Loading...
HomeMy WebLinkAboutA7-10-WINDOW-TYPE-ELEVATIONS-Rev.3WINDOW TYPES A B C D F G H J K L M N P Q R S T U V W2' - 6"5' - 0"2' - 6"4' - 6"2' - 7 1/4"8' - 5 1/2"1' - 7 1/4"2' - 0 1/2"3' - 10"1' - 11 1/2"11"2' - 0 1/2"3' - 10"1' - 11 1/2"1' - 7"5' - 1"1' - 11 1/2"10' - 0"X Y E10"2' - 6"4"4' - 2"4"4' - 0"4"7' - 10"4' - 8"WALK THRU D1 2' - 6"8' - 10 1/2"4' - 2"3' - 6"2' - 8"3' - 6"2' - 8"2"2' - 8"2"2"4' - 8"2"1' - 11 1/2"3' - 10"2' - 0 1/2"11"1' - 11 1/2"3' - 10"2' - 0 1/2"1' - 7 1/2"1' - 11 1/2"3' - 10"2' - 0 1/2"6 1/2"6"1' - 10 1/2"Z AA BB1' - 11 1/2"4' - 1 3/8"1' - 9 1/8"1' - 3 7/8"1' - 8 1/4"1' - 11 1/2"4' - 1 3/8"1' - 9 1/8"6 1/2"9 3/8"1' - 10 1/2"4"5"3 1/2"5' - 0 1/2"3 1/2"5"4" 7' - 1 1/2" EQ EQ 2 1/2"5" 1 1/2" 2"R = 3 ' - 0 1 / 4 "1' - 11 1/2"4' - 6 1/4"1' - 4 1/4"6 1/2"6"5 1/2" 6 1/2" 3' - 4 1/2" 6 1/2" 5 1/2" 2 1/2" 1 1/2" 5" 5' - 4 1/2"8' - 2"4' - 4"4"1' - 8"4"4' - 4"4"1' - 8"4"2/A7-149' - 0" 2' - 4"4' - 4"2' - 4" 2' - 0" 4" 2' - 0" 10/A7-14 2/A7-11GL-05 GL-04 2/A7-118' - 0" 2' - 6"3' - 0"2' - 6" 1' - 4" 4" 1' - 4"10"2' - 8"4"4' - 0"4"3' - 6"4"7' - 10"4' - 2"DOOR AS SCHED. 4"1' - 10"4"3' - 0"4"1' - 10"4" GL-04 GL-05 GL-05 4"10"4"6' - 0"4"10"4" EQ EQ DOORS AS SCHED. GL-05 GL-04 9' - 0" 1' - 6"6' - 0"1' - 6" R = 1' - 6"R = 1' - 10" R = 3 ' - 8 " GL-04 R = 2' - 2"4"1 3/8"4"1 3/8"R = 2' - 6"R = 4 ' - 2 " GL-04 2/A7-11GL-054"1 3/8"2' - 10" 4" 2' - 10"10"2' - 6"4"3' - 8"4"4' - 0"4"7' - 4"4' - 8"GL-04 R = 3' - 0"R = 3' - 4"R = 4' - 2"20/A7-127/A7-11GL-04 6/A7-11 8/A7-11GL-04 6/A7-11 SIM.10"2' - 6"4"4' - 2"4"4' - 0"GL-01 3/A7-114"1' - 8"4"4' - 4"4"1' - 8"4" GL-01 9' - 0" 2' - 4"4' - 4"2' - 4" 2' - 0" 4" 2' - 0" GL-02 R = 2' - 2"4"1 3/8"R = 2' - 6" R = 4 ' - 2 "GL-02 10/A7-11 BRACKETS12/A7-114' - 1" EQ EQ9/A7-1111/A7-11GL-04 2 1/2" 5"1 1/2" 2" 10/A7-11 SIM. BRACKETS12/A7-11SI M.13/A7-1111/A7-11GL-041' - 8"2"2 1/2"3 1/2"2"2 1/2"11"11" 5' - 0 1/2" 11"11"EQ EQ 2 1/2" 5"1 1/2" 2" GL-04 10/A7-11 13/A7-113 1/2"2"2 1/2"1' - 11 1/2"3' - 10"2' - 0 1/2"6 1/2"6"5 1/2"7' - 1 1/2"5 1/2"5 1/2"6' - 2"5 1/2" 7' - 1 1/2" 4"6' - 5 1/2"4" 5' - 0 1/2" EQ EQ11"11" 2 1/2" 5"1 1/2" 2" 4"5' - 6"4"4"6' - 5 1/2"4"1' - 8"BRACKETS 5 3/4"7' - 1 1/2"5 3/4" 4"6' - 5 1/2"4"3 1/2"2"2 1/2"5' - 0 1/2" 11"11"EQ EQ12/A7-11SIM.11/A7-1113/A7-1110/A7-11 GL-04 R = 5' - 7"6 1/2"2 1/2" 5"1 1/2" 2"1' - 11 1/2"3' - 10"2' - 0 1/2"6 1/2"6"1' - 11 1/2"1/A7-122/A7-12 GL-04 3/A7-121' - 11 1/2"3' - 10"2' - 0 1/2"11"EQ.EQ. 1 1/2"4"3' - 4 1/2"4"1 1/2" 3' - 4 1/2"9 1/2"1 1/2"4"1 1/2"A7-12 13/A7-112/A7-12 SIM. GL-04 3/A7-12SIM.1 1/2"6"5' - 0 1/2"6"1 1/2"1 1/2"4"3' - 4 1/2"4"1 1/2" 5' - 0 1/2" EQ EQ10"10"5 1/2"5 1/2"3 1/2"2"2 1/2"1' - 11 1/2"3' - 10"2' - 0 1/2"10"8 1/2"1 1/2"BRACKET BRACKET 3' - 4 1/2"13/A7-112/A7-12 GL-04 3/A7-12SIM.8"8"3 1/2"2"2 1/2"1' - 11 1/2"3' - 10"2' - 0 1/2"11"9 1/2"1 1/2"2 1/2"2 1/2" 4 13/A7-112/A7-12 GL-04 3/A7-12SIM.3' - 4 1/2" 9"9" 2 1/2" 1 1/2"5"3' - 4 1/2"5"1 1/2"1' - 11 1/2"3' - 10"1' - 4 1/2"1' - 5 1/2"R = 2 ' - 5 1 /2"5"EQ EQ 3 1/2"2"2 1/2"5' - 0 1/2" EQ EQ10" 3 1/2"3 1/2" 10" 6/A7-12 GL-04 R = 4' - 1 7/8"1' - 8 5/8"1' - 11 1/2"5' - 0 1/4"2' - 9 1/4"R = 4' - 10 7/8"10"1' - 7 1/4"9 1/4"4 3/4"7 3/8"7' - 3 1/2"7 3/8" 10"5' - 7 1/2"10"7/A7-125/A7-12EQ EQ10"10" 5' - 0 1/2" 2 1/2" 1 1/2"6"5' - 0 1/2"6"1 1/2"13/A7-113/A7-12SIM.2/A7-12 GL-04 3 1/2"2"2 1/2"1' - 11 1/2"4' - 6 1/4"2' - 1 3/4"R = 3' - 0 1/4"2' - 10 1/4"A7-12 4 3/A7-122/A7-12 1/A7-121 1/2"4"3' - 4 1/2"4"1 1/2"R = 2 ' - 5 1 / 2 "5"EQ EQ 1' - 11 1/2"3' - 10"1' - 4 1/2"1' - 5 3/4"GL-04 3' - 4 1/2" 5 1/2"5 1/2"1 1/2"4"2' - 10 1/4"1' - 8"GL-04 10/A7-11 3 1/2"2"2 1/2"BRACKETS 13/A7-1111/A7-11SIM.5' - 0 1/2" EQ EQ11"11"2 1/2"7 3/4"11 1/2"3 1/2"2"2 1/2"EQ EQ 3' - 4 1/2" 9"9" GL-04 2/A7-12 1 3/4"13/A7-113/A7-12SIM.6/A7-11SIM.6/A7-11 SIM. GL-04 GL-04 2/A7-12 13/A7-113/A7-12SIM.4' - 1" EQ EQ8"8" 2 1/2" 1 1/2" 4"3 1/2"2"2 1/2"1 1/2"4"4' - 1"4"1 1/2" 4' - 1" EQ EQ10 1/4"10 1/4" 2/A7-12 SIM. GL-04 13/A7-113/A7-12SIM.1 1/2"6"4' - 1"6"1 1/2"R = 3 ' - 0 1 / 4 "2' - 10 1/4"2 3/4" 1 1/2" 6"3 1/2"2"2 1/2"2"2"GL-04 16/A7-12 17/A7-122' - 8" GL-04 16/A7-12 17/A7-122"2"4' - 8"3 1/2"2"2 1/2"2' - 9" 8"8" 2 1/2" 1 1/2"4"2' - 9"4"1 1/2" GL-04 2/A7-12 13/A7-113/A7-12SIM.2' - 9"5' - 0 1/2" 9"9"11"11"EQ EQ GL-04 2/A7-12 13/A7-113/A7-12SIM.4' - 10" 6" 6 1/2" 2' - 9" 6 1/2" 6" EQ EQ 2 1/2" 1 1/2" 5" 1 3/4"2 1/2"7 3/4"11 3/4"3 1/2"2"2 1/2"12/A7-11SI M.9/A7-1111/A7-11GL-04 2/A7-12 5 1/2"7' - 1 1/2"5 1/2" 4"6' - 5 1/2"4" EQ EQEQ.EQ. EQ EQ 2 1/2" 5"1 1/2" 2"2"2 1/2"11/A7-11SIM.6/A7-14 15/A7-1215/A7-122' - 0" 2' - 0" C1 DBL. FIXED DOORS 4' - 3 3/4"2"3' - 11 3/4"4' - 4 1/4"2"4' - 4 1/4"J1 T18/A7-12@ T18/A7-12@ J120/A7-1212/A7-1212/A7-12ADD #4 ADD #4 /---- FIXED DOORS AT 242B, & 242C. OPERABLE DOOR AT 242A & 242D. FIXED DOORS AT 246A, 246C, 246D, 246E, 246F, & 246G. OPERABLE DOOR AT 246B B1 FIXED DOOR 7 11 1111 2/A7-1410/A7-14 6/A7-14 11 1111 2/A7-1410/A7-14 6/A7-14 11 1111 9/A7-14 5/A7-14 1/A7-1411 11 11 11 13 13 GLAZING TYPES: GL -01 1/4" SINGLE PANE, CLEAR TEMPERED GL -02 1/4" SINGLE PANE, CLEAR GL -03 3/8" SINGLE PANE, CLEAR LAMINATED GL -04 1" INSULATED, LOW-E TINTED GL -05 1" INSULATED, LOW-E TINTED TEMPERED GL -06 3/8" SINGLE PANE, LAMINATED W/ FROSTED FILM GL -07 3/8" BEVELED MIRROR MOUNTED TO 3/4" PLYWOOD PANEL (BOTH SIDES) DRAWING NO. DATE GSB PROJECT NO. DRAWING TITLE 3555 NW 58TH Street Suite 700-W Oklahoma City, OK 73112 T: 405.848.9549 F: 405.848.9783 www.gsb-inc.com Copyright ©GSB, Inc A7-10 07/20/18 WINDOW TYPE ELEVATIONS 171528 CARMEL, INCARMEL, IN 2018 ARCHITECT GSB, INC 3555 NW 58th Street, Suite 700W Oklahoma City, OK 73112 405 / 848-9549 CIVIL ENGINEER Circle Design Group 9229 Delegates Row, Suite 150 Indianapolis, IN 46240 317 / 706-2075 STRUCTURAL ENGINEER StructurePoint 7260 Shadeland Station Indianapolis, IN 46256 317 / 547-5580 MEP ENGINEER Circle Design Group 9229 Delegates Row, Suite 150 Indianapolis, IN 46240 317 / 706-2075 INTERIOR DESIGNER HBA Hirsch Bedner Associates 171 17th Street NW, Suite 600 Atlanta, GA 30363 404 / 873-4379 FOOD SERVICE CONSULTANT Ricca Design Studios 5325 South Valentia Way Greenwood Village, CO 80111 303 / 928-1333 ISSUED FOR CONSTRUCTION11 11 13 13 13 13 13 13 13 REVISIONS NO. DATE DESCRIPTION 1 08/27/2018 Issued for construction 11 05/29/2019 General Revisions 13 06/07/2019 Gen Rev - Team