Loading...
HomeMy WebLinkAboutA10-01-OVERALL-REFLECTED-CEILING-PLAN-LEVEL-1-Rev.6FFFAA FAA F C SS SS S SS S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S APAPAP AP AP APAP AP AP APAPAP AP AP APAPAP AP AP AP APAPS CAM CAMCAM CAM CAM CAM S SPKSPKSPKSPKSPKSPK SPK SPK SPK SPK S 5 8 11 12 17 21 23 23 26 26 28 28 30 32 32 D F F J L L P T 1 1 Y Y U U A A 94 K N N 7 W W 31 31 RR 2016 15 29 29 27 2725 25 14 13 E G G X S V 2 2 3 10 22 24 B B Q M A10-09 1 ZZ 19 19 C H 9.2 L.5 A.7 2 A4-04 3 A4-04 0.9 6.7 A.F.F.10' - 0" A.F.F.9' - 0" A.F.F.8' - 0" A.F.F.9' - 0"A.F.F.8' - 0" A.F.F.8' - 0" A.F.F.8' - 0"A.F.F.9' - 0" A.F.F.9' - 0" A.F.F.9' - 0" A.F.F.9' - 0" A.F.F.9' - 6" A.F.F.8' - 6" A.F.F.8' - 6" A.F.F.9' - 0" A.F.F.9' - 0" A.F.F.9' - 0" A.F.F.8' - 0" A.F.F.9' - 0" EXPOSED STRUCTURE EXPOSED STRUCTURE EXPOSED STRUCTURE EXPOSED STRUCTURE EXPOSED STRUCTURE EXTERIOR EIFS SOFFIT @ LOADING DOCK EXTERIOR EIFS SOFFIT @ TERRACE EXTERIOR EIFS SOFFIT @ DINING TERRACE MEN 103 WOMEN 104 MONON LOBBY 102 RAMP 105 VESTIBULE 106 COATS & STORAGE 107 ELEVATOR LOBBY 108 RECEPTION 109 FEINSTEIN'S CLUB 110 PRIVATE DINING 111 BAR 112 VESTIBULE 113 SERVICE 114 GREEN 115 CLUB OFFICE 119 HOUSEKEEPING 118 STAIR #2 1ST2 CORRIDOR 122 CORRIDOR 120 CORRIDOR 121 BREAK ROOM 125 MDF 123 HR 126 CLEAN 127 SOILED 128 SALES 129 SALES 130 HOLDING 132 SECURITY 133 MEN'S LOCKER 134 WOMEN'S LOCKER 135 SERVICE 136 JANITOR 137 CORRIDOR 139 HOTEL KITCHEN 140 MONON ENTRY 143 VESTIBULE 144 RESTAURANT & BAR 145 COVERED DINING 146 DRY STOR 149 WOMEN 148 PRIVATE DINING 152 STAIR #1 1ST1 RECYCLING 153 CAN 154 VESTIBULE 150 CLUB STOR 124 CHEM 159 OFFICE 117 ELEC 156 WORK 131 STOR 142 MEETING 101 EMER POWER 155 FIRE PUMP 138 VESTIBULE 157 COLLECTION 141 JAN. 158 MEN 147 HK STORAGE 160 UNISEX TLT 116 COLD STOR 151 3 A4-05 A10-07 2 12' - 0" 8 A6-21 GRAY COLORED AREA EXPOSED TO PLAZA DECK ABOVE. INSULATED CONDITIONED SPACE w/IN THE GRAY AREA w/ R-25 RIGID INSULATION. 2" SOFFIT VENT AT PERIMETER A.F.F.10' - 0" A.F.F.10' - 0" 3 ADD #2 ADD #2 3 ADD #2 3 3 ADD #2 ADD #2 3 ADD #2 3 C.J.C.J.C.J.C.J.C.J. C.J. C.J. C.J. C.J. C.J. ADD #4 3 C.J.C.J. C.J. 3 ADD #4 CEILING FANS, TYP 11' - 4" A.F.F. 11' - 2" 11' - 4" A.F.F.11' - 4" A.F.F. 11' - 4" A.F.F.11' - 4" A.F.F. 11' - 4" A.F.F. 11' - 4"11' - 4" 11' - 2" A.F.F. 10' - 3" 9' - 6" 11' - 2" 10' - 3" 10' - 3" 10' - 3" A.F.F. 10' - 3" A.F.F.A.F.F. A.F.F. A.F.F. 10' - 3" 1 A5-05 3 8 1 A5-28 3 A5-02 3" CONTINUOUS SOFFIT VENT, TYP. 3" CONTINUOUS SOFFIT VENT, TYP. 3" CONTINUOUS SOFFIT VENT, TYP. 11 RCP LEGEND sCEILING MOUNTED SPEAKER CEILING MOUNTED SPRINKLER HEAD CEILING ACCESS PANEL WALL SCONCE SIDEWALL DIFFUSER RECESSED CAN LIGHT PENDANT FIXTURE EXHAUST GRILL STRIP FIXTURE WALL WASHER RESTROOM WALL SCONCE LINEAR DIFFUSER LSPLOUDSPEAKER PENDANT CHANDELIER PIN LIGHT GYPSUM BOARD CEILING *CEILING NOTES: 1. ALL CEILING HEIGHTS TAKEN FROM FINISH FLOOR LEVEL. 2. REFER TO INTERIOR DESIGN DRAWINGS FOR ADDITIONAL INFORMATION @ PUBLIC FRONT OF HOUSE SPACES AND GUEST UNIT CEILING RCPs. EXIT LIGHT 2X LAY-IN CEILING FIXTURE SUPPLY DIFFUSER 2X ACOUSTICAL CEILING TILE DRAWING NO. DATE GSB PROJECT NO. DRAWING TITLE 3555 NW 58TH Street Suite 700-W Oklahoma City, OK 73112 T: 405.848.9549 F: 405.848.9783 www.gsb-inc.com Copyright ©GSB, Inc A10-01 08/27/18 OVERALL REFLECTED CEILING PLAN LEVEL 1 171528 CARMEL, INCARMEL, IN 2018 ARCHITECT GSB, INC 3555 NW 58th Street, Suite 700W Oklahoma City, OK 73112 405 / 848-9549 CIVIL ENGINEER Circle Design Group 9229 Delegates Row, Suite 150 Indianapolis, IN 46240 317 / 706-2075 STRUCTURAL ENGINEER StructurePoint 7260 Shadeland Station Indianapolis, IN 46256 317 / 547-5580 MEP ENGINEER Circle Design Group 9229 Delegates Row, Suite 150 Indianapolis, IN 46240 317 / 706-2075 INTERIOR DESIGNER HBA Hirsch Bedner Associates 171 17th Street NW, Suite 600 Atlanta, GA 30363 404 / 873-4379 FOOD SERVICE CONSULTANT Ricca Design Studios 5325 South Valentia Way Greenwood Village, CO 80111 303 / 928-1333 ISSUED FOR CONSTRUCTION 1/8" = 1'-0"A10-01 1 OVERALL REFLECTED CEILING PLAN LEVEL 1 3 ADD #2 REVISIONS NO. DATE DESCRIPTION 1 08/27/2018 Issued for construction 3 12/03/2018 General Revisions 8 03/22/2019 General Revisions 11 05/29/2019 General Revisions