HomeMy WebLinkAboutM-1.02 Second Floor Mechanical HVAC Plan�
i
�
1 � I�I�I 1
.LI,�I
' i �I�
_�
� ���
.:' ......... i _ I -I.
� 3 C \' - � ... I �
�
�
: i� A� I I�� Ifl �I ��I...
0 0
(xM)nP_y �� �
ii�
�
�
�
L1 �
(XM)HP-5 1
- �,
�
ii i ��
� � �
I � � �I ��
-------�_---- -
9T I e CTi �`
� I � I `
x � �I �� �
�x1� I �t
OO (x)HP-' I � �
J X
x
� (x)HP-z
X
� ;��
�
� �
���
�� �V�
��
0
, �� A�
�
H�
I� I, �
(XM)HP-5
(xM)np_< ��
- � ��� �
_ L.
ti � (xM)HE
-_ -
0
� ���.ri,, .r, ,r9
��
L� _ �_ .
� i 3A5 p5
�
� � �I � � � I �-''
� � � � � 16"0
� � 10'0 I I
� i .iz
�\ . 1, . i I 1 i ' 1., J
I:I�1
c�N RMF�cHo�MMN��N�.,���N�..,c.�.,�
si.s cnHoinnHs. .Hs csHsan� cnH.anc.
� cooaoirvnle n�� woarc nrvo
nxcN�rFcr o�nHv�w FHCF oF
nnFCNnNicni . Fi FcraicniF oa vi �nneiNc
. . nacrvi.eRuan�woaknrvo
aoc Eo Nc wi.H.H�woa �oa
SEE - �"SCALE - PUN
OR GRILLE SCHEOOLE FOR SHEH
MHAL DUCT SRES
HANG FROM STRUCTORE ABOVE —
(4)�1� GAUGE SHEEf METAL STRAP
HANGERS
i
SQUARE, RECiANGUTAR OR
ROUN� �ISiRIBUTION �UCT
4u u
1 � ,e�
INTERIOR ACOUSTICAL LINING
J
F�ow
�
�
� � �AIR FLOW
RETURN AIR BOOT
SCAIB NONE
CEILING
REfORN AIR CRILLE
WNICAL BRANCH
WNNECTION
DAMPER W/ LOCKING QUADRANT
ROUN� SHEEf MEiAL OUCT
ROOND FLENIBLE �UCT
(INSUTATE� 60" MA%
LENGiH FU LY EkiEN�E�
RELEASED FOR CONSTRl1CTI0N
Su6jec��o compliance with allregula�ions
of Sla�e antl Local Codes
City of Carmel
�i
`��¢m�' lamn�MNi�
DATE: O1IZ9IZO
SEPARATE Y-ttPE
SiRAINER WRH 6LOW�
OOWN VALVE AND HOSE
THRFAD CONNECTION
(iVPICAL)
PNO POSITION
ISOUTION VAWE
INTERLOCKED WITN
COMPRESSOR �
r
���-0
BALL VALVE (iYPICAL)
�CWR�
AUTOFLOW SELF BALINCING�
VALVE, SEE HEAT PUMP
SCHEDULE FOR GPM
REQUIREMENiS
PRESSURE/TEMPERATURE —
PWGS (NPICAL)
3/4' BALL IYPE DRAIN VAD
wirH cnaaEo HosE THREno
coNNEcrioN
MEfAL
R=2D
CEILING DIFFUSER
CEILING DIFFUSER INSTALLATION DETAIL
scn�e. NONE
(IYPICAL) CONOENSATE LWE
�DRNN PAN LINE
WATER SOURCE HEAT PUMP PIPING SCHEMATIC
SCALE NONE
MECHANICAL HVAC DEMOLITION PLAN
�
��
�
�
�.I �
�
i
�
SCALE: 1/8° = 1'-0"
MECHANICAL HVAC DEMOLITION PLAN GENERAL NOTES:
1. MECHANICAL HVAC CONiRACTOR SHALL COORDINATE ANY NECESSARY SHUIDOWNS
WITH BUILDING/MANAGEMENT.
2. MECHANICAL HVAC CONTRACTOR SHALL PERFORM A FlEL� SURVEY PRIOR TO
COMMENCING WIiH DEMOLIiION. NOiIFY ARCHIiECi�ENGINEER OP ANY
DISCREPANCIES FOUND FOR DIRECTION PRIOR TO COMMENCING WITH DEMOl1TI0N.
3. ANY EXISTING SYSiEMS AN�/OR EQUIPMENT NOTE� AS EXIS7ING TO REMAIN
SHALL BE FIELD VERIFlE� FOR �EFlQENQES. NOiIFY ARCHIiECi AN� ENGMEER
oF aNr oEFiciENciEs oiscovEREo.
4. EXISTING EQUIPMENT TO BE RELOCATE� SHALL BE INSPECTE� PRIOR TO
RELOCAiION. NOiIFY ARCHIiEC7 AN� ENGINEER OF ANY DEFlQENQES
oiscovEREo.
5. PROJECT SCOPE INVOLVES REMOVAL AN� MO�IFICATION TO CON�ENSER WATER
PIPING SYSTEM. CONTRACTOR SHALL ISOIATE/SHOIDFF SVSTEM AND DRAIN
(AND PROPERLY DISPOSE) TO ACCOMMODATE SCOPE OF WORK.
6. MECHANIGL HVAC CONTRACTOR SHALL REFER TO ALL SHEHS CONTAWED IN
DRAWING SEf FOR COMPLEfE SCOPE OF WORK. ttPICAL DEfAILS, MSTALUTION
REQUIREMENTS AN� GENERAL BUILDING STANDARDS ARE REFERENCED AND
APPLICABLE TO THESE CONTRPCT DOCUMENTS.
7. IT IS THE IMENT TO REUSE �UCiVlORK WHERE PRACTICAL CONTRACTOR MAY
REUSE DUCT TAPS OF EOUAL SIZE. ANY E%ISTING CONDITIONS THAT VARY SHALL
BE BROUGHi i0 iHE AiTENiION OF iHE ARCHIiECi�ENGMEER PRIOR i0
FABRICAiION OR INSiALLAiION OF NEW HVAC SYSiEMS.
MECHANICAL HVAC DEMOLITION PLAN CODED NOTES:OO
Q1 RELOCATE EXISTING THERMOSTAT.
� REMOVE EXISTING HEAT POMP AN� WMROLS COMPLETE AND RETURN TO
UN�LOR�. REMOVE CON�ENSER WATER SUPPLY AN� RHORN, AND CONDENSATE
�RAIN PIPING BACK TO MAIN AN� CAP.
MECHANICAL HVAC PLAN
�
�
,
�
�
' ����eoos» � .
•
q . STATE OF Q-
�
HELLYER
LEWIS=
ARCHITECTURE
INTERIOR DESIGN
211 South 12th St.
Phila., PA 19107
215.922.7066
SCALE: 1/8" = 1'-0"
MECHANICAL HVAC PLAN GENERAL NOTES:
1. MECHANICAL HVAC CONIRACIOR SHALL PERFORM A FlELD SURVEY PRIOR 10
FABRICAiING OR INSiALLING ANY NEW WORK OR MO�IFYING EXISiING. NOiIFY
ARCHITECT/ENGMEER OF ANY DISCREPANQES FOON� FOR �IRECTION PRIOR
ro PRacEEoiNc.
2 ANY EXISTING SYSTEMS NOTEO AS EXISTING TO REMAIN SHALL BE FlEL�
VERIFlE� FOR �EFlCIENCIES.
7. MECHANICAL HVAC CONTRACTOR SHALL COOR�INATE ANY NECESSARY
SHOIDOWNS WITH BWL�ING/MANAGEMENT.
4. MECHANICAL HVAC CONTRACTOR SHALL PROVIDE ALL ACCE55 PANELS
REOUIRED FOR THEIR TRADE SEE ARCHITECTURAL DRAWINGS FOR
SPEQFlCATIONS.
5. ROUTE �UCiWORK BEfWEEN JOISTS AND NIGH AS POSSIBLE THROUGHOUT
SPACE TRANSITION �OWN TO ACOUSTICAL CEILING.
6. MECHANICAL HVAC CONTRACTOR SHALL REUSE EXISTING DUCTNORK AS
PRACTICAL.
7. RELOCATE SOPPLY AIR GRILLES AS REQUIRED FOR NEW CEILING GRID. MAKE
NECESSARY AQlOSTMENTS IN DUCTNORK WHERE REO�IRE�.
8. ALL THERMOSTATS ARE TO BE LOCATED WITHIN 18" OF THE �OOR OPENING.
9. MECHANICAL HVAC CONiRACiOR SHALL COOR�INAiE WIiH ALL OiHER iRA�ES
AND PREPARE IMERFERENCE DRAWINGS FOR SUBMITfAL, PRIOR TO ANY
fABRICATION OR INSTALUTION.
10. MECHANICAL HVAC CON7RACi0R SHALL FlLL/REBAUNCE NEW iREAiE�
CON�ENSER WATER AS REQUIRE�.
11. MECHANICAL HVAC CONiRAC10R SHALL U1ILIZE BUILOING APPROVE�
iEMPERAiURE CONiROL CONiRACi0R5, USE APPROVEO BIIIL�ING SYSiEM
TEMPERATURE CONTROL SYSiEM MANUFACTORER ANO �EVICES, AS WELL AS
PROVI�E COMPLEiE IMEGRATION WITH EXISTING BIIIL�ING TEMPERATURE
CONTROLS.
MECHANICAL HVAC PLAN CODED NOTES: �
�i NEW LOCATION OF RELOCATED THERMOSTAT.
Q WNNECT NEW HEAT PUMP TO MAIN CONDENSER WATER SOPPLY AND REfORN
PIPING AND WNDENSAiE ORAIN LINES AT LOCATION AN� TAPS FROM
REAIOVAL OF HEAT PUMPS.
KEY PLAN
I I��ir u i m.�nrentr
��� �
�i
Project:
• Libcrty
Mutual�
iNsuRnNCE
350 East 96th Street,
1 st & 2nd Floors
Indianapolis, IN 46240
Project No: 047.79
Drawn by: MB
Checked by: AM
Approved by: AM
Client Approval: Dace:
IssuedForPermits: ����5��9
�� �'° N
r a ���
i � �� � No.
M-1 .02
Drawing:
Second Floor
Mechanical
HVAC Plan
Scale: 1 /8•' - 1'_0•'