Loading...
HomeMy WebLinkAboutT201-FIRST-LEVEL-TECHNOLOGY-FLOOR-PLAN-Rev.5UP CTL CTL AVAVCTLAV MIX MONMONMON SS S VCMONS S SS S S S S S S S S S S S S S S S S S S S S AV S S S S S SS S S S S S S S VC MONMON A/V RACK MON S S S TFPDS AP3AP5AP 3 AP 3 AP 5 AP5AP 5 AP 3 AP 3 AP5AP3AP 5 AP 5 AP 5 AP3AP5AP 3 AP 3AP 5 AP 3 AP5AP5MON S CAM CAMCAM CAM CAM CAM S SPKSPKSPKSPKSPKSPK SPK SPK SPK SPK SSSS MONAP3MEN 103 WOMEN 104 MONON LOBBY 102 RAMP 105 VESTIBULE 106 COATS & STORAGE 107 ELEVATOR LOBBY 108 RECEPTION 109 FEINSTEIN'S CLUB 110 PRIVATE DINING 111 BAR 112 VESTIBULE 113 SERVICE 114 GREEN 115 CLUB OFFICE 119 HOUSEKEEPING 118 STAIR #2 1ST2 CORRIDOR 122 CORRIDOR 120 CORRIDOR 121 BREAK ROOM 125 MDF 123HR 126 CLEAN 127 SOILED 128 SALES 129 SALES 130 HOLDING 132 SECURITY 133 MEN'S LOCKER 134 WOMEN'S LOCKER 135 SERVICE 136 JANITOR 137 CORRIDOR 139 HOTEL KITCHEN 140 MONON ENTRY 143 VESTIBULE 144 RESTAURANT & BAR 145 COVERED DINING 146 MEN 147 WOMEN 148 COLD STOR 151 PRIVATE DINING 152 STAIR #1 1ST1 RECYCLING 153 CAN 154 VESTIBULE 150 CLUB STOR 124 CHEM 159 OFFICE 117 ELEC 156 WORK 131 STOR 142 MEETING 101 EMER POWER 155 FIRE PUMP 138 VESTIBULE 157 COLLECTION 141 JAN. 158 T300 1 125-AP 118-AP 110-AP1 111-AP 110-AP2 136-AP 115-AP 120-AP 141-AP 145-AP1 140-AP2 139-AP 129-AP 102-AP1 145-AP3 146-AP1 145-AP2 140-AP1 152-AP 101-AP 105-AP 121-AP Z2 Z2 Z2 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1Z5 Z3 Z3 Z3 Z3 Z3 Z3 Z3 Z5 Z5 Z5 Z5 Z5 Z5 Z5 Z5 Z4 Z4Z4 Z4 80" 32" 32" 60" 50" 80"80" T403 1 MONON LOBBY 102 RESTAURANT & BAR 145 49" 60" 55" 50" HK STORAGE 160 102-AP2 TELECOM LEGEND WALL MOUNT ONT LOCATION WIRELESS ACCESS POINT -WALL MOUNTED REFER TO T400 FOR # INFORMATION DIGITAL SIGNAGE LOCATION TV/MONITOR LOCATION AUDIO INPUT LOCATION MOBILE CART LOCATION MIXING LOCATION AV INPUT LOCATION AV INPUT LOCATION 2 FITNESS ROOM TV LOCATION AV FLOORBOX LOCATION AV CONTROL LOCATION TECHNICAL FACILITIES PANEL LOCATION VOLUME CONTROL LOCATION SPEAKER -CEILING MOUNTED SPEAKER -WALL MOUNTED AV CAMERA LOCATION -WALL AV CAMERA LOCATION -CEILING SPK AP # S AV AV CTL ONT MON DS CAM CAM AUD AV MC TFP MIX VC TV 1. CEILING MOUNTED AV CAMERA LOCATION. ATTACH LOCATION TO OVERHEAD PIPE GRID SYSTEM. COORDINATE FINAL LOCATION WITH LIGHTING FIXTURES. 2. MONITOR LOCATION MOUNTED AT 6'-11" TO CENTER AFF WITHIN INSET AREA OF PILLAR. 3. DIGITAL SIGNAGE LOCATION MOUNTED AT 6'-6 1/2" TO CENTER AFF. SHEET NOTES DRAWING NO. DATE GSB PROJECT NO. DRAWING TITLE 3555 NW 58TH Street Suite 700-W Oklahoma City, OK 73112 T: 405.848.9549 F: 405.848.9783 www.gsb-inc.com Copyright ©GSB, Inc ISSUED FOR CONSTRUCTION09/24/18 T201 FIRST LEVEL TECHNOLOGY FLOOR PLAN 171528 CARMEL, INCARMEL, IN 2018 ARCHITECT GSB, INC 3555 NW 58th Street, Suite 700W Oklahoma City, OK 73112 405 / 848-9549 CIVIL ENGINEER Circle Design Group 9229 Delegates Row, Suite 150 Indianapolis, IN 46240 317 / 706-2075 STRUCTURAL ENGINEER StructurePoint 7260 Shadeland Station Indianapolis, IN 46256 317 / 547-5580 MEP ENGINEER Circle Design Group 9229 Delegates Row, Suite 150 Indianapolis, IN 46240 317 / 706-2075 INTERIOR DESIGNER HBA Hirsch Bedner Associates 171 17th Street NW, Suite 600 Atlanta, GA 30363 404 / 873-4379 FOOD SERVICE CONSULTANT Ricca Design Studios 5325 South Valentia Way Greenwood Village, CO 80111 303 / 928-1333 1/8" = 1'-0"1 LEVEL 1 TECHNOLOGY FLOOR PLAN GENERAL HORIZONTAL CABLING NOTES A MINIMUM CATEGORY 6 COMPLIANT 4-PAIR UNSHIELDED TWISTED PAIR (UTP) . ALL HORIZONTAL CABLING MUST BE PLENUM RATED. B MANUFACTURER CERTIFIED INCLUDING THE MINIMUM PERFORMANCE AND APPLICATIONS WARRANTY. C PAINTING OF THE STRUCTURED CABLING WILL VOID THE WARRANTY. ENSURE PROPER COORDINATION WITH PAINTING CONTRACTOR SO THAT ALL STRUCTURED CABLING IS PROTECTED PRIOR TO ANY PAINTING. D PROVIDE A MINIMUM 10 FOOT MAINTENANCE LOOP ON EACH HORIZONTAL CABLING RUN. MAINTENANCE LOOPS SHALL BE STORED ABOVE ACCESIBLE CEILINGS, IN CABLE TRAY, AND IN TELECOMMUNICATION ROOM CABLE TRAY. CABLING ABOVE CEILING SHALL BE SUSPENDED FROM APPROPRIATE SUPPORTS AND SHALL NOT TOUCH THE CEILING. E ALL PIN/PAIR ASSIGNMENTS SHALL BE T568B. F CABLE JACKET COLOR SHALL BE AS REQUIRED BY SPECIFICATIONS. G LABELING SHALL BE COMPLETED AS DEFINED IN THE CONTRACT DOCUMENTS AND SHALL BE COORDINATED WITH THE OWNER. H PROVIDE ALL TELECOMMUNICATION OUTLETS AS SHOWN ON THE DRAWINGS AND AS REQUIRED TO PROVIDE CONNECTIONS FOR EACH DEVICE SHOWN ON THE DRAWINGS. I ALL TESTING OF HORIZONTAL CABLING SHALL BE COMPLETED AS DIRECTED BY THE PROJECT SPECIFICATIONS. ALL CABLING MUST BE TESTED AND CERTIFIED TO THE APPLICABLE STANDARDS. GENERAL PATHWAYS NOTES A ALL CABLING SHALL BE TERMINATED IN THE ER/TR NOTED IN THE TELECOM SCHEDULES. B CONTRACTOR SHALL SUPPLY ALL CONDUIT, BOXES, AND CABLE TRAY AS REQUIRED TO ENSURE ALL TRANSMISSION MEDIA IS FULLY SUPPORTED FROM ALL DEVICE LOCATIONS TO THE POINT OF TERMINATION. C ALL TELECOM PATHWAY SYSTEMS SHALL BE INDEPENDENTLY SUPPORTED FROM AND ATTACHED TO THE BUILDING STRUCTURE. D ALL TELECOM PATHWAY SYSTEMS SHALL BE COMPLETELY AND PROPERLY LABELED AS REQUIRED IN REFERENCED STANDARDS. E CONDUIT SYSTEMS SHALL BE PROVIDED FOR ALL PATHWAYS IN INACCESSIBLE CEILING SPACES AND WHERE EXPOSED TO PUBLIC VIEW. ALL CONDUIT SYSTEMS THROUGHOUT THE BUILDING SHALL INCLUDE PROPERLY SIZED SLEEVED PENETRATIONS THROUGH ALL BARRIERS. F ALL TELECOM OUTLET BOXES SHALL BE A MINIMUM DOUBLE GANG BOX NO LESS THAN 2 1/8" DEEP. G CORRIDOR SUPPORT SYSTEMS SHALL BE PROVIDED AS REQUIRED BY THE CONTRACT DRAWINGS. REFER TO DIVISION 27 SPECIFICATIONS FOR ADDITIONAL PRODUCT DETAILS AND REQUIREMENTS. H CONTRACTOR SHALL NOT EXCEED 40% FILL RATIO WITHIN ANY CONDUIT MEANT FOR TELECOMMUNICATIONS CABLING. I CONTRACTOR SHALL CALCULATE FILL RATIOS BASED ON ACTUAL HORIZONTAL CABLING USED. TYPICAL FILL RATIOS FOR THE CABLE ARE SHOWN HERE FOR REFERENCE PURPOSES ONLY: 1" EMT = 6 CABLES; 1¼" EMT = 11 CABLES; 2" EMT = 24 CABLES; 3" EMT = 64 CABLES; 4" EMT = 107 CABLES J CONDUIT RUNS SHALL NOT INCLUDE MORE THAN TWO 90° BENDS BETWEEN PULLING POINTS. IF THE PATH OF THE CONDUIT RUN REQUIRES BENDS EXCEEDING A TOTAL OF 180°, INSTALLATION OF AN APPROPRIATELY SIZED JUNCTION BOX IS REQUIRED WITHIN A STRAIGHT CONDUIT SECTION. K CONTRACTOR SHALL PROVIDE CONTINUOUS ACCESSIBLE CONDUIT PATHWAY FOR ALL EXPOSED DATA CABLING. L CONTRACTOR SHALL PROVIDE FIRE STOPS TO SEAL ALL PENETRATIONS THROUGH FLOORS, WALLS, STAIRS, AND ELEVATORS AS NECESSARY TO MEET CODE REQUIREMENTS. FIRE STOPS SHALL BE PROVIDED IN ACCORDANCE WITH ALL APPLICABLE CODES AND STANDARDS. M CONTRACTOR SHALL PROVIDE PROPERLY RATED FIRE STOP SYSTEMS FOR ALL CONDUIT AND/OR CABLE TRAY ENTERING THE TELECOMMUNICATIONS ROOMS. EACH CONTRACTOR IS RESPONSIBLE FOR SEALING PENETRATIONS AFTER EACH SCOPE OF WORK IS COMPLETED. 1 REVISIONS NO. DATE DESCRIPTION 1 08/27/2018 Issued for construction 2 09/12/2018 Addendum #2 3 09/20/2018 Addendum #4 4 06/07/2019 Revision #13 5 10/28/2019 Revision #19 5 3 5 2 2 5