Loading...
HomeMy WebLinkAboutD-1.02 Second Floor Demolition PlanH ELLYER LEWIS'� U 1 ,� ■ DEMOLITION PLAN - SECOND FLOOR i.»ur�»rr����r�-�ui���r� � � � � SCOPE OF WORK � AREA NOT IN CONTRACT EXISTING PARTITION TO REMAIN. � ` EXISTING DOOR TO REMAIN. r� \ � � 1J_L I I I �—i—r �-� L—J !� � �� EXISTING PARTITION TO BE �EMOLISHED. 0 EXISTING �OOR, FRAME 8 HARDWARE TO BE REMOVEO, WITH SELECTIVE SALVAGING, IN OR�ER TO FULFILL THE REQIIIREMENTS STATE� IN THE DOOR k HAROWARE SCHE�l1LES ON OWG. A-5.00. EXISTING 2' X 2' SUSPEN�ED ACOl1STICAL CEILING GRI� AND TILE TO BE �EMOLISHE� EXISTING 2' X d FWORESCENT FIXTl1RE TO BE REMOVED ANO SALVAGED FOR REl1SE EXISTING DOWNLIGHT FIXTURE TO BE REMOVED AND SALVAGED FOR REUSE EXISTING SWITCH TO BE REMOVED, REFER TO NOTES �4 k ai. EXISTING ELECTRICAL Ol1TLET TO BE REMOVE�, REFER TO NOTE /4 k�l. VOICE/�ATA CABLING TO BE REMOVED, REFER TO NOTE �'5 t�7. RELEASED FOR CONSTRl1CTI0N Su6jec� �o compliance with all regula�ions of Sla�e antl Local Codes City of Carmel �i `��¢m�' lamn�Ml1 � DATE: O1IZ9IZO 0 ■ 1 ;�� � 1 � \ 1 , YiJ � �" ,� 1 ` >n 1_ �, 1 �` � � , � ,, �r- r�, :''�... �� �t A \ � � i � �\( `��' ' \� � 1 1 1 1 � � J ...�FE• � �Y(!.\�/Y j\n`��\ �Yj� ,� oFFICE 1 ��� ''� ��r ^� `i,-�� - �' ; 1 232 1 `.�t Y' \ ,,✓'`�/ >' � � `i �/ili=�'Yi(- ` Lr � er _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ � � ■ II II II I I � ���� /� ■ ■ _ _ _ — , � � n �ti------------------•�. t : � �, � � � � ' � � SEE NOTE p20 �i�i � 1 'i'i 1 1 " 1 nr +n 'i�i m'�,+n 1 ___tryLtr_��_v'�Sf_________ 1 ______ � ______________�ii ___________-__ � 1 ' u___ ii ii�i u___ � r-- � � T' �----� iiii �----� `-T 1 1 1 � ___ � � ___ � � u u u u � ' �----� �----� ' � ne�,nn ne�,nn � � ! 4s�r�r�r�r�r�r�r�ro0 % / � ////// DEMOLITION NOTES 1. THE PREMISES SHALL BE W COMPLIANCE WITH ALL Cl1RRENTLY APPLICABLE CODES, REGl1LATIONS AND OR�INANCES OF ALL GOVERNING BO�IES HAVING Jl1RISDICTION OVER THE PROJECT, IN OR�ER TO PERMIT �EMOLITION IN ACCOROANCE WITH THIS PLAN. 2 COOR�INATE ALL DEMOLITION WITH THE NEW SCOPE OF WORK, AS SHOWN ON THE ARCHITECTURAL ORAWINGS. 3. AS REQl11RED, PATCH AN� REPAIR ALL EXISTING CONSTRl1CTION TO REMAIN AS A RESl1LT OF DEMOLITION OF ADJACENT AND ATTACHE� CONSTRl1CTION. WHERE PARTITIONS A�JACENT TO EXTERIOR WINOOWS ARE TO BE �EMOLISHEO, PATCH AN� REPAIR CONVECTORS, MULLIONS AND SILLS TO MATCH EXISTING LIKE ELEMENTS. 4. AS APPLICABLE, G.G TO REMOVE ALL ABANDONE� ANO NO LONGER ACTNE POWER WIRING FROM EITHER THE CEILING PLENUM, DEMOLISHED PARTITIONS OR FROM FLOOR Ol1TLETS TO BE ABANDONE�. INACTIVE CIRCIIITS ARE TO BE REMOVED BACK TO THE CIRCl11T PANEL. 5. AS APPLICABLE, GENERAL CONTRACTOR TO REMOVE ALL ABAN�ONED AND NO LONGER ACTIVE VOICE/DATA CABLING FROM EITHER THE CEILING PLENUM, DEMOLISHED PARTITIONS OR FROM FLOOR OUTLETS TO 9E A6ANOONED.INACTIVE DATA CA9LING TO BE REMOVED BACK TO THE SOURCE, AND INACTIVE TELEPHONE CABLING TO BE REMOVED BACK TO THE PUNCHDOWN BLOCKS. 6. ALL EXISTING FLOOR OUTLETS OR MFEEDS TO BE A9ANOONED SHALL HAVE THEIR BOXES REMOVED, CORE DRILLS FIRE-SAFED AND BE CAPPED FWSH WITH THE FLOOR SLAB. HANDLE ABANDONED WIRING AND CABLING PER DEMOLITION NOTES S4 AND p5. COORDINATE WITH THE BUILDING MGML FOR ACCE55 TO FLOOR BELOW. i. THE GENERAL CONTRACTOR WILL BE RESPONSIBLE TO REMOVE UNNEEDED BACKBOXES, RESULTING FROM THE REMOVAL OF WALL MFEE�S, VOICE/DATA CONNECTORS AN� POWER OUTLETS RELATED TO THE PREVIOl15 LAYOUT FOft THE SUITE. PATCH WALLS SMOOTH IN PREPARATION FOR NEW WALL FINISH(ES). B. AS REQl11RED, ANV OISRl1PTE0 FIREPROOFING OF ALL Bl11LDING STRUCTl1RAL MEMBERS AN� WITHIN DEMISING WALLS, FLOORS AND CEILINGS SHALL BE Sl1PPLEMENTED AFTER OEMOLITION, IN ACCORDANCE WITH ALL Cl1RRENTLY APPLICABLE CO�ES, REGl1LATIONS AN� ORDINANCES OF ALL GOVERNING BO�IES HAVING JURISDICTION OVER THE PROJECT. 9. DO NOT CLOSE OR OBSTRl1CT FACILITIES OR MTERRl1PT 11TILITIES WITHOUT PRIOR PERMISSION FROM AN� COOROINATION WITH THE BUILDING MANAGEMENT. 10. THE SCHEOLILING, SEQUENCING AND EXECl1TION OF THE �EMOLITION WORK, REMOVAL OF DEBRIS AND STORAGE OF SALVAGED ITEMS SHALL BE COORDINATED WITH THE BllIL01NG MANAGEMENT AND PERFORMED ACCORDING THE BUILDING MANAGEMENT'S INSTRUCTIONS, 11. G.C. IS RESPON519LE TO TAKE WHATEVER STEPS ARE REQUIRED TO PROTECT THE EXISTING WINDOW BLINDS DURING DEMOLITION AND CONSTRUCTION. GENERAL CONTRACTOR IS AL50 RESPONSIBLE TO ENSURE THAT ALL WINDOW BLINDS DO FUNCTION PROPERLY OR HAVE NO BENT OR MISSING VANES OR WANDS. 12 G.C. IS RESPONSIBLE TO SALVAGE THE FOLLOWING ITEMS FOR REl1SE WHERE APPLICABLE. TVPICAL SALVAGEABLE ITEMS MAV WCWDE BUT ARE NOT LIMITED TO: DOORS, FRAMES, AND HARDWARE EXIT SIGNS, STROBE/ALARMS, FIRE PULLS, FIRE EXTINGUISHERS k THEIR CABWETS THERMOSTATS AND OTHER CONTROLS, DIFFUSERS, GRILLES LIGHT FIXTURES SPECIALIZED DATA CA9LING CARD KEY ACCESS DEVICES 13. DEMOLITION MUST OCCUR AFTER NORMAL BUSWESS HOURS. PRECAUTIONS MUST BE TAKEN TO ENSURE MINIMAL DISRUPTIONS TO ONGOING BUSWESS OPERATIONS OF THE TENANT. 14. THE GENERAL CONTRACTOR WILL BE RESPON516LE TO PREVENT AIR90RNE �EBRIS FROM ENTERING THE AIR DISTRIBUTION SVSTEM BY PROVIDING DUST PROTECTION AROUND THE WORK SITE, AND ON ALL RETURN AIR GRILLES, DIFFUSERS AND VAV BOXES. ALSO, AS IS PRACTICABLE, GENERAL CONTRACTOR WILL AL50 INSTALL FILTERING MEDIA OVER THE MAIN AIR HANDLERS ON THE FLOOR TO PROTECT THE UNITS FROM EXCESS DUST ACCUMULATION OURING �EMOLITION AND CONSTRUCTION. 15.IN AREAS OF DEMOLITION, ALL THERMOSTATS ARE TO BE CAREFULLY REMOVED FROM THE DRYWALL PARTITIONS, AND COILED BACK TO THEIR ASSOCIATEO VAV 90XE5. THE GENERAL CONTRACTOR IS TO ENSURE THAT ALL PNEUMATIC LMES REMAIN INTACT AND UNBROKEN, SEVERED, ETC. 16. THE GENERAL CONTRACTOR IS TO PLAN AND PROVI�E FOR TEMPORARY BARRIERS ANO ALL OTHER REQUIRED SAFEGUARDS FOR THE PROTECTION OF BUILDING USERS FROM CONSTRUCTION HAZARDS DURING ALL PHASES OF WORK. STAIRWAVS MUST REMAIN ACCESSIBLE AT ALL TIMES DURING CONSTRUCTION. 17. UPON COMPLETION OF DEMOLITION WORK, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR LEAVING CONSTRUCTION AREAS IN BROOMED AND CLEANED CONDITION. CARPETED AREAS TO BE LEFT IN VACUUM CLEAN CONDITION. VINYL FLOORING TO BE DAMP MOPPED AT THE END OF EACH WORK DAY. ALL DE9RI5 AND MISCELLANWUS MATERIAL TO BE REMOVED AT THE ENO OF EACH WORK DAY. 18. AT THIS LOCATION, EXISTING CEILING AND LIGHT FIXTURES TO BE REMOVED AS INDICATED. EXISTING MILLWORK TO REMAIN. 19. G.Q TO PATCH AND REPAIR THE EXISTING CEILING GRID TO REMAIN AS REQUIRED FOR A LIKE-NEW APPEARANCE. j / %; � � / j / / /� / / / / � >G41F� � � i�a�� r o N � ���t,�TE�T��E I �ITERI O R D E11G N 21 1 South 1 2th St. Phila., Pe� I 91 07 215.922.7066 Pro_iect T ]1JCYty Mulual INSUB�NCE 350 East 96th Street 2nd Floor Indianapolis, IN 46240 Project No: 047.79 onwnhy�. SPINR;IP cnP.�.i<Fd ny�. KS npprovrd by KB ❑lont Approval: Dat¢ ksuPd for Vricin9�� l Ol l 1; 1 9 Drawing: Second Floc�r C�emolition Pl�n No. D-1 .02 . .\ ' %\� . � .. ..« i.i. i Rio 1 >� ' ,� ^ � i � ,;? � s-;. .. 1 Sc�la.. � ���� _ ��_�„ KEY �LAN � IN�ICATES AREA NOT IN CONTRACT