Loading...
HomeMy WebLinkAboutSchutt-Lookabill/Eng/CO $6/1,858.46/136th St. Multi-Use Path and Pedestrian Bridge Project - Project #18- ENG - 08 City of Carmel Project 18-ENG-08 136th Multi-Use Path and Pedestrian Bridge CHANGE ORDER#6 14 Change in Contract to include additional costs for protection of existing utilities in conflict with multi-use path located at First Ave. and Pedestrian Bridge over Cool Creek. Contract Price prior to this Change Order $1,789,051.23 Contract Price will be increased by this Change Order $1,858.46 New Contract Price including this Change Order $1,790,909.69 Amount Adjusted Contract Cumulative%Change Price from Original Contract Original Contract $1,775,981.08 N/A N/A CO 001 ($15,099.91) $1,760,881,17 -0.85% CO 002 $2,563.14 $1,763,444.31 -0.71% CO 003 $22,025.00 $1,785,469.31 0.39% CO 004 $3,290.97 $1,788,760.28 0.72% CO 005 $290.95 $1,789,051.23 0.74% CO 006 $1,858.46 $1,790,909.69 0.84% Clark>Jietz Engiaeoring Quality of Lift Project No.: 18-ENG008 Description: Multi-Use Path-136th Street from Range Line Road to Stadium Drive Type: Design Change Summary: Change in Contract to include protection of existing utilities In conflict with multi-use path. Change Order Description: This submittal represents the change In contract to include payment for the protection of existing utilities in conflict with multi- use path utilizing sonutubes encased in compacted No.53 stone subbase with concrete cap as well as pedestrian protection utilizing Type II barricades and caution tape. Awarded Project Amount: S1,775,9B1.08 Authorized Project Amount: $1,789,051.23 Change Order Amount: S1,858.46 Revised Project Amount: 51,790,909.69 Quantity Changes: Item No. Description Unit Unit Price Quantity Amount 115' Duke Utility Protection LS $ 1,858.46 1.00 $1,858.46 51,858.48 NOTES; Contractor Date CITY OF CARMEL TO: CONTRACT CHANGE ORDER NO.:6 DATE:01/09/2020 PROJECT NAME: 18-ENG-08 MULTI-USE PATH ALONG 136 N ST. FROM RANGELINE RD.TO STADIUM DR. CITY REQ.NO.: CITY PO NO.: 102757 CITY PO DATE:03/27/2019 I. You are directed to make the following changes in this Contract: a. See Page 2 for all changes to contract SCHEDULED ADJUSTMENT ITEM AMOUNT j+)OR(-)DAYS *See Page 2 for all changes to contract II. The following referenced Documents further describe the changes outlined in Paragraph I,and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other:Change Order 6 The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 1,789,051.23 Contract Price will be increased/decreased by this Change Order $ 1.858.46 New Contract Price including this Change Order $ 1,790,909.69 Contract Time Prior to this Change Order N/A Days N/A Completion Date Net increased/decreased resulting from this Change Order N/A Days Current Contract Time including this Change Order N/A Days N/A Completion Date This Change Order is for full and final settlement of all direct,indirect,impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Approved: Recommended Accepted: Clark Dietz,Inc. $(#IvrI- t�0 KAsl46 G./1(( +- pry �� ENGINEER ONTRACTOR •. _ . . ayor / 8900 Keystone Crossing ,ro /2DGtv/vtd�I / �-✓ . 010 Address Address ary �y� be Suite 475 �r I,o Ws • ,n eysbe Indianapolis,IN 46240 IsobaA A/a a f. /N c( Z ZZ City/State/Zip City/State/Zip Jere sh an,P �1 E er By: ' I A'f fI;S'f: (4.43/1._ Phone: 219—775-1427 Phone: 7/7"4444 rif4 ,ae,u0 20049a/r175 SUE WOLFGANG,CITY CLERK /?aw Date:1-9-20 Date: I/4 Datpor.0//ae113 )(� 5cH °° CO.)INC, CONTRACTORS 4050 Rockville Road INDIANAPOLIS,INDIANA 46222 (317)484-1500 December 27,2019 Mr.Cody Niles Clark Dietz, Inc. 8900 Keystone Crossing, Suite 475 Indianapolis,IN 46240 RE: Utility Protection City of Carmel Contract 18-ENG-08, 1361h Street Multi-Use Path In accordance with INDOT 109.05 we are pleased to submit the following breakdown of costs incurred for extra work on the referenced project: Labor w/Burden $ 758.21 20%Allowable mark-up $ 151.64 Material $ 717.00 12% Allowable mark-up $ 86.04 Equipment $ 120.00 12% Allowable mark-up $ 14.40 Sub-Total $ 1,847.29 Bond$1,847 *5.5/1000+ 10% $ 11.17 Total $ 1,858.46 If you have any questions or need any additional information, please feel free to contact our office. Sincerely, Edward H. Kennedy,IV President enc cc: File 1908 AN EQUAL OPPORTUNITY EMPLOYER Schutt-Lookabill Co., Inc. Labor Cost City of Carmel Utility Protection Date Employee Craft Type Hours Rate Total 10/29/19 Richardson, Justin Laborer Regular 3.0 $ 46.93 $ 140.79 10/29/19 Arellano,Justin Laborer Apprentice Regular 3.0 $ 42.71 $ 128.13 10/30/19 Richardson,Justin Laborer Regular 2.0 $ 46.93 $ 93.86 10/30/19 Arellano, Justin Laborer Apprentice Regular 2.0 $ 42.71 $ 85.42 11/06/19 Petersen, James Foreman Regular 3.0 $ 61.27 $ 183.81 12/19/19 Medrano. Hector Foreman Regular 2.0 $ 63.10 $ 126.20 Total: 15.0 $ 758.21 Schutt-Lookablll Co.,Inc. Actual Labor Coat w/Burden by Employee December 31,2019 Jim Petersen Justin Richardson Juan Arellano Regular Regular Regular Wages $ 35.50 $ 24.27 $ 20.63 Health&Welfare $ 6.50 $ 6.50 $ 6.50 Pension $ 8.00 $ 8.00 $ 8.00 Annuity $ - $ $ Training $ 0.55 $ 0.55 $ 0.55 UBCTF $ $ $ ICIAF $ 0.13 $ 0.13 $ 0.13 SAT S 0.08 $ 0.08 $ 0.08 BITF $ $ $ - Savings $ $ $ CTLM $ • $ $ • ILDCTF $ 0.65 $ 0.65 $ 0.65 FICA 7.65% wage $ 2.72 $ 1.86 $ 1.58 State UT 7.40% wage $ 2.63 $ 1.80 $ 1.53 Federal UT 0.60% wage $ 0.21 $ 0.15 $ 0.12 Insurance 12.10% wage $ 4.30 $ 2.94 $ 2.94 Total Labor Burden S 25.77 $ 22.66 S 22.08 Total S 61.27 S 46.93 $ 42.71 Hector Medrano Regular Wages $ 32.00 Health&Welfare $ 9.14 Pension S 10.56 Annuity S 1.64 Training $ 0.53 UBCTF S 0.10 ICIAF S 0.13 SAT $ 0.08 BITF S 0.02 Savings $ • CTLM S 0.02 ILDCTF $ . FICA 7.65% wage $ 2.45 State UT 7.40% wage $ 2.37 Federal UT 0.60% wage $ 0.19 Insurance 12.10% wage $ 3.87 Total Labor Burden S 31.10 Total $ 63.10 Schutt-Lookablll Co.,Inc. Material Cost City of Carmel Utility Protection Date Vendor Description Amount 10/29/2019 IMI Concrete $ 90.00 10/29/2019 Schutt-Lookablll Inventory 12"Sonotube $ 30.00 10/29/2019 Martin Marietta No. 53 Stone $ 40.00 12/19/2019 Indiana Sign&Barricade 12-Cone Grabbers.Caution Tape $ 557.00 $ 717.00 Schutt-Lookabill Co., Inc. Equipment Cost City of Carmel Utility Protection Date Description Hours Rate Total 10/29/2019 Hand Tools 6.0 $ 3.00 $ 18.00 10/30/2019 Hand Tools 4.0 $ 3.00 $ 12.00 11/6/2019 Ford 1500 Pickup 3.0 $ 15.00 $ 45.00 11/6/2019 •Hand Tools 3.0 $ 3.00 $ 9.00 12/19/2019 Ford 1500 Pickup 2.0 $ 15.00 $ 30.00 12/19/2019 Hand Tools 2.0 $ 3.00 S 6.00 $ 120.00 Indiana Sign&Barricade, Inc. INVOICE 5240 E.25th Street Indianapolis, IN 46218 Invoice Number: RI22435 I N D I A N A Phone No.:317.377.8000 Invoice Date: 12/19/2019 siVi,..111FRICAo: Fax No.:317.377.8008 Page: 1 Home Page:www.indianasb.com E-Mail:info@indianasb.com Bill Ship To: Schutt Lookabill Co. Inc. To: Schutt Lookabill Co. Inc. 4050 Rockville Rd Job 1908 Indianapolis, IN 46222 Equipment Sales deannawojnar@hotmail.com Ticket 32740 P.O.Number 23898 Customer ID CU00068 P.O. Date 12/19/2019 ShipVia Our Order No. R004217 Terms Net 30 Days Due Date 1/18/2020 Item/Description Quantity Unit Price Total Price VARIOUS � 1.00 17.00 17.00 Caution Tape Roll EA CONEGRAB �/ 12.00 / 45.00 540.00 Cone Grabber EA :..161 z4sigi Amount 1 $ 04.0 . p0000- O 5/S1, oa C AL a u 'A. co,„_. r�-Uj lye r ` 1 ` Total: / 557.00