(3) Cer-c
(14) Nep-x
(11) Bux-x
(7) Cal-x
(76) All-m
(35) Nep-x
(47) Nep-x
(85) All-m
(11) Aro-a
(9) Aro-a
10'-0"10'-0"30'-0"ORDINANCE CHART
Zoning: S-1 - place of worship
Adjacent zoning:
North: S-1 single family home (same owner) - Buffer Yard D
East: Secondary Arterial - Buffer Yard A
South: Residential Parkway - Buffer Yard A
West: S-1 - single family - Buffer Yard D
BUFFERS*
Requirements
Type A: 4 shade or evergreen trees + 10 shrubs/100 l.f.
Type D: 8 shade or evergreen (min. 30%) trees + 2 ornamental trees + 20 shrubs
*buffer edge lengths are of the area to be constructed only, not the entire buffer
yard length of the property
Required
North: Type D @ 328 l.f. = 26 shade or evergreen trees + 7 ornamental trees +
66 shrubs
East: Type A @ 741 l.f. = 30 shade or evergreen trees + 74 shrubs
South 1: Type A @ 328 l.f. = 13 shade or evergreen trees + 33 shrubs
West: Type D @ 687 l.f. (extents of development) = 55 shade or evergreen trees
+ 14 ornamental trees + 137 shrubs
Provided:
North: 41 existing trees to remain on north parcel + 5 shade trees + 2 evergreen
trees + 39 shrubs
East: 30 shade/evergreen trees + 74 shrubs
South: 13 shade/evergreen trees + 33 shrubs
West: 38 shade trees + 21 evergreen trees + 15 ornamental trees + 148 shrubs
PARKING LOT INTERIOR
Requirement: Provide 1 shade tree + five shrubs/10 spaces
Required: 108 spaces/10 = 11 shade trees + 54 shrubs
Provided: 11 shade trees + 54 shrubs
FOUNDATION PLANTINGS
Requirement: Provide planting beds at 5 foot width around entire building; shrubs,
grasses, and ground cover shall cover at least 75% of this area.
Required: 495 l.f. x 5 s.f. = 2,475 s.f. x 75% = 1,856 s.f.of planting bed
Provided: 2,643 s.f. planting bed
STREET TREES (No Median)
Requirement: Provide within the ROW trees spaced between 25' min. to 50' max.
Required:
Shelborne Road: 741 l.f. - 25 l.f. (curb cut) = 14-29 trees
141st Street: 328 l.f. - 25 l.f. (curb cut) = : 6 to 12 tree
Provided:
Shelborne Road: 15 trees
141st Street: 6 trees
These Drawings and Specifications, and all copies
thereof are and shall remain the property and
copyright of the Landscape Architect. They shall
be used only with respect to this Project and are
not to be used on any other Project or Work
without prior written permission from the
Landscape Architect.
Sheet No: Revision Date Description Certified by:
Consultant:Sheet Title:NOT FOR CONSTRUCTION
Date: 10.15.2019
Job No: 2018-1162
Drawn by: app
Checked by: appSubmittal Drawings for theISLAMIC LIFE CENTER141st and Shelborne Road, Carmel, IndianaLandscape PlanL100
0
Scale 1" = 30'-0"
60'30' 15'
North
1. Plant material to be installed and maintained by a qualified and experienced landscape installer.
2. All materials are subject to the approval of the Landscape Architect and Owner at any time. Landscape Architect
to inspect all plant locations and plant bed conditions prior to installation. Stake all plant locations for review and
approval by the Landscape Architect before planting. On-site adjustments may be required. Plants are to be
freshly dug. Transporting of plants shall be done in a manner as to not destroy the natural shape, compromise the
health, or alter the characteristics of plant materials.
3. Rootballs shall meet or exceed size standards as set forth in 'American Standards for Nursery Stock'. MAIN
LEADERS OF ALL TREES SHALL REMAIN INTACT. Remove from the site any plant material that turns brown
or defoliates within five (5) days after planting. Replace immediately with approved, specified material.
4. Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall make own plant
quantity takeoffs using drawings, specifications, and plant schedule requirements (i.e., spacing), unless otherwise
directed by Landscape Architect. Contractor to verify bed measurements and install appropriate quantities as
governed by plant spacing per schedule.
5. All plant beds shall receive 3" minimum of genuine shredded hardwood bark mulch (unless otherwise noted).
Apply pre-emergent herbicide as directed by the manufacturer prior to installing mulch. Seed all areas disturbed
by construction activities that are not otherwise noted to receive pavement, planting bed, or other treatment.
6. The Contractor shall install and/or amend topsoil in all proposed bed areas to meet ASTM D5268 standards.
Landscaper shall verify depth and quality of topsoil prior to plant installation. A minimum of 4" of topsoil is required
for lawn areas; 12" for plant beds. Topsoil sources shall include the reuse of surface soil stockpiled on site, clean
of roots, plants, sod, stones, clay lumps, and other extraneous or foreign materials larger than 1". Supplement with
imported topsoil from off-site sources when quantities are insufficient. Do not obtain supplemental topsoil from
agricultural land, bogs, or marshes. Inorganic amendments, organic amendments, and fertilizers shall be used to
amend topsoil as needed for long-term plant health.
7. Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to satisfaction of the
Owner and Operating Authority at no additional cost.
8. Install all plant material in accordance with all local codes and ordinances. Coordinate with the Owner to obtain
any required permits necessary to complete work. All workmanship and materials shall be guaranteed by the
Contractor for a period of one (1) calendar year after Final Acceptance.
9. Maintain all plant material for a three (3) month period from date of Substantial Completion. Maintenance shall
include pruning, cultivating, watering, weeding, fertilizing, restoring plant saucers, spraying for disease and
insects, and replacing tree wrappings. Recommended long-term maintenance procedures shall be provided to the
Owner before expiration of this period.
10. Satisfactory Seeded Lawn: At end of maintenance period, a healthy, uniform, close stand of grass has been
established, free of weeds and surface irregularities, with coverage exceeding 90 percent over any 10 sq. ft. (0.92
sq. m) and bare spots not exceeding 3 by 3 inches.Reestablish lawns that do not comply with requirements and
continue maintenance until lawns are fully satisfactory to the Owner.
DESIGN/BUILD LANDSCAPE AND
PLANTING NOTES
ORDINANCE CHART LANDSCAPING MUST BE PLANTED ACCORDING TO THE
DETAILS ON SHEET L102 - SEE PLANTING DETAILS.
11/22/2019 Daren Mindham
Shelborne Road
Gle-t (3) Pic-a
(1) Bet-n
(7) Vib-x
(3) Pic-d
(5) Vib-x
(5) Ulm-v
(10) Vib-x
(4) Vib-xUlm-v
Ite-v
Existing Trees, typ.
Existing Evergreen Row of Trees to Remain
(2) Gle-t
(1) Que-b
(3) Cer-c
(11) Aro-a
(9) Aro-a
30'-0"
ORDINANCE CHART
Zoning: S-1 - place of worship
Adjacent zoning:
North: S-1 single family home (same owner) - Buffer Yard D
East: Secondary Arterial - Buffer Yard A
South: Residential Parkway - Buffer Yard A
West: S-1 - single family - Buffer Yard D
BUFFERS*
Requirements
Type A: 4 shade or evergreen trees + 10 shrubs/100 l.f.
Type D: 8 shade or evergreen (min. 30%) trees + 2 ornamental trees + 20 shrubs
*buffer edge lengths are of the area to be constructed only, not the entire buffer
yard length of the property
Required
North: Type D @ 328 l.f. = 26 shade or evergreen trees + 7 ornamental trees +
66 shrubs
East: Type A @ 741 l.f. = 30 shade or evergreen trees + 74 shrubs
South 1: Type A @ 328 l.f. = 13 shade or evergreen trees + 33 shrubs
West: Type D @ 687 l.f. (extents of development) = 55 shade or evergreen trees
+ 14 ornamental trees + 137 shrubs
Provided:
North: 41 existing trees to remain on north parcel + 5 shade trees + 2 evergreen
trees + 39 shrubs
East: 30 shade/evergreen trees + 74 shrubs
South: 13 shade/evergreen trees + 33 shrubs
West: 38 shade trees + 21 evergreen trees + 15 ornamental trees + 148 shrubs
PARKING LOT INTERIOR
Requirement: Provide 1 shade tree + five shrubs/10 spaces
Required: 108 spaces/10 = 11 shade trees + 54 shrubs
Provided: 11 shade trees + 54 shrubs
FOUNDATION PLANTINGS
Requirement: Provide planting beds at 5 foot width around entire building; shrubs,
grasses, and ground cover shall cover at least 75% of this area.
Required: 495 l.f. x 5 s.f. = 2,475 s.f. x 75% = 1,856 s.f.of planting bed
Provided: 2,643 s.f. planting bed
STREET TREES (No Median)
Requirement: Provide within the ROW trees spaced between 25' min. to 50' max.
Required:
Shelborne Road: 741 l.f. - 25 l.f. (curb cut) = 14-29 trees
141st Street: 328 l.f. - 25 l.f. (curb cut) = : 6 to 12 tree
Provided:
Shelborne Road: 15 trees
141st Street: 6 trees
These Drawings and Specifications, and all copies
thereof are and shall remain the property and
copyright of the Landscape Architect. They shall
be used only with respect to this Project and are
not to be used on any other Project or Work
without prior written permission from the
Landscape Architect.
Sheet No: Revision Date Description Certified by:
Consultant:Sheet Title:NOT FOR CONSTRUCTION
Date: 10.15.2019
Job No: 2018-1162
Drawn by: app
Checked by: appSubmittal Drawings for theISLAMIC LIFE CENTER141st and Shelborne Road, Carmel, Indiana0
Scale 1" = 30'-0"
60'30' 15' Landscape PlanL101
North
1. Plant material to be installed and maintained by a qualified and experienced landscape installer.
2. All materials are subject to the approval of the Landscape Architect and Owner at any time. Landscape Architect
to inspect all plant locations and plant bed conditions prior to installation. Stake all plant locations for review and
approval by the Landscape Architect before planting. On-site adjustments may be required. Plants are to be
freshly dug. Transporting of plants shall be done in a manner as to not destroy the natural shape, compromise the
health, or alter the characteristics of plant materials.
3. Rootballs shall meet or exceed size standards as set forth in 'American Standards for Nursery Stock'. MAIN
LEADERS OF ALL TREES SHALL REMAIN INTACT. Remove from the site any plant material that turns brown
or defoliates within five (5) days after planting. Replace immediately with approved, specified material.
4. Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall make own plant
quantity takeoffs using drawings, specifications, and plant schedule requirements (i.e., spacing), unless otherwise
directed by Landscape Architect. Contractor to verify bed measurements and install appropriate quantities as
governed by plant spacing per schedule.
5. All plant beds shall receive 3" minimum of genuine shredded hardwood bark mulch (unless otherwise noted).
Apply pre-emergent herbicide as directed by the manufacturer prior to installing mulch. Seed all areas disturbed
by construction activities that are not otherwise noted to receive pavement, planting bed, or other treatment.
6. The Contractor shall install and/or amend topsoil in all proposed bed areas to meet ASTM D5268 standards.
Landscaper shall verify depth and quality of topsoil prior to plant installation. A minimum of 4" of topsoil is required
for lawn areas; 12" for plant beds. Topsoil sources shall include the reuse of surface soil stockpiled on site, clean
of roots, plants, sod, stones, clay lumps, and other extraneous or foreign materials larger than 1". Supplement with
imported topsoil from off-site sources when quantities are insufficient. Do not obtain supplemental topsoil from
agricultural land, bogs, or marshes. Inorganic amendments, organic amendments, and fertilizers shall be used to
amend topsoil as needed for long-term plant health.
7. Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to satisfaction of the
Owner and Operating Authority at no additional cost.
8. Install all plant material in accordance with all local codes and ordinances. Coordinate with the Owner to obtain
any required permits necessary to complete work. All workmanship and materials shall be guaranteed by the
Contractor for a period of one (1) calendar year after Final Acceptance.
9. Maintain all plant material for a three (3) month period from date of Substantial Completion. Maintenance shall
include pruning, cultivating, watering, weeding, fertilizing, restoring plant saucers, spraying for disease and
insects, and replacing tree wrappings. Recommended long-term maintenance procedures shall be provided to the
Owner before expiration of this period.
10. Satisfactory Seeded Lawn: At end of maintenance period, a healthy, uniform, close stand of grass has been
established, free of weeds and surface irregularities, with coverage exceeding 90 percent over any 10 sq. ft. (0.92
sq. m) and bare spots not exceeding 3 by 3 inches.Reestablish lawns that do not comply with requirements and
continue maintenance until lawns are fully satisfactory to the Owner.
DESIGN/BUILD LANDSCAPE AND
PLANTING NOTES
ORDINANCE CHART
Enlarged Landscape Plan
Refer to L101
LANDSCAPING MUST BE PLANTED ACCORDING TO THE
DETAILS ON SHEET L102 - SEE PLANTING DETAILS.
11/22/2019 Daren Mindham
TREES QTY BOTANICAL NAME COMMON NAME CONT CAL REMARKS
Bet-n 11 Betula nigra River Birch B & B min. 8` ht. clump form, 3-5 stems
Cla-k 9 Cladrastis kentukea American Yellowwood B & B min. 2.5" cal. full, strong central leader, matched
Gin-p 3 Ginkgo biloba `Princeton Sentry` Princeton Sentry Ginkgo B & B min. 2.5" cal. full, strong central leader, matched
Gle-t 11 Gleditsia triacanthos inermis `Skycole` Skyline Thornless Honeylocust B & B min. 2.5" cal. full, strong central leader, matched
Lir-t 6 Liriodendron tulipifera Tulip Tree B & B min. 2.5" cal. full, strong central leader, matched
Nys-s 3 Nyssa sylvatica Sour Gum B & B min. 2.5" cal. full, strong central leader, matched
Pla-a 5 Platanus x acerifolia `Bloodgood` London Plane Tree B & B min. 2.5" cal. full, strong central leader, matched
Que-b 12 Quercus bicolor Swamp White Oak B & B min. 2.5" cal. spring dug, full, strong central leader,
matched
Que-x 6 Quercus robur `Fastigiata` Columnar English Oak B & B min. 2.5" cal. spring dug, full, strong central leader,
matched
Que-r 3 Quercus rubra Red Oak B & B min. 2.5" cal. spring dug, full, strong central leader,
matched
Ulm-v 18 Ulmus americana `Valley Forge` Valley Forge Elm B & B min. 2.5" cal. full, strong central leader, matched
Zel-s 8 Zelkova serrata `Green Vase` Green Vase Sawleaf Zelkova B & B min. 2.5" cal. full, strong central leader, matched
EVERGREEN TREES QTY BOTANICAL NAME COMMON NAME CONT CAL REMARKS
Pic-a 13 Picea abies Norway Spruce B & B min. 6` ht. full, strong central leader, matched,
symmetrical
Pic-d 10 Picea glauca `Densata` Black Hills Spruce B & B min. 6` ht. full, strong central leader, matched,
symmetrical
Pic-o 9 Picea omorika Serbian Spruce B & B min. 6` ht. full, strong central leader, matched,
symmetrical
Pic-p 7 Picea pungens Colorado Spruce B & B min. 6` ht. full, strong central leader, matched,
symmetrical
ORNAMENTAL TREES QTY BOTANICAL NAME COMMON NAME CONT CAL REMARKS
Ame-x 13 Amelanchier x grandiflora `Autumn Brilliance` Autumn Brilliance Serviceberry B & B min. 6` ht. clump form, 5-13 stems
Cer-c 5 Cercis canadensis Eastern Redbud B & B min. 6` ht. clump form, 3-7 stems
Syr-r 6 Syringa reticulata `Ivory Silk` Ivory Silk Japanese Tree Lilac B & B min. 1.5" cal. full, strong central leader, matched
SHRUBS QTY BOTANICAL NAME COMMON NAME SIZE HEIGHT REMARKS
Aro-a 47 Aronia arbutifolia `Brilliantissima` Brilliant Red Chokeberry container 24" space @ 3`-0" o.c.
Bux-x 55 Buxus x koreana `Winter Gem` Winter Gem Boxwood container 24" space @3`-0" o.c. allow to mass
Cor-c 11 Cornus sericea `Arctic Fire` Arctic Fire Red Twig Dogwood container 24" space @ 2`-6" o.c.
Cor-s 29 Cornus sericea `Cardinal` Cardinal Red-twig Dogwood container 24" space @ 4`-0" o.c.
Die-l 68 Diervilla lonicera `Kodiac Orange` Kodiac Orange Northern Bush Honeysuckle container 24" space @ 3`-0" o.c.
Hyd-q 19 Hydrangea quercifolia Oakleaf Hydrangea container 24" space @ 4`-0" o.c.
Hyd-w 28 Hydrangea quercifolia `Pee Wee` Pee Wee Oakleaf Hydrangea container 24" space @ 3`-0" o.c.
Ile-v 48 Ilex verticillata `Red Sprite` Red Sprite Winterberry container 24" space @ 4`-0" o.c., allow to mass; provide 1
Jim Dandy per 5 Red Sprites
Ite-v 43 Itea virginica `Sprich` Little Henry Viriginia Sweetspire container 18" ht. min. space @ 3`-0" o.c.
Jun-v 14 Juniperus virginiana `Grey Owl` Eastern Redcedar container 18" space @ 3`-0" o.c. allow to mass
Myr-p 9 Myrica pensylvanica Northern Bayberry container 24" space @ 5`-6" o.c., allow to mass
Phy-o 26 Physocarpus opulifolius `Summer Wine` Summer Wine Ninebark container 30" spae @ 4`-0" o.c.
Vib-x 67 Viburnum x juddii Judd Viburnum container 30" space @ 5`-0" o.c.
GRASSES QTY BOTANICAL NAME COMMON NAME SIZE HEIGHT REMARKS
Cal-x 37 Calamagrostis x acutiflora `Karl Foerster` Karl Foerster Feather Reed Grass pot #2 space @ 2`-6" o.c.
Pan-v 6 Panicum virgatum `Heavy Metal` Heavy Metal Switch Grass pot #2 space @ 3`-0" o.c.
Spo-h 59 Sporobolus heterolepis Prairie Dropseed pot #1 space @ 2`-0" o.c.
ANNUALS/PERENNIALS QTY BOTANICAL NAME COMMON NAME SIZE HEIGHT REMARKS
All-m 161 Allium x `Millenium` Millenium Ornamental Onion pot #1 space @ 15" o.c.
Dia-x 127 Dianthus x `Fire and Ice` Fire and Ice Carnation pot #1 space @ 12" o.c.
Nep-x 111 Nepeta x faassenii `Junior Walker` Junior Walker Catmint pot #1 space @ 2`-6"
PLANT SCHEDULE
These Drawings and Specifications, and all copies
thereof are and shall remain the property and
copyright of the Landscape Architect. They shall
be used only with respect to this Project and are
not to be used on any other Project or Work
without prior written permission from the
Landscape Architect.
Sheet No: Revision Date Description Certified by:
Consultant:Sheet Title:NOT FOR CONSTRUCTION
Date: 10.15.2019
Job No: 2018-1162
Drawn by: app
Checked by: appSubmittal Drawings for theISLAMIC LIFE CENTER141st and Shelborne Road, Carmel, IndianaLandscape DetailsL10212"Compacted subgrade3"Shredded Hardwood Organic Mulch
Place level with adjacent finish grades.
Refer to Special Provisions.min.Topsoil, to include a min. of 5% organic matter
Remove all stones 1" & larger and
other extraneous materials. Refer to Special Provisions.
LANDSCAPE BED PREPARATION
Not to Scale
Adjacent sidewalk or curb, typ.
3" shredded hardwood bark mulch
Refer to Planting Schedule for On-Center
Note: All perennial beds shall be planted
12" prepared soil; see specifications
Remove container
using triangular planting scheme.
Compacted subgrade
planting dimension.
Existing grade.
PERENNIAL PLANTING
Not to Scale
Area to receive lawn
11/22/2019 Daren Mindham